CN103243653A - 一种吸盘式基础跨海大桥预制与现浇桥梁施工 - Google Patents

一种吸盘式基础跨海大桥预制与现浇桥梁施工 Download PDF

Info

Publication number
CN103243653A
CN103243653A CN2013101661755A CN201310166175A CN103243653A CN 103243653 A CN103243653 A CN 103243653A CN 2013101661755 A CN2013101661755 A CN 2013101661755A CN 201310166175 A CN201310166175 A CN 201310166175A CN 103243653 A CN103243653 A CN 103243653A
Authority
CN
China
Prior art keywords
sea
basis
suction
prefabricated component
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101661755A
Other languages
English (en)
Inventor
李尚喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013101661755A priority Critical patent/CN103243653A/zh
Publication of CN103243653A publication Critical patent/CN103243653A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种吸盘式基础跨海大桥预制与现浇桥梁施工,包括吸盘基础一种件、吸注口、姊妹桩,其特征是将海底平整以后,利用吸盘的原理设计了吸盘式基础预制件,有吸盘式基础跨海大桥预制件和现浇为一体的姊妹桩,装置在预先设计好基础位置上,在吸盘式跨海大桥基础预制件上面设计了吸注口,利用本吸注口吸出海底泥浆和灌注沙浆,最后将吸注口封闭在装置路面。

Description

一种吸盘式基础跨海大桥预制与现浇桥梁施工
技术领域:
本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工,涉及到现在跨海大桥桥梁的新型技术建设与施工, 
背景技术:
在现在建设中的跨海大桥建设与施工技术中,是一个前辈没有的桥梁施工,对桥梁基础尤为重要对施工工期长,造价高,工程压力大,技术低,影响了国家交通,影响了经济发展。 
发明内容:
本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工,解决了上述技术中的技术之不足, 
本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工,包括吸盘基础一种件、吸注口、姊妹桩,其特征是将海底平整以后,利用吸盘的原理设计了吸盘式基础预制件,有吸盘式基础跨海大桥预制件和现浇为一体的姊妹桩,装置在预先设计好基础位置上,在吸盘式跨海大桥基础预制件上面设计了吸注口,利用本吸注口吸出海底泥浆和灌注沙浆,最后将吸注口封闭, 
本吸注口,在安装吸盘式跨海大桥基础预制件时。通过预制件的压力自动派出海底泥浆,泥浆太多利用机械抽出泥浆,然后封闭吸注口,在吸盘式跨海大桥基础预制件内空虚时利用压力灌注充实,把吸盘基础预制件发平以后再交接姊妹柱,预制件和现浇姊妹柱, 
本设计的跨海大桥姊妹桩是有异交通上下道斜度的左右姊妹桩,在吸注口稳定封闭以后上桥面。 
本发明一种吸盘式跨海大桥基础预制件的有益效果是:1环保不污染海水,2 施工简单、工期快,3节约原材料、坚固耐用, 
附图说明:
图1所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工总面图 
图2所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工平面基础图 
图3所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工基础立面剖切图 
图4所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工姊妹柱中线反向基础位置图 
具体实施方式:
参看图1所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工总面图,给出了一个跨海大桥质量高、工期快,造价底,施工简单的跨海大桥建设与施工实施例,设计了一个吸盘式基础,在海底水深的情况下,利用吸盘的原理设计了跨海大桥基础建设与施工,在吸盘上部的姊妹柱的中心位置设计了吸注口,利用吸注口抽出去海底泥浆以后,将吸注口封闭。 
参看图2所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工平面基础图,是一个吸盘式的平面基础预制件,在吸盘的上部设计了在中心的吸注口,,在吸注口两侧设计了俩根姊妹柱,把吸盘基础预制件发平以后再交接姊妹柱,预制件和现浇姊妹柱, 
参看图3所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工基础立面剖切图,是一个基础剖切图,图3中的1为本图的吸注口示意图,图3中的2有老个,是本设计中的姊妹柱位置示意图,在海底的跨海大桥桥柱的位置找平以后,将图3放人计划好的桥柱位置以后,通过本身体的压力,使海底的泥浆通过吸注口抽出去,如果海底的泥浆多,与机械抽出去,然后将吸注看封闭。 
参看图4所示本发明一种吸盘式基础跨海大桥预制与现浇桥梁施工姊妹柱异向基础位置图,本图是一个关系到桥柱的承受压力的关键,本图是利用异向受力来承受桥面的冲击,图4中的2为本图的中心位置,由箭头指示的方向,向箭头移位一个基础柱的位置,就是图4中的1,左右柱上部向中心倾斜为一体,达到路面冲击以后能承受的压力。 

Claims (1)

1.一种吸盘式基础跨海大桥预制与现浇桥梁施工,包括吸盘基础一种件、吸注口、姊妹桩,其特征是将海底平整以后,利用吸盘的原理设计了吸盘式基础预制件,有吸盘式基础跨海大桥预制件和现浇为一体的姊妹桩,装置在预先设计好基础位置上,在吸盘式跨海大桥基础预制件上面设计了吸注口,利用本吸注口吸出海底泥浆和灌注沙浆,最后将吸注口封闭,
本吸注口,在安装吸盘式跨海大桥基础预制件时。通过预制件的压力自动派出海底泥浆,泥浆太多利用机械抽出泥浆,然后封闭吸注口,在吸盘式跨海大桥基础预制件内空虚时利用压力灌注充实,把吸盘基础预制件发平以后再交接姊妹柱预制件和现浇姊妹柱,
本设计的跨海大桥姊妹桩是有异交通上下道斜度的左右姊妹桩,在吸注口稳定封闭以后上桥面。
CN2013101661755A 2013-04-19 2013-04-19 一种吸盘式基础跨海大桥预制与现浇桥梁施工 Pending CN103243653A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101661755A CN103243653A (zh) 2013-04-19 2013-04-19 一种吸盘式基础跨海大桥预制与现浇桥梁施工

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101661755A CN103243653A (zh) 2013-04-19 2013-04-19 一种吸盘式基础跨海大桥预制与现浇桥梁施工

Publications (1)

Publication Number Publication Date
CN103243653A true CN103243653A (zh) 2013-08-14

Family

ID=48923505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101661755A Pending CN103243653A (zh) 2013-04-19 2013-04-19 一种吸盘式基础跨海大桥预制与现浇桥梁施工

Country Status (1)

Country Link
CN (1) CN103243653A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024287A (zh) * 2018-07-21 2018-12-18 四川启创建设工程有限公司 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064125A (zh) * 1991-02-13 1992-09-02 王志刚 挖槽下沉沉井的施工方法及设备
JPH11247109A (ja) * 1998-03-05 1999-09-14 Tokyu Constr Co Ltd ラーメン高架橋の構築方法
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
CN2687178Y (zh) * 2003-11-21 2005-03-23 中国石油天然气集团公司 滩涂软土筑路用负压沉箱
CN101294394A (zh) * 2008-05-28 2008-10-29 中交公路规划设计院有限公司 钢空腔沉箱-桩逆作法复合基础及施工方法
CN202039382U (zh) * 2011-03-29 2011-11-16 中国水电顾问集团华东勘测设计研究院 加肋式海底吸力锚
CN202658629U (zh) * 2012-04-12 2013-01-09 东南大学 一种用于模型试验中吸力式沉箱沉贯垂直度的控制装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064125A (zh) * 1991-02-13 1992-09-02 王志刚 挖槽下沉沉井的施工方法及设备
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
JPH11247109A (ja) * 1998-03-05 1999-09-14 Tokyu Constr Co Ltd ラーメン高架橋の構築方法
CN2687178Y (zh) * 2003-11-21 2005-03-23 中国石油天然气集团公司 滩涂软土筑路用负压沉箱
CN101294394A (zh) * 2008-05-28 2008-10-29 中交公路规划设计院有限公司 钢空腔沉箱-桩逆作法复合基础及施工方法
CN202039382U (zh) * 2011-03-29 2011-11-16 中国水电顾问集团华东勘测设计研究院 加肋式海底吸力锚
CN202658629U (zh) * 2012-04-12 2013-01-09 东南大学 一种用于模型试验中吸力式沉箱沉贯垂直度的控制装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024287A (zh) * 2018-07-21 2018-12-18 四川启创建设工程有限公司 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法
CN109024287B (zh) * 2018-07-21 2020-01-24 四川启创建设工程有限公司 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法

Similar Documents

Publication Publication Date Title
CN1837512B (zh) 一种钢板桩和钢管桩组合围堰及其制作方法
CN103510528B (zh) 用于地下结构抗浮的盲沟排水结构
CN103628504B (zh) 一种拼装式预制钢筋混凝土平台结构水下节点的连接方法
CN104099943B (zh) 地下连续墙与废弃地下人防工程交会处理方法
CN104805854A (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN104314042B (zh) 采用桩承式箱筒结构的防波堤施工方法
CN108755731A (zh) 一种沉井基础及构建方法
CN201459756U (zh) 悬挂式施工顶管竖井
CN105586985A (zh) 一种地铁围护结构的修建方法及一种地铁围护结构
CN204282399U (zh) 一种地铁围护结构
CN203977409U (zh) 一种预制装配式混凝土桩基
CN103243653A (zh) 一种吸盘式基础跨海大桥预制与现浇桥梁施工
CN204282295U (zh) 桩承式箱筒防波堤结构
CN203007967U (zh) 一种高原戈壁沙土地区光伏电站组件支架基础
CN102839689A (zh) 水闸底部深覆盖层基础防渗墙顶大变形止水及施工方法
CN207277349U (zh) 一种公路桥梁施工围堰装置
CN215441846U (zh) 一种地基防沉降结构
CN201865118U (zh) 压浆螺旋锚基础
CN103726446A (zh) 跨海大桥吸盘式预制件基础与一体陆港码头建设与施工
CN104074234A (zh) 电厂循环水系统的内河水取水口结构及其施工方法
CN107476315A (zh) 一种针对紧邻型基坑的预制式构件及其施工方法
CN204898699U (zh) 一种桥梁沉箱基础
CN209509556U (zh) 托换无地下室建筑地下空间增层的施工结构
CN207131405U (zh) 深切沟谷隧道明洞结构
CN206110155U (zh) 一种沉井二次封底结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 266109 science and Technology Bureau of Chengyang District, Shandong, Qingdao

Applicant after: Li Shangxi

Address before: 266555 science and Technology Bureau of Qingdao economic and Technological Development Zone, Shandong Province, transferred to Li Shangxi

Applicant before: Li Shangxi

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 266109, Shandong province Qingdao District, Chengyang Province Street Zhuang Wen Wen costume research and development center 208B

Applicant after: Li Shangxi

Address before: 266109 science and Technology Bureau of Chengyang District, Shandong, Qingdao

Applicant before: Li Shangxi

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814