CN103251351A - Slide type arched window cleaning machine - Google Patents
Slide type arched window cleaning machine Download PDFInfo
- Publication number
- CN103251351A CN103251351A CN201310200533XA CN201310200533A CN103251351A CN 103251351 A CN103251351 A CN 103251351A CN 201310200533X A CN201310200533X A CN 201310200533XA CN 201310200533 A CN201310200533 A CN 201310200533A CN 103251351 A CN103251351 A CN 103251351A
- Authority
- CN
- China
- Prior art keywords
- walker
- passive
- window cleaning
- initiatively
- curb girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a slide type arched window cleaning machine, in particular to maintenance equipment which is used for cleaning and maintaining a curtain wall inside a high-rise building and belongs to high-rise building operation. The slide type arched window cleaning machine comprises a first supporting frame and a second supporting frame. A first rail is arranged at the upper end of the first supporting frame, and a driving traveling mechanism is connected on the first rail. A second rail is arranged at the upper end of the second supporting frame, and a driven traveling mechanism is connected on the second rail. The upper end of the driving traveling mechanism and the upper end of the driven traveling mechanism are respectively connected with two ends of an operating platform through bolts, and an electric cabinet is fixed on the operating platform. The operating platform comprises a first side beam, a middle main beam and a second side beam, wherein the two sides of the middle main beam are respectively connected with the first side beam and the second side beam through bolts. The slide type arched window cleaning machine is simple, compact, reasonable, light and attractive in structure, capable of being used for cleaning, installing and maintaining work of the glass curtain wall of an arched corridor structure with limited internal space, convenient to demount, mount and use, stable in operation and high in safe reliability.
Description
Technical field
The present invention relates to a kind of slide formula arch window cleaning equipment, be used for glass curtain wall to arch vestibule structure specifically and carry out clean and maintenance, belong to skyscraper operation service equipment.
Background technology
Window cleaning equipment is a kind of for the plant equipment that cleans, safeguards curtain wall for high rise building glass, and it generally is placed in top or the Architectural Equipment layer of skyscraper.Along with the acceleration propelling of Chinese Urbanization's process, the structure of skyscraper is constantly weeded out the old and bring forth the new.Along with the development of urban construction, the cladding glass of various exotic shapes building is increasing to be occurred, and keeps the neat and artistic for a long time of building curtain wall glass, just must regularly clean and safeguards building curtain wall glass.
Glass curtain wall increasing appearance the in this year of arch vestibule structure, its built-in function space of the glass curtain wall of arch vestibule structure is limited, traditional window cleaning equipment equipment is huge, can't well be competent at for cleaning, installation, the maintenance work of the glass curtain wall of this structure.Therefore, the window cleaning equipment that needs a kind of special use to the glass curtain wall of arch vestibule structure clean, installation, maintenance work.
Summary of the invention
The objective of the invention is to overcome above-mentioned weak point, thereby a kind of slide formula arch window cleaning equipment is provided, can be used in cleaning, installation, the maintenance work of the glass curtain wall of the limited arch vestibule structure in inner space, easy disassembly, structure is lightly attractive in appearance.
According to technical scheme provided by the invention, slide formula arch window cleaning equipment comprises first bracing frame and second bracing frame, connect a plurality of first chemical bolts on first bracing frame, connect a plurality of second chemical bolts on second bracing frame, it is characterized in that: first bracing frame upper end is provided with first track, connects initiatively walking mechanism on first track.Second bracing frame upper end is provided with second track, connects passive walking mechanism on second track.Initiatively walking mechanism and passive walking mechanism upper end are connected the two ends of workbench respectively by bolt, fixing electric cabinet on the workbench.Described workbench comprises first curb girder, middle girder and second curb girder, and middle girder both sides connect first curb girder and second curb girder by bolt respectively.Girder is provided with a plurality of middle foot pedals in the middle of described, and the spacing between a plurality of middle foot pedals equates, guardrail in the middle of connecting on the middle girder.First curb girder is provided with a plurality of first foot pedals, and the spacing between a plurality of first foot pedals equates, connects first side rail on first curb girder.Second curb girder is provided with a plurality of second foot pedals, and the spacing between a plurality of second foot pedals equates, connects second side rail on second curb girder.
Further, first bracing frame is provided with first stiffener.
Further, initiatively walking mechanism comprises initiatively walker, initiatively by clutch shaft bearing the positive transport wheel axle is installed in the walker.The positive transport wheel axle drives rotation by the reducing motor that is fixed on the active walker.Connect positive transport wheel on the positive transport wheel axle, be provided with first spacer ring between positive transport wheel and the active walker.Described active walker both sides connect one first guiding wheel carrier respectively.Initiatively the walker upper end connects initiatively walker upper support pipe, and the upper end welding of active walker upper support pipe is the walker upper backup pad initiatively.
Further, initiatively be provided with initiatively walker stiffener between walker upper support pipe and the active walker upper backup pad.
Further, second bracing frame is provided with second stiffener.
Further, passive walking mechanism comprises passive walker, by second bearing passive live axle is installed in the passive walker, connects passive road wheel on the passive live axle.Be provided with second spacer ring between passive road wheel and the passive walker.Described passive walker both sides connect one second guiding wheel carrier respectively.Passive walker upper end connects passive walker upper support pipe, the passive walker upper backup pad of passive walker upper support pipe upper end welding.
Further, be provided with passive walker stiffener between passive walker upper support pipe and the passive walker upper backup pad.
Further, the angle between middle girder and first curb girder, second curb girder is the obtuse angle.
Compared with the prior art the present invention has the following advantages:
The present invention is simple in structure, compact, reasonable, and structure is lightly attractive in appearance; Can be used in cleaning, installation, the maintenance work of the glass curtain wall of the limited arch vestibule structure in inner space, easy disassembly; Operate steadily the security reliability height.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is A place enlarged drawing among Fig. 1.
Fig. 3 is B place enlarged drawing among Fig. 1.
Fig. 4 is the Working table structure schematic diagram.
Description of reference numerals: 1-first bracing frame, 2-first chemical bolt, 3-first stiffener, 4-second bracing frame, 5-second chemical bolt, 6-second stiffener, 7-first track, 8-second track, 9-is walking mechanism initiatively, 9.1-reducing motor, 9.2-active walker, 9.3-clutch shaft bearing, 9.4-positive transport wheel, 9.5-the first guiding wheel carrier, 9.6-first spacer ring, 9.7-active walker upper support pipe, 9.8-active walker upper backup pad, 9.9-active walker stiffener, 9.10-positive transport wheel axle, the passive walking mechanism of 10-, 10.1-passive road wheel, 10.2-passive walker, 10.3-the second guiding wheel carrier, 10.4-passive live axle, 10.5-second bearing, 10.6-second spacer ring, 10.7-passive walker upper backup pad, 10.8-passive walker stiffener, 10.9-passive walker upper support pipe, the 11-workbench, the 12-electric cabinet, 13-first curb girder, girder in the middle of the 14-, 15-second curb girder, 16-first side rail, guardrail in the middle of the 17-, 18-second side rail, 19-first foot pedal, foot pedal in the middle of the 20-, 21-second foot pedal.
The specific embodiment
Embodiment during following the present invention incites somebody to action by reference to the accompanying drawings is further described:
As shown in Figure 1, the present invention comprises that mainly connecting a plurality of first chemical bolt, 2, the first bracing frames 1 on first bracing frame 1 and second bracing frame, 4, the first bracing frames 1 is fixed on the body of wall by a plurality of first chemical bolts 2.First bracing frame 1 is provided with first stiffener 3, strengthens the support strength of first bracing frame 1 by first stiffener 3.First bracing frame, 1 upper end is provided with and connects initiatively walking mechanism 9 on first track, 7, the first tracks 7.
As shown in Figure 2, described active walking mechanism 9 comprises initiatively walker 9.2, initiatively by clutch shaft bearing 9.3 positive transport wheel axle 9.10 is installed in the walker 9.2.Positive transport wheel axle 9.10 drives rotation by the reducing motor 9.1 that is fixed on the active walker 9.2.Connect positive transport wheel 9.4 on the positive transport wheel axle 9.10, be provided with first spacer ring 9.6 between positive transport wheel 9.4 and the active walker 9.2.Described active walker 9.2 both sides connect one first guiding wheel carrier 9.5 respectively, prevent that by the first guiding wheel carrier 9.5 positive transport wheel 9.4 breaks away from from first track 7.Initiatively walker 9.2 upper ends connect initiatively walker upper support pipe 9.7, and initiatively initiatively walker upper backup pad 9.8 is welded in walker upper support pipe 9.7 upper ends.Initiatively be provided with initiatively walker stiffener 9.9 between walker upper support pipe 9.7 and the active walker upper backup pad 9.8.
Connecting a plurality of second chemical bolt, 5, the second bracing frames 4 on second bracing frame 4 is fixed on the body of wall by a plurality of second chemical bolts 5.Second bracing frame 4 is provided with second stiffener 6, strengthens the support strength of second bracing frame 4 by second stiffener 6.Second bracing frame, 4 upper ends are provided with and connect passive walking mechanism 10 on second track, 8, the second tracks 8.
As shown in Figure 3, described passive walking mechanism 10 comprises passive walker 10.2, by second bearing 10.5 passive live axle 10.4 is installed in the passive walker 10.2, connects passive road wheel 10.1 on the passive live axle 10.4.Be provided with second spacer ring 10.6 between passive road wheel 10.1 and the passive walker 10.2.Described passive walker 10.2 both sides connect one second guiding wheel carrier 10.3 respectively, prevent that by the second guiding wheel carrier 10.3 passive road wheel 10.1 breaks away from from second track 8.Passive walker 10.2 upper ends connect passive walker upper support pipe 10.9, and passive walker upper backup pad 10.7 is welded in passive walker upper support pipe 10.9 upper ends.Be provided with passive walker stiffener 10.8 between described passive walker upper support pipe 10.9 and the passive walker upper backup pad 10.7.
Described first track 7 and second track 8 adopt the I-steel material to make.
Initiatively walking mechanism 9 and passive walking mechanism 10 upper ends are connected the two ends of workbench 11 respectively by bolt.Fixing electric cabinet 12 on the workbench 11, the work of electric cabinet 12 control reducing motors 9.1.
As shown in Figure 4, described workbench 11 comprises first curb girder 13, middle girder 14 and second curb girder 15, middle girder 14 both sides connect first curb girder 13 and second curb girder 15 by bolt respectively, and the angle between middle girder 14 and first curb girder 13, second curb girder 15 is the obtuse angle.
Girder 14 is provided with a plurality of middle foot pedals 20 in the middle of described, and the spacing between a plurality of middle foot pedals 20 equates.Guardrail 17 in the middle of connecting on the middle girder 14.
First curb girder 13 is provided with a plurality of first foot pedals 19, and the spacing between a plurality of first foot pedals 19 equates.Connect first side rail 16 on first curb girder 13.
Second curb girder 15 is provided with a plurality of second foot pedals 21, and the spacing between a plurality of second foot pedals 21 equates.Connect second side rail 18 on second curb girder 15.
Operation principle of the present invention is: workbench 11 of the present invention drives walking by reducing motor 9.1, and workbench 11 is used for the support works personnel finishes the work, the safety of the guardrail protection staff on the workbench 11.Equipment must be parked in indoor shelter, building during off working state and block the track I-steel with rail meter equipment is fixed, staff's access arrangement and the rail meter that will block the track I-steel unclamp during work, equipment is moved to the work appointed place again rail meter is blocked track, the staff was allowed for access and indoor wall was cleaned in the equipment this moment, install, safeguard.The present invention can be according to the concrete size of interior of building arch metope and the concrete size of fixed structure size guarantees to clean to all metopes.
Structure of the present invention is light and handy, operate steadily, easy to operate, security reliability is strong, each staff is equipped with the life rope.Because complete machine is light and handy, so transportation is installed all very conveniently, successfully solved the indoor problem that can't use outdoor hanging device.
Claims (8)
1. slide formula arch window cleaning equipment, comprise first bracing frame (1) and second bracing frame (4), first bracing frame (1) is gone up and is connected a plurality of first chemical bolts (2), second bracing frame (4) is gone up and is connected a plurality of second chemical bolts (5), it is characterized in that: first bracing frame (1) upper end is provided with first track (7), and first track (7) is gone up and connected initiatively walking mechanism (9); Second bracing frame (4) upper end is provided with second track (8), and second track (8) is gone up and connected passive walking mechanism (10); Initiatively walking mechanism (9) and passive walking mechanism (10) upper end is connected the two ends of workbench (11) respectively by bolt, fixing electric cabinet (12) on the workbench (11); Described workbench (11) comprises first curb girder (13), middle girder (14) and second curb girder (15), and middle girder (14) both sides connect first curb girder (13) and second curb girder (15) by bolt respectively; Girder (14) is provided with a plurality of middle foot pedals (20) in the middle of described, and the spacing between a plurality of middle foot pedals (20) equates that middle girder (14) is gone up and connected middle guardrail (17); First curb girder (13) is provided with a plurality of first foot pedals (19), and the spacing between a plurality of first foot pedals (19) equates that first curb girder (13) is gone up and connected first side rail (16); Second curb girder (15) is provided with a plurality of second foot pedals (21), and the spacing between a plurality of second foot pedals (21) equates that second curb girder (15) is gone up and connected second side rail (18).
2. slide formula arch window cleaning equipment as claimed in claim 1, it is characterized in that: described first bracing frame (1) is provided with first stiffener (3).
3. slide formula arch window cleaning equipment as claimed in claim 1 is characterized in that: described active walking mechanism (9) comprises initiatively walker (9.2), initiatively by clutch shaft bearing (9.3) positive transport wheel axle (9.10) is installed in the walker (9.2); Positive transport wheel axle (9.10) drives rotation by the reducing motor (9.1) that is fixed on the active walker (9.2); Positive transport wheel axle (9.10) is gone up and is connected positive transport wheel (9.4), is provided with first spacer ring (9.6) between positive transport wheel (9.4) and the active walker (9.2); Described active walker (9.2) both sides connect one first guiding wheel carrier (9.5) respectively; Initiatively walker (9.2) upper end connects initiatively walker upper support pipe (9.7), and the welding of active walker upper support pipe (9.7) upper end is walker upper backup pad (9.8) initiatively.
4. slide formula arch window cleaning equipment as claimed in claim 3 is characterized in that: be provided with initiatively walker stiffener (9.9) between described active walker upper support pipe (9.7) and the active walker upper backup pad (9.8).
5. slide formula arch window cleaning equipment as claimed in claim 1, it is characterized in that: described second bracing frame (4) is provided with second stiffener (6).
6. slide formula arch window cleaning equipment as claimed in claim 1, it is characterized in that: described passive walking mechanism (10) comprises passive walker (10.2), by second bearing (10.5) passive live axle (10.4) is installed in the passive walker (10.2), passive live axle (10.4) is gone up and is connected passive road wheel (10.1); Be provided with second spacer ring (10.6) between passive road wheel (10.1) and the passive walker (10.2); Described passive walker (10.2) both sides connect one second guiding wheel carrier (10.3) respectively; Passive walker (10.2) upper end connects passive walker upper support pipe (10.9), passive walker upper support pipe (10.9) upper end welding passive walker upper backup pad (10.7).
7. slide formula arch window cleaning equipment as claimed in claim 6 is characterized in that: be provided with passive walker stiffener (10.8) between described passive walker upper support pipe (10.9) and the passive walker upper backup pad (10.7).
8. slide formula arch window cleaning equipment as claimed in claim 1 is characterized in that: the angle in the middle of described between girder (14) and first curb girder (13), second curb girder (15) is the obtuse angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310200533.XA CN103251351B (en) | 2013-05-24 | 2013-05-24 | Sliding board-type arch window cleaning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310200533.XA CN103251351B (en) | 2013-05-24 | 2013-05-24 | Sliding board-type arch window cleaning equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103251351A true CN103251351A (en) | 2013-08-21 |
CN103251351B CN103251351B (en) | 2015-10-21 |
Family
ID=48955851
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310200533.XA Expired - Fee Related CN103251351B (en) | 2013-05-24 | 2013-05-24 | Sliding board-type arch window cleaning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103251351B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08322764A (en) * | 1995-06-01 | 1996-12-10 | Ishikawajima Inspection & Instrumentation Co | Glass window cleaning equipment |
CN201179034Y (en) * | 2008-04-17 | 2009-01-14 | 上海普英特高层设备有限公司 | Steerable wheel carried window wiping machine operation mechanism |
CN201416221Y (en) * | 2009-06-24 | 2010-03-03 | 北京江河幕墙股份有限公司 | Folding fan and hyperboloid unit building curtain wall system |
CN201861551U (en) * | 2010-11-12 | 2011-06-15 | 博宇(无锡)科技有限公司 | Roof synchronous window cleaning device |
CN202723758U (en) * | 2012-06-13 | 2013-02-13 | 深圳广田高科新材料有限公司 | Moveably guided track device for cleaning abnormal curtain wall |
CN203354461U (en) * | 2013-05-24 | 2013-12-25 | 博宇(无锡)科技有限公司 | Slide type arched window cleaning machine |
-
2013
- 2013-05-24 CN CN201310200533.XA patent/CN103251351B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08322764A (en) * | 1995-06-01 | 1996-12-10 | Ishikawajima Inspection & Instrumentation Co | Glass window cleaning equipment |
CN201179034Y (en) * | 2008-04-17 | 2009-01-14 | 上海普英特高层设备有限公司 | Steerable wheel carried window wiping machine operation mechanism |
CN201416221Y (en) * | 2009-06-24 | 2010-03-03 | 北京江河幕墙股份有限公司 | Folding fan and hyperboloid unit building curtain wall system |
CN201861551U (en) * | 2010-11-12 | 2011-06-15 | 博宇(无锡)科技有限公司 | Roof synchronous window cleaning device |
CN202723758U (en) * | 2012-06-13 | 2013-02-13 | 深圳广田高科新材料有限公司 | Moveably guided track device for cleaning abnormal curtain wall |
CN203354461U (en) * | 2013-05-24 | 2013-12-25 | 博宇(无锡)科技有限公司 | Slide type arched window cleaning machine |
Non-Patent Citations (1)
Title |
---|
薛抱新等: "高层建筑擦窗机的选型与建筑设计要求", 《建筑科学》 * |
Also Published As
Publication number | Publication date |
---|---|
CN103251351B (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205171975U (en) | Tuber pipe mounting platform based on BIM technique | |
CN202751338U (en) | Rail type suspension basket | |
CN104563528A (en) | Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building | |
KR102109969B1 (en) | A work bogie for tunnel work | |
CN101597958B (en) | Template system capable of internally erecting and detaching mould | |
CN105507640A (en) | Drawer type lifting stereo garage | |
CN203354461U (en) | Slide type arched window cleaning machine | |
CN203334695U (en) | Curtain wall glass installation and suspending system | |
CN103654610A (en) | Rail type hanging basket | |
CN203354455U (en) | Slide rail device for hanging window cleaning machine suspended working platform | |
CN103251351A (en) | Slide type arched window cleaning machine | |
CN203144912U (en) | Movable hanging rack operation platform | |
CN203033721U (en) | Portable-type lift truck | |
CN215331331U (en) | Bridge type jump barrier frame is striden to binary channels | |
CN205636517U (en) | Steel longeron construction and installation operation platform | |
CN104545680A (en) | Electric basket for vertical shafts | |
CN104249963A (en) | Electric lifting basket for large-size lock drainage shaft | |
CN203382337U (en) | Electric hanging basket for drainage vertical well of large-scale ship lock | |
CN203555689U (en) | Electric hanging basket for vertical shaft | |
CN207435891U (en) | A kind of equipment for the installation of bridge concrete guardrail tapping pipe | |
CN104555837A (en) | Boiler overhauling platform | |
CN105735342A (en) | Device for embedding of foundation anchor bolt hole of power plant dust remover | |
CN103251349B (en) | Window cleaning equipment hangs ship and hangs slide rail device | |
CN103206077B (en) | Structure for steel structure roof inner slab installation foot hand cradle | |
CN202611219U (en) | Rail-mounted cradle suspension mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |