CN103276801A - Assembly-type multi-storey steel special-shaped column framework-prestressed center supporting system - Google Patents

Assembly-type multi-storey steel special-shaped column framework-prestressed center supporting system Download PDF

Info

Publication number
CN103276801A
CN103276801A CN2013102067529A CN201310206752A CN103276801A CN 103276801 A CN103276801 A CN 103276801A CN 2013102067529 A CN2013102067529 A CN 2013102067529A CN 201310206752 A CN201310206752 A CN 201310206752A CN 103276801 A CN103276801 A CN 103276801A
Authority
CN
China
Prior art keywords
truss
plate
single channel
section steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102067529A
Other languages
Chinese (zh)
Other versions
CN103276801B (en
Inventor
刘学春
惠怡
张爱林
胡婷婷
赵越
田辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Electric Power Design Institute Co ltd
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201310206752.9A priority Critical patent/CN103276801B/en
Publication of CN103276801A publication Critical patent/CN103276801A/en
Application granted granted Critical
Publication of CN103276801B publication Critical patent/CN103276801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an assembly-type multi-storey steel special-shaped column framework-prestressed center supporting system, and belongs to the technical field of structural engineering. The assembly-type multi-storey steel special-shaped column framework-prestressed center supporting system comprises an assembly-type truss plate, assembly-type special-shaped columns and a prestressed center supporting component. The assembly-type truss plate comprises a lattice truss girder provided with a steel channel web member, and a floor slab. The assembly-type truss plate is prefabricated in a plant. On a construction site, the assembly-type truss plate is spliced with flanges of the assembly-type special-shaped columns through a beam-end blanking plate of the assembly-type truss plate. The assembly-type special-shaped columns are spliced on site through bolts between storeys to form a multi-storey truss plate steel framework structure. One the basis of the truss plate steel framework structure, the prestressed center supporting component which serves as a lateral load resistance component is connected with the truss girder in the assembly-type truss plate and the bottom or the top of each assembly-type special-shaped column. The assembly-type truss plate, the assembly-type special-shaped columns and the prestressed center supporting component are all prefabricated in the plant and assembled through bolts on the construction site.

Description

The how high-rise steel shaped pile frame of a kind of assembling-prestressing force center support system
Technical field
The present invention relates to the how high-rise steel shaped pile frame of a kind of assembling-prestressing force center support system, belong to technical field of structural engineering.
Background technology
2,000,000,000 square metres of China's annual town and country newly constructed house areas wherein are the high energy consumption building more than 80%, China unit's building area energy consumption is more than 2 times of developed country.Join in a common effort meter according to Chinese steel, China's output of steel was broken through 700,000,000 tons of high pointes in 2011, was sure to occupy output of steel first place, countries in the world in continuous 16 years, and developed country's steel building area accounts for overall floorage more than 50%, and Japan accounts for 80%, and China is less than 4%.China's conduct is the country of construction scope, steel output maximum in the world, and the development of house (comprising dwelling house) steel work seriously lags behind.
At present, the system research to the high-rise steel structure dwelling house both at home and abroad is in the starting stage, and the system innovation of industrialization assembling high-rise steel structure is imperative.Adopted a large amount of welding during the construction of traditional housing building of steel-structure, speed of application is slow, and seriously polluted to environment the most important thing is that the quality of weld seam should not be controlled, and has a strong impact on the security performance of building.
Prestressed cable only is used in the beam string structure at present, does not also use in high-level structure, adopts prestressed cable as high-rise lateral resistant member realization not to be arranged also on engineering.Traditional steel frame structural system, the lateral rigidity of structure is difficult to meet the demands, be out of shape bigger, cause the destruction of non-structural element easily, the how high-rise steel shaped pile frame of assembling-prestressing force center support system, increase horizontal and vertical prestressing force center drag-line on the basis of steel frame and supported, improved the lateral rigidity of structure, improved the deformation performance of structure.
Traditional structure design with analyze, generally beam column node processing in the frame construction is become desirable rigid joint or hinged joint.Because rigid joint bearing capacity and rigidity are all very big, thereby be considered to a kind of ideal shock-resistant node form usually and the node that is widely used in the earthquake zone frame construction connects and designs.But the earthquake experience shows: the rigidity bean column node of building connects and brittle fracture in various degree occurred.Adopt the steel framed structure of welding rigid joint because of node ductility difference brittle fracture to take place easily, and difficulty of construction is also big; Though hinged joint simple structure but rigidity and energy-dissipating property are poor is unfavorable to the antidetonation of structure; Have only the semi-rigid node of connected mode simple and fast to have the two advantage concurrently, have higher strength and stiffness and ductile performance and energy-dissipating property preferably, thereby reduced earthquake to a great extent.
Summary of the invention
The present invention proposes a kind of how high-rise steel shaped pile frame of assembling-prestressing force center support system that belongs to technical field of structural engineering.Its purpose is in the production of steel structure system and construction, with modularization, and batch production, standardization and assemblingization combine, realized batch production production, assemble fast at the scene, under the prerequisite that guarantees construction quality, improve speed of application, reduced the construction period, reduced construction costs.This structural system can realization body steel shaped pile frame and the Fast Installation of lateral resistant member, and can resist earthquake and wind load, has embodied the advantage of steel work.And bean column node connects the semi-rigid node of employing among the present invention, and the initial anti-side rigidity of Semi-rigid Connection Steel Frame is less, but ductility factor is bigger, and energy dissipation capacity is fine, can satisfy the design object of antidetonation under the rarely occurred earthquake effect well.
The how high-rise steel shaped pile frame of described assembling-prestressing force center support system, this assembling type steel structure prestressing force central support is sandwich construction, every layer of structure comprises assembling truss plate, assembling hetermorphiscal column and prestressing force center support member.
Described assembling truss plate comprises lattice truss beam and the floor of being furnished with the channel-section steel web member, described lattice truss beam is by the beam-ends shrouding, be connected with other lattice truss beams or hetermorphiscal column, form truss slab frame construction, again floor is placed on the truss plate framework structure and connect, form assembling truss plate; Described assembling truss plate is prefabricated in the factory, and at the construction field (site) assembling truss plate is spliced mutually by its beam-ends shrouding and assembling hetermorphiscal column, and the assembling hetermorphiscal column adopts the bolt scene to be spliced to form multilayer truss slab frame construction at interlayer; On the basis of described truss slab frame construction, prestressing force center support member as lateral resistant member be with assembling truss plate in girder truss and the post of assembling hetermorphiscal column at the bottom of or the top be connected; Described assembling truss plate, assembling hetermorphiscal column and prestressing force center support member all are prefabricated in the factory, and assemble by bolt the job site.
Described assembling type steel structure prestressing force center support system, its assembling truss plate comprises three kinds of specifications, is respectively A plate, B plate and C plate.
Described A plate comprises double flute steel truss beam 11, the long beam 15 of double flute steel truss, the long beam 12 of single channel-section steel truss, single channel-section steel girder truss 14, junction plate I16, junction plate II17 and floor 18; Double flute steel truss beam 11 vertically is connected by two-way hetermorphiscal column 7 mutually with the long beam 15 of double flute steel truss, all adopt bolt to link to each other by beam-ends shrouding and the two-way hetermorphiscal column edge of a wing, and place, the upper and lower end face of link is welded with a plate II17 respectively, and the two ends of junction plate II17 are connected on the last lower chord of double flute steel truss beam 17 and the long beam 15 of double flute steel truss; The other end of double flute steel truss beam 11 is connected with the long beam 12 of single channel-section steel truss of level, last lower chord and the beam-ends shrouding of double flute steel truss beam 11 described ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and double flute steel truss beam 11 and the long beam 12 of single channel-section steel truss link to each other by the junction plate I16 of two sections up and down again, and namely the last lower chord of double flute steel truss beam 11 and the long beam 12 of single channel-section steel truss all is weldingly connected with two junction plate I16; The other end of the long beam 12 of single channel-section steel truss is connected with single channel-section steel girder truss 14, the long beam 15 of double flute steel truss is relative with long beam 12 levels of single channel-section steel truss, single channel-section steel girder truss 14 is relative with double flute steel truss beam 11 levels, last lower chord and the beam-ends shrouding of single channel-section steel girder truss 14 ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and are connected by two junction plate I16 that are connected the lower chord place between single channel-section steel girder truss 14 and the long beam 12 of single channel-section steel truss again; Be connected by two junction plate II17 at last lower chord place between single channel-section steel girder truss 14 ends and the long beam 15 of double flute steel truss; The long beam 15 of described double flute steel truss, double flute steel truss beam 11, the long beam 12 of single channel-section steel truss, single channel-section steel girder truss 14 constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss 14 alignment in two rectangular frames also connect by bolt, and two long beams 15 of double flute steel truss are positioned on the straight line, and two long beams 12 of single channel-section steel truss are positioned on the straight line; The upper and lower side of two long beams 15 of double flute steel truss all adopts bolt to link to each other by the beam-ends shrouding, and described two single channel-section steel girder trusses 14 are connected on the three-dimensional hetermorphiscal column 8; Truss slab frame construction links to each other with floor 18 by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described A plate.
Described B plate comprises double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14, junction plate I16, junction plate II17 and floor 18, the long beam of double flute steel truss beam 11 and single channel-section steel truss 12 is vertical mutually, last lower chord and the beam-ends shrouding of double flute steel truss beam 11 ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and the junction plate I16 of two sections links to each other about passing through again, and namely double flute steel truss beam 11 all is weldingly connected with two junction plate I16 with the last lower chord of the long beam 12 of single channel-section steel truss; The other end of double flute steel truss beam 11 is connected with the long beam 13 of another root list channel-section steel truss by the three-dimensional column, the long beam 13 of another root list channel-section steel truss is relative with long beam 12 levels of single channel-section steel truss, and double flute steel truss beam 11 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; The two ends of single channel-section steel girder truss 14 are connected to the other end of long beam 12 other ends of described single channel-section steel truss and the long beam 13 of single channel-section steel truss, single channel-section steel girder truss 14 is relative with double flute steel truss beam 11 levels, and single channel-section steel girder truss 14 is identical with the type of attachment of the long beam 12 of single channel-section steel truss with long beam 12 types of attachment of single channel-section steel truss and described double flute steel truss beam 11; Single channel-section steel girder truss 14 adopts the four-way column to be connected with the long beam 13 of single channel-section steel truss, and single channel-section steel girder truss 14 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; Described double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14 constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss 14 alignment in two rectangular frames also connect by bolt, and the long beam 12 of single channel-section steel truss of a rectangular frame two piece single channel-section steel truss long beams 12 relative with another length direction framework level lay respectively on the straight line; The upper and lower side of two long beams 13 of single channel-section steel truss all adopts bolt to link to each other by the beam-ends shrouding with the frange plate of four-way column, described two single channel-section steel girder trusses 14 are connected on four-way column 9 frange plates side by side, and truss slab frame construction links to each other with two floors 18 by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described B plate.
Described C plate is the same with the B plated construction.
In assembling type steel structure prestressing force center support system, A plate, B plate and C plate are by arrangement mode ABCBC ... BCBCA splices, what middle ellipsis represented is a plurality of BC arrangement modes, connect by welding or bolt between the AB, adopt the three-dimensional column to connect at three-dimensional column place, adopt the four-way column to connect at four-way column place;
In the how high-rise steel shaped pile frame of assembling-prestressing force center support system, described A plate and B plate, with the alignment of A plate and B plate level, there is the end of junction plate I16 to splice with bolt by the beam-ends shrouding at an end that does not connect bean column node of the double flute steel truss beam 1 of A plate and the double flute steel truss beam 11 of B plate; The be not linked and packed end that junction plate I16 is arranged of single channel-section steel girder truss 14 of an end of formula column and B plate of single channel-section steel girder truss 14 of A plate is spliced the beam-ends shrouding by bolt; Single-beam is spliced every one section fixed range by bolt at the long beam 12 of single channel-section steel truss of A plate and the long beam of the single channel-section steel truss 12 web member upper bolt hole places of B plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of A plate and B plate.
Described B plate and C plate with the alignment of B plate and C plate level, have the end of junction plate II17 and the three-dimensional column 8 of C plate to link to each other by beam-ends shrouding employing bolt on the double flute steel truss beam 11 of B plate; Adopt bolt to link to each other the beam-ends shrouding that passes through of the four-way column of the end that junction plate II17 is arranged of single channel-section steel girder truss 14 of B plate and C plate; All adopt bolt to link to each other by two relative direction top flange plates of beam-ends shrouding and four-way column the upper and lower side of the long beam 13 of single channel-section steel truss of B plate, the other end of the long beam 13 of single channel-section steel truss of B plate is passed through beam-ends shrouding and C plate three-dimensional column frange plate employing bolt respectively link to each other; Single-beam is spliced every one section fixed range by bolt at the long beam 13 of single channel-section steel truss of B plate and the long beam of the single channel-section steel truss 12 web bolt hole places of C plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of B plate and C plate.
The connected mode of A plate and C plate is with the connected mode of A plate and B plate.
In the how high-rise steel shaped pile frame of assembling-prestressing force center support system, described assembling truss plate is connected by bolt with the assembling hetermorphiscal column at the bean column node place, forms frame construction; Described prestressing force center support member is made up of prestressed cable 23 and otic placode, otic placode is the lower chord place at the bottom of factory is connected in the post of frame construction by welding or bolt, on top or the girder truss 19, prestressed cable 23 is connected by bolt at the construction field (site) with the otic placode of every story frame structure top and bottom, forms framework-central support structure; Prestressed cable 23 applies prestressing force by adapter sleeve 21 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise steel shaped pile frame of described assembling-prestressing force center support system, the girder truss that related beam mainly is made up of last lower chord 1 and web member 2 splicings, wherein go up lower chord 1 and web member 2 all adopts channel-section steel, the angle of 1 one-tenth 30 degree of web member 2 and last lower chord ?, 60 degree; And be divided into single-beam and twin beams, single-beam arranges connecting hole every one section fixed range, and being convenient to becomes twin beams with bolt with two single-beam splicings when the splicing of plate and plate, and for twin beams, the connection of channel-section steel is used bolt to connect or used welding.
The perhaps girder truss that mainly is spliced by last lower chord, web member and fill plate of related beam, wherein go up lower chord and use channel-section steel 1, perhaps use angle steel 3, perhaps user's steel pipe 6, web member 4 uses angle steel, web member 4 and chord member 13 or 6 one-tenth 30 Du ?60 angles of spending; And be divided into single-beam and twin beams, single-beam arranges connecting hole every one section fixed range, being convenient to when the splicing of plate and plate becomes twin beams with bolt with two single-beams splicings, for twin beams, web member, goes up and being connected of lower chord and end-plate uses bolt to connect or use welding.
In the how high-rise steel shaped pile frame of described assembling-prestressing force center support system, the splicing of assembling column can have bolt hole by hetermorphiscal column frange plate top, the hetermorphiscal column that also has bolt hole with another lower part is spliced column with bolt by scab 10.Scab can be earlier factory with transport to the scene after the hetermorphiscal column bolt is connected and be connected with another pillar bolt again; Also can arrive on-the-spot with bolt column the splicing later; The assembling column also can be by scab 10, and with column welding splicing, scab can be earlier transported to the scene and is welded to connect with another pillar after factory and hetermorphiscal column are welded to connect; Also can arrive on-the-spot later usefulness welding splices column.
In the how high-rise steel shaped pile frame of described assembling-prestressing force center support system, it is characterized in that: the assembling column is made up of hetermorphiscal column, junction plate 10, hetermorphiscal column has three kinds of forms, non-ly be not: L shaped hetermorphiscal column 7, T shape hetermorphiscal column 8 and cross hetermorphiscal column 9, corresponding bean column node has three kinds of forms, is respectively two to node, three-dimensional node and four-way node; Can be divided into the column of 3 kinds of forms according to the difference of its bean column node, be respectively two-way column, three-dimensional column and four-way column; Two frange plates of L shaped hetermorphiscal column 7 are opened bolt hole form two to the node column; Three frange plates of T shape hetermorphiscal column 8 are opened bolt hole respectively form three-dimensional node column; Thereby four frange plates of cross hetermorphiscal column 9 are opened bolt hole respectively form four-way node column; Respectively with beam on end-plate splice with bolt.
Described floor uses profiled steel sheet combination floor, perhaps reinforced concrete floor, perhaps OSB shaving board.
Beneficial effect of the present invention is that in the how high-rise steel shaped pile frame of assembling-prestressing force center support system, the beam that adopts all is girder truss, because the belly space of beam is bigger, is convenient to pipeline and passes, and has effectively increased the clear height in room.
The how high-rise steel shaped pile frame of described assembling-prestressing force center support system, adopt bolt to carry out site assembly fully, traditional on-the-spot welding manner and concreting mode have been cancelled, effectively guaranteed construction quality, the environment pollution of having avoided the welding of concreting and steel to cause fully, realize the three no standards of " anhydrous, the nothing fire, dustless " of site operation, reduced the generation of hazardous accidents such as fire.And the lateral resisting system can effectively improve the lateral rigidity of structure, improves the deformation performance of structure, makes structure have bigger safety to stock.When the present invention removes at member, can recycle efficiently, reduced building waste, real realization the theory of environmental protection, be a kind of green, the steel structure system of sustainable development.
Description of drawings
Fig. 1 is assembling truss plate splicing layout plan of the present invention
Fig. 2 is that assembling truss plate of the present invention is not with gusset plate channel-section steel girder truss schematic diagram
Fig. 3 is assembling truss strip gusset plate channel-section steel girder truss schematic diagram of the present invention
Fig. 4 is that assembling truss plate of the present invention is not with gusset plate angle steel steel truss beam schematic diagram
Fig. 5 is assembling truss strip gusset plate truss of angle steel beam schematic diagram of the present invention
Fig. 6 is assembling truss strip gusset plate square steel pipe girder truss schematic diagram of the present invention
Fig. 7 is the L shaped post schematic diagram of assembling truss plate of the present invention
Fig. 8 is assembling truss plate T shape post schematic diagram of the present invention
Fig. 9 is assembling truss plate cross section column schematic diagram of the present invention
Figure 10 is the L shaped post splicing of assembling of the present invention schematic diagram
Figure 11 is assembling T shape post assembly unit schematic diagram of the present invention
Figure 12 is assembling cross section column splicing schematic diagram of the present invention
Figure 13 is assembling truss plate A of the present invention unit exploded view
Figure 14 is assembling truss plate A on-site consolidation figure of the present invention
Figure 15 is that assembling truss plate A unit splicing of the present invention is finished figure
Figure 16 is assembling truss plate B of the present invention unit exploded view
Figure 17 is assembling truss plate B on-site consolidation figure of the present invention
Figure 18 is that assembling truss plate B unit splicing of the present invention is finished figure
Figure 19 is assembling truss plate C of the present invention unit exploded view
Figure 20 is assembling truss plate C on-site consolidation figure of the present invention
Figure 21 is that assembling truss plate C unit splicing of the present invention is finished figure
Figure 22 is that assembling truss plate A of the present invention, B and C unit splicing are finished figure
Figure 23 is assembling truss plate node J1 exploded view in the accompanying drawing of the present invention
Figure 24 is assembling truss plate node J2 exploded view in the accompanying drawing of the present invention
Figure 25 is assembling truss plate node J3 exploded view in the accompanying drawing of the present invention
Figure 26 is assembling truss plate node J4 exploded view in the accompanying drawing of the present invention
Figure 27 is assembling truss plate node J5 exploded view in the accompanying drawing of the present invention
Figure 28 is assembling truss plate node J6 exploded view in the accompanying drawing of the present invention
Figure 29 is assembling truss plate node J7 exploded view in the accompanying drawing of the present invention
Figure 30 is assembling truss plate node J8 exploded view in the accompanying drawing of the present invention
Figure 31 is assembling truss plate assembly node J9 exploded view in the accompanying drawing of the present invention
Figure 32 is assembling truss plate assembly node J10 exploded view in the accompanying drawing of the present invention
Figure 33 is assembling truss plate assembly node J11 exploded view in the accompanying drawing of the present invention
Figure 34 is assembling truss plate assembly node J12 exploded view in the accompanying drawing of the present invention
Figure 35 is the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force center herringbone support frame system schematic diagram
Figure 36 is the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force center monocline bar-Type supporting framework system schematic diagram
Figure 37 is the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force center V font support frame system schematic diagram
Figure 38 is the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force central cross shape support frame system schematic diagram
Figure 39 is the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force center two-way monocline bar-Type supporting framework system schematic diagram
Figure 40 is the connected node detail drawing of the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force central support attaching lug plate I and prestressed cable
Figure 41 is the connected node detail drawing of the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force central support attaching lug plate II and prestressed cable
Figure 42 is the connected node detail drawing of the how high-rise steel shaped pile frame of assembling of the present invention-prestressing force central support attaching lug plate and assembling hetermorphiscal column
Figure 43 is the how high-rise steel shaped pile frame of individual layer assembling of the present invention-prestressing force central support structure schematic diagram
Lower chord I on 1. among the figure, 2. web member I 3. goes up lower chord II, 4. web member II, 5. gusset plate is 6. gone up lower chord III,, 7.L shape hetermorphiscal column, 8.T shape hetermorphiscal column, 9. cross hetermorphiscal column, 10. scab, 11. double flute steel truss beams, 12. single channel-section steel girder truss I, 13. single channel-section steel girder truss II, the long beam of 14. single channel-section steel truss, 15. double flute steel truss beam, 16. junction plate I, 17. junction plate II, 18. floors, 19. girder truss, 20. the assembling hetermorphiscal column, 21. adapter sleeves, 22. otic placode I, 23. prestressed cable, 24. otic placode II.
The specific embodiment
The present invention is described in detail below in conjunction with accompanying drawing:
As shown in Figure 1, the stitching position of assembling truss plate of the present invention is arranged on the middle part of girder, and this position shearing is relative with moment of flexure less, and from the angle of structural mechanics, arranging of stitching position is reasonable.
As shown in Figure 2, in the how high-rise steel shaped pile frame of assembling of the present invention-center support system, the girder truss that related beam is made up of the channel-section steel splicing, comprise lower chord I1 and web member 2, wherein go up lower chord I1 and web member 2 all adopts channel-section steel, and be divided into single steel channel beam and double flute girder steel, steel channel beam arranges connecting hole every one section fixed range, and being convenient to becomes the double flute girder steel with bolt with two single steel channel beam splicings when the splicing of plate and plate.
As shown in Figure 3, perhaps use the girder truss of being formed by channel-section steel and gusset plate splicing, comprise lower chord I1, web member 4 and gusset plate 5, wherein go up lower chord I1 and adopt channel-section steel, web member 4 adopts angle steel, and be divided into single steel channel beam and double flute girder steel, single steel channel beam arranges connecting hole every one section fixed range, being convenient to becomes the double flute girder steel with bolt with two single angle beam splicings when the splicing of plate and plate, for the double angle beam, being connected of angle steel and gusset plate uses bolt to connect or the use welding, all finishes in factory process.
As shown in Figure 4, perhaps use the girder truss of being formed by angle splice joint, comprise lower chord II3, web member 4, wherein go up lower chord II3 and web member 4 all adopts angle steel, and be divided into single angle beam and double angle beam, the single angle beam arranges connecting hole every one section fixed range, and being convenient to becomes the double angle beam with bolt with two single angle beam splicings when the splicing of plate and plate.
As shown in Figure 5, perhaps use the girder truss of being formed by angle steel and gusset plate splicing, perhaps use the girder truss of being formed by angle steel and gusset plate splicing, comprise lower chord II3, web member 4 and gusset plate 5, wherein go up lower chord II3 and adopt angle steel, web member 4 adopts angle steel, and be divided into single angle beam and double angle beam, the single angle beam arranges connecting hole every one section fixed range, being convenient to becomes the double angle beam with bolt with two single angle beam splicings when the splicing of plate and plate, for the double angle beam, being connected of angle steel and gusset plate uses bolt to connect, perhaps use welding, all finish in factory process.
As shown in Figure 6, perhaps use by angle steel, the girder truss that square steel pipe and gusset plate splicing are formed, comprise lower chord III6, web member II4 and gusset plate 5, wherein go up lower chord III6 and adopt square steel pipe, web member II4 adopts angle steel, and be divided into folk prescription steel tubular beam and both sides' steel tubular beam, the folk prescription steel tubular beam arranges connecting hole every one section fixed range, being convenient to becomes both sides' steel tubular beam with bolt with two folk prescription steel tubular beam splicings when the splicing of plate and plate, for both sides' steel tubular beam, angle steel, being connected of square steel pipe and gusset plate uses bolt to connect, and perhaps uses welding, all finishes in factory process.
For above five kinds of beam section forms, single-beam has good rigidity and stability by the connecting method that bolt is spliced into twin beams.Because the belly space of girder truss is bigger, is convenient to pipeline and passes, and has effectively increased the clear height in room.
In the how high-rise steel shaped pile frame of assembling of the present invention-center support system, shown in accompanying drawing 7-9, its hetermorphiscal column has three kinds of forms, is respectively L shaped hetermorphiscal column, T shape hetermorphiscal column and cross hetermorphiscal column; Have bolt hole on the frange plate of each hetermorphiscal column, splice with bolt with end-plate on the beam.
In the how high-rise steel shaped pile frame of assembling of the present invention-center support system, shown in accompanying drawing 10-12, the assembling column is made up of hetermorphiscal column, junction plate 10, hetermorphiscal column has three kinds of forms, non-ly be not: L shaped hetermorphiscal column 7, T shape hetermorphiscal column 8 and cross hetermorphiscal column 9, corresponding bean column node has three kinds of forms, is respectively two to node, three-dimensional node and four-way node; Can be divided into the column of 3 kinds of forms according to the difference of its bean column node, be respectively two-way column, three-dimensional column and four-way column; Two frange plates of L shaped hetermorphiscal column 7 are opened bolt hole form two to the node column; Three frange plates of T shape hetermorphiscal column 8 are opened bolt hole respectively form three-dimensional node column; Thereby four frange plates of cross hetermorphiscal column 9 are opened bolt hole respectively form four-way node column; Respectively with beam on end-plate splice with bolt.Described three kinds of assembling hetermorphiscal column are all finished at produce in factory.
In the how high-rise steel shaped pile frame of assembling-center support system, shown in accompanying drawing 13-15, described A plate comprises double flute steel truss beam 11, the long beam 15 of double flute steel truss, the long beam 12 of single channel-section steel truss, single channel-section steel girder truss 14, junction plate I16, junction plate II17 and floor 18; Double flute steel truss beam 11 vertically is connected by two-way hetermorphiscal column 7 mutually with the long beam 15 of double flute steel truss, all adopt bolt to link to each other by beam-ends shrouding and the two-way hetermorphiscal column edge of a wing, and place, the upper and lower end face of link is welded with a plate II17 respectively, and the two ends of junction plate II17 are connected on the last lower chord of double flute steel truss beam 17 and the long beam 15 of double flute steel truss; The other end of double flute steel truss beam 11 is connected with the long beam 12 of single channel-section steel truss of level, last lower chord and the beam-ends shrouding of double flute steel truss beam 11 described ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and double flute steel truss beam 11 and the long beam 12 of single channel-section steel truss link to each other by the junction plate I16 of two sections up and down again, and namely the last lower chord of double flute steel truss beam 11 and the long beam 12 of single channel-section steel truss all is weldingly connected with two junction plate I16; The other end of the long beam 12 of single channel-section steel truss is connected with single channel-section steel girder truss 14, the long beam 15 of double flute steel truss is relative with long beam 12 levels of single channel-section steel truss, single channel-section steel girder truss 14 is relative with double flute steel truss beam 11 levels, last lower chord and the beam-ends shrouding of single channel-section steel girder truss 14 ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and are connected by two junction plate I16 that are connected the lower chord place between single channel-section steel girder truss 14 and the long beam 12 of single channel-section steel truss again; Be connected by two junction plate II17 at last lower chord place between single channel-section steel girder truss 14 ends and the long beam 15 of double flute steel truss; The long beam 15 of described double flute steel truss, double flute steel truss beam 11, the long beam 12 of single channel-section steel truss, single channel-section steel girder truss 14 constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss 14 alignment in two rectangular frames also connect by bolt, and two long beams 15 of double flute steel truss are positioned on the straight line, and two long beams 12 of single channel-section steel truss are positioned on the straight line; The upper and lower side of two long beams 15 of double flute steel truss all adopts bolt to link to each other by the beam-ends shrouding, and described two single channel-section steel girder trusses 14 are connected on the three-dimensional hetermorphiscal column 8; Truss slab frame construction links to each other with floor 18 by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described A plate.
In the how high-rise steel shaped pile frame of assembling-center support system, shown in accompanying drawing 16-18, described B plate comprises double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14, junction plate I16, junction plate II17 and floor 18, the long beam of double flute steel truss beam 11 and single channel-section steel truss 12 is vertical mutually, last lower chord and the beam-ends shrouding of double flute steel truss beam 11 ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and the junction plate I16 of two sections links to each other about passing through again, and namely double flute steel truss beam 11 all is weldingly connected with two junction plate I16 with the last lower chord of the long beam 12 of single channel-section steel truss; The other end of double flute steel truss beam 11 is connected with the long beam 13 of another root list channel-section steel truss by the three-dimensional column, the long beam 13 of another root list channel-section steel truss is relative with long beam 12 levels of single channel-section steel truss, and double flute steel truss beam 11 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; The two ends of single channel-section steel girder truss 14 are connected to the other end of long beam 12 other ends of described single channel-section steel truss and the long beam 13 of single channel-section steel truss, single channel-section steel girder truss 14 is relative with double flute steel truss beam 11 levels, and single channel-section steel girder truss 14 is identical with the type of attachment of the long beam 12 of single channel-section steel truss with long beam 12 types of attachment of single channel-section steel truss and described double flute steel truss beam 11; Single channel-section steel girder truss 14 adopts the four-way column to be connected with the long beam 13 of single channel-section steel truss, and single channel-section steel girder truss 14 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; Described double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14 constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss 14 alignment in two rectangular frames also connect by bolt, and the long beam 12 of single channel-section steel truss of a rectangular frame two piece single channel-section steel truss long beams 12 relative with another length direction framework level lay respectively on the straight line; The upper and lower side of two long beams 13 of single channel-section steel truss all adopts bolt to link to each other by the beam-ends shrouding with the frange plate of four-way column, described two single channel-section steel girder trusses 14 are connected on four-way column 9 frange plates side by side, and truss slab frame construction links to each other with two floors 18 by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described B plate.
In the how high-rise steel shaped pile frame of assembling-center support system, shown in accompanying drawing 19-21, described C plate comprises double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14, junction plate I16, junction plate II17 and floor 18, the long beam of double flute steel truss beam 11 and single channel-section steel truss 12 is vertical mutually, last lower chord and the beam-ends shrouding of double flute steel truss beam 11 ends and the long beam of single channel-section steel truss 12 ends are weldingly connected respectively, and the junction plate I16 of two sections links to each other about passing through again, and namely double flute steel truss beam 11 all is weldingly connected with two junction plate I16 with the last lower chord of the long beam 12 of single channel-section steel truss; The other end of double flute steel truss beam 11 is connected with the long beam 13 of another root list channel-section steel truss by the three-dimensional column, the long beam 13 of another root list channel-section steel truss is relative with long beam 12 levels of single channel-section steel truss, and double flute steel truss beam 11 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; The two ends of single channel-section steel girder truss 14 are connected to the other end of long beam 12 other ends of described single channel-section steel truss and the long beam 13 of single channel-section steel truss, single channel-section steel girder truss 14 is relative with double flute steel truss beam 11 levels, and single channel-section steel girder truss 14 is identical with the type of attachment of the long beam 12 of single channel-section steel truss with long beam 12 types of attachment of single channel-section steel truss and described double flute steel truss beam 11; Single channel-section steel girder truss 14 adopts the four-way column to be connected with the long beam 13 of single channel-section steel truss, and single channel-section steel girder truss 14 all is weldingly connected with two junction plate II17 with the last lower chord of the long beam 13 of single channel-section steel truss; Described double flute steel truss beam 11, two long beams 12 of single channel-section steel truss and 13, single channel-section steel girder truss 14 constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss 14 alignment in two rectangular frames also connect by bolt, and the long beam 12 of single channel-section steel truss of a rectangular frame two piece single channel-section steel truss long beams 12 relative with another length direction framework level lay respectively on the straight line; The upper and lower side of two long beams 13 of single channel-section steel truss all adopts bolt to link to each other by the beam-ends shrouding with the frange plate of four-way column, described two single channel-section steel girder trusses 14 are connected on four-way column 9 frange plates side by side, and truss slab frame construction links to each other with two floors 18 by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described B plate.
In the how high-rise steel shaped pile frame of assembling of the present invention-center support system, as shown in Figure 22, described A plate and B plate, with the alignment of A plate and B plate level, there is the end of junction plate I16 to splice with bolt by the beam-ends shrouding at an end that does not connect bean column node of the double flute steel truss beam 11 of A plate and the double flute steel truss beam 11 of B plate; The be not linked and packed end that junction plate I16 is arranged of single channel-section steel girder truss 14 of an end of formula column and B plate of single channel-section steel girder truss 14 of A plate is spliced the beam-ends shrouding by bolt; Single-beam is spliced every one section fixed range by bolt at the long beam 12 of single channel-section steel truss of A plate and the long beam of the single channel-section steel truss 12 web member upper bolt hole places of B plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of A plate and B plate.
In the how high-rise steel shaped pile frame of assembling of the present invention-center support system, as shown in Figure 22, described B plate and C plate with the alignment of B plate and C plate level, have the end of junction plate II17 and the three-dimensional column 8 of C plate to link to each other by beam-ends shrouding employing bolt on the double flute steel truss beam 11 of B plate; Adopt bolt to link to each other the beam-ends shrouding that passes through of the four-way column of the end that junction plate II17 is arranged of single channel-section steel girder truss 14 of B plate and C plate; All adopt bolt to link to each other by two relative direction top flange plates of beam-ends shrouding and four-way column the upper and lower side of the long beam 13 of single channel-section steel truss of B plate, the other end of the long beam 13 of single channel-section steel truss of B plate is passed through beam-ends shrouding and C plate three-dimensional column frange plate employing bolt respectively link to each other; Single-beam is spliced every one section fixed range by bolt at the long beam 13 of single channel-section steel truss of B plate and the long beam of the single channel-section steel truss 12 web bolt hole places of C plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of B plate and C plate.
The connected mode of A plate and C plate is with the connected mode of A plate and B plate.
In sum, the whole floor of A, B, C splicing has node 9, node 10,12 4 kinds of different joint forms of node 11 and node in splicing place, wherein node 9 and node 10 places can the splicing node up and down overlay to strengthen node rigidity.
In the how high-rise steel shaped pile frame of above-mentioned assembling-center support system, shown in accompanying drawing 23-30, made the exploded detail of assembling truss plate node 1-8 respectively; Shown in accompanying drawing 31-34, made the exploded detail of assembling truss plate node 9-12 respectively.
In the how high-rise assembled steel shaped pile frame of industrialization of the present invention-prestressing force center support system, as shown in Figure 35, its herringbone lateral resistant member is made up of prestressed cable 23, adapter sleeve 21, otic placode I22 and otic placode II24; Otic placode I22 is connected on the column bottom by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode I22; Otic placode II24 is connected on the girder truss 19 by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode II24; Prestressed cable 23 applies prestressing force by adapter sleeve 21 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise assembled steel shaped pile frame of industrialization of the present invention-prestressing force center support system, as shown in Figure 36, its monocline rod-type lateral resistant member is made up of prestressed cable 23, adapter sleeve 21 and otic placode I22; Otic placode I22 is connected in column bottom and top by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode I22; Prestressed cable 23 applies prestressing force by adapter sleeve 21 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise assembled steel shaped pile frame of industrialization of the present invention-prestressing force center support system, as shown in Figure 37, its V font lateral resistant member is made up of prestressed cable 23, adapter sleeve 21, otic placode I22 and otic placode II24; Otic placode I22 is connected in column bottom and top by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode I22; Otic placode II24 is connected on the girder truss 19 by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode II24; Prestressed cable 23 applies prestressing force by adapter sleeve 21 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise assembled steel shaped pile frame of industrialization of the present invention-prestressing force center support system, as shown in Figure 38, its cruciform shape lateral resistant member is made up of prestressed cable 23, adapter sleeve 21 and otic placode I22; Otic placode I22 is connected in column bottom and top by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode I22; Prestressed cable 23 applies prestressing force by adapter sleeve 22 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise assembled steel shaped pile frame of industrialization of the present invention-prestressing force center support system, as shown in Figure 39, its two-way monocline rod-type lateral resistant member is made up of prestressed cable 23, adapter sleeve 21 and otic placode I22; Otic placode I22 is connected in column bottom and top by welding or bolt, and prestressed cable 23 is connected by bolt with otic placode I22; Prestressed cable 23 applies prestressing force by adapter sleeve 21 is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
In the how high-rise assembled steel shaped pile frame of above-mentioned industrialization-prestressing force center support system, shown in accompanying drawing 40-42, made the exploded detail at otic placode and cable body connected node place respectively.
In the how high-rise assembled steel shaped pile frame of above-mentioned industrialization-prestressing force center support system, be to have made the how high-rise steel shaped pile frame of individual layer assembling-prestressing force central support structure schematic diagram as accompanying drawing 43.

Claims (7)

1. the how high-rise steel shaped pile frame of assembling-prestressing force center support system, it is characterized in that, this assembling type steel structure prestressing force central support is sandwich construction, and every layer of structure comprises assembling truss plate, assembling hetermorphiscal column and prestressing force center support member.
Described assembling truss plate comprises lattice truss beam and the floor of being furnished with the channel-section steel web member, described lattice truss beam is by the beam-ends shrouding, be connected with other lattice truss beams or hetermorphiscal column, form truss slab frame construction, again floor is placed on the truss plate framework structure and connect, form assembling truss plate; Described assembling truss plate is prefabricated in the factory, and at the construction field (site) the bean column node of assembling truss plate by its beam-ends shrouding and assembling hetermorphiscal column is spliced mutually, and the assembling hetermorphiscal column adopts the bolt scene to be spliced to form multilayer truss slab frame construction at interlayer; On the basis of described truss slab frame construction, prestressing force center support member as lateral resistant member be with assembling truss plate in girder truss and the post of assembling column at the bottom of or the top be connected; Described assembling truss plate, assembling hetermorphiscal column and prestressing force center support member all are prefabricated in the factory, and assemble by bolt the job site.
2. according to the how high-rise steel shaped pile frame of a kind of assembling of claim 1-prestressing force center support system, it is characterized in that assembling truss plate comprises three kinds of specifications, be respectively A plate, B plate and C plate.
Described A plate comprises double flute steel truss beam (11), the long beam of double flute steel truss (15), the long beam of single channel-section steel truss (12), single channel-section steel girder truss (14), junction plate I (16), junction plate II (17) and floor (18); Double flute steel truss beam (11) vertically is connected by two-way hetermorphiscal column 7 mutually with the long beam of double flute steel truss (15), all adopt bolt to link to each other by beam-ends shrouding and the two-way hetermorphiscal column edge of a wing, and place, the upper and lower end face of link is welded with a plate II (17) respectively, and the two ends of junction plate II (17) are connected on the last lower chord of double flute steel truss beam (17) and the long beam of double flute steel truss (15); The other end of double flute steel truss beam (11) is connected with the long beam of single channel-section steel truss (12) of level, last lower chord and the beam-ends shrouding of the described end of double flute steel truss beam (11) and the long beam of single channel-section steel truss (12) end are weldingly connected respectively, and double flute steel truss beam (11) and the long beam of single channel-section steel truss (12) link to each other by the junction plate I (16) of two sections up and down again, and namely the last lower chord of double flute steel truss beam (11) and the long beam of single channel-section steel truss (12) all is weldingly connected with two junction plate I (16); The other end of single long beam of channel-section steel truss (12) is connected with single channel-section steel girder truss (14), the long beam of double flute steel truss (15) is relative with the long beam of single channel-section steel truss (12) level, single channel-section steel girder truss (14) is relative with double flute steel truss beam (11) level, last lower chord and the beam-ends shrouding of single channel-section steel girder truss (14) end and the long beam of single channel-section steel truss (12) end are weldingly connected respectively, and are connected by two the junction plate I (16) that are connected the lower chord place between single channel-section steel girder truss (14) and the long beam of single channel-section steel truss (12) again; Be connected by two the junction plate II (17) at last lower chord place between single channel-section steel girder truss (14) end and the long beam of double flute steel truss (15); The long beam of described double flute steel truss (15), double flute steel truss beam (11), the long beam of single channel-section steel truss (12), single channel-section steel girder truss (14) constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss (14) alignment in two rectangular frames also connects by bolt, and two long beams of double flute steel truss (15) are positioned on the straight line, and two long beams of single channel-section steel truss (12) are positioned on the straight line; The upper and lower side of two long beams of double flute steel truss (15) all adopts bolt to link to each other by the beam-ends shrouding, and described two single channel-section steel girder trusses (14) are connected on the three-dimensional hetermorphiscal column (8); Truss slab frame construction links to each other with floor (18) by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described A plate.
Described B plate comprises double flute steel truss beam (11), two long beams of single channel-section steel truss (12) and (13), single channel-section steel girder truss (14), junction plate I (16), junction plate II (17) and floor (18), double flute steel truss beam (11) is vertical mutually with the long beam of single channel-section steel truss (12), last lower chord and the beam-ends shrouding of double flute steel truss beam (11) end and the long beam of single channel-section steel truss (12) end are weldingly connected respectively, and the junction plate I (16) of two sections links to each other about passing through again, and namely double flute steel truss beam (11) all is weldingly connected with two junction plate I (16) with the last lower chord of the long beam of single channel-section steel truss (12); The other end of double flute steel truss beam (11) is connected with another long beam of root list channel-section steel truss (13) by the three-dimensional column, another long beam of root list channel-section steel truss (13) is relative with the long beam of single channel-section steel truss (12) level, and double flute steel truss beam (11) all is weldingly connected with two junction plate II (17) with the last lower chord of the long beam of single channel-section steel truss (13); The two ends of single channel-section steel girder truss (14) are connected to the other end of described single channel-section steel truss long beam (12) other end and the long beam of single channel-section steel truss (13), single channel-section steel girder truss (14) is relative with double flute steel truss beam (11) level, and single channel-section steel girder truss (14) is identical with the type of attachment of the long beam of single channel-section steel truss (12) with single channel-section steel truss long beam (12) type of attachment and described double flute steel truss beam (11); Single channel-section steel girder truss (14) adopts the four-way column to be connected with the long beam of single channel-section steel truss (13), and single channel-section steel girder truss (14) all is weldingly connected with two junction plate II (17) with the last lower chord of the long beam of single channel-section steel truss (13); Described double flute steel truss beam (11), two long beams of single channel-section steel truss (12) and (13), single channel-section steel girder truss (14) constitute a rectangular frame; Two identical rectangular frames connect and compose the under(-)chassis of a splicing; Single channel-section steel girder truss (14) alignment in two rectangular frames also connects by bolt, and the long beam of single channel-section steel truss (12) of a rectangular frame two piece single channel-section steel truss long beams (12) relative with another length direction framework level lay respectively on the straight line; The upper and lower side of two long beams of single channel-section steel truss (13) all adopts bolt to link to each other by the beam-ends shrouding with the frange plate of four-way column, described two single channel-section steel girder trusses (14) are connected on four-way column (9) frange plate side by side, and truss slab frame construction links to each other with two floors (18) by girder truss upper chord top anchoring piece; All prefabricated and assemblings in factory of all members of described B plate.
Described C plate is the same with the B plated construction.
In assembling type steel structure prestressing force center support system, A plate, B plate and C plate are by arrangement mode ABCBC ... BCBCA splices, what middle ellipsis represented is a plurality of BC arrangement modes, connect by welding or bolt between the AB, adopt the three-dimensional column to connect at three-dimensional column place, adopt the four-way column to connect at four-way column place.
In the how high-rise steel shaped pile frame of assembling-prestressing force center support system, described A plate and B plate, with the alignment of A plate and B plate level, there is the end of junction plate I (16) to splice with bolt by the beam-ends shrouding at an end that does not connect bean column node of the double flute steel truss beam (11) of A plate and the double flute steel truss beam (11) of B plate; The be not linked and packed end that junction plate I (16) is arranged of single channel-section steel girder truss (14) of an end of formula column and B plate of single channel-section steel girder truss (14) of A plate is spliced the beam-ends shrouding by bolt; Single-beam is spliced every one section fixed range by bolt at the long beam of single channel-section steel truss (12) of A plate and the long beam of single channel-section steel truss (12) the web member upper bolt hole place of B plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of A plate and B plate.
Described B plate and C plate with the alignment of B plate and C plate level, have the end of junction plate II (17) and the three-dimensional column (8) of C plate to link to each other by beam-ends shrouding employing bolt on the double flute steel truss beam (11) of B plate; Adopt bolt to link to each other the beam-ends shrouding that passes through of the four-way column of the end that junction plate II (17) is arranged of single channel-section steel girder truss (14) of B plate and C plate; All adopt bolt to link to each other by two relative direction top flange plates of beam-ends shrouding and four-way column the upper and lower side of the long beam of single channel-section steel truss (13) of B plate, the other end of the long beam of single channel-section steel truss (13) of B plate is passed through beam-ends shrouding and C plate three-dimensional column frange plate employing bolt respectively link to each other; Single-beam is spliced every one section fixed range by bolt at the long beam of single channel-section steel truss (13) of B plate and the long beam of single channel-section steel truss (12) the web bolt hole place of C plate, make two single-beams be connected to become twin beams; Thereby finish the splicing of B plate and C plate.
The connected mode of A plate and C plate is with the connected mode of A plate and B plate.
3. the how high-rise steel shaped pile frame of a kind of assembling according to claim 1-prestressing force center support system, it is characterized in that: described assembling truss plate is connected by bolt with the assembling hetermorphiscal column respectively up and down at bean column node, forms frame construction; Described prestressing force center support member is made up of prestressed cable (23) and otic placode, otic placode at the bottom of factory is connected in the post of steel framed structure by welding or bolt, top or girder truss (19) go up the lower chord place, prestressed cable (23) is connected by bolt at the construction field (site) with the otic placode of every floor top and bottom, forms framework-central support structure; Prestressed cable (23) applies prestressing force by adapter sleeve (21) is tightened; Described prestressed cable is the high strength rod iron, perhaps uses high strength steel strand, high strength shaped steel member, perhaps uses high strength rod iron, high strength steel strand or the high strength shaped steel member of band damper.
4. the how high-rise steel shaped pile frame of assembling according to claim 1-prestressing force center support system, it is characterized in that: the girder truss that related beam mainly is made up of last lower chord (1) and web member (2) splicing, wherein go up lower chord (1) and web member (2) all adopts channel-section steel, web member (2) becomes the angle of 30 degree ?, 60 degree with last lower chord (1); And be divided into single-beam and twin beams, single-beam arranges connecting hole every one section fixed range, and being convenient to becomes twin beams with bolt with two single-beam splicings when the splicing of plate and plate, and for twin beams, the connection of channel-section steel is used bolt to connect or used welding.
The perhaps girder truss that mainly is spliced by last lower chord, web member and fill plate of related beam, wherein go up lower chord and use channel-section steel (1), perhaps use angle steel (3), perhaps user's steel pipe (6), web member (4) use angle steel, web member (4) become with chord member (1) or (3) or (6) 30 Du ?60 angles of spending; And be divided into single-beam and twin beams, single-beam arranges connecting hole every one section fixed range, being convenient to when the splicing of plate and plate becomes twin beams with bolt with two single-beams splicings, for twin beams, web member, goes up and being connected of lower chord and end-plate uses bolt to connect or use welding.
5. the how high-rise steel shaped pile frame of assembling according to claim 1-prestressing force center support system, it is characterized in that: the splicing of assembling column can have bolt hole by hetermorphiscal column frange plate top, the hetermorphiscal column that also has bolt hole with another lower part is spliced column with bolt by scab (10).Scab can be earlier factory with transport to the scene after the hetermorphiscal column bolt is connected and be connected with another pillar bolt again; Also can arrive on-the-spot with bolt column the splicing later; It is convenient that hetermorphiscal column and other cylindricalitys are compared erection bolt.The assembling column also can be by scab (10), and with column welding splicing, scab can be earlier transported to the scene and is welded to connect with another pillar after factory and hetermorphiscal column are welded to connect; Also can arrive on-the-spot later usefulness welding splices column.
6. in the how high-rise steel shaped pile frame of assembling according to claim 1-prestressing force center support system, it is characterized in that: the assembling column is made up of hetermorphiscal column, junction plate (10), hetermorphiscal column has three kinds of forms, non-ly be not: L shaped hetermorphiscal column (7), T shape hetermorphiscal column (8) and cross hetermorphiscal column (9), corresponding bean column node has three kinds of forms, is respectively two to node, three-dimensional node and four-way node; Can be divided into the column of 3 kinds of forms according to the difference of its bean column node, be respectively two-way column, three-dimensional column and four-way column; Two frange plates of L shaped hetermorphiscal column (7) are opened bolt hole form two to the node column; Three frange plates of T shape hetermorphiscal column (8) are opened bolt hole respectively form three-dimensional node column; With cross hetermorphiscal column (9) thus four frange plates open bolt hole respectively and form four-way node column; Respectively with beam on end-plate splice with bolt.The type of attachment of hetermorphiscal column and beam is simple, and hetermorphiscal column is connected with bolt with the beam-ends shrouding, easy construction, and can realize rigidly connecting.
7. in the how high-rise steel shaped pile frame of assembling according to claim 1-prestressing force center support system, it is characterized in that: described floor uses profiled steel sheet combination floor, perhaps reinforced concrete floor, perhaps OSB shaving board.
CN201310206752.9A 2013-05-29 2013-05-29 A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system Active CN103276801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310206752.9A CN103276801B (en) 2013-05-29 2013-05-29 A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310206752.9A CN103276801B (en) 2013-05-29 2013-05-29 A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system

Publications (2)

Publication Number Publication Date
CN103276801A true CN103276801A (en) 2013-09-04
CN103276801B CN103276801B (en) 2016-01-20

Family

ID=49059407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310206752.9A Active CN103276801B (en) 2013-05-29 2013-05-29 A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system

Country Status (1)

Country Link
CN (1) CN103276801B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938712A (en) * 2014-04-11 2014-07-23 北京工业大学 Self-restoring prestressed anti-buckling herringbone supporting system for two frame plates of industrial assembly type multi-layer high-rise steel structure
CN111075013A (en) * 2020-02-18 2020-04-28 金陵科技学院 Light building with growing type assembly steel structure
CN112324159A (en) * 2020-11-12 2021-02-05 长安大学 Assembling method for H-shaped steel combined special-shaped beam column steel frame structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11269981A (en) * 1998-03-20 1999-10-05 Nippon Steel Corp Connecting structure between panel type structural floor and steel structural floor in multi-storied building
CA2592820A1 (en) * 2007-06-28 2008-12-28 Wilfred W. Siu Composite floor and composite steel stud wall construction systems
CN102995744A (en) * 2012-11-26 2013-03-27 北京工业大学 Industrialized multi-high-rise assembly type steel structure frame-pre-stressed center support system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11269981A (en) * 1998-03-20 1999-10-05 Nippon Steel Corp Connecting structure between panel type structural floor and steel structural floor in multi-storied building
CA2592820A1 (en) * 2007-06-28 2008-12-28 Wilfred W. Siu Composite floor and composite steel stud wall construction systems
CN102995744A (en) * 2012-11-26 2013-03-27 北京工业大学 Industrialized multi-high-rise assembly type steel structure frame-pre-stressed center support system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于劲: "钢异形柱结构体系抗震性的理论分析与试验研究", 《中国博士学位论文全文库(电子期刊),工程科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938712A (en) * 2014-04-11 2014-07-23 北京工业大学 Self-restoring prestressed anti-buckling herringbone supporting system for two frame plates of industrial assembly type multi-layer high-rise steel structure
CN111075013A (en) * 2020-02-18 2020-04-28 金陵科技学院 Light building with growing type assembly steel structure
CN112324159A (en) * 2020-11-12 2021-02-05 长安大学 Assembling method for H-shaped steel combined special-shaped beam column steel frame structure

Also Published As

Publication number Publication date
CN103276801B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN103290920B (en) A kind of assembling type steel structure center support frame system
CN102979175B (en) Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system
CN102979178B (en) Industrialized multi-story high-rise assembled steel structure frame - eccentrically-braced system
CN102995744B (en) Industrialized multi-high-rise assembly type steel structure frame-pre-stressed center support system
CN102979168B (en) Industrialized multi-story high-rise assembled steel structure frame - centrally-braced system
CN103206010B (en) A kind of assembling type steel structure prestressing force accentric support frame system
CN103276804B (en) A kind of industrialization assembling hetermorphiscal column steel work prestressing force center support system
CN103410218A (en) Fabricated multistory and high-rise prestressed steel frame-sway brace system provided with special-shaped columns
CN103276833B (en) A kind of industrialization assembling shaped pile frame-steel plate shear force wall steel structure system
CN103276806B (en) A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces
CN103206015B (en) A kind of assembling type steel structure accentric support frame system
CN103276809A (en) Assembly-type multi-storey steel special-shaped column framework-steel plate shear wall structure system
CN103276802B (en) A kind of many Tall Steels of industrialization assembled Framed Structure with Special-Shaped Columns system
CN103266660B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame prestressing force eccentrical braces
CN103410220A (en) Industrially assembled multiple high-rise steel special-shaped column frame-eccentric supporting system
CN103276832A (en) Hollow irregular column multi-layer high-rise assembling steel frame-steel plate shear wall system
CN103195164A (en) Assembly prestress center support system for steel structure
CN103290925A (en) Industrial prefabricated eccentric bracing system with penetrating columns for steel structural frame
CN103290921A (en) Industrial prefabricated steel structural frame system with penetrating columns
CN103410217B (en) A kind of assembling many Tall Steels shaped pile frame-prestressing force eccentrical braces
CN103276793A (en) Hollow irregular column multi-layer high-rise assembling steel frame-central support system
CN103276801B (en) A kind of assembling many Tall Steels shaped pile frame-prestressing force center support system
CN103276839A (en) Hollow irregular column multi-layer high-rise assembling steel frame-eccentric support system
CN103290922A (en) Industrial prefabricated solid-web steel structural frame system with columns penetrating beams
CN103410221A (en) Industrially assembled multiple high-rise steel special-shaped column frame-central supporting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: Huzhou xinbeilian Network Technology Co.,Ltd.

Address before: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room

Patentee before: Beijing Zhonglian Technology Service Co.,Ltd.

Effective date of registration: 20191216

Address after: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room

Patentee after: Beijing Zhonglian Technology Service Co.,Ltd.

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 12-14 / F, No. 90, Zhongshan West Road, Zhenjiang City, Jiangsu Province, 212000

Patentee after: ZHENJIANG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: Huzhou xinbeilian Network Technology Co.,Ltd.

TR01 Transfer of patent right