Prior art keywords
chassis
platform
girder
operating platform
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320114105
Other languages
Chinese (zh)
Inventor
刘康
王殿永
靳春尚
高杰
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN 201320114105 priority Critical patent/CN203144912U/en
Application granted granted Critical
Publication of CN203144912U publication Critical patent/CN203144912U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a movable hanging rack operation platform. The movable hanging rack operation platform structurally comprises a truss chassis and two pairs of connection rods which are transversely and symmetrically welded on the truss chassis. The upper ends of the connection rods are respectively provided with a single-track trolley which is provided with a reverse chain and forms a movement pair with inspection rails at the bottom of the lower bridge face of a steel girder. The distance between the two pairs of transversely symmetrical connection rods equals the distance between two inspection rails at the bottom of the lower bridge face of the steel girder. The length*width specification of a girder chassis is 16.5m*8m, a riffled metal plate is paved on the top face of the girder chassis, and rails are arranged on the periphery of the top face of the girder chassis. The movable hanging rack operation platform has the advantages of being reasonable in structure, low in manufacturing cost, and capable of being reused, avoiding material loss, ensuring that no potential safety hazard of objects falling from high altitudes and no pollution caused to the ambient environment are caused, and omitting a series of working procedures of repeatedly assembling and disassembling the operation at platform multiple times so as to achieve the aims of shortening a construction period and improving construction efficiency.

Description

A kind of packaged type hanger operating platform
Technical field
The utility model relates to a kind of operating platform, and in particular, the utility model relates to a kind of packaged type hanger operating platform for the steel truss girder assembly unit.
Background technology
The present inventor once participated in the construction construction of gulf, Jiangjin District powder room, Chongqing City Yangtze Bridge master bridge, this bridge is the dual-purpose steel truss girder cable-stayed bridge of the double tower public rail of two rope faces, the upper strata of bridge is highway bridge, and lower floor is Light Railway Bridge, and the steel truss girder of total length 897m is divided into 61 sections.Constitute the steel truss girder of this bridge, its cross sectional shape is for trapezoidal, describedly falls trapezoidal upper and lower bottom width and is respectively 37m and 16.5m, and height is 12.5m, and the length of each standard sections is 16m.In the concatenation construction of steel truss girder, all adopt high-strength bolt to connect between each sections and welding, and the construction of bridge floor bottom has comprised that not only high-strength bolt connects and welding down, also comprise operations such as pasting ceramic substrate.Therefore, the operating platform that need be provided for constructing in the bottom of following bridge floor.
Because described steel truss girder assembly unit belongs to free cantilever erection, and the height on the distance from bottom ground of bridge floor reaches 50m under its end bay, its main span also will be crossed over the Changjiang river, therefore, set up general steel pipe support and completely spread springboard not real as the operating platform of assembling construction thereon, must the hanger operating platform be installed in following bridge floor bottom, can be that the steel truss girder of 897m carries out section construction to total length, and avoid occurring in the work progress members such as electric welding spark, bolt and drop to situation under the bridge.Yet, with regard to total length the steel truss girder of 61 sections being arranged, the needed hanger operating platform of section construction must carry out operations such as repeated dismounting, installation along with the assembly unit progress of each sections of steel truss girder, not only waste time and energy, and security risk is bigger.
The utility model content
The purpose of this utility model solves above existing in prior technology problem exactly, and provides a kind of defective that can overcome prior art and emphasis to solve the packaged type hanger operating platform of construction inconvenience and two technical barriers of falling object from high altitude in the steel truss girder assembly unit process for this reason.
Packaged type hanger operating platform of the present utility model, comprise the truss chassis, the connection rod member of two pairs of vertical symmetries of lateral symmetry welding on the described truss chassis, every pair connect arrange respectively between the rod member its firm crosspiece, the upper end of each described connection rod member are arranged respectively be equipped with jack and with steel truss girder under the maintenance track of bridge floor bottom constitute the monorail trolley of kinematic pair.
The distance that two couple of described lateral symmetry connects between the rod member equals the distance between two the maintenance tracks in bridge floor bottom under the steel truss girder.
The length on described truss chassis * wide specification is 16.5m * 8m.
The end face on described truss chassis is laid checkered steel plate.
Be provided with guardrail around the end face of described truss chassis.
The utility model compared with prior art has following beneficial effect:
(1) rational in infrastructure, cheap, processing is simple, and is easy to operate, not only overcome many defectives of prior art, and can reuse, thereby avoided spillage of material, reaches the purpose of minimizing fund waste.
There is the situation that drops of members such as electric welding spark or bolt to take place when (2) having avoided in the work progress, guarantees not have the potential safety hazard of falling object from high altitude and the pollution that surrounding environment is caused, reduce security risk, guarantee the reliable and secure purpose of work progress thereby reach.
(3) any construction area that can arbitrarily move to bridge floor bottom under the steel truss girder along with the assembly unit progress of steel truss girder is constructed, avoided repeatedly repeating installing, the series of processes of dismantling operation platform, time saving and energy saving, reduce cost, thereby shorten the construction period, reach the purpose that improves efficiency of construction.
Description of drawings
Fig. 1 is Facad structure schematic diagram of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
Fig. 4 is the monorail trolley in the utility model constitutes the frictional movement pair with its friction pulley and maintenance track schematic diagram.
The specific embodiment
Technical characterstic of the present utility model is easier to be understood in order to make, below with reference to accompanying drawing and in conjunction with the embodiments the technical solution of the utility model is done to describe in detail:
With reference to Fig. 1, Fig. 2, Fig. 3, packaged type hanger operating platform of the present utility model, comprise the truss chassis 11 that is welded with shaped steel, lateral symmetry is welded with two pairs of vertically connection rod members 4 of symmetry on the described truss chassis 11, be respectively arranged with between every pair of described connection rod member 4 and make its firm crosspiece 8, the upper end of each described connection rod member 4 arranges the monorail trolley 5 that can constitute kinematic pair with the maintenance track 3 that steel truss girder carries respectively, and described monorail trolley 5 is provided with jack 6.
Distance between two couples connection rod member 4 of lateral symmetry welding on the described truss chassis 11 equals the spacing of two the maintenance tracks 3 in bridge floor bottom under the steel truss girder.
In order to be applicable to the needs of bridge floor bottom construction under the multiple steel truss girder, length * wide specification that the utility model arranges described truss chassis 11 is 16.5m * 8m.
In order to prevent falling object from high altitude and convenient construction, the utility model has been laid checkered steel plate 1 at the end face on described truss chassis 11, and with itself and described truss chassis 11 firm welding.
In order to guarantee construction safety, the utility model also is provided with guardrail 10 around 11 end faces of described truss chassis.
With reference to Fig. 4, monorail trolley 5 in the utility model, be commercially available secondary transmission jack dolly, its structure comprises car frame 12, the inboard of described car frame 12 is provided with two pairs and constitutes the friction pulley 9 of kinematic pairs with described maintenance track 3, the arranged outside of described car frame 12 has and pinion 14 coaxial mounted sprocket wheels 13, described jack 6 is arranged on the groove interior (because described monorail trolley 5 belongs to the commercially available finished product of prior art, so other parts of the vehicle structure that do not draw among Fig. 4) of described sprocket wheel 13.
When the described jack 6 of pulling, described sprocket wheel 13 rotates thereupon, this rotation is arranged on these pinion 14 both sides and constitutes on two gear wheels of Meshing Pair (not drawing among the figure) with this pinion 14 by sending to respectively with the coaxial pinion 14 of described sprocket wheel 13, and by two gear wheels drive with described gear wheel coaxial and with described maintenance track 3 contacted two pairs of friction pulleys, 9 rotations, move forward and backward thereby drive monorail trolley 5 by the rolling of described friction pulley 9 on described maintenance track 3, make portable hanger operating platform of the present utility model move to any construction area of bridge floor bottom under the steel truss girder.
When stopping drag described jack 6, then since the rubbing action self-locking between described friction pulley 9 and the described maintenance track 3 fix, thereby the convenient construction personnel by portable hanger operating platform of the present utility model bridge floor bottom under steel truss girder carry out that high-strength bolt connects, working procedures such as welding and subsides ceramic substrate.
In order to prevent described monorail trolley 5 in work progress because operation disengaging maintenance out of control track 3, when finishing the installation of the utility model on described maintenance track 3, should be specifically noted that at the two ends of described maintenance track 3 only rail device 7 is installed, thereby guarantee the reliable and secure of work progress.
Setting like this of the present utility model, must carry out the difficult problem of series of processes such as repeated installation, dismounting when having solved the hanger operating platform that uses prior art along with the assembly unit progress of steel truss girder to operating platform, although whole steel truss girder reaches 897m, also can be by pulling the plain mode of jack 6, make random the moving back and forth of packaged type hanger operating platform, thereby arrive the position that needs construction fast.
Setting like this of the present utility model has also solved and has avoided in steel truss girder assembly unit process because the security hidden trouble that causes of falling object from high altitude, thereby reduces influence and pollution to surrounding environment.
Portable hanger operating platform of the present utility model is an improvement to prior art, also is to being used for the innovative design of the form of structure that the hanger operating platform of construction carries out bottom the bridge floor under the steel truss girder.
Application of the present utility model, saved and used the hanger operating platform of prior art repeatedly to repeat series of processes such as installation, dismounting along with the assembly unit progress of steel truss girder, thereby the technical purpose of reach simple to operate, construction is convenient, economizing on the use of funds, avoiding polluting, reduce security risk, improve efficiency of construction, its design principle can also be extended to the high empty item of other various large tracts of land, has good practicability.
Above with reference to drawings and Examples, the utility model is schematically described, this description does not have restricted.Those of ordinary skill in the art will be understood that in actual applications the set-up mode of each parts all some change may take place in the utility model, and other staff also may make similar Design under its enlightenment.Only it is pointed out that otherwise break away from design aim of the present utility model that all apparent change and similar Design thereof all are included within the protection domain of the present utility model.

Claims (5)

1. packaged type hanger operating platform, comprise the truss chassis, it is characterized in that, the connection rod member of two pairs of vertical symmetries of lateral symmetry welding on the described truss chassis, every pair connect arrange respectively between the rod member its firm crosspiece, the upper end of each described connection rod member are arranged respectively be equipped with jack and with steel truss girder under the maintenance track of bridge floor bottom constitute the monorail trolley of kinematic pair.
2. packaged type hanger operating platform according to claim 1 is characterized in that, the spacing that two couple of described lateral symmetry connects rod member equals two maintenance in bridge floor bottom track space under the steel truss girder.
3. packaged type hanger operating platform according to claim 1 is characterized in that, the length on described truss chassis * wide specification is 16.5m * 8m.
4. packaged type hanger operating platform according to claim 1 is characterized in that, the end face on described truss chassis is laid checkered steel plate.
5. packaged type hanger operating platform according to claim 1 is characterized in that, is provided with guardrail around the end face of described truss chassis.
CN 201320114105 2013-03-12 2013-03-12 Movable hanging rack operation platform Withdrawn - After Issue CN203144912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320114105 CN203144912U (en) 2013-03-12 2013-03-12 Movable hanging rack operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320114105 CN203144912U (en) 2013-03-12 2013-03-12 Movable hanging rack operation platform

Publications (1)

Publication Number Publication Date
CN203144912U true CN203144912U (en) 2013-08-21

Family

ID=48972453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320114105 Withdrawn - After Issue CN203144912U (en) 2013-03-12 2013-03-12 Movable hanging rack operation platform

Country Status (1)

Country Link
CN (1) CN203144912U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132463A (en) * 2013-03-12 2013-06-05 中国建筑第六工程局有限公司 Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN109722996A (en) * 2019-03-05 2019-05-07 代营伟 For reinforcing the suspension apparatus of highway bridge and the building method of the suspension apparatus
CN111155788A (en) * 2018-11-07 2020-05-15 上海川勤建筑工程有限公司 House building pushing truss dismantling method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132463A (en) * 2013-03-12 2013-06-05 中国建筑第六工程局有限公司 Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN103132463B (en) * 2013-03-12 2015-06-24 中国建筑第六工程局有限公司 Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN111155788A (en) * 2018-11-07 2020-05-15 上海川勤建筑工程有限公司 House building pushing truss dismantling method
CN109722996A (en) * 2019-03-05 2019-05-07 代营伟 For reinforcing the suspension apparatus of highway bridge and the building method of the suspension apparatus
CN109722996B (en) * 2019-03-05 2021-09-28 广东恒大路桥建设有限公司 Suspension device for reinforcing highway bridges and construction method of suspension device

Similar Documents

Publication Publication Date Title
CN205501818U (en) Steel trussed arch bridge bridge tool car
CN103132463B (en) Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN203716573U (en) Rear cantilever type lifting and transversely-moving parking equipment
CN203144912U (en) Movable hanging rack operation platform
CN103898832A (en) Bridge cable hanging anchoring end detection working platform
CN201648969U (en) Railway T-girder bridge girder erection machine suitable for laying and erecting seamless lines for passenger and freight shared lines
CN103806725A (en) Non-foundation split singular-parking-place vertically circulating parking device
CN105544406A (en) Sliding-type Bailey beam dismantling device and dismantling method thereof
CN103240562A (en) Chained turnover equipment for H-shaped steel
CN203639826U (en) Steel truss girder bridge inspection vehicle
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN203782592U (en) Movable hanging basket operation device for high-altitude maintenance of bridge
CN103449313A (en) Maintenance crane special for rail container door type portal crane trolley travel mechanism
CN203307735U (en) Pulley combined type aerial work platform for bridge detection
CN204608602U (en) Novel bridge maintenance protection installation work car
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN204590641U (en) Steel work product construction trolley
CN201793331U (en) Translational crane for steel pipes
CN203684101U (en) Device for enabling simply supported beam to move transversally and take place
CN204001894U (en) Traction steel rope of cable lift-sliding parking storehouse on simple and easy back boom
CN203461693U (en) Ultrahigh steel support leg for combined gantry crane with Bailey truss
CN202707076U (en) Double-line railway tunnel trolley
CN204663090U (en) Suspension type lift-sliding parking equipment after self-balancing
CN201647844U (en) Beam lifting station without abutments

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
AV01 Patent right actively abandoned

Granted publication date: 20130821

Effective date of abandoning: 20150624

RGAV Abandon patent right to avoid regrant