CN103231444A - Tool for manufacturing exhaust vents of smoke exhaust ventilating pipes and using method thereof - Google Patents

Tool for manufacturing exhaust vents of smoke exhaust ventilating pipes and using method thereof Download PDF

Info

Publication number
CN103231444A
CN103231444A CN2013101540604A CN201310154060A CN103231444A CN 103231444 A CN103231444 A CN 103231444A CN 2013101540604 A CN2013101540604 A CN 2013101540604A CN 201310154060 A CN201310154060 A CN 201310154060A CN 103231444 A CN103231444 A CN 103231444A
Authority
CN
China
Prior art keywords
forming module
hammer
tup
refreshing tube
tools
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101540604A
Other languages
Chinese (zh)
Other versions
CN103231444B (en
Inventor
姚景祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310154060.4A priority Critical patent/CN103231444B/en
Publication of CN103231444A publication Critical patent/CN103231444A/en
Application granted granted Critical
Publication of CN103231444B publication Critical patent/CN103231444B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Percussive Tools And Related Accessories (AREA)

Abstract

The invention discloses a tool for manufacturing exhaust vents of smoke exhaust ventilating pipes and a using method thereof. The tool comprises an exhaust vent forming module and a dismantling hammer. The forming module is of a plate type structure, a peripheral outline of the forming module is matched with appearances of air inlet holes and air outlet holes. The dismantling hammer is composed of a hammer body and a hammer rod. An installing seat is arranged at the central position of the hammer body, a plurality of radially-arranged hook-shaped teeth are symmetrically installed on a peripheral side wall of the installing seat, the tail ends of the hook-shaped teeth are provided with impact blocks, and the forming module is provided with a hammer body inserting hole matched with a shape of the hammer body on the dismantling hammer. The tool for manufacturing the exhaust vents of the smoke exhaust ventilating pipes has the advantages of being designed by borrowing ideas from working principles of an unlocking key and a boat anchor and being simple in structure, easy to manufacture and convenient to operate. Hole walls of the air inlet holes of the smoke exhaust ventilating pipes manufactured by means of the tool are even, the appearance of the holes are in order, standard operation is achieved completely, a manufacture method is simple, the input cost is low, and the tool has a wide popularization and application space.

Description

Smoke evacuation air refreshing tube steam vent tools and using method thereof
Technical field
The present invention relates to a kind of tools of the air refreshing tube steam vent of discharging fume, the invention still further relates to a kind of using method of these tools.
Background technology
The smoke evacuation air refreshing tube of the civilian building in town and country comprises that airduct and heated kang have generally all adopted the design of prefabricated, and this design is subjected to the favor in market very much.But during the air inlet/outlet on making the smoke evacuation air refreshing tube, the method for employing differs, and its Products Quality is also just different, and there is air inlet/outlet regular defective inadequately in most methods; When manufacturing anti-clogging smoke evacuation air refreshing tube, the difficulty of making air admission hole is bigger, and the air admission hole that also has is to form with the instrument cutting on the sidewall of smoke evacuation air refreshing tube, so more wastes time and energy.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of tools of the air refreshing tube steam vent of discharging fume, and uses these tools not only can guarantee product quality effectively, but also significantly improves working (machining) efficiency.The another one technical problem that the present invention will solve is to provide a kind of using method of these tools.
Technical scheme of the present invention is: these tools comprise the forming module of steam vent and the dismounting hammer of this forming module.Forming module is plank frame, and the profile of its circumferential profile and air inlet/outlet is complementary.
The dismounting hammer is made of tup and hammer stem, is the mount pad of one section tubulose in the center of this tup, and symmetry is equipped with the briar tooth shape of a plurality of radial settings on the sidewall of mount pad periphery, and the angle that arranges between hook tooth and hammer stem is 90 degree, or is slightly smaller than 90 degree.Be equipped with one at the tail end of hook tooth and have the impact block that clashes into the plane, be provided with the tup patchhole that the shape with above-mentioned dismounting hammer upper ram is complementary at forming module.
Hook tooth can arrange two, is " one " font in the both sides of mount pad and arranges, and also can arrange three, is star-arrangement around mount pad, can also arrange four, is " ten " font and arranges around mount pad.The quantity that arranges of hook tooth can also be more.
Can also be equipped with on the forming module and air refreshing tube is made assembling and positioning device between template, comprise location magnetic patch or positioning screw.
Can also set up one block-shaped similarly to the forming module shape at this forming module back side, appearance and size is slightly larger than the accessory plate of forming module, and the plate face of accessory plate is provided with the structure setting identical with shape on the forming module.
Tup can also adopt the slidingtype design, and namely hammer stem is hollow pipe, and the hammer stem sliding axle is housed in hammer stem, and hammer stem and hammer stem sliding axle are slidingly matched.Tup on the dismounting hammer is fixed on hammer stem or the hammer stem sliding axle.
The using method of instrument of the present invention is as follows: forming module is connected air refreshing tube makes on the template, on template, go up slip then, the thickness of slip is equal to the thickness of forming module, after treating that slip solidifies, remove air refreshing tube and make template, the tup that to dismantle hammer again passes forming module by the tup patchhole, then tup is suitably rotated, make it to stagger with the tup patchhole, holding hammer stem at last firmly outwards firmly hits and draws, forming module just can be separated with smoke evacuation air refreshing tube wall like this, and finishing final vacuum hole makes namely to accuse finishes.
The invention has the beneficial effects as follows: the tools of smoke evacuation air refreshing tube steam vent are that the operation principle that is referred from unblank key and ship anchor designs, and have simple in structurely, make easily easy to operate advantage.Utilize the hole wall of the smoke evacuation air refreshing tube air admission hole that this instrument makes even, outward appearance is regular, has realized normalizing operation fully, and not only preparation method is simple, and the cost of input is also very low, has wide popularization and application space.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is described in detail.
Fig. 1 is the structural representation of the embodiment of the invention 1.
Fig. 2 is the structural representation of embodiment 2.
Fig. 3 is the structural representation of embodiment 3.
Fig. 4 is the structural representation of embodiment 4.
Fig. 5 is the structural representation of embodiment 5.
Fig. 6 is the structural representation of embodiment 6.
Number in the figure:
1, forming module 2, dismounting hammer 3, tup 4, hammer stem 5, mount pad 6, hook tooth
7, impact block 8, tup patchhole 9, location magnetic patch 10, positioning screw 11, accessory plate
12, hammer stem sliding axle.
The specific embodiment
Example 1
As shown in Figure 1, the tools of smoke evacuation air refreshing tube upper air-vent comprise forming module 1 and the dismounting hammer 2 of this forming module 1 after steam vent completes of steam vent.Forming module 1 is plank frame, and the profile of its circumferential profile and air inlet/outlet is complementary.
Dismounting hammer 2 is made of tup 3 and hammer stem 4, the center that is positioned at this tup 3 is the mount pad 5 of one section tubulose, on the sidewall of mount pad 5 peripheral annular in-line be equipped with two be oppositely arranged hook tooth 6, the angle that arranges of 4 of hook tooth 6 and hammer stems is 90 degree, is equipped with one at the tail end of hook tooth 6 and has the impact block 7 that clashes into the plane.Be provided with above-mentioned dismounting at forming module 1 and hammer the tup patchhole 8 that the shape of 2 upper rams 3 is complementary into shape.
Example 2
As shown in Figure 2, the hook tooth 6 on the described tup 3 arranges three, is star-arrangement around mount pad 5,
Example 3
As shown in Figure 3, the hook tooth 6 on the described tup 3 arranges four, is " ten " font and arranges around mount pad 5.
Example 4
As shown in Figure 4, also be equipped with on the forming module 1 and air refreshing tube is made assembling and positioning device between template, comprise location magnetic patch 9 and positioning screw 10.
Example 5
As shown in Figure 5, can also set up one block-shaped similarly to forming module 1 shape at this forming module 1 back side, appearance and size is slightly larger than the accessory plate 11 of forming module 1, and the plate face of accessory plate 11 is provided with the structure setting identical with shape on the forming module 1.
Example 6
As shown in Figure 6, tup 3 adopts the slidingtype design, and namely hammer stem 4 is hollow pipe, and hammer stem sliding axle 12 is housed in hammer stem 4, and hammer stem 4 is slidingly matched with hammer stem sliding axle 12.Tup 3 on the dismounting hammer 2 is fixed on the hammer stem 4.
Example 7
The using method of technical scheme is as follows among the embodiment 1: forming module 1 is connected air refreshing tube makes on the template, on template, go up slip then, the thickness of slip is equal to the thickness of forming module 1, after treating that slip solidifies, remove air refreshing tube and make template, the tup 3 that to dismantle hammer 2 again passes forming module 1 by tup patchhole 8, then tup 3 is suitably rotated, make it to stagger with tup patchhole 8, holding hammer stem 4 at last firmly outwards firmly hits and draws, forming module 1 just can be separated with smoke evacuation air refreshing tube wall like this, and finishing final vacuum hole makes namely to accuse finishes.

Claims (8)

  1. One kind should smoke evacuation air refreshing tube upper air-vent tools, it is characterized in that: this instrument comprises that the forming module (1) of steam vent and the dismounting of this forming module (1) hammer (2) into shape; Forming module 1 is plank frame, and the profile of its circumferential profile and air inlet/outlet is complementary; Dismounting hammer (2) is made of tup (3) and hammer stem (4), be the mount pad (5) of one section tubulose in the center of this tup (3), symmetry is equipped with the hook tooth (6) of a plurality of radial settings on the sidewall of mount pad (5) periphery, the angle that arranges between hook tooth (6) and hammer stem (4) is 90 degree, or is slightly smaller than 90 degree; Be equipped with one at the tail end of hook tooth (6) and have the impact block (7) that clashes into the plane; Be provided with the tup patchhole (8) that is complementary with the shape of dismantling hammer (2) upper ram (3) at forming module (1).
  2. 2. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1, it is characterized in that: described hook tooth (6) arranges two, is " one " font in the both sides of mount pad (5) and arranges.
  3. 3. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1, it is characterized in that: described hook tooth (6) arranges three, is star-arrangement around mount pad 5.
  4. 4. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1, it is characterized in that: described hook tooth (6) arranges four, is " ten " font and arranges around mount pad 5.
  5. 5. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1 is characterized in that: also be equipped with on the forming module (1) and air refreshing tube is made assembling and positioning device between template, comprising location magnetic patch (9) or positioning screw (10).
  6. 6. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1, it is characterized in that: also set up one block-shaped similar to forming module (1) shape at described forming module (1) back side, appearance and size is slightly larger than the accessory plate (11) of forming module 1, and the plate face of accessory plate (11) is provided with forming module (1) and goes up the identical structure setting of shape.
  7. 7. the tools of smoke evacuation air refreshing tube upper air-vent according to claim 1, it is characterized in that: described tup (3) adopts the slidingtype design, be that hammer stem (4) is hollow pipe, hammer stem sliding axle (12) is housed in hammer stem (4), hammer stem (4) is slidingly matched with hammer stem sliding axle (12), and the tup (3) on the dismounting hammer (2) is fixed on hammer stem (4) or the hammer stem sliding axle (12).
  8. 8. the using method of the tools of the air refreshing tube upper air-vent of discharging fume according to claim 1 is as follows: forming module (1) is connected air refreshing tube makes on the template, on all templates, go up slip then, the thickness of the same forming module of the thickness of slip (1) is equal to, after treating that slip solidifies, remove air refreshing tube and make template, the tup (3) that to dismantle hammer (2) again passes forming module (1) through tup patchhole (8), then with suitably rotation of tup (3), make it to stagger with tup patchhole (8), holding hammer stem (4) at last firmly outwards firmly hits and draws, forming module (1) just can be separated with smoke evacuation air refreshing tube wall like this, and finishing final vacuum hole makes namely to accuse finishes.
CN201310154060.4A 2013-04-16 2013-04-16 Smoke discharge ventilation pipeline steam vent tools and using method thereof Active CN103231444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310154060.4A CN103231444B (en) 2013-04-16 2013-04-16 Smoke discharge ventilation pipeline steam vent tools and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310154060.4A CN103231444B (en) 2013-04-16 2013-04-16 Smoke discharge ventilation pipeline steam vent tools and using method thereof

Publications (2)

Publication Number Publication Date
CN103231444A true CN103231444A (en) 2013-08-07
CN103231444B CN103231444B (en) 2016-09-28

Family

ID=48879547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310154060.4A Active CN103231444B (en) 2013-04-16 2013-04-16 Smoke discharge ventilation pipeline steam vent tools and using method thereof

Country Status (1)

Country Link
CN (1) CN103231444B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260445A (en) * 1995-03-24 1996-10-08 Hazama Gumi Ltd Method and equipment for forming joint weep hole in method of rcd construction
CN2599138Y (en) * 2002-11-13 2004-01-14 程光明 Building storage pipeline preleft hole mould
CN201056841Y (en) * 2007-07-23 2008-05-07 江苏省建工集团有限公司 Shaping device for pre-opened hole of cast-in-situ reinforced concrete plate
CN201292665Y (en) * 2008-11-10 2009-08-19 郑州市第一建筑工程集团有限公司 Concrete floor pre-arranged hole apparatus
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Construction method for reserved hole of tightly-fixed steel sleeve
CN102140840A (en) * 2011-01-25 2011-08-03 河南国基建设集团有限公司 Reducing and repeated-use reserved opening building device
CN202187556U (en) * 2011-07-26 2012-04-11 北京城建北方建设有限责任公司 Tool type reserved hole die
CN202202561U (en) * 2011-07-13 2012-04-25 中建一局集团第三建筑有限公司 Construction sleeve for reserved hole of floor slab
CN202220436U (en) * 2011-07-20 2012-05-16 黄传茂 Detachable grid beam mould
CN202391113U (en) * 2011-11-24 2012-08-22 中建三局第一建设工程有限责任公司 Device for reserving reserved hole in building engineering
CN202391114U (en) * 2011-11-24 2012-08-22 中建三局第一建设工程有限责任公司 Pipe passing floorslab sleeve pail
CN202627513U (en) * 2012-04-25 2012-12-26 浙江万达建设集团有限公司 Building reserved-hole bushing device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260445A (en) * 1995-03-24 1996-10-08 Hazama Gumi Ltd Method and equipment for forming joint weep hole in method of rcd construction
CN2599138Y (en) * 2002-11-13 2004-01-14 程光明 Building storage pipeline preleft hole mould
CN201056841Y (en) * 2007-07-23 2008-05-07 江苏省建工集团有限公司 Shaping device for pre-opened hole of cast-in-situ reinforced concrete plate
CN201292665Y (en) * 2008-11-10 2009-08-19 郑州市第一建筑工程集团有限公司 Concrete floor pre-arranged hole apparatus
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Construction method for reserved hole of tightly-fixed steel sleeve
CN102140840A (en) * 2011-01-25 2011-08-03 河南国基建设集团有限公司 Reducing and repeated-use reserved opening building device
CN202202561U (en) * 2011-07-13 2012-04-25 中建一局集团第三建筑有限公司 Construction sleeve for reserved hole of floor slab
CN202220436U (en) * 2011-07-20 2012-05-16 黄传茂 Detachable grid beam mould
CN202187556U (en) * 2011-07-26 2012-04-11 北京城建北方建设有限责任公司 Tool type reserved hole die
CN202391113U (en) * 2011-11-24 2012-08-22 中建三局第一建设工程有限责任公司 Device for reserving reserved hole in building engineering
CN202391114U (en) * 2011-11-24 2012-08-22 中建三局第一建设工程有限责任公司 Pipe passing floorslab sleeve pail
CN202627513U (en) * 2012-04-25 2012-12-26 浙江万达建设集团有限公司 Building reserved-hole bushing device

Also Published As

Publication number Publication date
CN103231444B (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN104029017A (en) Wind tunnel flow deflector forming device
CN101954513A (en) Broaching method of large mortise of wheel disc of large-size flue gas turbine
CN204082292U (en) The automobile gas exhausting manifold branch of Biomimetic Fish dermatoglyph internal surface
CN103231444A (en) Tool for manufacturing exhaust vents of smoke exhaust ventilating pipes and using method thereof
CN203900870U (en) Wind tunnel deflector molding device
CN204308635U (en) A kind of camera sky shade Drilling operation fixture
CN203391449U (en) Ventilation roller
CN203392560U (en) Winding roller for producing film
CN201884242U (en) Device used for treating noise and vibration generated by high-pressure gases
CN209907314U (en) Assembled device for quickly building physical model of river channel
CN102588059A (en) Bionic principle based design method of exhaust manifold of automobile engine
CN203955952U (en) Stripper apparatus in a kind of spinning
CN201412299Y (en) Piston for natural gas compressor
CN206859493U (en) A kind of aluminium grid installation structure
CN204567071U (en) A kind of bull for processing stone slab pattern revolves engraving device
CN206874398U (en) A kind of internal combustion engine tail gas discharge clarifier
CN105290336A (en) Hollow type wheel sand core with positioning function and exhaust function
CN201471347U (en) Air intake and exhaust device of handle body of pneumatic tool
CN206325923U (en) 3D printing turbo-charger impeller model cleans bracket
CN204748901U (en) Pottery bowl master model
CN204628708U (en) A kind of air-flow air dividing plate
CN201567789U (en) 4L-type variable section column template
CN205331249U (en) Bearing removing device
CN105081127A (en) Spinning internal demoulding device
CN202668815U (en) Mould core fast pressing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant