CN201232558Y - Fully-mechanized mining cutting hole full-section anchored net support - Google Patents
Fully-mechanized mining cutting hole full-section anchored net support Download PDFInfo
- Publication number
- CN201232558Y CN201232558Y CNU2008201476119U CN200820147611U CN201232558Y CN 201232558 Y CN201232558 Y CN 201232558Y CN U2008201476119 U CNU2008201476119 U CN U2008201476119U CN 200820147611 U CN200820147611 U CN 200820147611U CN 201232558 Y CN201232558 Y CN 201232558Y
- Authority
- CN
- China
- Prior art keywords
- tunnel
- anchor
- mesh
- sides
- adopts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201476119U CN201232558Y (en) | 2008-06-24 | 2008-06-24 | Fully-mechanized mining cutting hole full-section anchored net support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201476119U CN201232558Y (en) | 2008-06-24 | 2008-06-24 | Fully-mechanized mining cutting hole full-section anchored net support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201232558Y true CN201232558Y (en) | 2009-05-06 |
Family
ID=40618935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201476119U Expired - Fee Related CN201232558Y (en) | 2008-06-24 | 2008-06-24 | Fully-mechanized mining cutting hole full-section anchored net support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201232558Y (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102102526A (en) * | 2010-12-30 | 2011-06-22 | 枣庄矿业集团新安煤业有限公司 | Coal mine roadway supporting method and working face hole-cutting anchor mesh ladder and individual supporting device used by same |
CN102135005A (en) * | 2011-03-11 | 2011-07-27 | 中国矿业大学 | Method for supporting roof of roadway under coal pillar and gob transition section |
CN102155249A (en) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | Method for supporting tunnel roof below mined-out area |
CN102155248A (en) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | Method for supporting laneway below coal pillar |
CN102268998A (en) * | 2011-08-02 | 2011-12-07 | 山西潞安环保能源开发股份有限公司 | Dual-micro-arch span-reducing support method of large-span open-off cut |
CN102425438A (en) * | 2011-11-21 | 2012-04-25 | 大同煤矿集团有限责任公司 | Supporting method of laneway under multiple goafs in ultra-close coal seam group |
CN102425437A (en) * | 2011-11-21 | 2012-04-25 | 大同煤矿集团有限责任公司 | Crossheading roadway supporting method for carboniferous system coal bed exploitation |
CN103233748A (en) * | 2013-05-09 | 2013-08-07 | 安徽理工大学 | Anchor mesh cable column combined supporting design method for expanding extra-large span open-off cut brush into lane |
CN103277114A (en) * | 2013-04-23 | 2013-09-04 | 西南科技大学 | Non-sprayed-concrete anchor net supporting method of underground construction broken surrounding rocks |
CN103277124A (en) * | 2013-06-06 | 2013-09-04 | 武汉科技大学 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
CN103362519A (en) * | 2013-01-31 | 2013-10-23 | 中国矿业大学(北京) | Safe and quick coal roadway tunneling method |
CN104141503A (en) * | 2014-06-28 | 2014-11-12 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Sharp inclination fully mechanized coal face open-off cut square supporting method |
CN104153790A (en) * | 2014-07-29 | 2014-11-19 | 开滦(集团)有限责任公司林南仓矿业分公司 | Coalface cutting hole supporting structure and supporting method thereof |
CN108661663A (en) * | 2017-03-28 | 2018-10-16 | 北京爱卓达科技有限公司 | A kind of method of reinforcing insulating protection net in rough tunnel |
-
2008
- 2008-06-24 CN CNU2008201476119U patent/CN201232558Y/en not_active Expired - Fee Related
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102102526A (en) * | 2010-12-30 | 2011-06-22 | 枣庄矿业集团新安煤业有限公司 | Coal mine roadway supporting method and working face hole-cutting anchor mesh ladder and individual supporting device used by same |
CN102135005B (en) * | 2011-03-11 | 2012-07-25 | 中国矿业大学 | Method for supporting roof of roadway under coal pillar and gob transition section |
CN102135005A (en) * | 2011-03-11 | 2011-07-27 | 中国矿业大学 | Method for supporting roof of roadway under coal pillar and gob transition section |
CN102155249A (en) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | Method for supporting tunnel roof below mined-out area |
CN102155248A (en) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | Method for supporting laneway below coal pillar |
CN102155248B (en) * | 2011-03-11 | 2012-10-24 | 中国矿业大学 | Method for supporting laneway below coal pillar |
CN102268998A (en) * | 2011-08-02 | 2011-12-07 | 山西潞安环保能源开发股份有限公司 | Dual-micro-arch span-reducing support method of large-span open-off cut |
CN102425437A (en) * | 2011-11-21 | 2012-04-25 | 大同煤矿集团有限责任公司 | Crossheading roadway supporting method for carboniferous system coal bed exploitation |
CN102425438A (en) * | 2011-11-21 | 2012-04-25 | 大同煤矿集团有限责任公司 | Supporting method of laneway under multiple goafs in ultra-close coal seam group |
CN103362519A (en) * | 2013-01-31 | 2013-10-23 | 中国矿业大学(北京) | Safe and quick coal roadway tunneling method |
CN103362519B (en) * | 2013-01-31 | 2015-06-03 | 中国矿业大学(北京) | Safe and quick coal roadway tunneling method |
CN103277114A (en) * | 2013-04-23 | 2013-09-04 | 西南科技大学 | Non-sprayed-concrete anchor net supporting method of underground construction broken surrounding rocks |
CN103233748A (en) * | 2013-05-09 | 2013-08-07 | 安徽理工大学 | Anchor mesh cable column combined supporting design method for expanding extra-large span open-off cut brush into lane |
CN103277124A (en) * | 2013-06-06 | 2013-09-04 | 武汉科技大学 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
CN103277124B (en) * | 2013-06-06 | 2015-03-25 | 武汉科技大学 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
CN104141503A (en) * | 2014-06-28 | 2014-11-12 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Sharp inclination fully mechanized coal face open-off cut square supporting method |
CN104153790A (en) * | 2014-07-29 | 2014-11-19 | 开滦(集团)有限责任公司林南仓矿业分公司 | Coalface cutting hole supporting structure and supporting method thereof |
CN108661663A (en) * | 2017-03-28 | 2018-10-16 | 北京爱卓达科技有限公司 | A kind of method of reinforcing insulating protection net in rough tunnel |
CN108661663B (en) * | 2017-03-28 | 2020-06-30 | 北京爱卓达科技有限公司 | Method for reinforcing insulating protective net in lining-free tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201232558Y (en) | Fully-mechanized mining cutting hole full-section anchored net support | |
CN101514633B (en) | Non-roadside supporting gob-side entry retaining process | |
CN101761338B (en) | Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed | |
CN103075165B (en) | Vertical beam of coal road combined type supporting method | |
CN102733836B (en) | Roadway support method for fully mechanized caving mining of weak extra-thick coal seam | |
CN103670470B (en) | Full coal roadway safe and speedy drivage supporting method | |
CN205117366U (en) | Supporting device is encircleed to two pressure -bearings of big soft broken coal road of section | |
CN105134266A (en) | Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel | |
CN104763425A (en) | Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method | |
CN203145954U (en) | Bolt support system | |
CN102383857A (en) | Gob-side entry retaining process for solid-filling, coal-mining and laying gangue wall | |
CN103233748A (en) | Anchor mesh cable column combined supporting design method for expanding extra-large span open-off cut brush into lane | |
CN103758529A (en) | Coal mine gob-side entry retaining side supporting method | |
CN109681248A (en) | A kind of grouting cable anchor advanced support method | |
CN106523003A (en) | Rigid-flexible coupling energy absorbing support technology suitable for deep mining roadway | |
CN105370299A (en) | Kilometers-deep thick coal seam narrow coal pillar gob-side entry supporting process | |
CN102704965A (en) | Method for preventing tunnel top plate collapse risk caused by severe mining | |
CN205172609U (en) | Asymmetric supporting device in tunnel | |
CN104533483A (en) | Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method | |
CN102418525A (en) | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method | |
CN103967505A (en) | Coal mine underground isolated soft rock mass supporting device used in dynamic pressure environment | |
CN210948737U (en) | Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam | |
CN1948714A (en) | Method of construction supporting protection for mine under ground tunnel surrounding rock broken | |
CN102733832A (en) | Support method for extra-thick broken coal seam employing nest anchored ropes | |
CN205135648U (en) | Rib wall caving anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: YIMA MINING GROUP CO., LTD. Free format text: FORMER NAME: YIMA MINING( GROUP ) CO., LTD |
|
CP03 | Change of name, title or address |
Address after: No 6, Tian Long Road, Henan, Yima: 472300 Patentee after: Yima Coal Industry Group Co., Ltd. Address before: No 6, Tian Long Road, Henan, Yima: 472300 Patentee before: Yima Coal Industry (Group) Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: HE NAN DAYOU ENERGY CO., LTD. Free format text: FORMER OWNER: YIMA MINING GROUP CO., LTD. Effective date: 20110329 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 472300 NO. 6, QIANQIU ROAD, YIMA CITY, HE NAN PROVINCE TO: 472300 YARD 6, QIANQIU EAST ROAD, YIMA CITY, HE NAN PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20110329 Address after: 472300 No. six, long East Road, Yima, Henan Patentee after: Henan Da You Energy Co., Ltd. Address before: 472300 No. 6, Tian Long Road, Yima, Henan Patentee before: Yima Coal Industry Group Co., Ltd. |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090506 Termination date: 20130624 |