CN103267200A - Fire hose on-line under-pressure quick leaking stoppage nail and quick leaking stoppage method - Google Patents

Fire hose on-line under-pressure quick leaking stoppage nail and quick leaking stoppage method Download PDF

Info

Publication number
CN103267200A
CN103267200A CN2013102107507A CN201310210750A CN103267200A CN 103267200 A CN103267200 A CN 103267200A CN 2013102107507 A CN2013102107507 A CN 2013102107507A CN 201310210750 A CN201310210750 A CN 201310210750A CN 103267200 A CN103267200 A CN 103267200A
Authority
CN
China
Prior art keywords
leak stopping
leakage hole
nail
bar
stopping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102107507A
Other languages
Chinese (zh)
Other versions
CN103267200B (en
Inventor
薛林
阙兴贵
南江林
张磊
阮桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fire Research Institute of Ministry of Public Security
Original Assignee
Shanghai Fire Research Institute of Ministry of Public Security
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Fire Research Institute of Ministry of Public Security filed Critical Shanghai Fire Research Institute of Ministry of Public Security
Priority to CN201310210750.7A priority Critical patent/CN103267200B/en
Publication of CN103267200A publication Critical patent/CN103267200A/en
Application granted granted Critical
Publication of CN103267200B publication Critical patent/CN103267200B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a fire hose on-line under-pressure quick leaking stoppage nail and a quick leaking stoppage method. The leaking stoppage nail is inserted in a leaking opening. A nail rod of the leaking stoppage is matched with a leaking stoppage sleeve to deform so as to simultaneously compress and seal the leaking opening from the inner side and the outer side of the leaking opening, so that the leaking opening is blocked. The fire hose on-line under-pressure quick leaking stoppage nail is simple in structure and capable of realizing quick on-line leaking stoppage on a soft pipeline.

Description

A kind of fire-extinguisher water hose is pressed instantaneous leaking-stopping nail and instantaneous leaking-stopping method at tape
Technical field
The present invention relates to a kind of pipe plugging technology, be specifically related to a kind of online pipe plugging technology.
Background technique
Fire-extinguisher water hose is the important equipment that fire brigade is carried extinguishing medium when putting out a fire, and plays crucial effects in fire fighting and rescue.In fire fighting, fire-extinguisher water hose usually can or run into sharp weapon such as hard thrust and is scratched because of material ageing, phenomenon damaged and that leak occurs.And the water that leaks out under the high pressure not only causes adverse effect to fire fighting and rescue, probably can lead to grave consequences.Especially at the fire rescue scene, break in case mains water is taken out of now, will directly influence the front court and supply water, the water band that more renews need stop water pump, and the waste plenty of time, this is very worthless for the fire fighting and rescue of seizing every minute and second.At this moment just need be a kind of under the prerequisite that does not stop to supply water, the method for shutoff water band leakage hole.
At present, the most frequently used on-the-spot craft leakage mending method is to use strap to twine to tie up at the place of leaking, and perhaps use two-sided fastening adhesive tape to bond, but these method effects is unsatisfactory.Because fire-extinguisher water hose is operation under wet-out conditions, Bond its cementitiousness under water stain influence can be had a greatly reduced quality, and it is higher to add hydraulic pressure, and this quadrat method can realize the mending-leakage effect hardly, and therefore above-mentioned various methodologies all can not well address this problem.
At above-mentioned problem, people have also proposed the device of some online leak stopping, but all there is the problem of complex structure, complex operation in these devices, when using these online leakage-baffling device to carry out leak stopping, need the long time of cost, can not in time carry out leak stopping to soft pipeline or water band fast.
Summary of the invention
The present invention is directed to existing pipe plugging technology and can't realize the problem of online quick, effective leak stopping, and provide a kind of fire-extinguisher water hose to press the instantaneous leaking-stopping nail at tape.Very convenient of this leak stopping pin structure operation can carry out online leak stopping to water band or soft pipeline in the very short time.
As second purpose of the present invention, the present invention also provides a kind of instantaneous leaking-stopping method based on the leak stopping nail.It can realize soft pipeline or hard pipeline are carried out online leak stopping fast.
In order to achieve the above object, the present invention adopts following technological scheme:
A kind of fire-extinguisher water hose is pressed the instantaneous leaking-stopping nail at tape, and described leak stopping nail assigns in the leakage hole, and the nail bar on it and leak stopping cover cooperate and produce deformation and compress simultaneously from the inside and outside both sides of leakage hole and seal up leakage hole, thereby block leakage hole.
In a preferred embodiment of leak stopping nail, described leak stopping nail comprises driving uses nail bar and leak stopping cover, described leak stopping cover is for by the leak stopping lid be arranged on the "T"-shaped leak stopping cover that leak stopping bar that leak stopping covers forms, described leak stopping lid is used for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar on it pass leakage hole; Described nail bar movably is located in the leak stopping cover along leak stopping bar bearing of trend, its front end sleeve is provided with the leak stopping cap, when the nail bar moves in the leak stopping cover, leak stopping bar in leak stopping cap and the leak stopping cover cooperates, the port sidewall blocking of leak stopping cap is leaked bar and is driven integral body towards revealing direction deformation, and described deformation sidewall covers leakage hole from interior side compression and the sealing of leakage hole.
Further, described leak stopping cover is provided with sealed member.
Further again, described sealed member is the layer or for being set in the seal ring on the leak stopping bar of being bonded and sealed that is arranged on the leak stopping lid coverage rate.
Further, the arranged outside of described leak stopping bar has the leak stopping hat to become device; The degree of depth of described leak stopping cap becomes length between the device greater than leak stopping bar free end to leak stopping hat.
Further again, described leak stopping bar comprises the leak stopping section of back segment and the mobile section of leading portion, and the external diameter of described mobile section carries out transition by arc transiting surface between the two less than the leak stopping section, and described arc transiting surface constitutes the leak stopping hat and becomes device.
Further again, the end face of described leak stopping cap port is the arc shaped surface that cooperates with arc transiting surface.
Further again, the top of described leak stopping cap is cone.
In another preferred embodiment of leak stopping nail, described leak stopping nail comprises driving uses nail bar and leak stopping cover, described leak stopping cover is for by the leak stopping lid be arranged on the "T"-shaped leak stopping cover that leak stopping bar that leak stopping covers forms, described leak stopping lid is used for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar on it pass leakage hole; Described nail bar movably is located in the leak stopping cover along leak stopping bar bearing of trend, its head arranges guide pad, when the nail bar moves in the leak stopping cover, guide pad cooperates with the free end of leak stopping bar, drive the free end integral body of leak stopping bar towards revealing direction deformation, described deformation part covers leakage hole from interior side compression and the sealing of leakage hole.
Further, the guide surface of described guide pad is the conical surface.
Further, described leak stopping nail comprises that also a Sealing, described Sealing are set on the nail bar, and between clamping sleeve and guide pad.
As second purpose of the present invention, a kind of instantaneous leaking-stopping method, described blocking method is by assigning into the leak stopping nail in the leakage hole, and make nail bar and leak stopping cover on it cooperate generation deformation, cooperated from the inside and outside both sides of leakage hole with the lateral part that is positioned at the leakage hole outside by deformations to compress and to seal up leakage hole simultaneously, thereby block leakage hole.
In a preferred embodiment of blocking method, described blocking method comprises the steps:
(1) leak stopping nail is interted in leakage hole, in making leak stopping bar in the leak stopping nail assign into to reveal mouthful and the leak stopping cap on the nail bar be positioned at the inboard of leakage hole;
(2) outwards extract the nail bar from the leak stopping tops, withstand the leak stopping lid towards leakage hole simultaneously;
(3) nail bar pulling leak stopping cap moves towards leakage hole, and the leak stopping bar drives the port sidewall integral body of leak stopping cap towards the deformation of leakage direction, and makes the covering of deformation sidewall and sealing compress the inboard of leakage hole;
(4) leak stopping hat change sidewall seals when compressing the leakage hole inboard, and leakage hole is pressed to the leak stopping lid, makes the leak stopping lid also seal from outer side covers and compresses leakage hole.
In another preferred embodiment of blocking method, described blocking method comprises the steps:
(11) leak stopping nail is interted in leakage hole, in making leak stopping bar in the leak stopping nail assign into to reveal mouthful and the guide pad on the nail bar be positioned at the inboard of leakage hole;
(12) outwards extract the nail bar from the leak stopping tops, withstand the leak stopping lid towards leakage hole simultaneously;
(13) nail bar pulling guide pad moves towards leakage hole, and guide pad drives the free end integral body of leak stopping bar towards the deformation of leakage direction, and makes deformations cover leakage hole from interior side compression and the sealing of leakage hole;
When (14) sealing of leak stopping bar deformations compresses the leakage hole inboard, leakage hole is pressed to the leak stopping lid, make the leak stopping lid compress leakage hole from outer side covers and sealing.
Very simple of the leak stopping nail overall structure that obtains according to such scheme, be easy to realize and operation, only need " one insert, a top, take out ", can realize the leakage hole of water band is carried out leak stopping, and can realize fast the soft pipeline of various leakages is carried out online leak stopping.
Total in the middle of the outside of leakage hole, leakage hole and inboard three aspects of leakage hole carry out the leak stopping seal operation simultaneously, effectively stop ducted medium from leakage hole, to leak, guarantee plugging effect.
Need not pipeline during the leak stopping operation and quit work, do not influence the work of relevant device fully; The leak stopping operating process simply can realize fast; Can guarantee after the leak stopping that medium do not reveal, guarantee that the pressure medium in the pipeline is constant, with reveal before consistent; Realize real pressing instantaneous leaking-stopping at tape.
Description of drawings
Further specify the present invention below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation of leak stopping nail in the example one of the present invention;
Fig. 2 is the preoperative schematic representation of leak stopping nail leak stopping in the example one of the present invention;
Fig. 3 is the schematic representation after the leak stopping of leak stopping nail is operated in the example one of the present invention;
Fig. 4 is the structural representation of leak stopping nail in the example two of the present invention;
Fig. 5 is the preoperative schematic representation of leak stopping nail leak stopping in the example two of the present invention;
Fig. 6 is the schematic representation after the leak stopping of leak stopping nail is operated in the example two of the present invention.
Embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the present invention.
Example 1
Referring to Fig. 1, leak stopping that this example provides nail 100 comprises that mainly nail bar 104 and leak stopping overlap 105 two-part.The cross section of leak stopping cover 105 is "T"-shaped, is made up of leak stopping lid 101 and the leak stopping bar 102 that is arranged on the leak stopping lid 101, and leak stopping lid 101 is used for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar 102 on it pass leakage hole; And nail bar 104 movably is located in the leak stopping cover 105 along leak stopping bar bearing of trend, its front end sleeve is provided with leak stopping cap 103, when the nail bar moves in the leak stopping cover, leak stopping bar in leak stopping cap 103 and the leak stopping cover cooperates, the port sidewall blocking of leak stopping cap is leaked bar and is driven integral body towards inner-walls of duct (namely revealing a mouthful direction) deformation, and this deformation sidewall covers leakage hole from interior side compression and the sealing of leakage hole.
This scheme in the specific implementation, the leak stopping lid 101 in the leak stopping cover 105 is used for covering the outside of seal leakage mouth, it is whole to be the bow body structure, arc shaped surface 101a is used for the operation of outer bound pair leak stopping lid 101, as presses pressure etc. as the fore side of leak stopping lid 101.Leak stopping lid 101 is positioned at the leakage hole outside, and the slick and sly structure of its arc can also effectively be avoided the problem (as, the scuffing that is caused by corner angle, problem such as puncture) of the damage that other structure (as square, polygonal etc.) causes on-the-spot other parts of leak stopping easily.
The plane 101b of the leak stopping lid 101 of bow body structure is used for living whole leakage hole and peripheral part thereof from outer side covers when leak stopping as the coverage rate 101b of leak stopping lid.
In order to guarantee that leak stopping lid 101 covers and the sealing effect in the seal leakage mouth outside, coverage rate 101b is provided with a sealed member 101c, joins by the sealing between sealing parts 101c realization coverage rate 101b and leakage hole and the peripheral part thereof.
Layer 101c that be bonded and sealed for sealing parts 101c specifically can adopt some sealers or other sealing compound to constitute specifically decides according to the material of pipeline and medium and the pressure medium size of Qi Nei, as long as can guarantee to seal the effect of joining.
In order to reach sealing effect, sealed member 101c is not limited to adopt layer 101c that be bonded and sealed, and a layer 101c replaces being bonded and sealed can to adopt seal ring (concrete as rubber ring).Under the compressing of leak stopping lid 101, can play the effect of enhanced leaktightness equally.
So the leak stopping of structure lid 101 generally can adopt the material with certain deformability to form, can produce corresponding deformation at different pipelines like this, make when leak stopping lid 101 covers sealing, coverage rate 101b on it matches with the pipe shape at leakage hole place, reaches perfect covering sealing.
Leak stopping bar 102 is used for passing leakage hole, and leak stopping cap 103 is sent into the inboard of leakage hole, and can be when leak stopping cap 103 moves towards leakage hole, to the whole outside deformation power of port sidewall generation of leak stopping cap 103.
This leak stopping bar 102 is vertically set on the coverage rate 101b of leak stopping lid 101, and is providing a through hole 102a who runs through leak stopping bar 102 and leak stopping lid 101 along its bearing of trend.This leak stopping bar 102 comprises that mainly the rear end is near the leak stopping section 102b of coverage rate 101b and along the outward extending mobile section 102c of leak stopping section 102b, wherein leak stopping section 102b assigns into when being used for leak stopping and reveals mouth, leakage hole is carried out directly preliminary leak stopping, and the length of the 102b of leak stopping section is for this reason generally covered thickness and the pipeline wall thickness sum of layer 101c that be bonded and sealed on 101 greater than leak stopping.
Mobile section 102c on the leak stopping bar 102 is used for cooperating with leak stopping cap 103, and the movement of leak stopping cap 103 is led, and makes leak stopping cap 103 move along mobile section 102c.This section of movement 102c external diameter is less than leak stopping section 102b, transition structure 102d between the two becomes device as the leak stopping hat, be used for the port sidewall 103b of leak stopping cap 103 is produced whole deformation power towards inner-walls of duct (namely revealing a mouthful direction), make the port sidewall 103b integral body deformation laterally of leak stopping cap 103 open.
In order to reach stable deformation effect, transition structure 102d on the leak stopping bar 102 between mobile section 102c and the leak stopping section 102b is an arc transiting surface, by the slick and sly progressive formation of arc transiting surface, both guaranteed the reliability of leak stopping cap 103 sidewall deformation, be convenient to operation again.
In this example, nail bar 104 matches with the through hole 102a that leak stopping is overlapped in 105, and among the whole through hole 102a that movably is located on the leak stopping cover 105, and length is greater than the total length of leak stopping bar 102 with leak stopping lid 101.The front end of nail bar 104 is arranged on the neutral position of settling notch 103d bottom 103a on the leak stopping cap 103, realizes driving leak stopping cap 103 thus and moves along the mobile section 102c on the leak stopping bar 102.When nail bar 104 is located among the through hole 102a, the free end of nail bar 104 will cover 101 outer side surface from leak stopping and stretch out, follow closely bar 104 from the outside as long as spur like this, the leak stopping cap 103 that nail bar 104 will drive its front end moves towards leakage hole, and the mobile section 102c that makes leak stopping cap 103 be set in leak stopping bar 102 goes up and a mobile section 102c moves.
Leak stopping cap 103 is set on the free end of nail bar 104, and it covers whole leakage hole and peripheral part thereof by deformation in the inboard of leakage hole.
These leak stopping cap 103 integral body are cylindrical, and the centre has the notch of arrangement 103d.The external diameter of leak stopping section 102b on the external diameter of leak stopping cap 103 and the leak stopping bar 102 is identical, the external diameter of mobile section 102c on the internal diameter of median slot 103d and the leak stopping bar 102 is identical, when the mobile section 102c that is set in leak stopping bar 102 when leak stopping cap 103 goes up like this, its outer side surface 103e is the outer side surface of leak stopping section 102b with the outermost surface 102e(of leak stopping bar 102) flush, be convenient to leak stopping bar 102 and assign in the leakage hole, also avoid the external diameter difference to cause secondary to destroy to the leak stopping mouth.The external diameter of mobile section 102c on the internal diameter of leak stopping cap 103 median slot 103d and the leak stopping bar 102 can be inequality as required.
Deformation can take place for the arc transiting surface 102d of sidewall 103b on leak stopping bar 102 that guarantees leak stopping cap 103 drives, the degree of depth of this leak stopping cap 103 (namely settling the degree of depth of notch 103d) enters into the length of leakage hole inboard greater than leak stopping bar 102, guarantee that leak stopping cap 103 has sufficiently long stroke along mobile section 102c when leakage hole moves, make the sidewall 103b of leak stopping cap 103 ports to contact with the arc transiting surface 102d on the leak stopping bar 102, the whole generation towards the deformation of inner-walls of duct (namely revealing a mouthful direction) under the effect of arc transiting surface 102d, and the part of generation deformation can cover whole leakage hole and peripheral part thereof.
The end face 103f of leak stopping cap 103 ports is designed to the arc shaped surface that matches with arc transiting surface 102d, when both contact, by both cooperations, make leak stopping cap 103 sidewalls be more prone to take place deformation like this, and reliable and stable, avoid rupturing of leak stopping cap 103 sidewall 103b.
Simultaneously, the top 103c of leak stopping cap 103 is designed to a vertebral body structure, is convenient to the operation of assigning to leakage hole like this.
Because need produce certain deformation during 103 work of leak stopping cap, its integral body can adopt the material with certain deformation nature to make.
When the leak stopping nail 100 that utilizes such scheme to form carried out leak stopping, concrete operating procedure was as follows:
(1) will follow closely bar 104 is located among the through hole 102a on the leak stopping cover 105, and the free end of nail bar 104 will cover 101 outer side surface from leak stopping and stretch out, make the leak stopping cap 103 of nail bar 104 front ends be set on the mobile section 102c of leak stopping bar 102 in the leak stopping cover 105, finish the assembling of leak stopping nail thus.
(2) leak stopping being followed closely integral body assigns in the leakage hole 301, make leak stopping bar 102 pass leakage hole 301 together with sheathed leak stopping cap 103 thereon, leak stopping on leak stopping bar 102 lid 101 contacts with the outer side wall of pipeline 300, realization is from outer side covers and seal up leakage hole 301(as shown in Figure 2), the leak stopping section 102b of leak stopping this moment bar 102 assigns in the leakage hole 301, its outer side wall will fully push the inwall of leakage hole 301, blocks in leakage hole 301.
(3) withstand leak stopping lid 101 towards leakage hole, make leak stopping lid 101 by the outside that Sealing 101c compresses pipeline 300, avoid its back side leakage hole to move.
(4) spur nail bar 104 outside the lateral, nail bar 104 will drive leak stopping cap 103 and move to leakage hole 301 along the mobile section 102c on the leak stopping bar 102, reach the bottom 103a of leak stopping cap 103 until the top of mobile section 102c.
(5) referring to Fig. 3, in the moving process, when the sidewall 103b of leak stopping cap 103 ports contacts with arc transiting surface 102d on the leak stopping bar 102, wholely under the effect of arc transiting surface 102d produce towards inner-walls of duct (namely revealing a mouthful direction) open deformation and can not rupture; After the deformation part 103g of this generation deformation reaches certain length, the inner-walls of duct around the leakage hole be will push down, thereby whole leakage hole and peripheral part thereof covered, when acquiring a certain degree, pressure will form sealing; In the process, the pressure of the inner-walls of duct of deformation part 103g is except being moved by leak stopping cap 103 thrust of generation, the pressure of flowing medium will be to the pressure of deformation part 103g product towards inner-walls of duct in the pipeline, make deformation part 103g further to seal and compress inner-walls of duct, avoid medium to flow to leakage hole from the contacting point between deformation part 103g and the inner-walls of duct.
(6) the leak stopping hat becomes part 103g and compresses leakage hole when inboard in sealing, and its pressure will make tube wall mobile towards the leak stopping lid in the outside, because leak stopping lid 101 is withstood, leak stopping lid 101 compresses leakage hole by Sealing 101c from outer side covers and sealing.Accordingly, in the middle of the outside of leakage hole, leakage hole and inboard three aspects of leakage hole simultaneously leakage hole is finished sealing and plugging.
Example 2
Referring to Fig. 4, leak stopping that this example provides nail 200 comprises that mainly nail bar 204 and leak stopping overlap 205 two-part.The cross section of leak stopping cover 205 is "T"-shaped, and mainly by leak stopping lid 201 be arranged on the leak stopping bar 202 that leak stopping covers and form, leak stopping lid 201 is for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar 202 on it pass leakage hole.Nail bar 204 movably is located in the leak stopping cover along leak stopping bar 202 bearing of trends, its head arranges guide pad 203, when the nail bar moves in the leak stopping cover, guide pad 203 cooperates with the free end 202b of leak stopping bar, drive the free end integral body of leak stopping bar towards inner-walls of duct (namely revealing a mouthful direction) deformation, and make deformations cover leakage hole from interior side compression and the sealing of leakage hole.
This scheme in the specific implementation, the leak stopping lid 201 in the leak stopping cover 205 is used for compressing the outside that covers the seal leakage mouth, it is whole to be the bow body structure, arc shaped surface 201a is used for the operation of outer bound pair leak stopping lid 201 as the fore side of leak stopping lid 201, as roof pressure etc.Because leak stopping lid 201 is positioned at the leakage hole outside, the slick and sly structure of its arc can also effectively be avoided the problem (as, the scuffing that is caused by corner angle, problem such as puncture) of the damage that other structure (as square, polygonal etc.) causes on-the-spot other parts of leak stopping easily.But leak stopping lid 201 is not limited to this structure.
The plane 201b of the leak stopping lid 201 of bow body structure is used for living whole leakage hole and peripheral part thereof from outer side covers when leak stopping as the coverage rate 201b of leak stopping lid.
In order to guarantee that leak stopping lid 201 covers and the sealing effect in the seal leakage mouth outside, coverage rate 201b is provided with a sealed member 201c, joins by the sealing between sealing parts 201c realization coverage rate 201b and leakage hole and the peripheral part thereof.
For the layer that is bonded and sealed that sealing parts 201c specifically can adopt some sealers or other sealing compound to constitute, specifically decide according to the material of pipeline and medium and the pressure medium size of Qi Nei, as long as can guarantee to seal the effect of joining.
In order to reach sealing effect, be not limited to adopt the layer that is bonded and sealed, sealed member can adopt seal ring (concrete as rubber ring) to replace the layer that is bonded and sealed.Under the compressing of leak stopping lid 201, can play the effect of enhanced leaktightness equally.
So the leak stopping of structure lid 201 generally can adopt the material with certain deformability to form, can produce corresponding deformation at different pipelines like this, make when leak stopping lid 201 covers sealing, coverage rate 201b on it matches with the pipe shape at leakage hole place, reaches perfect covering sealing.
Leak stopping bar 202 is vertically set on the coverage rate 201b of leak stopping lid 201, and is providing a through hole 202a who runs through leak stopping bar 202 and leak stopping lid 201 along its bearing of trend.This leak stopping bar 202 interts in leakage hole when leak stopping, and produces deformation under pressure, and its free end 202b covers whole leakage hole and peripheral part thereof by deformations in the inboard of leakage hole.
In concrete enforcement, leak stopping bar 202 can adopt the metal material with certain deformation nature to make, and makes leak stopping bar 202 can not rupture when deformation.
In this example, nail bar 204 matches with the through hole 202a that leak stopping is overlapped in 205, and among the whole through hole 202a that movably is located on the leak stopping cover 205, and length is greater than the total length of leak stopping bar 202 with leak stopping lid 201, and the front end at nail bar 204 arranges guide pad 203 simultaneously.Thus, when nail bar 204 is located among the through hole 202a, the free end of nail bar 204 will cover 201 outer side surface from leak stopping and stretch out, follow closely bar 204 from the outside as long as spur like this, the guide pad 203 that nail bar 204 will drive its front end moves towards leakage hole, the free end 202b of guide pad 203 extruding leak stopping bars 202, by leading role, make the whole deformation that the free end 202b of leak stopping bar 202 (namely reveals a mouthful direction) along the guide surface 203a generating plane of guide pad 203 to inner-walls of duct, thereby cover whole leakage hole and peripheral part thereof by deformations in the inboard of leakage hole.
This guide pad 203 is specially the bicone structure that a bottom surface joins, and the shape of two cones in this bicone structure is not necessarily identical, can require to decide according to reality.The top of upper cone 203c joins with nail bar 204 in the guide pad 203 of this bicone structure, and its conical surface 203a is used for the free end 202b of leak stopping bar is cooperated as the guide surface 203a of guide pad 203.Because guide surface 203a is the conical surface with certain angle of inclination, when guide pad 203 in the leakage hole moving process, the top of guide surface 203a at first enters into the inside of leak stopping bar free end 202b, and contacts with free end 202b inwall; Along with guide pad 203 continues mobilely, guide surface 203a will push the inside of leak stopping bar free end 202b gradually, and the inside of free end 202b is applied one towards the extruding force that increases gradually in the outside; Along with guide pad 203 continues mobile, this extruding force will increase gradually, then can drive the whole outwards deformation of extruding leak stopping bar free end 202b, because guide surface 203a is the conical surface of gradual change, it can contact all around simultaneously with free end 202b inwall, then can be to applying the extruding force of identical gradual change around the free end 202b inwall simultaneously, thereby make that leak stopping bar free end 202b can whole outwards deformation simultaneously, and can not rupture, form the deformations 202c(of a ring-type as shown in Figure 6).
Along with the continuous movement of guide pad 203, deformations 202c will become greatly and gradually gradually and move towards leakage hole, until the inner side surface contact of deformations 202c and compress pipe inner wall.
When guide pad 203 displacement distances reached maximum, it is maximum that the deformation of leak stopping bar free end 202b will reach, and its deformations 202c will cover whole leakage hole and peripheral part thereof in interior side compression and the sealing of leakage hole.
The concrete angle of this guide surface 203a can be decided according to the actual requirements, and adopts arc transition between guide surface 203a and nail bar 204 outer side surfaces, here with guide surface 203a and leak stopping bar free end 202b between cooperate.
Lower cone 203d in the guide pad 203 of bicone structure is as the end of assigning of whole leak stopping nail, and lower cone 203d Extreme breadth (being the Extreme breadth of guide pad 203) from the bottom up is slightly larger than the external diameter of leak stopping bar 202, make leak stopping bar 202 directly to assign in the leakage hole with lower cone 203d, and leakage hole can be followed closely integral body with leak stopping very easily by the conical surface 203b on the lower cone 203d like this and assign in the leakage hole the obstruct of leak stopping bar 202.
Be generally cone for the cone in the guide pad 203 of bicone structure, also can adopt other multiaspect cones as required.
When the leak stopping nail 200 that utilizes such scheme to form carried out leak stopping, concrete operating procedure was as follows:
(1) will follow closely bar 204 is located among the through hole 202a on the leak stopping cover 205, and the free end of nail bar 204 will cover 201 outer side surface from leak stopping and stretch out, make the guide pad 103 of nail bar 204 front ends overlap leak stopping bar 202 corresponding matching in 205 with leak stopping, finish the assembling of leak stopping nail thus.
(2) leak stopping being followed closely integral body assigns in the leakage hole 301, make leak stopping bar 202 pass leakage hole 301 together with the guide pad 203 on the nail bar 204, leak stopping on leak stopping bar 202 lid 201 contacts with the outer side wall of pipeline 300, realization is from outer side covers and seal up leakage hole 301(as shown in Figure 5), leak stopping this moment bar 202 assigns in the leakage hole 301, its outer side wall will fully push the inwall of leakage hole 301, blocks in leakage hole 301.
(3) withstand leak stopping lid 201 towards leakage hole, make leak stopping lid 201 by the outside that Sealing 201c compresses pipeline 300, avoid its back side leakage hole to move.
(4) spur nail bar 204 outside the lateral, nail bar 204 will drive guide pad 203 and move towards leakage hole 301.
(5) referring to Fig. 6, in the moving process, when the guide surface 203a of guide pad 203 contacts cooperation with the free end 202b of leak stopping bar, to apply the extruding force towards leakage hole to the free end 202b of leak stopping bar, under the leading role of guide surface, produce towards inner-walls of duct (namely revealing a mouthful direction) open deformation and can not rupture making that the free end 202b of leak stopping bar is whole; After the deformation part 202c of this generation deformation reaches certain length, the inner-walls of duct around the leakage hole be will push down, thereby whole leakage hole and peripheral part thereof covered, when acquiring a certain degree, pressure will form sealing; In this process, the pressure of the inner-walls of duct of deformation part 202c is except deformation power, the pressure of flowing medium will be to the pressure of deformation part 202c product towards inner-walls of duct in the pipeline, make deformation part 202c further to seal and compress inner-walls of duct, avoid medium to flow to leakage hole from the contacting point between deformation part 202c and the inner-walls of duct.
(6) the leak stopping hat becomes part 202c when sealing compresses the leakage hole inboard, its pressure will make tube wall move towards the leak stopping lid 201 in the outside, because leak stopping lid 201 is by the top, leak stopping lid 201 compresses leakage hole by Sealing 201c from outer side covers and sealing.Accordingly, in the middle of the outside of leakage hole, leakage hole and inboard three aspects of leakage hole simultaneously leakage hole is finished sealing and plugging.
According to the characteristics of above-mentioned example, it in use has the following advantages:
1, can be to the online leak stopping of carrying out of the leakage of hard pipelines such as soft pipelines such as fire-extinguisher water hose and metal tubes, practical.
2, leakage-baffling device simple in structure, be easy to produce.
3, operation is extremely simple, only needs " one insert, a top, take out ", can realize the leak stopping to leakage hole, can realize fast various leakage pipelines are carried out online leak stopping.
4, reliability height effectively stops ducted medium to leak from leakage hole, guarantees plugging effect.
More than show and described basic principle of the present invention, major character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that describes in above-described embodiment and the specification just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (14)

1. a fire-extinguisher water hose is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described leak stopping nail assigns in the leakage hole, and the nail bar on it and leak stopping cover cooperate and produce deformation and compress simultaneously from the inside and outside both sides of leakage hole and seal up leakage hole, thereby block leakage hole.
2. a kind of fire-extinguisher water hose according to claim 1 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described leak stopping nail comprises driving uses nail bar and leak stopping cover, described leak stopping cover is for by the leak stopping lid be arranged on the "T"-shaped leak stopping cover that leak stopping bar that leak stopping covers forms, described leak stopping lid is used for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar on it pass leakage hole; Described nail bar movably is located in the leak stopping cover along leak stopping bar bearing of trend, its front end sleeve is provided with the leak stopping cap, when the nail bar moves in the leak stopping cover, leak stopping bar in leak stopping cap and the leak stopping cover cooperates, the port sidewall blocking of leak stopping cap is leaked bar and is driven integral body towards revealing direction deformation, and described deformation sidewall covers leakage hole from interior side compression and the sealing of leakage hole.
3. a kind of fire-extinguisher water hose according to claim 2 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that described leak stopping cover is provided with sealed member.
4. a kind of fire-extinguisher water hose according to claim 3 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described sealed member is the layer or for being set in the seal ring on the leak stopping bar of being bonded and sealed that is arranged on the leak stopping lid coverage rate.
5. a kind of fire-extinguisher water hose according to claim 2 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, the arranged outside of described leak stopping bar has the leak stopping hat to become device; The degree of depth of described leak stopping cap becomes length between the device greater than leak stopping bar free end to leak stopping hat.
6. a kind of fire-extinguisher water hose according to claim 5 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described leak stopping bar comprises the leak stopping section of back segment and the mobile section of leading portion, the external diameter of described mobile section is less than the leak stopping section, carry out transition by arc transiting surface between the two, described arc transiting surface constitutes the leak stopping hat and becomes device.
7. a kind of fire-extinguisher water hose according to claim 6 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that the end face of described leak stopping cap port is the arc shaped surface that cooperates with arc transiting surface.
8. press the instantaneous leaking-stopping nail according to claim 2 or 7 described a kind of fire-extinguisher water hoses at tape, it is characterized in that the top of described leak stopping cap is cone.
9. a kind of fire-extinguisher water hose according to claim 1 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described leak stopping nail comprises driving uses nail bar and leak stopping cover, described leak stopping cover is for by the leak stopping lid be arranged on the "T"-shaped leak stopping cover that leak stopping bar that leak stopping covers forms, described leak stopping lid is used for compressing and seal the outside that covers leakage hole, and makes the leak stopping bar on it pass leakage hole; Described nail bar movably is located in the leak stopping cover along leak stopping bar bearing of trend, its head arranges guide pad, when the nail bar moves in the leak stopping cover, guide pad cooperates with the free end of leak stopping bar, drive the free end integral body of leak stopping bar towards revealing direction deformation, described deformation part covers leakage hole from interior side compression and the sealing of leakage hole.
10. a kind of fire-extinguisher water hose according to claim 9 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that the guide surface of described guide pad is the conical surface.
11. a kind of fire-extinguisher water hose according to claim 9 is pressed the instantaneous leaking-stopping nail at tape, it is characterized in that, described leak stopping nail comprises that also a Sealing, described Sealing are located on the nail bar, and between clamping sleeve and guide pad.
12. instantaneous leaking-stopping method, it is characterized in that, described blocking method is by assigning into the leak stopping nail in the leakage hole, and make nail bar and leak stopping cover on it cooperate generation deformation, cooperated from the inside and outside both sides of leakage hole with the lateral part that is positioned at the leakage hole outside by deformations to compress and to seal up leakage hole simultaneously, thereby block leakage hole.
13. a kind of instantaneous leaking-stopping method according to claim 12 is characterized in that described blocking method comprises the steps:
(1) leak stopping nail is interted in leakage hole, in making leak stopping bar in the leak stopping nail assign into to reveal mouthful and the leak stopping cap on the nail bar be positioned at the inboard of leakage hole;
(2) outwards extract the nail bar from the leak stopping tops, withstand the leak stopping lid towards leakage hole simultaneously;
(3) nail bar pulling leak stopping cap moves towards leakage hole, and the leak stopping bar drives the port sidewall integral body of leak stopping cap towards the deformation of leakage direction, and makes the covering of deformation sidewall and sealing compress the inboard of leakage hole;
(4) leak stopping hat change sidewall seals when compressing the leakage hole inboard, and leakage hole is pressed to the leak stopping lid, makes the leak stopping lid also seal from outer side covers and compresses leakage hole.
14. a kind of instantaneous leaking-stopping method according to claim 12 is characterized in that described blocking method comprises the steps:
(11) leak stopping nail is interted in leakage hole, in making leak stopping bar in the leak stopping nail assign into to reveal mouthful and the guide pad on the nail bar be positioned at the inboard of leakage hole;
(12) outwards extract the nail bar from the leak stopping tops, withstand the leak stopping lid towards leakage hole simultaneously;
(13) nail bar pulling guide pad moves towards leakage hole, and guide pad drives the free end integral body of leak stopping bar towards the deformation of leakage direction, and makes deformations cover leakage hole from interior side compression and the sealing of leakage hole;
When (14) sealing of leak stopping bar deformations compresses the leakage hole inboard, leakage hole is pressed to the leak stopping lid, make the leak stopping lid compress leakage hole from outer side covers and sealing.
CN201310210750.7A 2013-05-30 2013-05-30 A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass Expired - Fee Related CN103267200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310210750.7A CN103267200B (en) 2013-05-30 2013-05-30 A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310210750.7A CN103267200B (en) 2013-05-30 2013-05-30 A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass

Publications (2)

Publication Number Publication Date
CN103267200A true CN103267200A (en) 2013-08-28
CN103267200B CN103267200B (en) 2016-11-02

Family

ID=49010843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310210750.7A Expired - Fee Related CN103267200B (en) 2013-05-30 2013-05-30 A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass

Country Status (1)

Country Link
CN (1) CN103267200B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255204A (en) * 2017-07-25 2017-10-17 上海安宏建设工程有限公司 A kind of non-stop plugging technique leaked for gas pipeline crack formula
CN110925518A (en) * 2019-12-13 2020-03-27 东营市品尚石油科技有限公司 Quick wedge type leakage-stopping power assisting device
CN112610796A (en) * 2021-01-22 2021-04-06 庞长青 Bolt for blocking blind hole of water pipe in wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3949461A (en) * 1971-10-28 1976-04-13 A/S E. Rasmussen Methods for joining insulated pipe lengths
JPH083992A (en) * 1994-06-24 1996-01-09 Moriya Koki Kk Method for closing hole of pipe material and plug structure for pipe material
CN1392929A (en) * 2000-09-13 2003-01-22 好孩子控股公司 Blind fastener and drive nut assembly
CN101255941A (en) * 2007-02-08 2008-09-03 袁志明 Leak-proof expansible plug
JP2010007724A (en) * 2008-06-25 2010-01-14 Kansai Electric Power Co Inc:The Method for repairing fluid leakage section
CN203336136U (en) * 2013-05-30 2013-12-11 公安部上海消防研究所 On-line under-pressure quick leaking stoppage nail for fire hose

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3949461A (en) * 1971-10-28 1976-04-13 A/S E. Rasmussen Methods for joining insulated pipe lengths
JPH083992A (en) * 1994-06-24 1996-01-09 Moriya Koki Kk Method for closing hole of pipe material and plug structure for pipe material
CN1392929A (en) * 2000-09-13 2003-01-22 好孩子控股公司 Blind fastener and drive nut assembly
CN101255941A (en) * 2007-02-08 2008-09-03 袁志明 Leak-proof expansible plug
JP2010007724A (en) * 2008-06-25 2010-01-14 Kansai Electric Power Co Inc:The Method for repairing fluid leakage section
CN203336136U (en) * 2013-05-30 2013-12-11 公安部上海消防研究所 On-line under-pressure quick leaking stoppage nail for fire hose

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255204A (en) * 2017-07-25 2017-10-17 上海安宏建设工程有限公司 A kind of non-stop plugging technique leaked for gas pipeline crack formula
CN110925518A (en) * 2019-12-13 2020-03-27 东营市品尚石油科技有限公司 Quick wedge type leakage-stopping power assisting device
CN110925518B (en) * 2019-12-13 2024-03-12 中国石油化工股份有限公司 Use method of quick wedge type leakage-stopping booster
CN112610796A (en) * 2021-01-22 2021-04-06 庞长青 Bolt for blocking blind hole of water pipe in wall
CN112610796B (en) * 2021-01-22 2022-09-23 郴州德隆带压堵漏工程有限公司 Bolt for blocking blind hole of water pipe in wall

Also Published As

Publication number Publication date
CN103267200B (en) 2016-11-02

Similar Documents

Publication Publication Date Title
CN103267200A (en) Fire hose on-line under-pressure quick leaking stoppage nail and quick leaking stoppage method
CN106090217A (en) Interior swollen plugging device
CN203336136U (en) On-line under-pressure quick leaking stoppage nail for fire hose
CN206958487U (en) A kind of sealer under pressure applied to oil-gas pipeline
CN103822046A (en) Online rapid pressurized leaking stoppage device and method for bound type fire hose
CN203797251U (en) Binding-type online quick under-pressure leaking stoppage device for fire hose
CN109915676A (en) Pipe connecting structure
CN104608893B (en) Irregular hole leaking stoppage device
JPS5995962A (en) Pig for repairing inside surface of installed pipe
CN105716805B (en) A kind of closure detection device
CN107166166B (en) A kind of method and device for the leakage of non-stop plugging sand holes
CN205172893U (en) Mixed type inflater
CN203623943U (en) Irregular hole plugging device
CN105757056B (en) A kind of sealed leakage detector
CN204677157U (en) Three stifled two note hole sealing devices
CN205065100U (en) Clamping pressing type antiseep connecting piece and heating system
CN202974580U (en) Hose tightness testing device
CN204371188U (en) Polish rod seal device
CN110453811A (en) Construction wall structure
KR101769698B1 (en) Pneumatic shock absorber
CN105699024B (en) Test machine is pressurized in a kind of
CN105841897B (en) A kind of performing leak test machine
CN208004237U (en) U-shaped cavity body and dispensing needle cylinder device
CN105823609B (en) A kind of air-tightness quality inspection equipment
CN207470149U (en) A kind of external casing packer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102

Termination date: 20170530