CN103231345A - Bolt installing tool for gypsum board hung ceiling - Google Patents
Bolt installing tool for gypsum board hung ceiling Download PDFInfo
- Publication number
- CN103231345A CN103231345A CN2013101443233A CN201310144323A CN103231345A CN 103231345 A CN103231345 A CN 103231345A CN 2013101443233 A CN2013101443233 A CN 2013101443233A CN 201310144323 A CN201310144323 A CN 201310144323A CN 103231345 A CN103231345 A CN 103231345A
- Authority
- CN
- China
- Prior art keywords
- nut
- furred ceiling
- erecting tools
- fixed bar
- bolt installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Clamps And Clips (AREA)
Abstract
The invention discloses a bolt installing tool for a gypsum board hung ceiling. The bolt installing tool comprises a fixed rod and a nut tightening device. The nut tightening device is fixedly installed at the upper end of the fixed rod and is cylindrical, a fixed ring protruded outwards is arranged in the cylinder, a nut placing groove is arranged on the upper portion of the fixed ring, and an opening is arranged on the side of the cylinder. The bolt installing tool overcomes the shortcomings in the prior art and is simple in design and reasonable in structure, the tightening device is arranged at the upper end of a telescopic rod, a nut and a screw can be placed in the tightening device, the nut can be tightened by rotating the telescopic rod, and the bolt installing tool is convenient to operate.
Description
Technical field
The present invention relates to furred ceiling screw erecting tools technical field, specifically belong to a kind of plasterboard furred ceiling bolt erecting tools.
Background technology
Indoor with the plasterboard ceiling decoration is more common, and plasterboard will be fixed in indoor upper end.Existing mainly by being fixed at screw and bolt.Generally all need a ladder and electric drill, inconvenient operation when mounted.Because need be with ladder when generally installing outside, increase the installation personnel burden of going out, by the ladder upper and lower fitting operation that carries out back and forth, also inconvenient.
Summary of the invention
The purpose of this invention is to provide a kind of plasterboard furred ceiling bolt erecting tools, the deficiencies in the prior art have been overcome, simplicity of design, rational in infrastructure, by tightening device being arranged at the expansion link upper end, can place nut and screw rod in the tightening device, just can be with nut screwing clamping by rotating expansion link, easy to operate.
The technical solution used in the present invention is as follows:
A kind of plasterboard furred ceiling bolt erecting tools, comprise fixed bar and nut screwing clamping device, described nut screwing clamping device is installed in the fixed bar upper end, described nut screwing clamping device is cylindric, has the retainer ring to outer lug in its cylinder, retainer ring top has the nut standing groove, and described cylinder side has an opening.
Described retainer ring is positioned at the cylinder centre position.
Described fixed bar is that a plurality of expansion links constitute, and passes through engagement connection between the expansion link.
Between described a plurality of expansion link by being threaded.
Described expansion link is that steel pipe or plastics are made.
Described fixed bar bottom is provided with the lines that increases frictional force.
Compared with the prior art, beneficial effect of the present invention is as follows:
The present invention is by by being arranged at tightening device expansion link upper end, can place nut and screw rod in the tightening device, just can be with nut screwing clamping by rotating expansion link, tightening the back namely can take down expansion link by the opening on the tightening device, easy to operate, expansion link is shunk and stretch according to house height, need not at cat ladder, improve installation effectiveness, reduce labour intensity.
Description of drawings
Fig. 1 is structural representation of the present invention;
The structural representation that Fig. 2 analyses and observe for nut screwing clamping device of the present invention.
The specific embodiment
Referring to accompanying drawing, a kind of plasterboard furred ceiling bolt erecting tools comprises fixed bar 1 and nut screwing clamping device 2, and fixed bar 1 is that a plurality of expansion links 101 constitute, and by engagement connection, fixed bar 1 bottom is provided with the lines 102 that increases frictional force between the expansion link 101.Fixed bar 1 is made for steel pipe or plastics.Nut screwing clamping device 2 is installed in fixed bar 1 upper end, and nut screwing clamping device 2 is cylindric, has the retainer ring 201 to outer lug in its cylinder, and retainer ring 201 is positioned at the cylinder centre position.Retainer ring 201 tops have nut standing groove 202, and the cylinder side has an opening 203.Nut is positioned in the nut standing groove 202, just nut screwing clamping can be tightened the back and namely expansion link can be taken down by the opening 203 on the tightening device by rotating expansion link 101, and is easy to operate.
Claims (6)
1. plasterboard furred ceiling bolt erecting tools, comprise fixed bar and nut screwing clamping device, it is characterized in that: described nut screwing clamping device is installed in the fixed bar upper end, described nut screwing clamping device is cylindric, has the retainer ring to outer lug in its cylinder, retainer ring top has the nut standing groove, and described cylinder side has an opening.
2. a kind of plasterboard furred ceiling bolt erecting tools according to claim 1, it is characterized in that: described retainer ring is positioned at the cylinder centre position.
3. a kind of plasterboard furred ceiling bolt erecting tools according to claim 1 is characterized in that: described fixed bar is that a plurality of expansion links constitute, and passes through engagement connection between the expansion link.
4. a kind of plasterboard furred ceiling bolt erecting tools according to claim 3 is characterized in that: between described a plurality of expansion links by being threaded.
5. a kind of plasterboard furred ceiling bolt erecting tools according to claim 3, it is characterized in that: described expansion link is that steel pipe or plastics are made.
6. a kind of plasterboard furred ceiling bolt erecting tools according to claim 1 is characterized in that: described fixed bar bottom is provided with the lines that increases frictional force.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101443233A CN103231345A (en) | 2013-04-19 | 2013-04-19 | Bolt installing tool for gypsum board hung ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101443233A CN103231345A (en) | 2013-04-19 | 2013-04-19 | Bolt installing tool for gypsum board hung ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103231345A true CN103231345A (en) | 2013-08-07 |
Family
ID=48879451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101443233A Pending CN103231345A (en) | 2013-04-19 | 2013-04-19 | Bolt installing tool for gypsum board hung ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103231345A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103624748A (en) * | 2013-10-24 | 2014-03-12 | 哈尔滨宏万智科技开发有限公司 | Shoulder pad type dustproof electric hammer |
CN112756733A (en) * | 2020-12-31 | 2021-05-07 | 晶澳(邢台)太阳能有限公司 | Change welding tucking device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007105866A (en) * | 2005-10-14 | 2007-04-26 | Hirosugi Seiki:Kk | Tool for automating embedding of nut of outer threaded type to be embedded |
KR20110007486A (en) * | 2009-07-16 | 2011-01-24 | 한국항공우주산업 주식회사 | Tool for bush installation |
CN202006452U (en) * | 2011-04-27 | 2011-10-12 | 上海宝钢设备检修有限公司 | Tool for disassembly and assembly of collar nut of fuel oil spraying pipe of locomotive engine |
CN202318225U (en) * | 2011-11-15 | 2012-07-11 | 深圳海外装饰工程有限公司 | Fastening device |
CN202416664U (en) * | 2011-11-28 | 2012-09-05 | 中国华冶科工集团有限公司 | Tool for installing suspender in construction of suspended ceiling |
CN203197842U (en) * | 2013-04-19 | 2013-09-18 | 刘伟 | Bolt installation tool used for plasterboard ceiling |
-
2013
- 2013-04-19 CN CN2013101443233A patent/CN103231345A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007105866A (en) * | 2005-10-14 | 2007-04-26 | Hirosugi Seiki:Kk | Tool for automating embedding of nut of outer threaded type to be embedded |
KR20110007486A (en) * | 2009-07-16 | 2011-01-24 | 한국항공우주산업 주식회사 | Tool for bush installation |
CN202006452U (en) * | 2011-04-27 | 2011-10-12 | 上海宝钢设备检修有限公司 | Tool for disassembly and assembly of collar nut of fuel oil spraying pipe of locomotive engine |
CN202318225U (en) * | 2011-11-15 | 2012-07-11 | 深圳海外装饰工程有限公司 | Fastening device |
CN202416664U (en) * | 2011-11-28 | 2012-09-05 | 中国华冶科工集团有限公司 | Tool for installing suspender in construction of suspended ceiling |
CN203197842U (en) * | 2013-04-19 | 2013-09-18 | 刘伟 | Bolt installation tool used for plasterboard ceiling |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103624748A (en) * | 2013-10-24 | 2014-03-12 | 哈尔滨宏万智科技开发有限公司 | Shoulder pad type dustproof electric hammer |
CN112756733A (en) * | 2020-12-31 | 2021-05-07 | 晶澳(邢台)太阳能有限公司 | Change welding tucking device |
CN112756733B (en) * | 2020-12-31 | 2022-08-26 | 晶澳(邢台)太阳能有限公司 | Change welding tucking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016000416A1 (en) | Overhead ground wire lifter | |
CN103231345A (en) | Bolt installing tool for gypsum board hung ceiling | |
CN203147672U (en) | Embedded installing rail hanging device | |
CN203197842U (en) | Bolt installation tool used for plasterboard ceiling | |
CN202791874U (en) | Adjustable lamp hoop | |
CN202273401U (en) | Extension pipe connecting piece | |
CN202680340U (en) | Folding bird preventing device | |
CN204942760U (en) | Double flute hanger | |
CN204076121U (en) | A kind of Telescopic screwdriver | |
CN204088587U (en) | A kind of Novel connecting ground wire handle arrangement | |
CN201935129U (en) | Adjustable factory lamp assembling set | |
CN202812478U (en) | Pipe clamp structure | |
CN202200217U (en) | Fixture device for steel wire mesh tubes | |
CN202622700U (en) | Hanger rod installation tool | |
CN202377962U (en) | Wrench for fast installing bolts | |
CN204345208U (en) | A kind of spherical camera mounting bracket | |
CN203325737U (en) | Adjustable brake pull-rod | |
CN204096917U (en) | A kind of large-scale lifting pawl | |
CN202791868U (en) | Safe lamp base | |
CN204238567U (en) | Hanger erection device | |
CN204220909U (en) | A kind of homalocephalus clip screw head upsetting device | |
CN204230809U (en) | Novel cable frame | |
CN203293078U (en) | Combination type wrench | |
CN204036334U (en) | Top board expansion bolt fastener | |
CN220118190U (en) | Underground pipeline supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130807 |