CN103233768B - 一种井下煤层水平钻孔分段压裂卸压方法 - Google Patents

一种井下煤层水平钻孔分段压裂卸压方法 Download PDF

Info

Publication number
CN103233768B
CN103233768B CN201310181262.8A CN201310181262A CN103233768B CN 103233768 B CN103233768 B CN 103233768B CN 201310181262 A CN201310181262 A CN 201310181262A CN 103233768 B CN103233768 B CN 103233768B
Authority
CN
China
Prior art keywords
coal bed
hole
lateral aperture
main
main lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310181262.8A
Other languages
English (en)
Other versions
CN103233768A (zh
Inventor
张岗
许卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunchun Yao day new energy development and utilization of limited liability company
Original Assignee
YANBIAN YAOTIAN GAS GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANBIAN YAOTIAN GAS GROUP CO Ltd filed Critical YANBIAN YAOTIAN GAS GROUP CO Ltd
Priority to CN201310181262.8A priority Critical patent/CN103233768B/zh
Publication of CN103233768A publication Critical patent/CN103233768A/zh
Application granted granted Critical
Publication of CN103233768B publication Critical patent/CN103233768B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种井下煤层水平钻孔分段压裂卸压方法,主要是在井下煤层工作面用钻头水平钻一个长度500m-1000m的主水平孔;在主水平孔内下入石油套管,用G级水泥固井,候凝后,下入单弯螺杆,在主水平孔上钻8-10个100-200m的分支钻孔;彻底清洗钻孔后,在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,往孔内注入带有天然石英砂支撑剂的聚合物凝胶液体,蹩起高压,压开煤层,在煤层内形成有流动能力的渗流通道;在主水平孔口处安装水环式真空泵,将主水平孔和分支钻孔内的瓦斯抽排出来。本发明方法能在煤层工作面内形成最大体积的裂缝,最大限度的改善煤层渗透性,使煤层的天裂理得到沟通,形成一定规模的裂缝松散带,从而使聚焦在煤层内的应力得到释放,降低了煤层的冲击地压的危险性和煤层内瓦斯含量,为安全生产提供保障。

Description

一种井下煤层水平钻孔分段压裂卸压方法
技术领域
本发明涉及一种井下煤层水平钻孔分段压裂卸压方法。
技术背景
目前,瓦斯爆炸事故占我国煤矿事故的80%左右,瓦斯突出和冲击地压已经成为导致我国煤矿特大事故的头号杀手。含瓦斯的煤层发生冲击地压是在有一定的瓦斯赋存条件和地质因素的背景下,受扰动影响而发生的动力失稳过程。高瓦斯煤层冲击地压发生时,游离瓦斯随煤体一起被抛出,由于新的自由面的形成,周围煤体中的游离的瓦斯将会大量涌出,同时使周围煤中的瓦斯含量降低,加速了远场游离瓦斯向冲击点方向渗流,因此高瓦斯煤层发生冲击地压后瓦斯会继续涌出,大量聚焦后就发生瓦斯突出,而发生瓦斯事故。
发明内容
本发明的目的是为了提供一种解决现有煤矿开采过程中高瓦斯突出和冲击地压的发生问题,能够降低煤层内瓦斯含量和煤层冲击地压的危险性,能为煤矿安全生产提供技术保障的井下煤层水平钻孔分段压裂卸压方法。
本发明的技术方案为:
一种井下煤层水平钻孔分段压裂卸压方法 ,包括以下步骤:
a、在井下煤层工作面用钻头水平钻一个长度500m----1000m的主水平孔;
b、在主水平孔内下入石油套管, 用G级水泥固井, 候凝后,下入单弯螺杆, 在主水平孔上钻8-10个100-200m的分支钻孔;
c、彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,往主水平孔和分支钻孔内注入聚合物凝胶液体,并携带天然石英砂支撑剂,蹩起高压, 压开煤层,在煤层内形成有流动能力的渗流通道;
d、在主水平孔口处安装水环式真空泵,将主水平孔和分支钻孔内的瓦斯抽排出来。
另一种井下煤层水平钻孔分段压裂卸压方法 ,包括以下步骤:
a、在井下煤层工作面用钻头水平钻一个长度500m----1000m的主水平孔;
b、在主水平孔内下入石油套管, 用G级水泥固井, 候凝后,下入螺杆, 在主水平孔上再钻500m----1000m的水平钻孔;
c、彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,往主水平孔内注入聚合物凝胶液体,并携带天然石英砂支撑剂,蹩起高压, 压开煤层,在煤层内形成有流动能力的渗流通道;
d、在主水平孔口处安装水环式真空泵,将主水平孔内的瓦斯抽排出来。
所述的一种井下煤层水平钻孔分段压裂卸压方法,可用Φ215.9mm钻头钻成主水平孔, 然后下入直径Φ139.7mm壁厚7.72mm钢级N80的石油套管。
所述的一种井下煤层水平钻孔分段压裂卸压方法,可往主水平孔和分支钻孔内注入1500m3的或更多体积的聚合物凝胶液体,并携带60m3粒径为0.5-0.8mm的天然石英砂支撑剂。
在所述的另一种井下煤层水平钻孔分段压裂卸压方法,所述的c步骤中,彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,然后边往主水平孔内注入携带有天然石英砂支撑剂的聚合物凝胶液体,边在主孔内每100m分段下入可钻桥塞实施分段压裂,形成多条人工裂缝, 施工结束后, 下入钻塞工具将主孔内的可钻桥塞钻掉,打通主水平孔。
本发明方法能在煤层工作面内形成最大体积的裂缝,能最大限度的改善煤层渗透性, 同时由于煤层经高压注液压裂施工后,使煤层的天裂理得到沟通,在煤层内形成一定规模的裂缝松散带,从而使聚焦在煤层内的应力得到释放,降低了煤层的冲击地压的危险性,降低了煤层内瓦斯含量,为安全生产提供了保障,为类似煤矿解决煤层的冲击地压的危险性和保证安全生产具有重大意义。
附图说明
图1为本发明实施例1中水平多分支钻孔示意图。
图2为本发明实施例2水平钻孔多钻压裂模式示意图。
具体实施方式
实施例1
根据煤层工作面的煤层结构特点,在煤层成孔地质条件好、渗透性好的情况下,按照如附图1进行实施,具体方法是在井下煤层工作面7用Φ215.9mm钻头钻一个长度500m----1000m的主水平孔5, 然后下入直径Φ139.7mm壁厚7.72mm钢级N80的石油套管4, 用G级水泥固井, 候凝然后48小时后, 下入Φ118mm*2的单弯螺杆, 再在这个主水平孔5上钻8-10个100-200m的分支钻孔6, 彻底清洗钻孔后,,通过高压管线与在主水平孔5口安装耐压70MPa高压封孔装置3,并连接工作压力达到70MPa泵注设备2,往孔内注入1500m3的或更多体积的浓度为0.5%的HPD凝胶液体,并携带60m3粒径为0.5-0.8mm的天然石英砂支撑剂,蹩起高压, 压开煤层,在煤层内形成有一定流动能力的渗流通道;为了形成最大体积的裂缝,然后在孔口处安装2BE620水环式真空泵1主水平孔5和分支钻孔6将孔内的瓦斯抽排出来。
实施例2
根据煤层工作面的煤层结构特点,在煤层成孔地质条件不好、渗透性差的情况下,按照如附图2进行实施,具体方法是在井下煤层工作面7用Φ215.9mm钻头钻一个长度500m----1000m的主水平孔5, 然后下入直径Φ139.7mm壁厚7.72mm钢级N80的石油套管4, 用G级水泥固井,候凝然后48小时后,下入Φ118mm螺杆, 再在这个主水平孔5上钻500-1000m的水平钻孔,彻底清洗钻孔后, 在主水平孔口5处安装耐压70MPa高压封孔装置3,通过高压管线连接工作压力达到70MPa高压泵注设备2,然后边往主水平孔5内注入携带有天然石英砂支撑剂的聚合物凝胶液体,聚合物凝胶液体为浓度为0.5%的HPD凝胶液体,边在孔内每100m分段下入可钻桥塞6实施分段压裂,形成多条人工裂缝8, 施工结束后, 下入钻塞工具将孔内的可钻桥塞6钻掉,打通孔内通道, 然后在主水平孔5口处安装2BE620水环式真空泵1,将孔内的瓦斯抽排出来。

Claims (6)

1.一种井下煤层水平钻孔分段压裂卸压方法 ,包括以下步骤:
a、在井下煤层工作面用钻头水平钻一个长度500m----1000m的主水平孔;
b、在主水平孔内下入石油套管, 用G级水泥固井, 候凝后,下入单弯螺杆, 在主水平孔上钻8-10个100-200m的分支钻孔;
c、彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,然后往主水平孔和分支钻孔内注入聚合物凝胶液体,并携带天然石英砂支撑剂,蹩起高压, 压开煤层,在煤层内形成有流动能力的渗流通道;
d、在主水平孔口处安装水环式真空泵,将主水平孔和分支钻孔内的瓦斯抽排出来。
2.一种井下煤层水平钻孔分段压裂卸压方法 ,包括以下步骤:
a、在井下煤层工作面用钻头水平钻一个长度500m----1000m的主水平孔;
b、在主水平孔内下入石油套管, 用G级水泥固井, 候凝后,下入螺杆, 在主水平孔上再钻500m----1000m的水平钻孔;
c、彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,往主水平孔内注入聚合物凝胶液体,并携带天然石英砂支撑剂,蹩起高压, 压开煤层,在煤层内形成有流动能力的渗流通道;
d、在主水平孔口处安装水环式真空泵,将主水平孔内的瓦斯抽排出来。
3.根据权利要求1或2所述的一种井下煤层水平钻孔分段压裂卸压方法,其特征在于用Φ215.9mm钻头钻成主水平孔, 然后下入直径Φ139.7mm壁厚7.72mm钢级N80的石油套管。
4.根据权利要求1所述的一种井下煤层水平钻孔分段压裂卸压方法,其特征在于往主水平孔和分支钻孔内注入1500m3的或更多体积的聚合物凝胶液体,并携带60m3粒径为0.5-0.8mm的天然石英砂支撑剂。
5.根据权利要求2所述的一种井下煤层水平钻孔分段压裂卸压方法,其特征在于往主水平孔和水平钻孔内注入1500m3的或更多体积的聚合物凝胶液体,并携带60m3粒径为0.5-0.8mm的天然石英砂支撑剂。
6.根据权利要求2所述的一种井下煤层水平钻孔分段压裂卸压方法,其特征在于所述的c步骤中,彻底清洗钻孔后, 在主水平孔口处安装高压封孔装置,通过高压管线连接高压泵注设备,边往主水平孔内注入携带有天然石英砂支撑剂的聚合物凝胶液体,边在主孔内每100m分段下入可钻桥塞实施分段压裂,形成多条人工裂缝, 施工结束后, 下入钻塞工具将主孔内的可钻桥塞钻掉,打通主水平孔。
CN201310181262.8A 2013-05-16 2013-05-16 一种井下煤层水平钻孔分段压裂卸压方法 Expired - Fee Related CN103233768B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310181262.8A CN103233768B (zh) 2013-05-16 2013-05-16 一种井下煤层水平钻孔分段压裂卸压方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310181262.8A CN103233768B (zh) 2013-05-16 2013-05-16 一种井下煤层水平钻孔分段压裂卸压方法

Publications (2)

Publication Number Publication Date
CN103233768A CN103233768A (zh) 2013-08-07
CN103233768B true CN103233768B (zh) 2015-03-11

Family

ID=48881831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310181262.8A Expired - Fee Related CN103233768B (zh) 2013-05-16 2013-05-16 一种井下煤层水平钻孔分段压裂卸压方法

Country Status (1)

Country Link
CN (1) CN103233768B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234738B (zh) * 2014-07-21 2017-08-15 河南理工大学 一种低渗煤层多分支定向钻孔割缝增透方法
CN104747230B (zh) * 2015-03-02 2016-10-19 陈宝宝 一种煤矿井瓦斯抽取装置及其使用方法
CN105239988A (zh) * 2015-09-23 2016-01-13 辽宁工程技术大学 一种仿生抽放瓦斯钻孔
CN106225617B (zh) * 2016-08-09 2018-08-21 武汉大学 一种基于爆夯水压致裂的岩爆防治方法
CN106894816A (zh) * 2017-02-23 2017-06-27 中国矿业大学 基于三角板结构模型的远场关键层切顶卸压护巷方法
CN108361010A (zh) * 2018-02-12 2018-08-03 安徽理工大学 一种高瓦斯煤层“十”字型水力压裂增透方法
CN108625824A (zh) * 2018-05-02 2018-10-09 辽宁工程技术大学 一种深埋含水煤层瓦斯抽采钻孔布置方法
CN109001042A (zh) * 2018-09-17 2018-12-14 中国科学院地质与地球物理研究所 一种基于流体压力加载的三轴水力压裂实验装置
CN110965964B (zh) * 2019-12-16 2021-10-12 临沂矿业集团菏泽煤电有限公司 一种特厚煤层瓦斯抽采方法
CN112360421A (zh) * 2020-12-01 2021-02-12 中国石油天然气股份有限公司 一种低渗透油藏侧钻井的全通径完井压裂方法
CN113246216A (zh) * 2021-05-06 2021-08-13 贾凤霞 一种基于高效传导波纤维的钻头加压减震装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4544208A (en) * 1984-07-23 1985-10-01 Concoco Inc. Degasification of coal
RU2419723C1 (ru) * 2010-02-02 2011-05-27 Александр Васильевич Булкин Способ дегазации разрабатываемых угольных пластов
CN102080526B (zh) * 2011-01-17 2012-08-22 河南理工大学 地面煤层顶板顺层水平压裂井抽采瓦斯方法
CN102116167B (zh) * 2011-01-25 2012-03-21 煤炭科学研究总院西安研究院 一种煤层气地面、井下立体化抽采系统
CN102094611B (zh) * 2011-03-07 2013-06-05 杜劼 煤矿井下压裂成套装置
CN102691515A (zh) * 2011-03-21 2012-09-26 大庆中油庆瑞石油科技有限公司 煤矿井下巷道式煤层瓦斯压裂设备
CN102493831B (zh) * 2011-11-14 2014-05-28 山西晋城无烟煤矿业集团有限责任公司 地面压裂井下水平钻孔抽放煤层气方法

Also Published As

Publication number Publication date
CN103233768A (zh) 2013-08-07

Similar Documents

Publication Publication Date Title
CN103233768B (zh) 一种井下煤层水平钻孔分段压裂卸压方法
CN101575983B (zh) 煤矿井下定向压裂增透消突方法及压裂增透消突装置
CN108612508B (zh) 一种利用高强度可降解暂堵球的页岩气水平井压裂新方法
CN105332684B (zh) 一种高压水爆与co2压裂相结合的煤层气驱替抽采工艺
CN102619552B (zh) 导向槽定向水力压穿增透及消突方法
CN104632174A (zh) 煤层液态二氧化碳压裂装置及方法
CN106761740A (zh) 一种坚硬煤层顶板耦合致裂方法
CN103924955A (zh) 一种页岩气井co2及滑溜水混合压裂工艺
CN102635327A (zh) 破碎煤岩体注浆方法及系统
CN103498680B (zh) 提高综放工作面初采期间顶煤回收率的方法
AU2019201471B2 (en) High-pressure self-locking packer and setting method thereof
CN105221129B (zh) 一种水压爆破启裂‑co2携支撑剂压裂的储层增透方法
CN109488370B (zh) 一种井下灰岩探放水钻孔施工方法
CN205063929U (zh) 一种煤矿井下封压一体化分段水力压裂装置
CN204419145U (zh) 煤层液态二氧化碳压裂装置
CN105370256A (zh) 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN108166953A (zh) 射流割缝与co2酸压爆破联作煤岩动力灾害防治方法
CN108119122A (zh) 一种套变复杂井分段压裂方法
CN105351001A (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN107620581B (zh) 一井两用煤矿井筒检查孔的施工方法
RU2485306C1 (ru) Способ гидравлического разрыва пласта в скважине
CN102434192A (zh) 增加煤层致裂效果的装置及增加煤层致裂效果的方法
CN104612649A (zh) 低压低渗透储层煤层气井化学增透压裂增透增产方法及其设备
CN109578058B (zh) 一种通过辅助钻孔提高抽采钻孔瓦斯抽采浓度的方法
CN104234682A (zh) 一种适用于多、薄煤层的连续油管分层压裂方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170401

Address after: 4 Hunchun border economic cooperation zone, Jilin, No. 133300

Patentee after: Hunchun Yao day new energy development and utilization of limited liability company

Address before: 133400 Longjing Industrial Zone, Yanbian Korean Autonomous Prefecture, Jilin, China

Patentee before: Yanbian Yaotian Gas Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20190516