CN103225496B - Profile control method for immobile pipe column of injection well - Google Patents

Profile control method for immobile pipe column of injection well Download PDF

Info

Publication number
CN103225496B
CN103225496B CN201310118133.4A CN201310118133A CN103225496B CN 103225496 B CN103225496 B CN 103225496B CN 201310118133 A CN201310118133 A CN 201310118133A CN 103225496 B CN103225496 B CN 103225496B
Authority
CN
China
Prior art keywords
profile control
gel
oil pipe
injection well
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310118133.4A
Other languages
Chinese (zh)
Other versions
CN103225496A (en
Inventor
雒继忠
史成恩
李亮
马立军
令永刚
王明瑜
寇卫伟
王玉罡
高超君
吴春生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310118133.4A priority Critical patent/CN103225496B/en
Publication of CN103225496A publication Critical patent/CN103225496A/en
Application granted granted Critical
Publication of CN103225496B publication Critical patent/CN103225496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to a profile control method for an immobile pipe column of a split injection well, which comprises the following steps of fishing up a water nozzle of the split injection well, and injecting clear water and a high-viscosity temporary plugging agent into a shaft to perform shaft pretreatment; gel particles, inorganic gel and weak gel are injected from an oil pipe in sequence to perform profile control, and the diameter of the gel particles is controlled to ensure that the gel particles can pass through a water nozzle; and (3) washing the shaft by using the high-efficiency gel breaker, reducing the viscosity of the high-viscosity temporary plugging agent, backwashing the high-viscosity temporary plugging agent out of the shaft, and completing the profile control operation of the non-movable pipe column of the split injection well. The method is simple to operate, and saves time and labor.

Description

A kind of dispensing well fixed tubular column profile control method
Technical field
The present invention relates to petroleum production engineering field, be specifically related to a kind of dispensing well fixed tubular column profile control method.
Background technology
During oil field dispensing well profile control operation at present, first have to trip out former well separate injection tubing string, more lower profile control tubing string, Profile control trips out profile control tubing string after completing, then under enter separate injection tubing string and carry out dispensing.Lower tubular column is played during this Four times, its workload is big, and operating cost is high, and the engineering time is long.And must be to water before lift pipe string Well pressure release, extends the engineering time, increases workload.After profile control completes, lift pipe string is the most easily because letting out Pressure causes that blocking agent is counter tells to pit shaft, affects profile control effect.
Summary of the invention
In order to solve above technical problem, the present invention provides a kind of dispensing well fixed tubular column profile control method, Eliminate the step repeatedly playing lower tubular column, saved the engineering time, it is to avoid blocking agent is counter tells.
This invention is achieved through the following technical solutions:
A kind of dispensing well fixed tubular column profile control method, comprises the steps:
Water nozzle on the injection well downhole flow regulator of dispensing well water injection string is picked up, vacates and lay water on described injection well downhole flow regulator The hole of mouth, in described oil pipe, injected clear water and height glue diverting agent and carry out described oil pipe and oil jacket annular space Pretreatment;
It is implanted sequentially gel particle, inorganic gel and Weak Gels to described oil pipe and carries out profile control, described solidifying The diameter of glue granule meets the requirement in the hole by laying water nozzle on injection well downhole flow regulator;
Use efficient gel breaker to clean described oil pipe, reduce the viscosity of the viscous diverting agent of height, by viscous for height the most stifled Agent backwash goes out described oil pipe, completes dispensing well fixed tubular column profile control operation.
In technique scheme, it is that partially hydrolyzed polyacrylamide (PHPA) passes through crosslinking that described height glues diverting agent Formed.
In technique scheme, described gel particle, inorganic gel, three kinds of blocking agents of Weak Gels Grain diameter is all in the range of 1-3mm.
In technique scheme, the total injection of described gel particle, inorganic gel and Weak Gels leads to Cross formula V=π R2H ф (1-Sor) calculate, wherein R is the dispensing well shaft radius needing profile control, and H is Profile control formation thickness, ф is profile control formation average porosity, SorFor remaining oil saturation.
In technique scheme, described efficient gel breaker is Ammonium persulfate. built agent.
The dispensing well fixed tubular column profile control method of the present invention is owing to having picked up water nozzle, directly by former tubing string Oil pipe in injection profile blocking agent, eliminate the step repeatedly playing lower tubular column, decrease workload, joint About engineering time, it is to avoid because lift pipe string causes the anti-phenomenon told of blocking agent.
Accompanying drawing explanation
The dispensing well water injection string structural representation that Fig. 1 provides for the embodiment of the present invention.
The dispensing well profile control tubular column structure schematic diagram that Fig. 2 provides for the embodiment of the present invention.
Detailed description of the invention
With embodiment, technical scheme is described in detail below in conjunction with the accompanying drawings.
See Fig. 1, be a kind of dispensing well water injection string structural representation of embodiment of the present invention offer, All being picked up by water nozzle 3 on eccentric injection mandrel 2 before carrying out profile control construction, it is dispensing well and adjusts Cut open tubing string, see Fig. 2.Inject 30 side's clear water from oil pipe 1, inject from oil pipe 1 high viscous temporary the most again Blocking agent;High viscous diverting agent can oil pipe 1 following to injection well downhole flow regulator and oil jacket annular space 5, oil jacket annular space i.e. oil Space between pipe 1 and sleeve pipe 4, blocks up temporarily to oil pipe 1 and oil jacket annular space 5, prevents follow-up stifled Agent settles wherein.Then, more successively inject the gel particle as blocking agent, inorganic solidifying from oil pipe 1 Glue, Weak Gels;Gel particle, inorganic gel, Weak Gels total consumption by V=π R2H ф (1-Sor) Obtaining, R is the dispensing well shaft radius needing profile control, is 25 meters, and H is profile control formation thickness, for 13 meters, ф is profile control formation average porosity, is 12.56%, and remaining oil saturation (is adopted through a certain Oil method or displacement effect after, still can not extraction and residue in the crude oil in oil reservoir hole be referred to as remnants Oil, its volume percent of shared volume in blowhole is referred to as residual oil saturation Sor), this example In be 40%.Therefore V=3.14 × 252× 13 × 12.56% × (1-40%) ≈ 1923m3.Described gel Grain, inorganic gel, three kinds of blocking agents of Weak Gels particle diameter all in the range of 1-3mm, blocking agent granule The size of diameter is mainly installed the hole size of water nozzle by injection well downhole flow regulator, the expansion character of gel particle determines, If gel diameter is excessive, it can not pass through injection well downhole flow regulator, and after additionally entering stratum, imbibition makes it Migrate relatively difficult, be therefore extremely difficult to earth formation deep closure crack;Gel diameter is too small, after water suction Intensity can reduce, and additionally diameter is too small, is easy to transport after entering stratum under bigger production pressure Move so that the water breakthrough blocking agent of injection enters stratum.
Blocking agent enters oil jacket annular space 5 by laying the hole of water nozzle 3 on eccentric injection mandrel 2, then by set Perforation on pipe 4 enters stratum.Gel particle can block crack big in stratum, and inorganic gel is right Crack and big duct are further blocked, and strengthen the intensity of blocking agent, and Weak Gels is to fine pore Blocking, and play the effect of the displacement of reservoir oil, three kinds of blocking agents comprehensive uses and reaches to block up, adjusts, drives phase In conjunction with.Owing to having picked up water nozzle 3, the throttling of water nozzle 3 is not had to ensure that the throughput of blocking agent, Conventional 1.5-3m can be reached3The throughput of/h, thereby ensure that gel particle, inorganic gel, weak solidifying Glue is sufficiently injected at short notice, thus ensures the filling at short notice of relatively large fracture and duct in stratum Enfeoffment is blocked up, and plays preferable profile control effect.The size controlling gel particle makes it can be joined by bias The hole laying water nozzle 3 on hydrophone 2 can reach again preferable profile control effect, and after profile control, well water filling is normal, Injection pressure rises, and the water-absorption surface water suction on water injection well stratum is uniformly.
After blocking agent is injected, inject efficient gel breaker, closing well about two hours, then carry out well-flushing, directly Reach tubing string unimpeded, and the water quality of tubing string export and import is the same.
Recovering to tubing string water filling, profile control construction terminates.
The dispensing well fixed tubular column profile control method of the present invention is owing to having picked up water nozzle, directly by former tubing string Oil pipe in injection profile blocking agent, eliminate the step repeatedly playing lower tubular column, workload reduces, operation Low cost, saved the engineering time, profile control complete after without lift pipe string, it is to avoid because pressure release causes blocking agent Counter tell to pit shaft, it is ensured that profile control effect.
It should be noted last that, above example only in order to the technology implementation scheme of this material to be described and Unrestricted, although the present invention being described in detail with reference to preferred embodiment, the common skill of this area Art personnel should be appreciated that and can modify technical scheme or equivalent, and not Departing from the spirit and scope of technical solution of the present invention, it all should be contained in scope of the presently claimed invention In the middle of.

Claims (1)

1. a dispensing well fixed tubular column profile control method, it is characterised in that: comprise the steps,
Water nozzle (3) on the injection well downhole flow regulator (2) of dispensing well water injection string is picked up, vacates injection well downhole flow regulator (2) On lay the hole of water nozzle, in oil pipe (1), injected clear water and height glue diverting agent to oil pipe (1) and oil Set annular space (5) carries out pretreatment;
It is implanted sequentially gel particle, inorganic gel and Weak Gels to oil pipe (1) and carries out profile control, described solidifying The diameter of glue granule meets the requirement in the hole by laying water nozzle on injection well downhole flow regulator (2);
Use efficient gel breaker to clean described oil pipe (1), reduce the viscosity of the viscous diverting agent of height, height is glued Diverting agent backwash goes out described oil pipe (1), completes dispensing well fixed tubular column profile control operation;Described height is viscous temporarily Blocking agent is that partially hydrolyzed polyacrylamide (PHPA) passes through to be cross-linked to form;Described gel particle, inorganic gel, The particle diameter of three kinds of blocking agents of Weak Gels is all in the range of 1-3mm;Described gel particle, inorganic gel Formula V=π R is passed through with the total injection of Weak Gels2Hф(1-Sor) calculate, wherein R is for needing profile control Dispensing well shaft radius, H is the formation thickness of profile control, and ф is the formation average porosity of profile control, Sor is remaining oil saturation;Described efficient gel breaker is Ammonium persulfate. built agent.
CN201310118133.4A 2013-04-07 2013-04-07 Profile control method for immobile pipe column of injection well Active CN103225496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310118133.4A CN103225496B (en) 2013-04-07 2013-04-07 Profile control method for immobile pipe column of injection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310118133.4A CN103225496B (en) 2013-04-07 2013-04-07 Profile control method for immobile pipe column of injection well

Publications (2)

Publication Number Publication Date
CN103225496A CN103225496A (en) 2013-07-31
CN103225496B true CN103225496B (en) 2016-12-28

Family

ID=48836111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310118133.4A Active CN103225496B (en) 2013-04-07 2013-04-07 Profile control method for immobile pipe column of injection well

Country Status (1)

Country Link
CN (1) CN103225496B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968635B (en) * 2017-03-28 2019-03-19 四川光亚聚合物化工有限公司 A kind of efficient depth profile control method of Low Damage
CN108825158A (en) * 2018-06-15 2018-11-16 中国石油集团长城钻探工程有限公司 A kind of bushing pipe reinforcing pre- blocking method of well
CN111827920B (en) * 2019-04-22 2022-11-04 中国石油天然气股份有限公司 Layered gas channeling plugging process for fireflooding production well
CN114961631B (en) * 2021-02-24 2024-06-21 中国石油化工股份有限公司 Compound water shutoff method for gel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480627A (en) * 2003-08-05 2004-03-10 中国石油天然气股份有限公司 Water injection well oil-containing sludge depth profile control technology
CN201810292U (en) * 2010-10-22 2011-04-27 中国石油天然气股份有限公司 Separated layer water injection process tubular column
CN102619493A (en) * 2012-03-28 2012-08-01 中国石油天然气股份有限公司 Profile control and water plugging method for thickened oil horizontal well of screen pipe well completion and combination device thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1752403A (en) * 2004-09-22 2006-03-29 中国石油天然气股份有限公司 Composite slug method large channel oil reservoir deep profile control method
US20070204989A1 (en) * 2006-02-28 2007-09-06 Hongxin Tang Preformed particle gel for conformance control in an oil reservoir
WO2009051881A1 (en) * 2007-10-16 2009-04-23 Exxonmobil Upstream Research Company Fluid control apparatus and methods for production and injection wells
CN103013480A (en) * 2012-12-27 2013-04-03 大庆中油泰克石油技术服务有限公司 Modified petroleum coke granule composite profile control water blocking agent and multi-round bidirectional blocking control technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480627A (en) * 2003-08-05 2004-03-10 中国石油天然气股份有限公司 Water injection well oil-containing sludge depth profile control technology
CN201810292U (en) * 2010-10-22 2011-04-27 中国石油天然气股份有限公司 Separated layer water injection process tubular column
CN102619493A (en) * 2012-03-28 2012-08-01 中国石油天然气股份有限公司 Profile control and water plugging method for thickened oil horizontal well of screen pipe well completion and combination device thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
厚油层高渗透带化学封堵技术研究;闫建文;《大庆石油学院硕士学位论文》;20070115;第6.1.4节 *
埕岛油田不动管柱堵水方法研究;王建国;《中国石油大学硕士学位论文》;20100315;第1.1.2.4节、第2.4节、第3.2节、第4.1节、第5.3节,图4-1 *

Also Published As

Publication number Publication date
CN103225496A (en) 2013-07-31

Similar Documents

Publication Publication Date Title
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN107100607B (en) Temporary stall is to fracturing process
CN103225496B (en) Profile control method for immobile pipe column of injection well
CN106382111B (en) Method for increasing complexity of shale gas fracturing fracture
WO2012066327A3 (en) Drilling method for drilling a subterranean borehole
CA2625753A1 (en) Method of isolating open perforations in horizontal wellbores using an ultra lightweight proppant
CN104285029B (en) Inflatable collar and downhole method for moving a coiled tubing string
CN102812205A (en) Method and materials for proppant fracturing with telescoping flow conduit technology
CN104153738A (en) Blocking controlling and leaking stopping tool assembly and leaking stopping method applied to drilling engineering
CN105443098B (en) A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method
CN103470242A (en) Oilfield horizontal well volume fracturing method
CN101915079B (en) Integrated de-plugging yield increasing process
CN104533354A (en) Plug type sand control method for slim hole sidetracked well
CN106150429A (en) Shale gas is multistage splits pressure diverting agent, without bridging plug fracturing process and device
CN104948141A (en) Same well production and injection device
CN105178910A (en) Horizontal well water plugging process pipe column and method
CN204126624U (en) Open-hole horizontal well fixed tubular column jetting sectional well completion fracturing string
CN101338660B (en) Horizontal production-injection well completion structure possessing flow control function
JP2022046072A (en) Multistage simultaneous injection device
CN105443101A (en) Compression type double-sealing and single-clamping subsection fracturing process pipe column and fracturing method thereof
CN201236685Y (en) Horizontal production-injection well completion structure with flow control function
CN104121000B (en) Water plugging method for low-permeability fractured reservoir casing completion horizontal well
CN103470221B (en) Method made by the connection that pump was taken out and examined to oil pipe under underbalance, no killing well gaslift, axle
CN109083631A (en) Utilize the device and method for repairing and mending in coiled tubing repairing cementing concrete crack
CN102925124B (en) A kind of oil reservoir is stifled composition and application method temporarily

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant