CN103226753A - Realization method of full life circle drawing data management system - Google Patents

Realization method of full life circle drawing data management system Download PDF

Info

Publication number
CN103226753A
CN103226753A CN2013101403749A CN201310140374A CN103226753A CN 103226753 A CN103226753 A CN 103226753A CN 2013101403749 A CN2013101403749 A CN 2013101403749A CN 201310140374 A CN201310140374 A CN 201310140374A CN 103226753 A CN103226753 A CN 103226753A
Authority
CN
China
Prior art keywords
shelves
data management
pdm
file data
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101403749A
Other languages
Chinese (zh)
Inventor
李鑫
朱烨
田钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CETC 10 Research Institute
Original Assignee
CETC 10 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CETC 10 Research Institute filed Critical CETC 10 Research Institute
Priority to CN2013101403749A priority Critical patent/CN103226753A/en
Publication of CN103226753A publication Critical patent/CN103226753A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a realization method of a full life circle drawing data management system and aims at providing a method capable of conducting safety management on a whole process of production, use, circulation, recovery and disposal of files and drawings, and ensuring that data is flexible to organize, concentrated to control and convenient to consult. The realization method adopts the following technical scheme that the realization method comprises the steps of establishing unified coded drawing files, determining identity information of the drawings with bar codes, setting binding of scanning equipment hardware with an IP (Internet Protocol) address and a production technology place, and full life circle closed loop management binding from the issuing and use to recovery of the drawings, setting bar-code scanning spots in key circulation links of the drawings, recording transfer paths of the drawings, transmitting the bound drawing files to a PDM (Pulse Duration Modulation) system, and transferring drawing related information such as the drawing bar codes, drawing numbers, names and versions into a drawing data management member through a PDM access interface for management synchronously to be integrated with the drawing data management member seamlessly when the drawings or optical disks are output to the outside.

Description

The implementation method of Life cycle chart file data management system
Technical field
The present invention relates to a kind of based on product data management system PDM(PDM, Product Data Management System) under the environment, rely on the binding of hardware device and physical address, realize the figure shelves from providing, use the infosystem of accurate, the fine-grained management of reclaiming Life cycle.
Background technology
Traditional drawing granting relies on manual control usually, the efficient of providing is lower, and probability of errors is also bigger, though also there is part to adopt bar codes technique to solve efficient and reliability problems, but also just controlled the process of " sending out " and " receipts " first tail usually, can't follow the tracks of the file drawing of output, can't allow all drawings obtain one by one, on time, in an orderly manner reclaiming and destroying.
In addition, the problem of traditional drawing granting maximum is to fail to reflect in real time the state of validity of drawing.Original drawing often occurs change has taken place, but the information of change is failed in time to receive in the production scene, still uses the old figure that cancels to process.
In traditional file administration, based on the papery archives, and at present owing to the development of technology, most technical data are to be produced by computing machine, and file administration need be carried out filing management to the paper document of necessity on the one hand; Be the long preservation that guarantees electronic data file and available on the other hand, also need to these e-files collect, sorting and file and utilization.By information in recent years popularization and construction, many units have begun to pay attention to collection, arrangement and the repeated use of electronic graph-text event data, and the general mode that adopts comprises: disk file system and map file management software system.Disk file system is that data centralization is left in the file server, uploads data download by the resource browser or the FTP mode of operating system; Generally, come the bookkeeping authority by the authority of operating system according to project and professional association facsimile file data.The data of map file management software system are submitted to and tissue by the client of system by the designer, according to project and professional association facsimile file data, leave in the Database Systems; Carry out query and search, upload operations such as download by client.All there is following deficiency in above dual mode:
1. need a large amount of artificial interferences; No matter be on disk, to submit to or submit to, all need the user of service to find correct position, fill in and submit relevant information to, can successfully carry out by software client; In case make mistakes, need go through more complicated modification process.
2. uncontrollable version; The obtaining of e-file needs the designer initiatively to take place, in case after situation such as modifications took place version, if not submission in time of designer, difference will appear in the version of Electronic Filing and final true submission version.
3. operability is not good; The data organization underaction substantially all is to organize data according to project, specialty; Operating personnel need can obtain final data by the search condition combination of complexity.
4. control of authority is loose; Disk file system mode management data can only depend on the control of authority of operating system, if there is not powerful territory administrative mechanism, authority is difficult to be guaranteed.
Product data management (PDM) technology is born in mid-term in 20th century, and formally proposing this notion of PDM is in the later stage eighties.PDM is the technology of management all information relevant with product (comprising electronic document, digital file, data-base recording, parts information, configuration, cad file, structure, authority letter etc.) process (comprise workflow and change flow) relevant with product with all based on software.It provides the information management of product lifecycle, and can set up the Collaborative environment of a parallelization for product design with making in enterprise-wide.The ultimate principle of PDM is, logically the information-based isolated island of each CAX is integrated, utilize the development and Design process of computer system control entire product,, finally form complete product description, production run description and production run control data by progressively setting up virtual product model.The organic integration of technical information systems and management infosystem has constituted the infosystem of supporting the entire product forming process, has also set up the technical foundation of CIMS simultaneously.By set up virtual product model, the digital information of the various complexity in the entire product life cycle that the control that the PDM system can be effective, real-time, complete is handled from the product planning to the product rejection.The PDM system has adopted OO data management instrument, and product definition data and product structure parts, son assembling, assembling are connected.The user can utilize navigational tool, determine position component along patterned product tree, and launch to describe the written form and the patterned product definition data of parts on this basis.PDM system most important function be exactly catch and shared design process in the product data that produce.
Summary of the invention
The objective of the invention is at above-mentioned the deficiencies in the prior art part, a kind of artificial interference in a large number is provided, data organization is flexible, management and control is concentrated, use reference convenient, can be to the overall process safety management of production, use, circulation, recovery and the destruction of file, drawing, and can realize the method for Life cycle chart file data management system.
Above-mentioned purpose of the present invention can realize a kind of implementation method of Life cycle chart file data management system by the mode that hardware device and application system support, and has following technical characterictic:
Set up the Unified coding drawing file, applying bar code, determine the identity information of each part figure shelves, by infrastructure service and layout structure scanning device hardware and IP address and production technology place are set and bind and the figure shelves are bound from the closed loop management of providing, use the recovery Life cycle; Each key link in the drawing circulation is provided with the bar code scan point, the transfer path of record drawing; The figure shelves scan member to be passed through identification figure shelves unique identification bar code record diagram shelves or CD tracking use, change, transfers, cancels, recovery, destruction operation flow; Drawing files with above-mentioned binding transfers to the PDM system then, when external output drawing, CD, by the PDM access interface, synchronously the drawing relevant information of figure paper bar code, figure number, title, version is changed in the chart file data management component and manage, between PDM system and the Life cycle chart file data management system by the Webservice interface with PDM system design change, print and provide, hand over the system inventory, in real time and the chart file data management component seamless integrated; In case initiate change, chart file data management component drawing state automatically is set to change control; When flow process is rejected, cancel its state automatically; When change flow was passed through, state was automatically updated into calcellation, in time reclaims old drawing, issues new figure.
The present invention has following beneficial effect than prior art.
The present invention adopts the pattern of Unified coding to set up drawing file, determine the identity information of each part figure shelves, mode by hardware device and IP address binding, under the PDM environment, applying bar code, run through development environment and production and manufacturing environment, rely on the binding of hardware device and physical address, realization is to scheming shelves from providing, use accurate, the fine-grained management of reclaiming Life cycle; Implement the figure shelves from printout, receive, change, transfer, reclaim, link such as destruction binds with people's behavior, make the management and the use of figure shelves implement to the individual, and with its fundamentals of management and data support as figure shelves Life cycle closed loop management, with pure manually-operated in the past, the supervisor status of doing things in his own way, complete concentrated area control measures, turn concentrated management and control into, disperse to dispose, seek unity of standard, and safeguard file, drawing generation and mobile security, high-level efficiency, guarantee research and production, and then realize fine-grained management and closed loop management document.Lifting is to the control ability of figure shelves state; By Bar Code, informationalized means are adopted in output, use, the destruction of figure shelves fully, save artificial registration, intersected and the manual intervention link such as receive, improved the work efficiency of figure shelves management.Pass through the Webservice interface between PDM system and the Life cycle chart file data management system and realize that granting is changed, printed in the PDM system design, friendship system inventory is real-time and the chart file data management system is seamless integrated.In case the designer initiates change, chart file data management system drawing state automatically is set to change control; When flow process is rejected, cancel its state automatically; When change flow was passed through, state was automatically updated into calcellation, so that in time reclaim old drawing, issues new figure.Thereby getting through research and development makes zero with the design of producing.By dynamic configure hardware device scan equipment and IP address binding, can adapt to various complicated procedures of forming in the production run, need not to change code and just can all the figure shelves in the production run be managed.The present invention supports multiple drawing form online browse, and all drawings can both well be supported.Support local amplification of sliding mouse roller to dwindle drawing, use the dilatory drawing of mouse, conveniently check the drawing local detail.Support full frame browsing and two kinds of patterns of window, and can open many drawings simultaneously at a plurality of browser windows.By the statistical study member of diversification, in Report Printing System, can print tens of kinds form, these forms not only files department can use, and also provide valid data for links such as design, plan, production, goods and materials simultaneously.By these forms, archives staff, staff planners, designer, production management personnel can be freed from heavy tabulation work, and can help to search a large amount of mistakes, thus the quality of raising product data.
The present invention disposes the intelligent graphic file management system only need install a print drive and client-side program in client; System passes through the e-file title block content of printing, the analysis of file attribute, automatically extract bullets, project name or the like information, print management and archive management simultaneously, alleviate user of service's burden to reach, keep the conforming effect of final version.
Data are submitted to and tissue by the client of system by the designer, according to project and professional association drawing and document data, leave in the Database Systems; Carry out query and search by client, realize the online browse of drawing by the Silverlight4.0 of Microsoft technology, non-print and preservation simultaneously makes the user just can the dynamic view drawing in browser, conveniently consults.
Description of drawings
Below in conjunction with drawings and Examples this method is further specified.
Fig. 1 is the synoptic diagram that the present invention is based on the chart file data management system of PDM environment.Fig. 2 is the synoptic diagram of Fig. 1 PDM print management member synchrodata process.
Fig. 3 is the synoptic diagram of Fig. 1 PDM change management member change flow process.
Embodiment
Consult Fig. 1.In embodiment described below, at first, adopt the pattern of Unified coding to set up drawing file, determine the identity information of each part figure shelves, and according to production site installation scanning device, the quantity of scanning device is consistent with the production process place, by infrastructure service and layout structure scanning device hardware device and IP address and the binding of production technology place is set; Under the PDM environment, applying bar code is provided with scanning hardware equipment and IP address and the binding of production technology place in figure shelves management component, for figure shelves management component is followed the trail of drawing, CD circulation process is prepared.When the print management member is externally exported drawing, CD,, include chart file data management component range of management immediately in by drawing relevant informations such as access interface synchronization scheme paper bar code, figure number, title, versions.Changing the chart file data management component over to manages, figure shelves scanning member passes through identification figure shelves unique identification bar code record diagram shelves or CD is followed the tracks of use, change, transfers, cancelled, reclaim, destroy operation flow, realize PDM system design change, print and provide, hand over the system inventory by the Webservice interface between PDM system and the Life cycle chart file data management system then, in real time and the chart file data management component seamless integrated; Last on the basis of above-mentioned data accumulation, by scheming shelves condition managing member registration figure shelves, upgrading products structure and generating the statistical study form.
The chart file data management component, it is the core component that constitutes running software, the structure of this member comprises at least with lower member or functional module: around crosslinked product structure management member, statistical study member, holographic browsing file member, cooperation processing management component, infrastructure service and the layout structure of figure shelves management component, and figure shelves management component is crosslinked between holographic browsing file member and infrastructure service and layout structure, and figure shelves management component passes through PDM access interface crosslinked PDM print management member and PDM change management member respectively.Location information and operating personnel's identity thereof of circulation processes such as the use of drawing and CD, change, transfer, calcellation, recovery, destruction all are recorded in figure shelves management component and the cooperation processing management component.On this basis, chart file data is organized again, represented to each user, satisfy different regulatory requirements with different visual angles by statistical study member and product structure management member.Holographic browsing file member is crosslinked in electronic board, and electronic board is hung with 1-n electronic board, and the cooperation processing member is crosslinked in the external coordination CD, and each cooperation processing all issues a CD, and infrastructure service and layout structure are crosslinked in database.
The PDM access interface comprises: PDM print management member and PDM change management member, wherein PDM print management member comprises that publish picture print management member and printing receive management component.
Consult Fig. 2, when PDM publishes picture printing, the print management member of publishing picture will be created bar code and be synchronized to the chart file data management system, upgrade the product structure of this figure place project, printing is received management component by Webservice interface acquisition figure shelves state, and the figure shelves are set notice figure shelves management component or the external coordination CD is received information.Figure shelves management component sends the information of receiving to other operation systems such as FDRP simultaneously.
Consult Fig. 3.PDM change management member, when the PDM alteration of graphics file, the chart file data management system passes to PDM by interface with the detailed datas such as production site at on-the-spot drawing place, and shows intuitively in the change interface, and whether the decision of designer's selector bar font code replaces on-the-spot drawing.After the PDM auditing flow passed through, then by changing the status indicator of drawing, calcellation scene photo shelves were implemented at the scene to freeze, and are withdrawed from production link.Issue new figure shelves by PDM print management member, notify the relevant personnel to reclaim calcellation figure shelves and receive new figure shelves, concentrate at last and destroy the figure shelves that cancel.
Figure shelves management component is the core component of chart file data management system, and it is crosslinked in the product structure management member, statistical study member, holographic browsing file member, scanning member infrastructure service of figure shelves and system configuration member.Be the state synchronized management that management comprises paper document and e-file to the figure shelves in the production run, at first analyze with abstract, figure shelves state is defined the circulation state and the state of validity of figure shelves by making production PDM figure shelves circulation process.Secondly, by the circulation of figure shelves scanning member tracing figure shelves, represent the variation of figure shelves state in real time.
The statistical study member comprises the bar code statistics, map sheet statistics, time statistical module, the requiring department statistical module is given back department statistics, project statistical module, batch statistics, the external coordination statistics, statistics to be given back has been given back multiple statistical report forms such as statistics, and the function of statistic analysis of diversification is provided.With crossing use Transact-SQL programming language, by mass data library storage process and table variable, constantly test optimization is used the VML of Microsoft language generates lightweight fast in IE statistical graph, in time represents statistics.
The product structure management member comprises bulleted list, the product structure of project, and details such as the figure shelves of printing, product batches etc. reflect the neat cover situation of this batch parts simultaneously, filing and figure below situation
The cooperation processing member when being used for other unit and assist producing, issues the partial graph shelves with the CD form, it comprises that the task of external coordination handles, CD numbering and imprinting, and CD is received affirmation, identifies and reclaims, and destroys batch etc.
Holographic browsing file member carries out batch according to bar code and articulates after discerning file by OCR, the unified conversion of electronic document format, and the online browse of holographic file.The online browse of holographic file is realized by electronic board.Holographic file circulation is with the printed drawings files, and to be scanned production site, equipment place scanned when the printed drawings files, but during by the scanning of next production site, this production site has the holographic browsing file authority of this figure shelves.The holographic function of browse of drawing has following characteristic, and the drawing holography is browsed and adopted the special protection technology, and drawing can only onlinely be watched, and can not print and download.But can the screen printing mode preserve, increase watermark and normal drawing difference.By holographic browsing file function, progressively realize the electronization of figure shelves, use electronic board, replace printout.
Infrastructure service and layout structure comprise hardware device and IP address binding function, with the configuration of other system interface parameters, and authority configuration, project management, log pattern etc.Wherein extendible System Privileges module satisfies the needs of system manager, safe and secret member, three Yuans management of security audit person.Unified log pattern, the user visits at every turn, and all operations of being done all goes on record, and preserves in the mode of Operation Log.By Operation Log, can its operating process of playback.The record of the e-file that the user checks is at every turn also preserved separately in the mode of daily record, can inquire about and add up the visit capacity of e-file easily, checks the situation that each file is consulted.
After the printout of figure shelves, by interface routine, Life cycle chart file data management system obtains drawing relevant informations such as bar code and figure number, the map title, version; Each key link in the drawing circulation is provided with the bar code scan point, the transfer path of record drawing.The drawing of change takes place, control in the PDM system, inform Life cycle chart file data management system by interface, Life cycle chart file data management system will in time be notified the relevant personnel's concern figure change of shelves according to this information; When alteration of graphics file came into force, the Life cycle chart file data management system prompting relevant personnel reclaimed the figure shelves that cancel; Life cycle chart file data management system will write down each process, the state of the shelves of more changing plan in real time; And can provide figure shelves Life cycle to assume overall responsibility for view by the project structure tree, the current state of reflection figure shelves.

Claims (10)

1. the implementation method of a Life cycle chart file data management system has following technical characterictic:
Set up the Unified coding drawing file, applying bar code, determine the identity information of each part figure shelves, by infrastructure service and layout structure scanning device hardware and IP address and production technology place are set and bind and the figure shelves are bound from the closed loop management of providing, use the recovery Life cycle; Each key link in the drawing circulation is provided with the bar code scan point, the transfer path of record drawing; The figure shelves scan member to be passed through identification figure shelves unique identification bar code record diagram shelves or CD tracking use, change, transfers, cancels, recovery, destruction operation flow; Drawing files with above-mentioned binding transfers to the PDM system then, when external output drawing, CD, by the PDM access interface, synchronously the drawing relevant information of figure paper bar code, figure number, title, version is changed in the chart file data management component and manage, between PDM system and the Life cycle chart file data management system by the Webservice interface with PDM system design change, print and provide, hand over the system inventory, in real time and the chart file data management component seamless integrated; In case initiate change, chart file data management component drawing state automatically is set to change control; When flow process is rejected, cancel its state automatically; When change flow was passed through, state was automatically updated into calcellation, in time reclaims old drawing, issues new figure.
2. the implementation method of Life cycle chart file data management system as claimed in claim 1, it is characterized in that, the PDM access interface comprises: PDM print management member and PDM change management member, wherein PDM print management member comprises that publish picture print management member and printing receive management component.
3. the implementation method of Life cycle chart file data management system as claimed in claim 1, it is characterized in that the location information of the circulation process of the use of drawing and CD, change, transfer, calcellation, recovery, destruction and operating personnel's identity thereof all are recorded in figure shelves management component and the cooperation processing management component.
4. the implementation method of Life cycle chart file data management system as claimed in claim 1, it is characterized in that, the chart file data management component, at least comprise: around crosslinked product structure management member, statistical study member, holographic browsing file member, cooperation processing management component, infrastructure service and the layout structure of figure shelves management component, and figure shelves management component is crosslinked between holographic browsing file member and infrastructure service and layout structure, and figure shelves management component passes through PDM access interface crosslinked PDM print management member and PDM change management member respectively.
5. the implementation method of Life cycle chart file data management system as claimed in claim 4 is characterized in that, holographic browsing file member is crosslinked in electronic board, and electronic board is hung with 1-n sub-electronic board.
6. the implementation method of Life cycle chart file data management system as claimed in claim 1, it is characterized in that, when PDM publishes picture printing, the print management member of publishing picture will be created bar code and be synchronized to the chart file data management system, upgrade the product structure of this figure place project, printing is received management component by Webservice interface acquisition figure shelves state, and the figure shelves are set notice figure shelves management component or the external coordination CD is received information.Figure shelves management component sends the information of receiving to FDRP or other operation systems simultaneously.
7. the implementation method of Life cycle chart file data management system as claimed in claim 4 is characterized in that, the statistical study member, comprise the bar code statistics, map sheet statistics, time statistical module, the requiring department statistical module, give back department statistics, project statistical module, batch statistics, the external coordination statistics, statistics to be given back has been given back the multiple statistical report form of statistics, and the function of statistic analysis of diversification is provided.
8. the implementation method of Life cycle chart file data management system as claimed in claim 4, it is characterized in that, the product structure management member, comprise bulleted list, the product structure of project, the details of the figure shelves of printing, product batches etc., the neat cover situation that reflects this batch parts simultaneously, filing and figure below situation.
9. the implementation method of Life cycle chart file data management system as claimed in claim 4, it is characterized in that, the cooperation processing member, when being used for other unit's assistance production, the partial graph shelves are issued with the CD form, and it comprises that the task of external coordination handles, CD numbering and imprinting, CD is received affirmation, identify to reclaim and destroys batch.
10. the implementation method of Life cycle chart file data management system as claimed in claim 4, it is characterized in that, after holographic browsing file member is discerned file by OCR, carrying out batch according to bar code articulates, the unified conversion of electronic document format, and the online browse of holographic file, the online browse of holographic file is realized by electronic board.
CN2013101403749A 2013-04-22 2013-04-22 Realization method of full life circle drawing data management system Pending CN103226753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101403749A CN103226753A (en) 2013-04-22 2013-04-22 Realization method of full life circle drawing data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101403749A CN103226753A (en) 2013-04-22 2013-04-22 Realization method of full life circle drawing data management system

Publications (1)

Publication Number Publication Date
CN103226753A true CN103226753A (en) 2013-07-31

Family

ID=48837192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101403749A Pending CN103226753A (en) 2013-04-22 2013-04-22 Realization method of full life circle drawing data management system

Country Status (1)

Country Link
CN (1) CN103226753A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105590157A (en) * 2014-12-25 2016-05-18 中国银联股份有限公司 Data management based on data lifecycle management template
CN105830117A (en) * 2014-02-27 2016-08-03 李圣哲 Library management system
CN106227838A (en) * 2016-07-25 2016-12-14 浙江大唐乌沙山发电有限责任公司 A kind of electric power enterprise eletronic data management system
CN107392264A (en) * 2017-07-06 2017-11-24 滨州渤海活塞有限公司 Eletronic data management system and eletronic data management method
CN109767178A (en) * 2018-12-20 2019-05-17 北京动力机械研究所 Drawing and document integrated design collaborative management method and device
CN111709702A (en) * 2020-06-01 2020-09-25 昆山夏洛特智能科技有限公司 Product full life cycle management system
CN111913673A (en) * 2020-07-28 2020-11-10 立讯智造(浙江)有限公司 Method, device and equipment for managing controlled files
CN113807651A (en) * 2021-08-09 2021-12-17 中建二局安装工程有限公司 Big data based component whole process management system, terminal equipment and management method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110137892A1 (en) * 2009-06-10 2011-06-09 Dassault Systemes Process, Program and Apparatus for Displaying an Assembly of Objects of a PLM Database
CN102314165A (en) * 2010-07-05 2012-01-11 上海盛锐软件技术有限公司 PLM (programmable logic matrix)-based RFID (radio frequency identification device) control system for industrial production line and method
CN102324074A (en) * 2011-10-28 2012-01-18 山东城通科技有限公司 Informatization application cluster platform of small and medium enterprises
CN102968693A (en) * 2012-11-23 2013-03-13 国家电网公司 Automatic survey and design management system
CN103028945A (en) * 2012-12-31 2013-04-10 南京奥特电气股份有限公司 System, method and device for prefabricating informatization whole-lifecycle pipeline

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110137892A1 (en) * 2009-06-10 2011-06-09 Dassault Systemes Process, Program and Apparatus for Displaying an Assembly of Objects of a PLM Database
CN102314165A (en) * 2010-07-05 2012-01-11 上海盛锐软件技术有限公司 PLM (programmable logic matrix)-based RFID (radio frequency identification device) control system for industrial production line and method
CN102324074A (en) * 2011-10-28 2012-01-18 山东城通科技有限公司 Informatization application cluster platform of small and medium enterprises
CN102968693A (en) * 2012-11-23 2013-03-13 国家电网公司 Automatic survey and design management system
CN103028945A (en) * 2012-12-31 2013-04-10 南京奥特电气股份有限公司 System, method and device for prefabricating informatization whole-lifecycle pipeline

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105830117A (en) * 2014-02-27 2016-08-03 李圣哲 Library management system
CN105590157A (en) * 2014-12-25 2016-05-18 中国银联股份有限公司 Data management based on data lifecycle management template
CN106227838A (en) * 2016-07-25 2016-12-14 浙江大唐乌沙山发电有限责任公司 A kind of electric power enterprise eletronic data management system
CN107392264A (en) * 2017-07-06 2017-11-24 滨州渤海活塞有限公司 Eletronic data management system and eletronic data management method
CN109767178A (en) * 2018-12-20 2019-05-17 北京动力机械研究所 Drawing and document integrated design collaborative management method and device
CN111709702A (en) * 2020-06-01 2020-09-25 昆山夏洛特智能科技有限公司 Product full life cycle management system
CN111913673A (en) * 2020-07-28 2020-11-10 立讯智造(浙江)有限公司 Method, device and equipment for managing controlled files
CN113807651A (en) * 2021-08-09 2021-12-17 中建二局安装工程有限公司 Big data based component whole process management system, terminal equipment and management method
CN113807651B (en) * 2021-08-09 2024-02-23 中建二局安装工程有限公司 Component whole process management system based on big data, terminal equipment and management method

Similar Documents

Publication Publication Date Title
CN103226753A (en) Realization method of full life circle drawing data management system
CN106202447B (en) A kind of digital cartography system having production and management integration
US8548997B1 (en) Discovery information management system
CN100492370C (en) Document management method facing to integration business model
CN102884532A (en) Systems and methods for construction field management and operations with building information modeling
Kumar et al. Performance dashboard: Cutting-edge business intelligence and data visualization
CN104657903A (en) Compressive guarantee system for equipment based on IETM
CN102609526A (en) Internet website content management system
CN105359146A (en) Automated database migration architecture
CN105574303A (en) Enterprise informatization operation system
CN205354023U (en) Collect management system based on electron picture shelves organizational structure
CN103049815A (en) Customer archive information management system and method
CN111179139B (en) Internet + supervision data processing method and device
WO2015021394A2 (en) Document generation, interpretation, and administration system with built in workflows and analytics
CN103455896A (en) Paperless assembling quality control method based on internet of things
CN110990620A (en) Intelligent transformer substation drawing and document data management method based on intelligent technology application
CN115033905A (en) Wisdom archives management system platform based on thing networking
CN113190501A (en) Method for forming and filing electronic file for quality testing of water conservancy and hydropower engineering
CN113688396A (en) Automobile information safety risk assessment automation system
CN101894299A (en) Fast freight departure and entry intelligent declaration system capable of supporting RFID and HS coding and image processing
CN111752249A (en) Data acquisition and cataloguing method, system, terminal equipment and storage medium applied to production process of discrete manufacturing industry
CN104766107A (en) System utilizing RFID electronic product code to collect data in BIM
KR101398027B1 (en) Facility Management System using Perspective Definition Metadata and Method Therefor
CN107423035A (en) A kind of software development process product data management system
CN105550264A (en) User journal collecting and processing system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130731