CN103234077A - 长距离管道输煤在地震断裂带的保护方法 - Google Patents
长距离管道输煤在地震断裂带的保护方法 Download PDFInfo
- Publication number
- CN103234077A CN103234077A CN2013101737824A CN201310173782A CN103234077A CN 103234077 A CN103234077 A CN 103234077A CN 2013101737824 A CN2013101737824 A CN 2013101737824A CN 201310173782 A CN201310173782 A CN 201310173782A CN 103234077 A CN103234077 A CN 103234077A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- earthquake
- pipe
- protection method
- take
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101737824A CN103234077A (zh) | 2013-05-11 | 2013-05-11 | 长距离管道输煤在地震断裂带的保护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101737824A CN103234077A (zh) | 2013-05-11 | 2013-05-11 | 长距离管道输煤在地震断裂带的保护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103234077A true CN103234077A (zh) | 2013-08-07 |
Family
ID=48882129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101737824A Pending CN103234077A (zh) | 2013-05-11 | 2013-05-11 | 长距离管道输煤在地震断裂带的保护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103234077A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112613094A (zh) * | 2020-12-01 | 2021-04-06 | 西安石油大学 | 一种砂土盒的承载力评价方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1837666A (zh) * | 2005-03-25 | 2006-09-27 | 衡水长江预应力有限公司 | 大截面圆心应力抗震涵管及其制备工艺 |
CN102162554A (zh) * | 2011-04-12 | 2011-08-24 | 中国十九冶集团有限公司 | 矿浆管道在地震断裂带地段的敷设方法和敷设结构 |
CN102878351A (zh) * | 2012-10-18 | 2013-01-16 | 中煤科工集团武汉设计研究院 | 一种长距离管道输煤的管道敷设方法 |
-
2013
- 2013-05-11 CN CN2013101737824A patent/CN103234077A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1837666A (zh) * | 2005-03-25 | 2006-09-27 | 衡水长江预应力有限公司 | 大截面圆心应力抗震涵管及其制备工艺 |
CN102162554A (zh) * | 2011-04-12 | 2011-08-24 | 中国十九冶集团有限公司 | 矿浆管道在地震断裂带地段的敷设方法和敷设结构 |
CN102878351A (zh) * | 2012-10-18 | 2013-01-16 | 中煤科工集团武汉设计研究院 | 一种长距离管道输煤的管道敷设方法 |
Non-Patent Citations (2)
Title |
---|
海南省国土环境资源厅: "地质灾害防治知识", 《海南省国土环境资源厅网站》, 28 April 2001 (2001-04-28) * |
管道防腐胶带: "断层管线保护措施及选线建议", 《新浪博客》, 2 June 2012 (2012-06-02) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112613094A (zh) * | 2020-12-01 | 2021-04-06 | 西安石油大学 | 一种砂土盒的承载力评价方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | A top pilot tunnel preconditioning method for the prevention of extremely intense rockbursts in deep tunnels excavated by TBMs | |
AU2015358166B2 (en) | Water-preserving mining method for close-distance coal seam group | |
CN105155556B (zh) | 一种露天矿边坡单台阶楔形缺口整平坡面的施工方法 | |
CN105134216A (zh) | 破碎顶板110工法巷旁防塌落结构 | |
Mu et al. | F-structure model of overlying strata for dynamic disaster prevention in coal mine | |
Li et al. | 3D rotational failure mechanism of tunnel face in weathered and saturated Hoek-Brown rock masses | |
CN103234077A (zh) | 长距离管道输煤在地震断裂带的保护方法 | |
Prusek et al. | Powered support selection for longwall workings in dynamic load conditions | |
CN103542174A (zh) | 一种煤矿塌陷区管道敷设方法 | |
CN104480944B (zh) | 出土坡道结构及其施工方法 | |
CN205530758U (zh) | 一种建筑隔震结构 | |
CN104631474B (zh) | 一种边坡防护绿化结构 | |
CN202954370U (zh) | 一种大型卸荷松弛岩质边坡的开挖保护结构 | |
Song et al. | Optimization of a pre-improvement support system for large underground excavation | |
Ma et al. | The strata movement regularity and parameter simulation analysis in multiple seams repeated mining | |
Han et al. | Mechanical properties of buried steel pipeline in rock stratum under surface load | |
Zhao et al. | Stability and control technology for coal roadway of composite roof with thin-layered and argillaceous. | |
Xu et al. | Pressure-relief effect of coal rock body of long distance lower protective seam mined based on FLAC3D | |
CN204739317U (zh) | 压力钢管预埋结构 | |
Yu-long et al. | Mechanism analysis of restraining surface cracks and protecting Tetraena mongolice maxin with backfilling mining | |
CN203783480U (zh) | 全套管全回转钻机固定架 | |
Shan et al. | Coupled supporting of rock bolt and anchor cable in large cross-section roadway | |
Niederhuber et al. | Geomechanical explanation of the Enguri power tunnel leakage | |
CN109056753B (zh) | 一种边坡近水平支护杆件及其边坡预加固方法 | |
Zheng et al. | Study on the mechanism of water inrush in the arid western mining area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442 Applicant after: Wuhan Design and Research Institute Co., Ltd. pf China Coal Technology & Engineering Group Address before: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442 Applicant before: Wuhan Design and Research Institute of China Coal Technology & Engineering Group |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: WUHAN DESIGN AND RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP TO: WUHAN DESIGN AND RESEARCH INSTITUTE CO., LTD. PF CHINA COAL TECHNOLOGY + ENGINEERING GROUP |
|
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130807 |