The preparation method of intubator
Technical field
The present invention relates to a kind of preparation method of in concrete revetment structure body, carrying out the plant planting device.
Background technology
The protection water and soil resources, improving climatic environment, making up conservation culture is international research theme.China's slope bulk area is big, the soil property complexity, and it is serious to collapse under the existing sloping body, and sloping body function is not good enough; How to plant plant on concrete sloping body, adopting which kind of instrument is a difficult problem all the time.
Summary of the invention
The object of the present invention is to provide a kind of convenience in concrete revetment, to plant the preparation method of the intubator of plant.
Technical solution of the present invention is:
A kind of preparation method of intubator is characterized in that: intubator is made up of egative film, anchor clamps, crab-bolt, four parts of capable ring; It is 1 group that egative film is 2, and 2 ~ 10 groups of set of planes are combined into 1 frame; Egative film adopts stainless-steel sheet, and length is 10m, and width is 0.5m, thickness is 1cm, press the 1m spacing on egative film, be polished into half garden shape hole respectively, hole diameter equals kind of a pipe diameter, 2 egative films are 1 group, be spliced to form the garden shape hole that inserts kind of pipe, use the wafer type clamp clamps around every frame, the left and right sides two halves of anchor clamps are fixed with crab-bolt, the capable boxing made from φ 10-15 reinforcing bar is connected on the anchor clamps upper end, forms intubator.
Described kind pipe is the PVC plastic film tube, and diameter is 1.5cm-2cm, and length is 〉=slope protection concrete structure body thickness+4cm that end 4cm is coniform; Elder generation pours into soil in kind of the pipe a part of, plants pipe top and reserves 0.5cm space highly, and pour into again and plant, the 2-4 grain, after seed pours into, capable again grave mound, grave mound thickness is 0.5cm.
The present invention is easy to make, makes in concrete revetment the plantation plant very convenient, effective.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of egative film.
Fig. 2 is the structural representation of kind of pipe.
Embodiment
A kind of preparation method of intubator, intubator is made up of egative film 1, anchor clamps, crab-bolt, four parts of capable ring; It is 1 group that egative film is 2, and 2 ~ 10 groups of set of planes are combined into 1 frame; Egative film adopts stainless-steel sheet, and length is 10m, and width is 0.5m, thickness is 1cm, press the 1m spacing on egative film, be polished into half garden shape hole respectively, hole diameter equals kind of a pipe diameter, 2 egative films are 1 group, be spliced to form the garden shape hole that inserts kind of pipe, use the wafer type clamp clamps around every frame, the left and right sides two halves of anchor clamps are fixed with crab-bolt, the capable boxing made from φ 10-15 reinforcing bar is connected on the anchor clamps upper end, forms intubator.
Described kind pipe is a PVC plastic film tube 2, and diameter is 1.5cm-2cm, and length is 〉=slope protection concrete structure body thickness+4cm that end 4cm is coniform; Elder generation pours into soil 3 in kind of the pipe a part of, plants pipe top and reserves 0.5cm space highly, and pour into again and plant 4, the 2-4 grain, after seed pours into, capable again grave mound, grave mound thickness is 0.5cm.
Plant planting: after concrete structure body forms, before the initial set, among building back 24 hours, the intubator that kind of pipe is housed is inserted in the concrete with hammering kind pipe on concrete surface, dismantle crab-bolt then and remove intubator, stay the concrete surface surface because of kind of a pipe still has head, so again at kind of a pipe upper surface, cover and press beam slab, vibrate, make in the whole implantation of the plant species pipe concrete with vibrator.