CN103267200B - A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass - Google Patents
A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass Download PDFInfo
- Publication number
- CN103267200B CN103267200B CN201310210750.7A CN201310210750A CN103267200B CN 103267200 B CN103267200 B CN 103267200B CN 201310210750 A CN201310210750 A CN 201310210750A CN 103267200 B CN103267200 B CN 103267200B
- Authority
- CN
- China
- Prior art keywords
- leak stopping
- leakage hole
- nail
- bar
- leak
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
- Building Environments (AREA)
Abstract
The invention discloses a kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass, this leak stopping nail assigns in leakage hole, nail rod thereon and leak stopping set cooperation generation deformation compress from the inside and outside both sides of leakage hole simultaneously and seal up leakage hole, thus block leakage hole.Present configuration is simple, and is capable of the quickly online leak stopping of soft pipeline.
Description
Technical field
The present invention relates to a kind of pipe plugging technology, be specifically related to a kind of online pipe plugging technology.
Background technology
Fire hose is fire brigade's important equipment of conveying extinguishing medium when putting out a fire, at fire fighting and rescue
In play vital effect.In fire fighting, fire hose usually can because of material ageing or
Run into the sharp weapon such as hard thrust and be scratched, phenomenon that is damaged and that leak occurs.And seepage under high pressure
Fire fighting and rescue is not only adversely affected by the water gone out, it is more likely that can lead to grave consequences.Especially at fire
Calamity rescue site, once rupturing occurs in mains water band, and will directly affect front court and supply water, the water band more renewed
Needing to stop water pump, waste the plenty of time, this is very can not for the fire fighting and rescue seized every minute and second
Take.At this moment it is accomplished by a kind of on the premise of not stopping supplying water, the method for closure water band leakage hole.
At present, the most frequently used on-the-spot craft leakage mending method, is to use strap to be wound tying up at the place of leaking, or
Person uses two-sided fastening adhesive tape to bond, but these method effects are unsatisfactory.Owing to fire hose is
Operation under wet-out conditions, binding agent its cementitiousness under the influence of water stain can be had a greatly reduced quality, and adds water
Pressing higher, this quadrat method is little to realize mending-leakage effect, and the most above-mentioned various methodologies all can not be good
Solve this problem.
For above-mentioned problem, it is proposed the device of some online leak stopping, but these devices are all
There is structure complexity, the problem of complex operation, when using these online device for plugging to carry out leak stopping, need
Spend the longer time, it is impossible to enough quickly in time soft pipeline or water band are carried out leak stopping.
Summary of the invention
The present invention is directed to existing pipe plugging technology and cannot realize the problem of leak stopping the quickest, effective, and
A kind of online Quick leaking stoppage nail with pressure of fire hose is provided.The operation of this leak stopping pin structure is the most convenient, energy
Enough within the shortest time, water band or soft pipeline are carried out online leak stopping.
As the second object of the present invention, the present invention also provides for a kind of fast blockage side based on leak stopping nail
Method.It is capable of soft pipeline or hard pipeline carry out the most online leak stopping.
In order to achieve the above object, the present invention adopts the following technical scheme that:
A kind of online Quick leaking stoppage nail with pressure of fire hose, described leak stopping nail assigns in leakage hole, on it
Nail rod and leak stopping set coordinate and produce deformation and compress from the inside and outside both sides of leakage hole simultaneously and seal up leakage
Mouthful, thus block leakage hole.
In a preferred embodiment of leak stopping nail, described leak stopping nail includes driving nail rod and leak stopping set, institute
State leak stopping set for by leak stopping lid be arranged on the "T"-shaped leak stopping set that the leak stopping bar that leak stopping covers is formed, described
Leak stopping lid covers the outside of leakage hole for compressing and sealing, and makes leak stopping bar thereon through leakage
Mouthful;Described nail rod is movably located in leak stopping set along leak stopping bar bearing of trend, and its front end sleeve is provided with stifled
Reduction cap, when nail rod moves in leak stopping is overlapped, the leak stopping bar during leak stopping cap overlaps with leak stopping coordinates, leak stopping cap
Port sidewall blocking leakage bar drive overall towards revealing direction deformation, described deformation sidewall is from leakage hole
Interior side compression sealing cover leakage hole.
Further, described leak stopping puts and is provided with seal member.
Further, described seal member be arranged on leak stopping blanketing capping be bonded and sealed layer or
For being set in the sealing ring on leak stopping bar.
Further, the outside of described leak stopping bar is provided with leak stopping cap deformation apparatus;Described leak stopping cap deep
Degree is more than the length between leak stopping bar free end to leak stopping cap deformation apparatus.
Further, described leak stopping bar includes leak stopping section and the mobile section of leading portion of back segment, described movement
The external diameter of section, less than leak stopping section, carries out transition, described arc transiting surface by arc transiting surface between the two
Constitute leak stopping cap deformation apparatus.
Further, the end face of described leak stopping cap port is the arcwall face coordinated with arc transiting surface.
Further, the top of described leak stopping cap is cone.
In another preferred embodiment of leak stopping nail, described leak stopping nail includes driving nail rod and leak stopping set, institute
State leak stopping set for by leak stopping lid be arranged on the "T"-shaped leak stopping set that the leak stopping bar that leak stopping covers is formed, described
Leak stopping lid covers the outside of leakage hole for compressing and sealing, and makes leak stopping bar thereon through leakage
Mouthful;Described nail rod is movably located in leak stopping set along leak stopping bar bearing of trend, and its head arranges guiding
Block, when nail rod moves in leak stopping is overlapped, guide pad coordinates with the free end of leak stopping bar, drives leak stopping bar
Free end overall towards revealing direction deformation, described deformation part is from the interior side compression of leakage hole and seals
Cover leakage hole.
Further, the spigot surface of described guide pad is the conical surface.
Further, described leak stopping nail also includes that a sealing member, described sealing member are set in nail rod, and
Between clamping sleeve and guide pad.
As the second object of the present invention, a kind of rapid plugging method for fiberglass, described blocking method is by by leak stopping
Nail assigns in leakage hole, and makes nail rod thereon and leak stopping set coordinate generation deformation, by deformations and position
Lateral part cooperation outside leakage hole compresses simultaneously from the inside and outside both sides of leakage hole and seals up leakage
Mouthful, thus block leakage hole.
In a preferred embodiment of blocking method, described blocking method comprises the steps:
(1) leak stopping nail is interspersed in leakage hole so that the leak stopping bar in leak stopping nail assigns into leakage mouth
In and nail rod on leak stopping cap be positioned at the inner side of leakage hole;
(2) outwards extract nail rod from leak stopping tops, withstand leak stopping lid towards leakage hole simultaneously;
(3) nail rod pulls leak stopping cap to move towards leakage hole, and leak stopping bar drives the port sidewall of leak stopping cap
Overall towards revealing direction deformation, and make deformation sidewall cover and seal the inner side compressing leakage hole;
(4), when leak stopping hat becomes inside sidewall sealing compression leakage hole, will leak out mouth and press to leak stopping lid,
Leak stopping lid is made from outer side covers and to seal compression leakage hole.
In another preferred embodiment of blocking method, described blocking method comprises the steps:
(11) leak stopping nail is interspersed in leakage hole so that the leak stopping bar in leak stopping nail assigns into leakage mouth
In and nail rod on guide pad be positioned at the inner side of leakage hole;
(12) outwards extract nail rod from leak stopping tops, withstand leak stopping lid towards leakage hole simultaneously;
(13) nail rod pulls guide pad to move towards leakage hole, and the free end of guide pad driving leak stopping bar is whole
Dignity is to revealing direction deformation, and makes the deformations interior side compression from leakage hole sealing cover leakage
Mouthful;
(14), when leak stopping bar deformations seals and compresses inside leakage hole, will leak out mouth and press to leak stopping lid, make
Obtain leak stopping lid and from outer side covers and seal compression leakage hole.
The simplest according to the leak stopping nail overall structure that such scheme obtains, it is easy to accomplish and operation, only
Need " one insert, a top, one take out ", can realize the leakage hole of water band is carried out leak stopping, and can be quickly real
Now pipeline soft to various leakages carries out online leak stopping.
Total is carried out in terms of three in the middle of the outside of leakage hole, leakage hole and inside leakage hole simultaneously
Leak stopping seal operation, effectively stops the medium in pipeline to leak from leakage hole, it is ensured that plugging effect.
Quit work without pipeline during leak stopping operation, the most do not affect the work of relevant device;Leak stopping operates
Process simply can quickly realize;Ensure that after leak stopping that medium is not revealed, it is ensured that the medium pressure in pipeline
Power is constant, front consistent with revealing;Realize real fast blockage online with pressure.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation of leak stopping nail in present example one;
Fig. 2 is the leak stopping nail preoperative schematic diagram of leak stopping in present example one;
Fig. 3 is the schematic diagram in present example one after the leak stopping operation of leak stopping nail;
Fig. 4 is the structural representation of leak stopping nail in present example two;
Fig. 5 is the leak stopping nail preoperative schematic diagram of leak stopping in present example two;
Fig. 6 is the schematic diagram in present example two after the leak stopping operation of leak stopping nail.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and effect and be readily apparent from
Solve, below in conjunction with being specifically illustrating, the present invention is expanded on further.
Example 1
Seeing Fig. 1, the leak stopping nail 100 that this example provides mainly includes that nail rod 104 and leak stopping overlap 105 liang
Part.The cross section of leak stopping set 105 is "T"-shaped, by leak stopping lid 101 be arranged on leak stopping lid 101
Leak stopping bar 102 forms, and leak stopping lid 101 covers the outside of leakage hole for compressing and sealing, and makes it
On leak stopping bar 102 through leakage hole;And nail rod 104 is movably located in along leak stopping bar bearing of trend
In leak stopping set 105, its front end sleeve is provided with leak stopping cap 103, when nail rod moves in leak stopping is overlapped, and leak stopping
Leak stopping bar during cap 103 and leak stopping are overlapped coordinates, the port sidewall blocking leakage bar of leak stopping cap drive entirety towards
Inner-walls of duct (i.e. revealing mouth direction) deformation, this deformation sidewall covers from interior side compression the sealing of leakage hole
Cover leakage hole.
In the specific implementation, the leak stopping lid 101 in leak stopping set 105 is used for covering sealing leak the program
Mouthful outside, it generally bends body structure, and arcwall face 101a, as the operating surface of leak stopping lid 101, uses
In the operation of outer bound pair leak stopping lid 101, as pressed pressure etc..Leak stopping lid 101 is positioned at outside leakage hole, its arc
It is easily existing to leak stopping that the round and smooth structure of shape can also be prevented effectively from other structure (such as square, polygon etc.)
The problem of the damage that other parts cause problems such as (scuffing that e.g., corner angle causes) puncturing.
Plane 101b of the leak stopping lid 101 of bow body structure is as the coverage rate 101b of leak stopping lid, in leak stopping
Time for living whole leakage hole and peripheral part thereof from outer side covers.
In order to ensure the sealing effectiveness outside leak stopping lid 101 covering sealing leak mouth, at coverage rate 101b
On be provided with a seal member 101c, realize coverage rate 101b and leakage hole by this seal member 101c
And the sealing between peripheral part connects.
Some fluid sealants or the bonding of other sealant composition specifically can be used for this seal member 101c
Sealant 101c, depending on the material of pipeline and the medium of Qi Nei and pressure medium size, only
Ensure that and seal the effect connected.
In order to reach sealing effectiveness, seal member 101c is not limited to employing and is bonded and sealed a layer 101c, can
Sealing ring (concrete such as rubber ring) is used to replace layer 101c that be bonded and sealed.Compression at leak stopping lid 101
Under, the effect strengthening sealing can be played equally.
So leak stopping lid 101 of structure typically can use the material with certain deformability to be formed, so
Corresponding deformation can be produced so that leak stopping lid 101 covers when sealing, thereon for different pipelines
Coverage rate 101b matches with the pipe shape at leakage hole, reaches perfectly to cover sealing.
Leak stopping cap 103, for through leakage hole, is sent into the inner side of leakage hole by leak stopping bar 102, and can
When leak stopping cap 103 moves towards leakage hole, the port sidewall of leak stopping cap 103 is produced overall outside
Deformation power.
This leak stopping bar 102 is vertically set on the coverage rate 101b of leak stopping lid 101, and is prolonging along it
Stretch and on direction, provide a through hole 102a running through leak stopping bar 102 and leak stopping lid 101.This leak stopping bar 102
Mainly include that rear end near leak stopping section 102b of coverage rate 101b and stretches out along leak stopping section 102b
Mobile section 102c, wherein leak stopping section 102b for leak stopping time assign into leakage mouth in, leakage hole is entered
Row directly preliminary leak stopping, be generally higher than for the length of this leak stopping section 102b bond on leak stopping lid 101 close
The thickness of sealing 101c and pipeline wall thickness sum.
Mobile section 102c on leak stopping bar 102 is for coordinating with leak stopping cap 103, to leak stopping cap 103
Move and guide so that leak stopping cap 103 moves along mobile section 102c.Outside this mobile section 102c
Footpath is less than leak stopping section 102b, and transition structure 102d between the two, as leak stopping cap deformation apparatus, is used for
The port sidewall 103b of leak stopping cap 103 is produced entirety towards inner-walls of duct (i.e. revealing mouth direction)
Deformation power so that the port sidewall 103b entirety deformation laterally of leak stopping cap 103 is opened.
In order to reach stable deformation effects, on leak stopping bar 102 mobile section 102c and leak stopping section 102b it
Between transition structure 102d be an arc transiting surface, by the round and smooth progressive formation of arc transiting surface, both
Ensure the reliability of leak stopping cap 103 sidewall deformation, the most convenient to operate.
In this example, nail rod 104 matches with the through hole 102a in leak stopping set 105, and entirety can be moved
In the dynamic through hole 102a being located on leak stopping set 105, and length is more than leak stopping bar 102 and leak stopping lid
The total length of 101.The front end of nail rod 104 is arranged on leak stopping cap 103 103a bottom arrangement notch 103d
Centre position, be achieved in drive the leak stopping cap 103 mobile section 102c along leak stopping bar 102 move.
When nail rod 104 is located in through hole 102a, the free end of nail rod 104 is by outside leak stopping lid 101
Side is stretched out, as long as so pull nail rod 104 from outside, nail rod 104 will drive the leak stopping cap of its front end
103 move towards leakage hole so that leak stopping cap 103 is set on the mobile section 102c of leak stopping bar 102 also
Mobile section 102c moves.
Leak stopping cap 103 is set on the free end of nail rod 104, and it is covered in the inner side of leakage hole by deformation
Cover whole leakage hole and peripheral part thereof.
This leak stopping cap 103 is the most cylindrical, and centre has arrangement notch 103d.Outside leak stopping cap 103
Footpath is identical with the external diameter of leak stopping section 102b on leak stopping bar 102, the internal diameter of median slot 103d and leak stopping
The external diameter of the mobile section 102c on bar 102 is identical, is so set in leak stopping bar 102 when leak stopping cap 103
Mobile section 102c on time, the outermost surface 102e(i.e. leak stopping of its lateral surface 103e and leak stopping bar 102
The lateral surface of section 102b) flush, it is simple to leak stopping bar 102 assigns in leakage hole, also avoids external diameter not
Secondary is caused to destroy with to leak stopping mouth.The internal diameter of leak stopping cap 103 median slot 103d is with stifled as required
The external diameter of the mobile section 102c on leakage bar 102 can differ.
In order to ensure that the sidewall 103b of the leak stopping cap 103 arc transiting surface 102d on leak stopping bar 102 drives
Kinetic energy enough deforms upon, and the degree of depth (i.e. disposing the degree of depth of notch 103d) of this leak stopping cap 103 is more than stifled
Leakage bar 102 enters into the length inside leakage hole, it is ensured that leak stopping cap 103 is along mobile section 102c towards letting out
There is when leak moves sufficiently long stroke so that the sidewall 103b of leak stopping cap 103 port can be with
Arc transiting surface 102d contact on leak stopping bar 102, overall product under the effect of arc transiting surface 102d
Dough is to the deformation of inner-walls of duct (i.e. revealing mouth direction), and the part deformed upon can cover whole
Individual leakage hole and peripheral part thereof.
The end face 103f of leak stopping cap 103 port is designed to the arcwall face matched with arc transiting surface 102d,
So when both contact, by both cooperations so that leak stopping cap 103 sidewall is more prone to shape
Become, and reliable and stable, it is to avoid leak stopping cap 103 sidewall 103b ruptures.
Meanwhile, the top 103c of leak stopping cap 103 is designed to a vertebral body structure, is so easy to leakage
Mouthful assign operation.
Owing to needing to produce certain deformation when leak stopping cap 103 works, its entirety can use has a setting
The material of degeneration energy is made.
When the leak stopping nail 100 utilizing such scheme to be formed carries out leak stopping, concrete operating procedure is as follows:
(1) nail rod 104 is located in leak stopping set 105 on through hole 102a in, and nail rod 104 from
To be stretched out from the lateral surface of leak stopping lid 101 by end so that the leak stopping cap 103 of nail rod 104 front end is set in
In leak stopping set 105 on the mobile section 102c of leak stopping bar 102, thus complete the assembling of leak stopping nail.
(2) leak stopping is followed closely entirety and assign in leakage hole 301 so that leak stopping bar 102 is together with being set in
Leak stopping cap 103 thereon together through leakage hole 301, until the leak stopping lid 101 on leak stopping bar 102 with
Pipeline 300 lateral wall contact, it is achieved from outer side covers and seal up leakage hole 301(as shown in Figure 2),
Now leak stopping section 102b of leak stopping bar 102 assigns in leakage hole 301, and its lateral wall will be to leakage hole
The inwall of 301 fully extrudes, and blocks in leakage hole 301.
(3) leak stopping lid 101 is withstood towards leakage hole so that leak stopping lid 101 is pressed by sealing member 101c
The outside of tight pipeline 300, it is to avoid its back side leakage hole moves.
(4) pulling out nail rod 104 from outside, nail rod 104 will drive leak stopping cap 103 along leak stopping bar
Mobile section 102c on 102 moves to leakage hole 301, until the top of mobile section 102c reaches leak stopping
The bottom 103a of cap 103.
(5) Fig. 3 is seen, in moving process, when sidewall 103b and the leak stopping of leak stopping cap 103 port
Arc transiting surface 102d contact on bar 102, overall generation face under the effect of arc transiting surface 102d
The deformation opened to inner-walls of duct (i.e. reveal mouth direction) and will not rupturing;When this deforms upon
After deformation part 103g reaches certain length, it will push down the inner-walls of duct of leakage hole surrounding, thus
Cover whole leakage hole and peripheral part thereof, when pressure reaches to a certain degree, formation is sealed;Process
In, deformation part 103g to the pressure of inner-walls of duct except moved by leak stopping cap 103 generation thrust it
Outward, in pipeline, the pressure of flow media is by producing the pressure towards inner-walls of duct to deformation part 103g, makes
Obtain deformation part 103g and can further seal compression inner-walls of duct, it is to avoid medium is from deformation part
Contact position between 103g and inner-walls of duct flows to leakage hole.
(6) leak stopping hat change part 103g is when sealing inside compression leakage hole, and its pressure will make
Duct wall moves towards the leak stopping lid in outside, and owing to leak stopping lid 101 is withstood, leak stopping lid 101 is by close
Sealing 101c is from outer side covers and seals compression leakage hole.Accordingly, from the outside of leakage hole, leakage hole
In the middle of and leakage hole inside three aspects leakage hole is completed sealing and plugging simultaneously.
Example 2
Seeing Fig. 4, the leak stopping nail 200 that this example provides mainly includes that nail rod 204 and leak stopping overlap 205 liang
Part.The cross section of leak stopping set 205 is "T"-shaped, mainly by leak stopping lid 201 be arranged on leak stopping and cover
Leak stopping bar 202 formed, leak stopping lid 201 covers the outside of leakage hole for compressing and sealing, and makes
Leak stopping bar 202 thereon is through leakage hole.Nail rod 204 is movably worn along leak stopping bar 202 bearing of trend
Being located in leak stopping set, its head arranges guide pad 203, when nail rod moves in leak stopping is overlapped, and guide pad
203 coordinate with the free end 202b of leak stopping bar, and the free end driving leak stopping bar is overall towards inner-walls of duct
(i.e. revealing mouth direction) deformation, and make the deformations interior side compression from leakage hole sealing cover and let out
Leak.
In the specific implementation, the leak stopping lid 201 in leak stopping set 205 covers sealing for compression to the program
The outside of leakage hole, it generally bends body structure, arcwall face 201a as the operating surface of leak stopping lid 201,
For the operation of outer bound pair leak stopping lid 201, such as top pressure etc..Owing to leak stopping lid 201 is positioned at outside leakage hole,
The round and smooth structure of its arc can also be prevented effectively from other structure (such as square, polygon etc.) easily to stifled
The problem of the damage that leakage other parts on-the-spot cause problems such as (scuffing that e.g., corner angle causes) puncturing.
But leak stopping lid 201 is not limited to this structure.
Plane 201b of the leak stopping lid 201 of bow body structure is as the coverage rate 201b of leak stopping lid, in leak stopping
Time for living whole leakage hole and peripheral part thereof from outer side covers.
In order to ensure the sealing effectiveness outside leak stopping lid 201 covering sealing leak mouth, at coverage rate 201b
On be provided with a seal member 201c, realize coverage rate 201b and leakage hole by this seal member 201c
And the sealing between peripheral part connects.
Some fluid sealants or the bonding of other sealant composition specifically can be used for this seal member 201c
Sealant, depending on the material of pipeline and the medium of Qi Nei and pressure medium size, if energy
Enough guarantee seals the effect connected.
In order to reach sealing effectiveness, however it is not limited to using the layer that is bonded and sealed, seal member can use sealing ring
(concrete such as rubber ring) replaces the layer that is bonded and sealed.Under the compression of leak stopping lid 201, can rise equally
To the effect strengthening sealing.
So leak stopping lid 201 of structure typically can use the material with certain deformability to be formed, so
Corresponding deformation can be produced so that leak stopping lid 201 covers when sealing, thereon for different pipelines
Coverage rate 201b matches with the pipe shape at leakage hole, reaches perfectly to cover sealing.
Leak stopping bar 202 is vertically set on the coverage rate 201b of leak stopping lid 201, and is extending along
A through hole 202a running through leak stopping bar 202 and leak stopping lid 201 is provided on direction.This leak stopping bar 202 exists
Being interspersed in leakage hole during leak stopping, and produce deformation under pressure, its free end 202b passes through shape
Change portion covers whole leakage hole and peripheral part thereof in the inner side of leakage hole.
Being embodied as, leak stopping bar 202 can use the metal material with certain deformation nature to make, and makes
Obtain leak stopping bar 202 will not rupture when deformation.
In this example, nail rod 204 matches with the through hole 202a in leak stopping set 205, and entirety can be moved
In the dynamic through hole 202a being located on leak stopping set 205, and length is more than leak stopping bar 202 and leak stopping lid
The total length of 201, arranges guide pad 203 in the front end of nail rod 204 simultaneously.Thus, when nail rod 204
When being located in through hole 202a, the free end of nail rod 204 will stretch out from the lateral surface of leak stopping lid 201,
As long as so pull nail rod 204 from outside, nail rod 204 will drive the guide pad 203 of its front end towards letting out
Leak moves, and guide pad 203 extrudes the free end 202b of leak stopping bar 202, passes through guide effect so that
The free end 202b of leak stopping bar 202 occurs towards inner-walls of duct (i.e. along the spigot surface 203a of guide pad 203
Reveal mouth direction) overall deformation, thus cover whole leakage by deformations in the inner side of leakage hole
Mouth and peripheral part thereof.
The bicone structure that this guide pad 203 specially one bottom surface connects, two in this bicone structure
The shape of cone is the most identical, can be according to actual requirement depending on.The guide pad 203 of this bicone structure
The top of middle upper cone 203c connects with nail rod 204, and its conical surface 203a is as the guiding of guide pad 203
Face 203a, for coordinating the free end 202b of leak stopping bar.Owing to spigot surface 203a is for having a constant inclination
The conical surface of rake angle, when guide pad 203 is towards in leakage hole moving process, the top of spigot surface 203a
Be first into the inside of leak stopping bar free end 202b, and with free end 202b contact internal walls;Along with leading
Continuing to move to block 203, spigot surface 203a will gradually extrude the inside of leak stopping bar free end 202b, right
The inside of free end 202b applies an extruding force being gradually increased towards outside;Along with guide pad 203
Continuing to move to, this extruding force will be gradually increased, and extruding leak stopping bar free end 202b then can be driven overall
Outwards deformation, owing to spigot surface 203a is the conical surface of gradual change, itself and the surrounding energy of free end 202b inwall
Enough contact simultaneously, then the surrounding of free end 202b inwall can be applied squeezing of identical gradual change simultaneously
Pressure so that leak stopping bar free end 202b can overall the most outwards deformation, and will not rupture,
Form ring-type deformations 202c(as shown in Figure 6).
Continuous along with guide pad 203 is moved, and deformations 202c will become larger and gradually towards leakage
Mouth is mobile, until the medial surface of deformations 202c contacts and compresses pipe inner wall.
When guide pad 203 displacement reaches maximum, the deformation of leak stopping bar free end 202b is up to
Maximum, its deformations 202c by leakage hole interior side compression and seal cover whole leakage hole and
Peripheral part.
The concrete angle of this spigot surface 203a can according to the actual requirements depending on, and spigot surface 203a and nail rod
Use arc transition between 204 lateral surface, here and spigot surface 203a and leak stopping bar free end 202b it
Between cooperation.
Lower cone 203d in the guide pad 203 of bicone structure assigns end as what whole leak stopping was followed closely,
And the Breadth Maximum (i.e. the Breadth Maximum of guide pad 203) that lower cone 203d is from the bottom up is slightly larger than
The external diameter of leak stopping bar 202 so that leak stopping bar 202 can directly assign into leakage hole with lower cone 203d
In, and the obstruct that leakage hole is to leak stopping bar 202, so by the conical surface 203b energy on lower cone 203d
Enough very easily leak stopping is followed closely entirety to assign in leakage hole.
Cone is generally for the cone in the guide pad 203 of bicone structure, as required can also
Use other multiaspect cones.
When the leak stopping nail 200 utilizing such scheme to be formed carries out leak stopping, concrete operating procedure is as follows:
(1) nail rod 204 is located in leak stopping set 205 on through hole 202a in, and nail rod 204 from
To be stretched out from the lateral surface of leak stopping lid 201 by end so that the guide pad 103 of nail rod 204 front end and leak stopping
Leak stopping bar 202 corresponding matching in set 205, thus completes the assembling of leak stopping nail.
(2) leak stopping is followed closely entirety and assign in leakage hole 301 so that leak stopping bar 202 is together with nail rod 204
On guide pad 203 together through leakage hole 301, until the leak stopping lid 201 on leak stopping bar 202 and pipe
Road 300 lateral wall contact, it is achieved from outer side covers and seal up leakage hole 301(as shown in Figure 5),
During now leak stopping bar 202 assigns into leakage hole 301, the inwall of leakage hole 301 will be carried out by its lateral wall
Fully extruding, blocks in leakage hole 301.
(3) leak stopping lid 201 is withstood towards leakage hole so that leak stopping lid 201 is pressed by sealing member 201c
The outside of tight pipeline 300, it is to avoid its back side leakage hole moves.
(4) pulling out nail rod 204 from outside, nail rod 204 will drive guide pad 203 towards leakage hole
301 move.
(5) Fig. 6 is seen, in moving process, when spigot surface 203a and the leak stopping bar of guide pad 203
When free end 202b contact coordinates, the free end 202b of leak stopping bar will be applied the extruding towards leakage hole
Power, under the guide effect of spigot surface, produces the free end 202b entirety making leak stopping bar towards pipe
Deformation that road inwall (i.e. reveal mouth direction) opens and will not rupturing;When this deformation deformed upon
After part 202c reaches certain length, it will push down the inner-walls of duct of leakage hole surrounding, thus cover
Live whole leakage hole and peripheral part thereof, when pressure reaches to a certain degree, formation is sealed;During Gai,
Deformation part 202c to the pressure of inner-walls of duct in addition to deformation power, the pressure of flow media in pipeline
Deformation part 202c will be produced the pressure towards inner-walls of duct so that deformation part 202c can be further
Sealing compress inner-walls of duct, it is to avoid medium is from the contact position between deformation part 202c and inner-walls of duct
Flow to leakage hole.
(6) leak stopping hat change part 202c is when sealing inside compression leakage hole, and its pressure will make
Duct wall moves towards the leak stopping lid 201 in outside, owing to leak stopping lid 201 is led to by top, leak stopping lid 201
Cross sealing member 201c and from outer side covers and seal compression leakage hole.Accordingly, from the outside of leakage hole, let out
Three aspects complete sealing and plugging to leakage hole simultaneously in the middle of leak and inside leakage hole.
According to the feature of examples detailed above, it in use has the advantage that
1, the carrying out of the leakage of the hard pipelines such as soft pipeline and metal tubes such as fire hose can be existed
Line leak stopping, practical.
2, device for plugging simple in construction, be readily produced.
3, operate extremely simple, only need " one insert, a top, one take out ", can realize leakage hole is blocked up
Leakage, it is possible to quickly realize various leakage pipelines are carried out online leak stopping.
4, reliability is high, effectively stops the medium in pipeline to leak from leakage hole, it is ensured that leak stopping
Effect.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.One's own profession
Skilled person will appreciate that of industry, the present invention is not restricted to the described embodiments, above-described embodiment and explanation
The principle that the present invention is simply described described in book, without departing from the spirit and scope of the present invention,
The present invention also has various changes and modifications, and these changes and improvements both fall within claimed invention model
In enclosing.Claimed scope is defined by appending claims and equivalent thereof.
Claims (13)
1. the online Quick leaking stoppage nail with pressure of fire hose, it is characterised in that described leak stopping nail assigns into
In leakage hole, nail rod thereon and leak stopping set coordinate generation deformation to compress from the inside and outside both sides of leakage hole simultaneously
Sealing covers leakage hole and peripheral part thereof, thus in the middle of the outside of leakage hole, leakage hole and leakage
Inside Kou, three aspects block leakage hole simultaneously;Described leak stopping nail includes driving nail rod and leak stopping set, described
Leak stopping set is for by leak stopping lid be arranged on the "T"-shaped leak stopping set that the leak stopping bar that leak stopping covers is formed, described leak stopping
Lid covers the outside of leakage hole for compressing and sealing, and makes leak stopping bar thereon through leakage hole;Described
Nail rod is movably located in leak stopping set along leak stopping bar bearing of trend, and its front end sleeve is provided with leak stopping cap, works as nail
When bar moves in leak stopping is overlapped, the leak stopping bar during leak stopping cap overlaps with leak stopping coordinates, and the port sidewall of leak stopping cap is subject to
Leak stopping bar drives overall towards revealing direction deformation, and deformation sidewall is from the interior side compression of leakage hole and seals covering
Live leakage hole.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 1, its feature exists
In, described leak stopping puts and is provided with seal member.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 2, its feature exists
It it is the layer or for being set in leak stopping bar of being bonded and sealed being arranged on leak stopping blanketing capping in, described seal member
On sealing ring.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 1, its feature exists
In, the outside of described leak stopping bar is provided with leak stopping cap deformation apparatus;The degree of depth of described leak stopping cap is more than leak stopping bar
Free end is to the length between leak stopping cap deformation apparatus.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 4, its feature exists
In, described leak stopping bar includes leak stopping section and the mobile section of leading portion of back segment, and the external diameter of described mobile section is less than stifled
Leakage section, carries out transition by arc transiting surface between the two, and described arc transiting surface constitutes leak stopping hat and becomes dress
Put.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 5, its feature exists
In, the end face of described leak stopping cap port is the arcwall face coordinated with arc transiting surface.
7., according to the online Quick leaking stoppage nail with pressure of a kind of fire hose described in claim 1 or 6, it is special
Levying and be, the top of described leak stopping cap is cone.
8. the online Quick leaking stoppage nail with pressure of fire hose, it is characterised in that described leak stopping nail assigns into
In leakage hole, nail rod thereon and leak stopping set coordinate generation deformation to compress from the inside and outside both sides of leakage hole simultaneously
Sealing covers leakage hole and peripheral part thereof, thus in the middle of the outside of leakage hole, leakage hole and leakage
Inside Kou, three aspects block leakage hole simultaneously;Described leak stopping nail includes driving nail rod and leak stopping set, described stifled
Leakage set is for by leak stopping lid be arranged on the "T"-shaped leak stopping set that the leak stopping bar that leak stopping covers is formed, described leak stopping lid
Cover the outside of leakage hole for compression sealing, and make leak stopping bar thereon through leakage hole;Described nail
Bar is movably located in leak stopping set along leak stopping bar bearing of trend, and its head arranges guide pad, when nail rod exists
When moving in leak stopping set, guide pad coordinates with the free end of leak stopping bar, drives the free end integral face of leak stopping bar
To revealing direction deformation, deformation part covers leakage hole from interior side compression the sealing of leakage hole.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 8, its feature exists
In, the spigot surface of described guide pad is the conical surface.
A kind of online Quick leaking stoppage nail with pressure of fire hose the most according to claim 8, its feature exists
In, described leak stopping nail also includes that a sealing member, described sealing member are located in nail rod, and is positioned at clamping sleeve and leads
Between block.
11. 1 kinds of rapid plugging method for fiberglass, it is characterised in that described blocking method is by by claim 1-10
According to any one of leak stopping nail assign in leakage hole, and make nail rod thereon and leak stopping set coordinate produce shape
Become, deformations coordinate the inside and outside both sides from leakage hole to compress with the lateral part being positioned at outside leakage hole simultaneously
And seal and cover leakage hole and peripheral part thereof, thus in the middle of the outside of leakage hole, leakage hole and let out
Inside leak, three aspects block leakage hole simultaneously.
12. a kind of rapid plugging method for fiberglass according to claim 11, it is characterised in that described leak stopping
Method comprises the steps:
(1) leak stopping nail is interspersed in leakage hole so that the leak stopping bar in leak stopping nail assigns in leakage mouth
And the leak stopping cap in nail rod is positioned at the inner side of leakage hole;
(2) outwards extract nail rod from leak stopping tops, withstand leak stopping lid towards leakage hole simultaneously;
(3) nail rod pulls leak stopping cap to move towards leakage hole, and the port sidewall of leak stopping bar driving leak stopping cap is whole
Dignity is to revealing direction deformation, and makes deformation sidewall cover and seal the inner side compressing leakage hole;
(4), when leak stopping hat becomes inside sidewall sealing compression leakage hole, will leak out mouth and press to leak stopping lid, make
Obtain leak stopping lid and from outer side covers and seal compression leakage hole.
13. a kind of rapid plugging method for fiberglass according to claim 11, it is characterised in that described leak stopping
Method comprises the steps:
(11) leak stopping nail is interspersed in leakage hole so that the leak stopping bar in leak stopping nail assigns in leakage mouth
And the guide pad in nail rod is positioned at the inner side of leakage hole;
(12) outwards extract nail rod from leak stopping tops, withstand leak stopping lid towards leakage hole simultaneously;
(13) nail rod pulls guide pad to move towards leakage hole, and guide pad drives the free end entirety of leak stopping bar
Towards revealing direction deformation, and the deformations interior side compression from leakage hole sealing is made to cover leakage hole;
(14), when leak stopping bar deformations seals and compresses inside leakage hole, will leak out mouth and press to leak stopping lid so that
Leak stopping lid is from outer side covers and seals compression leakage hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310210750.7A CN103267200B (en) | 2013-05-30 | 2013-05-30 | A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310210750.7A CN103267200B (en) | 2013-05-30 | 2013-05-30 | A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103267200A CN103267200A (en) | 2013-08-28 |
CN103267200B true CN103267200B (en) | 2016-11-02 |
Family
ID=49010843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310210750.7A Expired - Fee Related CN103267200B (en) | 2013-05-30 | 2013-05-30 | A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103267200B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107255204B (en) * | 2017-07-25 | 2019-02-05 | 上海安宏建设工程有限公司 | A kind of non-stop plugging technique for the leakage of gas pipeline crack formula |
CN110925518B (en) * | 2019-12-13 | 2024-03-12 | 中国石油化工股份有限公司 | Use method of quick wedge type leakage-stopping booster |
CN112610796B (en) * | 2021-01-22 | 2022-09-23 | 郴州德隆带压堵漏工程有限公司 | Bolt for blocking blind hole of water pipe in wall |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE790619A (en) * | 1971-10-28 | 1973-02-15 | Rasmussen As E | PROCESS FOR CONSTITUTING INSULATED JOINTS IN A TUBE SHEATH FOR ITS IMPLEMENTATION |
JP2951208B2 (en) * | 1994-06-24 | 1999-09-20 | 守谷鋼機株式会社 | Plug structure for pipe material |
US6454502B1 (en) * | 2000-09-13 | 2002-09-24 | Fairchild Holding Corp. | Blind fastener and drive nut assembly |
CN101255941A (en) * | 2007-02-08 | 2008-09-03 | 袁志明 | Leak-proof expansible plug |
JP2010007724A (en) * | 2008-06-25 | 2010-01-14 | Kansai Electric Power Co Inc:The | Method for repairing fluid leakage section |
CN203336136U (en) * | 2013-05-30 | 2013-12-11 | 公安部上海消防研究所 | On-line under-pressure quick leaking stoppage nail for fire hose |
-
2013
- 2013-05-30 CN CN201310210750.7A patent/CN103267200B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103267200A (en) | 2013-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109869550B (en) | Reducing two-way pipe joint | |
CN103267200B (en) | A kind of online Quick leaking stoppage nail with pressure of fire hose and rapid plugging method for fiberglass | |
CN206831048U (en) | A kind of sea-bottom oil-gas pipeline leaks real-time automatic sealing package leakage device | |
CN105841896A (en) | Device for testing sealing performance of steel plastic pipe | |
CN110206942A (en) | A kind of anti-leak gas pipeline | |
CN206958487U (en) | A kind of sealer under pressure applied to oil-gas pipeline | |
CN207073674U (en) | A kind of crude oil pipeline perforation plugging device | |
CN203336136U (en) | On-line under-pressure quick leaking stoppage nail for fire hose | |
CN203797251U (en) | Binding-type online quick under-pressure leaking stoppage device for fire hose | |
CN109915676A (en) | Pipe connecting structure | |
CN103822046A (en) | Online rapid pressurized leaking stoppage device and method for bound type fire hose | |
CN105716805B (en) | A kind of closure detection device | |
CN208919334U (en) | Connecting sewing sealing device | |
CN104345504B (en) | A kind of method for exhausting of liquid crystal ink jet type coating machine and its nozzle | |
CN104608893A (en) | Irregular hole leaking stoppage device | |
CN204041433U (en) | A kind of plunger and fracturing pump fluid end | |
CN206392669U (en) | Automobile radiators production hydraulic casing roller | |
JP2005324367A (en) | Pipe lining material and its manufacturing method | |
CN105841895B (en) | Joint sealing equipment | |
CN105757056B (en) | A kind of sealed leakage detector | |
CN203623943U (en) | Irregular hole plugging device | |
JP2008168468A (en) | Branched pipe lining material and branched pipe lining technique | |
CN206454865U (en) | A kind of foaming agent filling gun | |
CN204677157U (en) | Three stifled two note hole sealing devices | |
CN206988687U (en) | One kind is used for Oil & Gas Storage pipeline repair-welding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161102 Termination date: 20170530 |