CN103248042B - Peak shifting and avoiding method for electric management system - Google Patents

Peak shifting and avoiding method for electric management system Download PDF

Info

Publication number
CN103248042B
CN103248042B CN201310152027.8A CN201310152027A CN103248042B CN 103248042 B CN103248042 B CN 103248042B CN 201310152027 A CN201310152027 A CN 201310152027A CN 103248042 B CN103248042 B CN 103248042B
Authority
CN
China
Prior art keywords
peak
mistake
management system
user
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310152027.8A
Other languages
Chinese (zh)
Other versions
CN103248042A (en
Inventor
王立峰
陈东
顾黎强
王沁
徐芳敏
骆亮
袁一鸣
盛佳蓉
张麟
胡年平
吴世敏
沈祝萍
贾优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201310152027.8A priority Critical patent/CN103248042B/en
Publication of CN103248042A publication Critical patent/CN103248042A/en
Application granted granted Critical
Publication of CN103248042B publication Critical patent/CN103248042B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a peak shifting and avoiding method for an electric management system, which includes the following steps: 1, user information is transmitted by an electric monitoring system to the electric management system; 2, obtaining a peak shifting and avoiding planning list by the electric management system as per the running condition of a power grid; 3, calculating out the allowable peak shifting and avoiding capacity of users by the electric management system as per the peak shifting and avoiding planning list and information of users, and deriving out the list of peak shifting and avoiding users; 4, confirming the allowable peak shifting and avoiding capacity of users, forming a peak shifting and avoiding user report, and deriving the report in the electric management system; 5, selecting a peak shifting and avoiding day; and 6, selecting electric equipment required for peak shifting and avoiding capacity analysis, and obtaining the allowable peak shifting and avoiding capacity of the electric equipment and relative information of the user through the electric management system based on the peak shifting and avoiding report. According to the invention, the electric management system can be used for quickly arranging users using overload equipment in the power grid, and providing industrial users with allowable peak shifting and avoiding ways and the suggesting peak shifting and avoiding distribution capacity as per the characteristics of users, loading and accessing capacities of users and condition of power utilization.

Description

Mistake based on electric power management system keeps away peak method
Technical field
The present invention relates to a kind of electric power mistake and keep away peak method, be specifically related to a kind of mistake based on electric power management system and keep away peak method.
Background technology
At present, there is the imbalance of partial electric grid development and Regional Economic Development, minority area and user are in dynamic removal, economic transition, under the support of support on policy, there is shooting up of power load, and part power grid construction is subject to the external channel various factors such as to be obstructed causes construction speed relatively slow, directly cause the heavily overload of equipment component, especially change is flowed, the overload of cable, once occur that equipment damage will cause equipment to overhaul for a long time, low-voltage network complex structure on the other hand, the requirement of user to power supply reliability and power supply quality is also more and more higher.
For overload prevention device, especially after implementing every operational mode arrangement transfer, the equipment still transshipped, the mistake of reasonable arrangement user keeps away peak work, and when heavy overload, margining electric method is taked to minority industry class user, is guarantee electric power netting safe running, ensures the necessary means of most of user's normal electricity consumption.
As shown in Figure 1, it is as follows that heave-load device mistake keeps away peak workflow: regulation and control center fortune root increases according to network load plan with every engineering (containing Adding User), and during the peak of power consumption to next year, whole electrical network and hot zones proposition mistake keep away peak demand; According to predicting the overload prevention device and overload degree that may occur, establishment overload prevention device mistake keeps away peak capacity, sales department keeps away peak capacity demand according to the equipment of scheduling establishment and mistake, arrange user inventory, and confer practicable mistake with user and keep away peak capacity, after the actual mistake of completing user keeps away peak arrangement, be aggregated into each overload prevention device mistake and keep away peak capacity, give scheduling, check equipment and whether will transship, then taken interim measures according to overload situations by scheduling.During peak of power consumption, when causing provisional mistake to keep away peak demand by thermal extremes, all kinds of fault, scheduling needs clear and definite interim mistake to keep away peak time.
Overload prevention device mistake is kept away peak analytical work and is divided into check analysis and mistake to keep away peak macroanalysis two class.Whether check analysis wrong keep away mistake that peak equipment carries out for arranging and keep away peak capacity and meet the demands, and whether there is overload risk with calibration equipment.Mistake keep away peak macroanalysis work be to mistake every day keep away peak total amount and difference mistake keep away peak classification (have holidays by turns, allow electricity, avoid the peak hour) carry out macroanalysis.
Its shortcoming is, mistake keeps away peak work, and to relate to number of users numerous, also industrial cousumer must be filtered out, simultaneously mistake is kept away peak work and is also classified and have holidays by turns, allow electricity, execution of avoiding the peak hour, and every user performs mistake, and to keep away the peak date also different, therefore, only rely on artificial, not only waste time and energy, and be difficult to accomplish promptly and accurately, especially still exist equipment after taking mistake to keep away peak and may transship the equipment scheduling department of risk and cannot grasp timely and accurately.
Summary of the invention
The invention provides a kind of mistake based on electric power management system and keep away peak method, realize the user of the heavy overload prevention device of electrical network fast finishing, and according to user's character and user's attaching capacity and electricity consumption situation, draw and can keep away peak partition capacity for the wrong industrial cousumer that keep away peak with suggestion mistake.
For achieving the above object, the invention provides a kind of mistake based on electric power management system and keep away peak method, be characterized in, the method includes the steps of:
Step 1, electric power monitoring system transmitting subscriber information are to electric power management system;
Step 2, electric power management system obtain wrong peak averting plan inventory according to grid operating conditions;
Step 3, electric power management system calculate user according to wrong peak averting plan inventory and user profile mistake can keep away peak capacity, and keeps away peak user's inventory to operating personnel by prescribed form derivation mistake;
Step 4, operating personnel and the wrong user kept away in peak user's inventory determine that user's mistake keeps away peak capacity, and are compiled into user's mistake and keep away peak form and import electric power management system;
Step 5, electric power management system are kept away peak report generation mistake according to user's mistake and are kept away peak daily sheet, and scheduling operation personnel selection needs to carry out mistake one day keeps away peak, and electric power management system is kept away peak statement analysis according to mistake and shown that this day mistake keeps away peak capacity and inventory;
Step 6, electric power management system are kept away peak report generation equipment mistake according to user's mistake and are kept away peak capacity, and scheduling operation personnel selection needs to carry out the power consumption equipment that mistake keeps away peak capacity analysis, electric power management system is kept away peak statement analysis according to mistake and is drawn the capacity that this power consumption equipment can be avoided the peak hour and relevant user information.
In above-mentioned steps 1, user profile comprises user's character, user's attaching capacity, and user power utilization situation.
Above-mentioned steps 2 comprises following steps: operating personnel select the equipment input electric power management system needing to carry out wrong peak averting plan analysis, and electric power management system draws the 10kV that this power consumption equipment power supply station associates and above user's inventory according to grid operating conditions analysis.
The type of above-mentioned power consumption equipment is transformer in the station in network system.
Compared to the prior art the mistake that the present invention is based on electric power management system keeps away peak method, its advantage is, the present invention utilizes topological relation and the supply district user of electrical network in electric power management system, realize user's inventory of the heavy overload prevention device of system finishing, according to user's character and user's attaching capacity and electricity consumption situation, arrange out and can keep away peak partition capacity for the wrong industrial cousumer's inventory keeping away peak with suggestion mistake; And information necessary in electric power monitoring system is imported electric power management system, or call information necessary in electric power monitoring system, arrange out industrial cousumer's inventory and carry out mistake and keep away peak and distribute;
The mistake that the present invention utilizes electric power management system to gather keeps away peak data, and Realization analysis mistake every day keeps away the capacity that peak arranges, the possibility of checkout facility overload;
The present invention utilizes the mistake of all actual arrangements user's every day in system to keep away peak capacity, quickly and easily mistake can be kept away the summary that peak situation is carried out promptly and accurately, be convenient to traffic department and adopt an effective measure in advance to the equipment that will transship.
Accompanying drawing explanation
Fig. 1 is that in prior art, heave-load device mistake keeps away peak workflow diagram;
Fig. 2 is the method flow diagram that the mistake that the present invention is based on electric power management system keeps away peak method.
Embodiment
Below in conjunction with accompanying drawing, further illustrate specific embodiments of the invention.
As shown in Figure 2, the present invention discloses a kind of mistake based on electric power management system and keeps away peak method, and the method includes the steps of:
Step 1, electric power monitoring system (CMS) transmitting subscriber information are to electric power management system (PMS); Wherein, user profile (MD information) comprises user's character, user's attaching capacity, and user power utilization situation.
Step 2, electric power management system obtain wrong peak averting plan inventory according to grid operating conditions.Operating personnel select the equipment input electric power management system needing to carry out wrong peak averting plan analysis, and electric power management system draws the 10kV that this power consumption equipment power supply station associates and above user's inventory according to grid operating conditions analysis.
Wherein the type of power consumption equipment is transformer in station in network system.
Step 3, electric power management system calculate user according to wrong peak averting plan inventory and user profile mistake can keep away peak capacity, and keeps away peak user's inventory to operating personnel by prescribed form derivation mistake.
Step 4, operating personnel and the wrong user kept away in peak user's inventory determine that user's mistake keeps away peak capacity, and are compiled into user's mistake and keep away peak form and import electric power management system.
The mistake that electric power management system analytical calculation completes is kept away the operating personnel submitting to sales department outside peak user's inventory line by the operating personnel of step 4.1, traffic department.
After the operating personnel of step 4.2, sales department and the wrong user kept away in peak user's inventory determine that mistake keeps away peak capacity, be compiled into user's mistake and keep away the operating personnel that peak form sends to traffic department.
The mistake that sales department is compiled into by the operating personnel of step 4.3, traffic department keeps away peak form importing electric power management system.
Step 5, electric power management system are kept away peak report generation mistake according to user's mistake and are kept away peak daily sheet, and scheduling operation personnel selection needs to carry out mistake one day keeps away peak, and electric power management system is kept away peak statement analysis according to mistake and shown that this day mistake keeps away peak capacity and inventory.
Step 6, electric power management system are kept away peak report generation equipment mistake according to user's mistake and are kept away peak capacity, and scheduling operation personnel selection needs to carry out the power consumption equipment that mistake keeps away peak capacity analysis, electric power management system is kept away peak statement analysis according to mistake and is drawn the capacity that this power consumption equipment can be avoided the peak hour and relevant user information.Wherein, the type of power consumption equipment is transformer in station in network system.
Although content of the present invention has done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple amendment of the present invention and substitute will be all apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (4)

1. the mistake based on electric power management system keeps away a peak method, and it is characterized in that, the method includes the steps of:
Step 1, electric power monitoring system transmitting subscriber information are to electric power management system;
Step 2, electric power management system obtain wrong peak averting plan inventory according to grid operating conditions;
Step 3, electric power management system calculate user according to wrong peak averting plan inventory and user profile mistake can keep away peak capacity, and keeps away peak user's inventory to operating personnel by prescribed form derivation mistake;
Step 4, operating personnel and the wrong user kept away in peak user's inventory determine that user's mistake keeps away peak capacity, and are compiled into user's mistake and keep away peak form and import electric power management system;
Step 5, electric power management system are kept away peak report generation mistake according to user's mistake and are kept away peak daily sheet, and scheduling operation personnel selection needs to carry out mistake one day keeps away peak, and electric power management system is kept away peak statement analysis according to user's mistake and shown that this day mistake keeps away peak capacity and inventory;
Step 6, electric power management system are kept away peak report generation equipment mistake according to user's mistake and are kept away peak capacity, and scheduling operation personnel selection needs to carry out the power consumption equipment that mistake keeps away peak capacity analysis, electric power management system is kept away peak statement analysis according to user's mistake and is shown that this power consumption equipment wrong can keep away capacity and the relevant user information at peak.
2. keep away peak method based on the mistake of electric power management system as claimed in claim 1, it is characterized in that, in described step 1, described user profile comprises user's character, user's attaching capacity, and user power utilization situation.
3. keep away peak method based on the mistake of electric power management system as claimed in claim 1, it is characterized in that, described step 2 comprises following steps: operating personnel select the equipment input electric power management system needing to carry out wrong peak averting plan analysis, and electric power management system draws the 10kV of the equipment power supply station association needing to carry out wrong peak averting plan analysis and above user's inventory according to grid operating conditions analysis.
4. the mistake based on electric power management system as described in claim 1 or 3 keeps away peak method, it is characterized in that, the type of described power consumption equipment is transformer in the station in network system.
CN201310152027.8A 2013-04-27 2013-04-27 Peak shifting and avoiding method for electric management system Active CN103248042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310152027.8A CN103248042B (en) 2013-04-27 2013-04-27 Peak shifting and avoiding method for electric management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310152027.8A CN103248042B (en) 2013-04-27 2013-04-27 Peak shifting and avoiding method for electric management system

Publications (2)

Publication Number Publication Date
CN103248042A CN103248042A (en) 2013-08-14
CN103248042B true CN103248042B (en) 2015-04-15

Family

ID=48927349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310152027.8A Active CN103248042B (en) 2013-04-27 2013-04-27 Peak shifting and avoiding method for electric management system

Country Status (1)

Country Link
CN (1) CN103248042B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106443138A (en) * 2016-11-15 2017-02-22 国家电网公司 Voltage quality management method
CN107798475A (en) * 2017-10-25 2018-03-13 云南电网有限责任公司电力科学研究院 A kind of formulating method and device of Demand-side load adjustment scheme
CN112446645A (en) * 2020-12-14 2021-03-05 江苏新智合电力技术有限公司 Power management service system based on Internet of things

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102280935B (en) * 2011-06-24 2014-05-14 中国科学院电工研究所 Intelligent power grid management system
CN202197105U (en) * 2011-09-16 2012-04-18 郭梦珑 Peak load shifting control system
JP3176399U (en) * 2012-03-28 2012-06-21 伊藤 幸男 Intelligent power supply controller for machine tools
CN102723785B (en) * 2012-07-03 2015-10-21 广东电网公司电力科学研究院 The Methods of electric load forecasting gathered based on large user's intelligent terminal and system

Also Published As

Publication number Publication date
CN103248042A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
Fan et al. The evolution of distribution
Barzkar et al. A novel peak load shaving algorithm via real‐time battery scheduling for residential distributed energy storage systems
Dharmakeerthi et al. A comprehensive planning framework for electric vehicle charging infrastructure deployment in the power grid with enhanced voltage stability
CN104638642B (en) Active power distribution network analysis and evaluation system
CN102637203B (en) Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems
Xie et al. Supplementary automatic generation control using controllable energy storage in electric vehicle battery swapping stations
CN104636988A (en) Active power distribution network assessment method
CN102855525B (en) A kind of resident's load prediction analytic system and method
CN103617561A (en) System and method for evaluating state of secondary equipment of power grid intelligent substation
CN102879696B (en) Automatic judgment method for over-load operational feasibility of transformer
CN102938106A (en) Power network power-cut scheme based major network N-1 risk assessment method and system
CN102723726A (en) Method for determining maximal direct current receiving quantity in alternating current receiving system
CN103248042B (en) Peak shifting and avoiding method for electric management system
CN108510242A (en) Worksheet method, system and terminal device
Lauby et al. Balancing act
CN104767281B (en) A kind of high voltage distribution network topological Simplification method
CN116455078A (en) Intelligent operation and maintenance management and control platform for power distribution network
Singh et al. A smart volt-var optimization engine for energy distribution system
CN106251244A (en) Power distribution network transformation method considering comprehensive utilization rate of equipment
Wruk et al. Automated planning of smart low voltage networks using an evolutionary algorithm
CN102938107B (en) Main distribution power failure plan coordination method and system
CN112509301A (en) Centralized meter reading system and method for task distribution type acquisition through meter box terminal and storage medium
CN103345659B (en) Power distribution network Adds User and optimizes access information processing method
Tavares et al. Distribution network planning using detailed flexibility models for DER
Hadley et al. Additional EIPC Study Analysis. Final Report

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant