CN103222325B - Descending and the implementation method of uplink baseband resource pool and base station - Google Patents
Descending and the implementation method of uplink baseband resource pool and base station Download PDFInfo
- Publication number
- CN103222325B CN103222325B CN201280002552.5A CN201280002552A CN103222325B CN 103222325 B CN103222325 B CN 103222325B CN 201280002552 A CN201280002552 A CN 201280002552A CN 103222325 B CN103222325 B CN 103222325B
- Authority
- CN
- China
- Prior art keywords
- plate
- mainboard
- channel
- main control
- control module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/02—Arrangements for optimising operational condition
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses implementation method and the base station of uplink/downlink base-band resource pool in a kind of LTE base station, described method includes: at downgoing baseband resource pool, according to downlink user respectively to mainboard with from plate configurating downlink user profile, mainboard and from plate, the channel of the downlink user of distribution is carried out the process of bit-level and symbol level;At uplink baseband resource pool, configure to mainboard with from plate respectively according to channel, then the uplink user in scheduling respective channel, mainboard and the channel of the uplink user of scheduling being processed from plate.By the way, it is possible to Appropriate application mainboard and the disposal ability from plate, the coupling between user in channel is solved.
Description
Technical field
The present invention relates to wireless communication technology field, particularly relate to a kind of Long Term Evolution LTE base station
In the descending and implementation method of uplink baseband resource pool and base station.
Background technology
In Long Term Evolution (LTE) system, baseband board is responsible for realizing thing in whole base station system
Algorithm that reason layer protocol, base band are relevant and relevant some characteristics of product.Along with the evolution of agreement,
The application scenarios of the complexity of PHY, the complexity of algorithm and product becomes increasingly complex,
Require that the disposal ability of baseband board is more and more higher.
In prior art, due to the progressively upgrading of technology and for cost consideration, there are some base stations
System exists the baseband board of early version and the baseband board of redaction simultaneously.The baseband board of early version can
To support some old agreements, algorithm and characteristic;The baseband board of newly purchased redaction is then supported
New agreement, algorithm and characteristic.The collocation of above-mentioned new early version baseband board uses, and is by the old and new's version
This baseband board all uses, and specifically, the baseband board of early version processes certain customers, and
The baseband board of redaction then processes other user, can be so that operator saves a lot of costs.
Correspondingly, there are two baseband boards in the downlink resource pond of base station system: mainboard and from plate, mainboard
For the baseband board of redaction, it is the baseband board of early version from plate.Mainboard processes the letter of a part of user
Road, processes the channel of another part user from plate.From plate, user data is processed the journey of bit-level
Degree i.e. terminates, and then bit-level data is transferred to mainboard, mainboard completes the remainder of all users
Process.Equally, there are two baseband boards in the ascending resource pond of base station system: mainboard and from plate, mainboard
Process the channel of a part of user, process the channel of another part user from plate.
Present inventor finds in long-term research and development, for downlink resource pond, bit-level
Only account for the 30% of whole operand, can not well process computing to whole downlink user from plate
Amount is shared;For ascending resource pond, it is allocated to mainboard with from plate according to user, for
The when of multiple user's frequency domain resource multiplexing, if distribution can cause repeating meter on different baseband boards
Calculate, waste hardware resource.
Summary of the invention
The technical problem that present invention mainly solves is to provide descending and up base in a kind of LTE base station
Implementation method with resource pool and base station, it is possible to Appropriate application mainboard and the disposal ability from plate, solve
Certainly coupling between user in channel.
An aspect of of the present present invention is: provide the realization side of downgoing baseband resource pool in a kind of LTE base station
Method, including: main control module according to mainboard and the information from the most configured downlink user of plate, to
Described mainboard and the described channel dispatching corresponding downlink user from plate;Described mainboard and described divide from plate
The information that the channel of the other downlink user scheduled to described main control module is carried carries out bit-level
Process with symbol level, it is thus achieved that the time domain data of described mainboard generation and the described time domain produced from plate
Data.
Wherein, described mainboard and the described downlink user scheduled to described main control module respectively from plate
The information that carried of channel carry out the step of process of bit-level and symbol level, including described master
The physical down of plate and the described downlink user scheduled to described main control module respectively from plate is shared
The information that channel PDSCH is carried carries out the process of bit-level and symbol level;Or, described mainboard
Letter is controlled with the physical down of the described downlink user scheduled to described main control module respectively from plate
The information that road PDCCH is carried carries out the process of bit-level and symbol level.
Wherein, described main control module distinguishes the most configured downlink user information according to mainboard with from plate,
To described mainboard and the described step of channel dispatching corresponding downlink user from plate, including: described master
Control module is equal according to described mainboard and the described downlink user information the most configured from plate and load
Weighing apparatus, to described mainboard and the described current Transmission Time Interval dispatching its loading condition corresponding from plate
TTI needs the channel of downlink user to be processed.
Wherein, described main control module distinguishes the most configured downlink user information according to mainboard with from plate,
To described mainboard and the described step of channel dispatching corresponding downlink user from plate, including: described master
Control module is according to described mainboard and the described downlink user information the most configured from plate and described
Mainboard and described disposal ability from plate or the characteristic of support, to described mainboard with described dispatch from plate
The channel of the downlink user of the characteristic of its disposal ability corresponding or support.
Wherein, described method also includes: described mainboard descending use allocated to described main control module
The control format instruction CFI at family, hybrid automatic repeat-request instruction HI, Physical Broadcast Channel
PBCH, synchronous channel SCH, location-pilot tone P-RS and channel condition information-pilot tone CSI-RS
The information that common signal channel is carried processes.
Wherein, described main control module distinguishes the most configured downlink user information according to mainboard with from plate,
Before the step of described mainboard and the described channel dispatching corresponding downlink user from plate, including: institute
State main control module respectively to described mainboard and the described information from plate configurating downlink user.
Wherein, described mainboard and the described downlink user scheduled to described main control module respectively from plate
The information that carried of channel carry out the process of bit-level and symbol level, it is thus achieved that described mainboard produces
Time domain data and described from plate produce time domain data step after, including: described from plate to institute
State the described time domain data produced from plate of mainboard transmission;Described mainboard is by from the described time domain from plate
The time domain data that data and this plate produce is overlapped;Described mainboard is by the time domain number after described superposition
Send according to middle radio-frequency module.
Another aspect of the present invention is: provide the realization of uplink baseband resource pool in a kind of LTE base station
Method, including: main control module distinguishes the most configured different channels, to described according to mainboard with from plate
Mainboard and the described uplink user from plate scheduling respective channel;Described mainboard and described the most right from plate
The information that the channel of the uplink user that described main control module is scheduled is carried processes.
Wherein, described main control module, according to the configured different channels of mainboard, is dispatched to described mainboard
The step of the uplink user of respective channel, including: described main control module is configured according to described mainboard
Different channels, to described mainboard scheduling Physical Uplink Shared Channel PUSCH uplink user,
Or the uplink user to described mainboard scheduling Physical Uplink Control Channel PUCCH, or to described master
The uplink user of plate scheduling measurement reference signal SRS, or access to described mainboard scheduling physical accidental
The uplink user of channel PRACH.
Wherein, the channel of the uplink user that described mainboard is scheduled to described main control module is carried
Information carries out the step processed, including: the PUSCH that described mainboard is scheduled to described main control module
The information that carried of the channel of uplink user process;Or, described mainboard is to described master control mould
The information that the channel of the uplink user of the PUCCH that block is scheduled is carried processes;Or, institute
The information that the channel of the uplink user stating the mainboard SRS scheduled to described main control module is carried
Process;Or, the uplink user of the PRACH that described mainboard is scheduled to described main control module
The information that carried of channel process.
Wherein, described main control module, according to the different channels configured from plate, is dispatched from plate to described
The step of the uplink user of respective channel, including: described main control module is according to described configured from plate
Different channels, to described from plate scheduling PUSCH uplink user, or to described from plate dispatch
The uplink user of PUCCH, or to described from plate scheduling SRS uplink user, or to described from
The uplink user of plate scheduling PRACH.
Wherein, the channel of the described uplink user scheduled to described main control module from plate is carried
Information carries out the step processed, including: the described PUSCH scheduled to described main control module from plate
The information that carried of the channel of uplink user process;Or, described from plate to described master control mould
The information that the channel of the uplink user of the PUCCH that block is scheduled is carried processes;Or, institute
State the information that the channel from the uplink user of the plate SRS scheduled to described main control module is carried
Process;Or, the uplink user of the described PRACH scheduled to described main control module from plate
The information that carried of channel process.
Wherein, described main control module is according to mainboard with from the respectively the most configured different channels of plate, to institute
State mainboard and described before the step of the uplink user of plate scheduling respective channel, including: described master
Control module respectively to described mainboard and the described information repeating to configure the uplink user in community from plate,
Described main control module is respectively to described mainboard and the described channel differently configured from plate.
Wherein, described main control module is according to mainboard with from the respectively the most configured different channels of plate, to institute
State mainboard and the step of the described uplink user from plate scheduling respective channel, including: described master control mould
Tuber is according to described mainboard and the described different channels respectively the most configured from plate, to described mainboard and described
Uplink user to be processed is needed from the TTI of plate scheduling respective channel.
Wherein, described mainboard and the described uplink user scheduled to described main control module respectively from plate
The information that carried of channel carry out the step processed after, including: described mainboard and described from plate
Result after the information that described channel is carried being processed is reported to described main control module.
Another aspect of the present invention is: providing a kind of base station, described base station includes: main control module,
Mainboard and from plate;Described main control module is for according to described mainboard and described respectively the most configured from plate
Downlink user information, to described mainboard and described from plate dispatch corresponding downlink user channel;Institute
State mainboard and described from plate for the channel of downlink user scheduled to described main control module respectively
The information carried carries out the process of bit-level and symbol level, it is thus achieved that the time domain number that described mainboard produces
According to described from plate produce time domain data.
Wherein, described mainboard includes mainboard baseband processing module, described includes at plate base band from plate
Reason module;Described mainboard baseband processing module and described from plate baseband processing module for respectively to institute
State the information that the PDSCH channel of the scheduled downlink user of main control module carried and carry out bit-level
Process with symbol level;Or, described mainboard baseband processing module and described from plate baseband processing module
The letter carried for the PDCCH channel of downlink user scheduled to described main control module respectively
Breath carries out the process of bit-level and symbol level.
Wherein, described main control module includes scheduling unit, and described scheduling unit is for according to described master
Plate and the described downlink user information respectively the most configured from plate and load balancing, to described mainboard and institute
State the channel needing downlink user to be processed from the current TTI of plate scheduling its loading condition corresponding.
Wherein, described main control module includes scheduling unit, and described scheduling unit is for according to described master
Plate and the described downlink user information respectively the most configured from plate, and described mainboard and described from plate
Disposal ability or the characteristic of support, to described mainboard with described from plate dispatch its disposal ability corresponding or
The channel of the downlink user of the characteristic supported.
Wherein, described mainboard is additionally operable to the control lattice of downlink user allocated to described main control module
Formula instruction CFI, hybrid automatic repeat-request instruction HI, Physical Broadcast Channel PBCH, synchronization letter
Road SCH, location-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel are held
The information carried processes.
Wherein, described main control module be additionally operable to respectively to described mainboard and described from plate configurating downlink use
Family information.
Wherein, described from plate for the described time domain data produced from plate of described mainboard transmission;Institute
State mainboard for folding from the described time domain data produced from the time domain data of plate and this plate
Add;Described mainboard is for sending the time domain data after described superposition to middle radio-frequency module.
Another aspect of the present invention is: providing a kind of base station, described base station includes: main control module,
Mainboard and from plate;Described main control module is for according to described mainboard and described respectively the most configured from plate
Different channels, to described mainboard and described from plate scheduling respective channel uplink user;Described master
The channel of plate and the described uplink user scheduled to described main control module respectively from plate is carried
Information processes.
Wherein, described main control module includes mainboard scheduling unit;Described mainboard scheduling unit is used for root
According to the different channels that described mainboard is configured, to the uplink user of described mainboard scheduling PUSCH,
Or the uplink user to described mainboard scheduling PUCCH, or dispatch the up of SRS to described mainboard
User, or the uplink user to described mainboard scheduling PRACH.
Wherein, described mainboard includes mainboard baseband processing module;Described mainboard baseband processing module is used
In the letter that the channel of the uplink user of the PUSCH scheduled to described mainboard scheduling unit is carried
Breath processes;Or, described mainboard baseband processing module is for modulated to described mainboard scheduling unit
The information that the channel of the uplink user of the PUCCH of degree is carried processes;Or, described mainboard
Baseband processing module is for the letter of the uplink user of the SRS scheduled to described mainboard scheduling unit
The information that road is carried processes;Or, described mainboard baseband processing module is for described mainboard
The information that the channel of the uplink user of the PRACH that scheduling unit is scheduled is carried processes.
Wherein, described main control module includes from plate scheduling unit;Described from plate scheduling unit for root
According to the described different channels configured from plate, to the described uplink user from plate scheduling PUSCH,
Or to the described uplink user from plate scheduling PUCCH, or dispatch the up of SRS to described from plate
User, or to the described uplink user from plate scheduling PRACH.
Wherein, described include from plate baseband processing module from plate;Described from plate baseband processing module use
In the letter that the channel of the uplink user to the described PUSCH scheduled from plate scheduling unit is carried
Breath processes;Or, described from plate baseband processing module for described modulated from plate scheduling unit
The information that the channel of the uplink user of the PUCCH of degree is carried processes;Or, described from plate
Baseband processing module is for the letter of the uplink user to the described SRS scheduled from plate scheduling unit
The information that road is carried processes;Or, described from plate baseband processing module for described from plate
The information that the channel of the uplink user of the PRACH that scheduling unit is scheduled is carried processes.
Wherein, described main control module be additionally operable to respectively to described mainboard and described repeat to configure from plate little
The information of the uplink user in district, described main control module be additionally operable to respectively to described mainboard and described from
The channel that plate is differently configured.
Wherein, described main control module is additionally operable to according to described mainboard and described respectively the most configured from plate
Different channels, needs to be processed up to described mainboard and the described TTI from plate scheduling respective channel
User.
Wherein, from described mainboard and the described information being additionally operable to be carried by described channel from plate are carried out
Result after reason is reported to described main control module.
Wherein, described mainboard is additionally operable to the result after the information that described channel is carried being processed
Report to described mainboard scheduling unit;The described information being additionally operable to described channel is carried from plate is entered
Result after row processes is reported from plate scheduling unit to described.
Embodiment of the present invention provides the benefit that: be different from the situation of prior art, LTE of the present invention
Base station is at downgoing baseband resource pool, according to downlink user respectively to mainboard with from plate configurating downlink user
Information, mainboard and the channel from the plate downlink user to distributing are carried out at bit-level and symbol level
Reason, in this way, it is possible to Appropriate application mainboard and the disposal ability from plate;At uplink baseband
Resource pool, configures to mainboard with from plate respectively according to channel, then in scheduling respective channel
Uplink user, mainboard and the channel from the plate uplink user to dispatching process, by this side
Formula, it is possible to solve the coupling between user in channel.
Accompanying drawing explanation
Fig. 1 is the implementation method schematic diagram of downgoing baseband resource pool in prior art LTE base station;
Fig. 2 is the implementation method schematic diagram of uplink baseband resource pool in prior art LTE base station;
Fig. 3 is the flow chart of the implementation method of uplink baseband resource pool in prior art LTE base station;
Fig. 4 is implementation method one embodiment of downgoing baseband resource pool in LTE base station of the present invention
Flow chart;
Fig. 5 is the another embodiment of the implementation method of downgoing baseband resource pool in LTE base station of the present invention
Flow chart;
Fig. 6 is the implementation method of downgoing baseband resource pool embodiment again in LTE base station of the present invention
Flow chart;
Fig. 7 is the implementation method of downgoing baseband resource pool embodiment again in LTE base station of the present invention
Flow chart;
Fig. 8 is implementation method one embodiment of uplink baseband resource pool in LTE base station of the present invention
Flow chart;
Fig. 9 is another embodiment of the implementation method of uplink baseband resource pool in LTE base station of the present invention
Flow chart;
Figure 10 is the another embodiment of the implementation method of uplink baseband resource pool in LTE base station of the present invention
Flow chart;
Figure 11 is the structural representation of base station one of the present invention embodiment;
Figure 12 is the structural representation of another embodiment of base station of the present invention;
Figure 13 is the base station of the present invention structural representation in an actual application;
Figure 14 is the structural representation of the another embodiment in base station of the present invention;
Figure 15 is the structural representation of the another embodiment in base station of the present invention;
Figure 16 is the base station of the present invention structural representation in another actual application;
Figure 17 is the implementation method flow chart of uplink baseband resource pool in base station of the present invention.
Detailed description of the invention
Currently for LTE protocol descending for, along with the application of increasing multi-antenna technology,
Physical Downlink Shared Channel (PDSCH, Physical Downlink Shared Channel) becomes
Become increasingly complex, it is desirable to community can the most online and transmission user also get more and more, and so makes
Become PDSCH channel more and more higher to the requirement of the disposal ability of baseband board.
For LTE protocol is up, subscriber equipment (UE, User Equipment) is supported many
Antenna transmission, multi-cell cooperating, intra-cell users on-line normalization also get more and more, and cause up
Demodulate more and more higher for the requirement of the disposal ability of baseband board.
It is the implementation method of downgoing baseband resource pool in prior art LTE base station refering to Fig. 1, Fig. 1
Schematic diagram, downgoing baseband resource pool has two baseband boards: mainboard and from plate, and mainboard is redaction
Baseband board, is the baseband board of early version from plate.The main control module of base station manages mainboard and from plate simultaneously,
A part of downlink user is assigned to mainboard and processes by main control module, is distributed by another part downlink user
Process to from plate.The process of whole downlink user is divided into bit-level and symbol level, from plate to descending use
The data at family process the degree of bit-level and can terminate, and then the data of bit-level are transferred to main
Plate, is completed the remaining process of all downlink users by mainboard.
In such scheme, mutual between master/slave board is the number processing bit-level degree of downlink user
According to.In the data handling procedure of whole downlink user, if by whole down user data
Processing operand and regard an entirety as, the operand that processes of bit-level only accounts for the 30% of whole operand,
The operand of 70% is all that symbol level processes, so, can not be the most right from plate in existing scheme
The process operand of the data of whole downlink user is shared.
It is uplink baseband resource in prior art LTE base station refering to Fig. 2 and Fig. 3, Fig. 2 and Fig. 3
The implementation method in pond, uplink baseband resource pool has two baseband boards: mainboard and from plate, and mainboard is new
The baseband board of version, is the baseband board of early version from plate.Main control module is by the uplink user in community
Information repeat to be allocated to mainboard and from plate;Or according to load balancing, user profile is joined respectively
Put to mainboard with from plate;Mainboard L2 scheduler module is according to load balancing, by between current launch time
Uplink user to be processed is needed to distribute to mainboard every (TTI, Transmission Time Interval)
Process with from plate;Mainboard and from plate respectively to distribution uplink user physical uplink share letter
Road (PUSCH, Physical Uplink Shared Channel), Physical Uplink Control Channel
(PUCCH, Physical Uplink Control Channel) and measuring reference signals (SRS,
Sounding Reference Signal) data that carried of channel process.
The implementation in above-mentioned ascending resource pond, has three problems: first, and multiple user's frequency domains provide
The when of the multiplexing of source, between multiple users, there is public process part, assist between the most multiple users
Deal with and also contribute to performance boost, if the plurality of user distributes on different boards, will cause
Double counting, wastes hardware resource.Second, PUSCH channel consideration coordinate multipoint (COMP,
Coordinated Multi-Point) cooperation scene time, if according to user do resource pool distribution, and
In channel, two users are dispensed on different plates and process, and COMP data need to transmit many parts,
The operation of interference mitigation (IC, Interference Canceling) is done also for COMP minizone
Inconvenient.3rd, the L2 scheduler module centralized dispatching of mainboard can only be used, each baseband board is not
Can independently dispatch, can not Parallel Scheduling, easily waste resource.
The present invention is described in detail with embodiment below in conjunction with the accompanying drawings.
It is the implementation method one of downgoing baseband resource pool in LTE base station of the present invention refering to Fig. 4, Fig. 4
The flow chart of embodiment, including:
Step S101: main control module is according to mainboard and the letter from the respectively the most configured downlink user of plate
Breath, to mainboard and the channel from the plate corresponding downlink user of scheduling.
Main control module is to be controlled to mainboard with from plate in LTE base station downgoing baseband resource pool, adjust
Degree, the module of configuration, such as: to mainboard and the information that is respectively configured downlink user from plate;To master
Plate and the channel from plate dispatching downlink user respectively, process for mainboard with from plate;To mainboard and from
Plate is respectively configured cell information;According to and the disposal ability of baseband board (mainboard or from plate), amendment
Parameter of community etc..After increasing baseband board in LTE base station, main control module can identify newly automatically
The baseband board increased and the disposal ability of this baseband board.
Mainboard and be the baseband board of LTE base station from plate, typically represents new baseband board and old base band
Plate, mainboard and the quantity from plate are determined according to practical situations.
Downlink user refers to that base station sends the user of information to the subscriber equipment of user.Need explanation
It is that downlink user herein can be the downlink user of same community, it is also possible to be different districts
Downlink user.
Channel is the passage of information transmission, when i.e. information is transmitted a path of process.
The channel of downlink user includes but not limited to: Physical Downlink Shared Channel PDSCH, physics
Down control channel PDCCH, Physical Broadcast Channel PBCH etc..
Main control module, according to the most identified mainboard with from plate, for mainboard and is respectively configured from plate in advance
The information of downlink user.According to the information of the most configured downlink user, main control module is to mainboard
With from plate dispatch corresponding downlink user channel, in order to mainboard and from plate to channel carrying number
According to processing.
Step S102: mainboard and the channel institute from scheduled to the main control module respectively downlink user of plate
The information of carrying carries out the process of bit-level and symbol level, it is thus achieved that time domain data that mainboard produces and from
The time domain data that plate produces.
Bit-level process specifically include that the CRC of transmission block (Transport Block, TB) additional,
Sub-block segmentation and CRC add, chnnel coding, rate-matched, code block cascade, control information
Chnnel coding and rate-matched, business datum and control information multiplexing, channel interleaving and data ratio
Special scrambling etc..
Symbol level processes the channel volume specifically included that in each code word transmitted on the physical channel
Bit after Ma scrambles;Bit after scrambling is modulated, obtains complex modulation symbols;
Obtained complex modulation symbols is mapped in one or more transport layer;Complex modulation to every layer
Symbol carries out precoding;Complex modulation symbols on each antenna port is mapped to resource element (RE,
Resource Element) on;Each antenna port produces the time-domain signal of plural number.
Time domain is the fundamental property of signal, can understand the mutual shadow between reaction signal and interconnection line
Ring.The information that the channel of the downlink user that mainboard is scheduled to main control module is carried carries out bit-level
Process with symbol level, it is thus achieved that the time domain data that mainboard produces;Scheduled to main control module from plate
The information that the channel of downlink user is carried carries out the process of bit-level and symbol level, it is thus achieved that produce from plate
Raw time domain data.
LTE base station of the present invention at downgoing baseband resource pool, according to downlink user respectively to mainboard and from
Plate carries out configurating downlink user profile, mainboard and the channel from the plate downlink user to distributing to be compared
The superfine process with symbol level, in this way, it is possible to Appropriate application mainboard and the process from plate
Ability.
It is downgoing baseband resource pool in LTE base station of the present invention refering to Fig. 5 to Fig. 7, Fig. 5 to Fig. 7
The flow chart of implementation method three embodiment, including:
Step S201: main control module is respectively to mainboard and the information from plate configurating downlink user.
Main control module is according to the most identified mainboard with from plate, for mainboard be respectively configured descending from plate
The information of user.
Main control module is to be controlled to mainboard with from plate in LTE base station downgoing baseband resource pool, adjust
Degree, the module of configuration.
Mainboard and be the baseband board of LTE base station from plate, typically represents new baseband board and old base band
Plate, mainboard and the quantity from plate are determined according to practical situations.
Downlink user refers to that base station sends the user of information to the subscriber equipment of user.Need explanation
It is that downlink user herein can be the downlink user of same community, it is also possible to be different districts
Downlink user.
Step S202: main control module is according to mainboard and the letter from the respectively the most configured downlink user of plate
Breath, to mainboard and the channel from the plate corresponding downlink user of scheduling.
Channel is the passage of information transmission, when i.e. information is transmitted a path of process.
According to the information of the most configured downlink user, main control module dispatches phase to mainboard with from plate
Answer the channel of downlink user, in order to mainboard and from plate to channel carrying data process.
Main control module, can be according to two kinds to mainboard with when the channel of corresponding downlink user dispatched by plate
Situation is respectively to mainboard and the channel from the plate corresponding downlink user of scheduling, respectively:
The first foundation: main control module distinguishes the most configured downlink user information according to mainboard with from plate
And load balancing, to mainboard and the current Transmission Time Interval dispatching its loading condition corresponding from plate
TTI needs the channel of downlink user to be processed.
Transmission Time Interval (TTI) is at UMTS (UMTS, Universal
Mobile Telecommunications System) and other numeral telecommunication network (such as LTE system)
In a parameter, refer to the length of in wireless link one independent decoding transmission.TTI with
Relevant from the size of the data block of higher Internet to radio link layer.It is RRM
The ultimate unit of (such as scheduling etc.) administered time.The corresponding business of each transmission channel,
Owing to miscellaneous service is different to the requirement of time delay, so its TTI is different, TTI can be
10ms, 20ms, 40ms or 80ms etc..
Load balancing refers to that mainboard and the downlink user number loaded respectively from plate substantially equalize, such as,
It is 10 that main control module is allocated to the downlink user number of mainboard load, is allocated to the descending use from plate load
Amount is 5, and now, according to load balancing, main control module is to corresponding from plate load feelings from plate scheduling
The current TTI of condition needs the channel of downlink user to be processed.
The second foundation: main control module is believed according to mainboard with from the downlink user that plate is the most configured
Breath, and mainboard and the disposal ability from plate or the characteristic of support are corresponding with from plate scheduling to mainboard
The channel of the downlink user of the characteristic of its disposal ability or support.
Mainboard and the disposal ability from plate, such as, the flow of mainboard is 500M, from the flow of plate
For 300M, at this point it is possible to by downlink user to descending use less than 300M of the requirement of flow
The channel dispatch at family is given and is processed from plate, by downlink user to the requirement of flow more than under 300M
The channel dispatch of row user processes to mainboard.
Mainboard and the characteristic supported from plate, such as employ the characteristic that product is new in downlink user, from
When plate cannot process, the channel of this downlink user can be dispatched to mainboard process to mainboard.
In actual applications, can consider mainboard and the disposal ability from plate and mainboard and from
The characteristic that plate is supported, or only consider mainboard and the disposal ability from plate, or only consider mainboard and
The characteristic supported from plate.
Main control module, can be according to reality to mainboard with when the channel of corresponding downlink user dispatched by plate
Applicable cases selects two kinds of above-mentioned foundations.
Step S203: mainboard and the channel institute from scheduled to the main control module respectively downlink user of plate
The information of carrying carries out the process of bit-level and symbol level, it is thus achieved that time domain data that mainboard produces and from
The time domain data that plate produces.
Bit-level processes and specifically includes that the CRC of transmission block is additional, sub-block segmentation and CRC is additional,
The cascade of chnnel coding, rate-matched, code block, the chnnel coding controlling information and rate-matched, industry
Business data and control information multiplexing, channel interleaving and data bit scrambling etc..
Symbol level processes the channel volume specifically included that in each code word transmitted on the physical channel
Bit after Ma scrambles;Bit after scrambling is modulated, obtains complex modulation symbols;
Obtained complex modulation symbols is mapped in one or more transport layer;Complex modulation to every layer
Symbol carries out precoding;Complex modulation symbols on each antenna port is mapped on resource element;
Each antenna port produces the time-domain signal of plural number.
Step S203 specifically includes:
Step S203a: mainboard and the physics from scheduled to the main control module respectively downlink user of plate
The information that DSCH Downlink Shared Channel PDSCH is carried carries out the process of bit-level and symbol level.
Or, step S203b: mainboard and from scheduled to the main control module respectively downlink user of plate
Physical Downlink Control Channel (PDCCH, Physical Downlink Control Channel) is held
The information carried carries out the process of bit-level and symbol level.
Step S204: the time domain data produced to mainboard transmission from plate from plate.
The information carried from the channel of the plate downlink user scheduled to main control module carries out bit
Level and the process of symbol level, it is thus achieved that the time domain data produced from plate.The time domain data that will produce from plate
It is transferred to mainboard.
Step S205: the time domain data that mainboard produces since time domain data and this plate of plate in the future is carried out
Superposition.
Step S206: the time domain data after superposition is sent by mainboard to middle radio-frequency module.
Step S207: mainboard downlink user allocated to main control module control format instruction CFI,
Hybrid automatic repeat-request instruction HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location
The information that-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel are carried is carried out
Process.
Step S207 performed before step S206.
In a word, LTE base station of the present invention is at downgoing baseband resource pool, according to downlink user respectively to master
Plate and carry out configurating downlink user profile from plate, mainboard and from the plate channel to the downlink user of distribution
Carry out the process of bit-level and symbol level, in this way, it is possible to Appropriate application mainboard and from plate
Disposal ability.
It is the implementation method one of uplink baseband resource pool in LTE base station of the present invention refering to Fig. 8, Fig. 8
The flow chart of embodiment, including:
Step S301: main control module distinguishes the most configured different channels, to master according to mainboard with from plate
Plate and the uplink user from plate scheduling respective channel.
Main control module is to be controlled to mainboard with from plate in LTE base station downgoing baseband resource pool, adjust
Degree, the module of configuration, such as: to mainboard and the information that is respectively configured downlink user from plate;To master
Plate and the channel from plate dispatching downlink user respectively, process for mainboard with from plate;To mainboard and from
Plate is respectively configured cell information;According to and the disposal ability of baseband board (mainboard or from plate), amendment
Parameter of community etc..After increasing baseband board in LTE base station, main control module can identify newly automatically
The baseband board increased and the disposal ability of this baseband board.
Mainboard and be the baseband board of LTE base station from plate, typically represents new baseband board and old base band
Plate, mainboard and the quantity from plate are determined according to practical situations.
Uplink user refers to be sent to base station the user of information by subscriber equipment.Need explanation
It is that uplink user herein can be the uplink user of same community, it is also possible to be different districts
Uplink user.
In the present embodiment, main control module is respectively configured different letters to mainboard with from plate in advance
Road.Main control module distinguishes the most configured different channels according to mainboard with from plate, adjusts to mainboard with from plate
The uplink user of degree respective channel.
Step S302: mainboard and the channel institute from scheduled to the main control module respectively uplink user of plate
The information of carrying processes.
Main control module to mainboard with after the uplink user of plate scheduling respective channel, mainboard and dividing from plate
The information that the channel of the other uplink user scheduled to main control module is carried processes.
LTE base station of the present invention, at uplink baseband resource pool, is entered to mainboard with from plate respectively according to channel
Row configuration, then scheduling respective channel on uplink user, mainboard and from plate to scheduling up use
The channel at family processes, in this way, it is possible to solve the coupling between user in channel, side
Just the operation of interference mitigation is done in COMP minizone.
It is uplink baseband resource in LTE base station of the present invention refering to Fig. 9 to Figure 10, Fig. 9 to Figure 10
The flow chart of another embodiment of implementation method in pond, including:
Step S401: main control module repeats to configure the uplink user in community to mainboard with from plate respectively
Information.
Main control module is to be controlled to mainboard with from plate in LTE base station downgoing baseband resource pool, adjust
Degree, the module of configuration.
Mainboard and be the baseband board of LTE base station from plate, typically represents new baseband board and old base band
Plate, mainboard and the quantity from plate are determined according to practical situations.
Uplink user refers to be sent to base station the user of information by subscriber equipment.Need explanation
It is that uplink user herein can be the uplink user of same community, it is also possible to be different districts
Uplink user.
Repeat to configure the information referring to that mainboard and compounding from plate counterpoise is put same uplink user.
Step S402: main control module is respectively to mainboard with from the differently configured channel of plate.
Main control module according to channel to mainboard with from the differently configured channel of plate.Such as, main control module
By PUSCH channel configuration to mainboard, PUCCH channel configuration is given from plate.
Step S403: main control module distinguishes the most configured different channels, to master according to mainboard with from plate
Plate and the uplink user from plate scheduling respective channel.
Distinguishing the most configured different channels according to mainboard with from plate, main control module is adjusted to mainboard with from plate
The uplink user of degree respective channel.Such as, main control module by PUSCH channel configuration to mainboard,
The uplink user of this PUSCH channel is then dispatched to mainboard;PUCCH channel is joined by main control module
Put to from plate, then to the uplink user dispatching this PUCCH channel from plate.
Wherein, step S403 includes:
Step S403a: main control module distinguishes the most configured different channels according to mainboard with from plate, to
Mainboard and the TTI from plate scheduling respective channel need uplink user to be processed.
TTI is the ultimate unit of RRM (such as scheduling etc.) administered time.Each
The corresponding business of transmission channel, owing to miscellaneous service is different to the requirement of time delay, so its TTI
Being different, TTI can be 10ms, 20ms, 40ms or 80ms etc..
Such as, PUSCH channel configuration to mainboard, is then dispatched this PUSCH to mainboard by main control module
The TTI of channel needs uplink user to be processed;PUCCH channel configuration is given from plate by main control module,
Then need uplink user to be processed to the TTI dispatching this PUCCH channel from plate.
Specifically, main control module is according to the configured different channels of mainboard, corresponding to mainboard scheduling
The step of the uplink user of channel, including:
Step S403b: main control module, according to the configured different channels of mainboard, dispatches thing to mainboard
The uplink user of reason Uplink Shared Channel PUSCH, or dispatch Physical Uplink Control Channel to mainboard
The uplink user of PUCCH, or the uplink user to mainboard scheduling measurement reference signal SRS, or
Uplink user to mainboard scheduling Physical Random Access Channel PRACH.
Specifically, main control module is according to the different channels configured from plate, to corresponding from plate scheduling
The step of the uplink user of channel, including:
Step S403c: main control module, according to the different channels configured from plate, is dispatched to from plate
The uplink user of PUSCH, or to the uplink user from plate scheduling PUCCH, or dispatch to from plate
The uplink user of SRS, or to the uplink user from plate scheduling PRACH.
Such as, the channel that mainboard is configured is: PUSCH channel and PUCCH channel, then master control
The uplink user of module schedules PUSCH channel and the uplink user of PUCCH channel are to mainboard;
The channel configured from plate is: SRS channel and PRACH channel, then main control module scheduling SRS
The uplink user of channel and the uplink user of PRACH channel are given from plate.
Step S404: mainboard and the channel institute from scheduled to the main control module respectively uplink user of plate
The information of carrying processes.
Specifically, the information that the channel of the uplink user that mainboard is scheduled to main control module is carried
Carry out the step processed, including:
Step S404a: the channel of the uplink user of the PUSCH that mainboard is scheduled to main control module
The information carried processes;Or, the PUCCH's that mainboard is scheduled to main control module is up
The information that the channel of user is carried processes;Or, the SRS that mainboard is scheduled to main control module
The information that carried of the channel of uplink user process;Or, mainboard is scheduled to main control module
The information that carried of the channel of uplink user of PRACH process.
Specifically, the information carried from the channel of the plate uplink user scheduled to main control module
Carry out the step processed, including:
Step S404b: from the channel of the uplink user of the plate PUSCH scheduled to main control module
The information carried processes;Or, up from the plate PUCCH scheduled to main control module
The information that the channel of user is carried processes;Or, from the SRS that plate is scheduled to main control module
The information that carried of the channel of uplink user process;Or, scheduled to main control module from plate
The information that carried of the channel of uplink user of PRACH process.
Step S405: mainboard and information channel carried from plate process after result to master
Control module report.
LTE base station of the present invention, at uplink baseband resource pool, is entered to mainboard with from plate respectively according to channel
Row configuration, then scheduling respective channel on uplink user, mainboard and from plate to scheduling up use
The channel at family processes, in this way, it is possible to solve the coupling between user in channel, side
Just the operation of interference mitigation is done in COMP minizone.
It is the structural representation of base station one of the present invention embodiment refering to Figure 11, Figure 11, this base station
Including: main control module 101, mainboard 102 and from plate 103.
Alternatively, the base station of Figure 11 can perform the operation in Fig. 4 to Fig. 7.
Main control module 101 is used for distinguishing the most configured downlink user according to mainboard 102 with from plate 103
Information, to mainboard 102 and the channel of dispatching corresponding downlink user from plate 103.
Main control module 101 is to mainboard 102 with from plate 103 in LTE base station downgoing baseband resource pool
The module be controlled, dispatch, configured.
Mainboard 102 and be the baseband board of LTE base station from plate 103, typically represent new baseband board and
Old baseband board, mainboard 102 and the quantity from plate 103 are determined according to practical situations.
Downlink user refers to that base station sends the user of information to the subscriber equipment of user.Need explanation
It is that downlink user herein can be the downlink user of same community, it is also possible to be different districts
Downlink user.
Channel is the passage of information transmission, when i.e. information is transmitted a path of process.
The channel of downlink user includes but not limited to: Physical Downlink Shared Channel PDSCH, physics
Down control channel PDCCH, Physical Broadcast Channel PBCH etc..
Main control module 101, according to the most identified mainboard 102 with from plate 103, is mainboard 102 in advance
With the information being respectively configured downlink user from plate 103.Letter according to the most configured downlink user
Breath, main control module 101 to mainboard 102 and the channel of dispatching corresponding downlink user from plate 103, with
It is easy to mainboard 102 and from plate 103, the data of carrying channel is processed.
Mainboard 102 and from plate 103 for downlink user scheduled to main control module 101 respectively
The information that channel is carried carries out the process of bit-level and symbol level, it is thus achieved that mainboard 102 produce time
Numeric field data and the time domain data produced from plate 103.
Bit-level process specifically include that the CRC of transmission block (Transport Block, TB) additional,
Sub-block segmentation and CRC add, chnnel coding, rate-matched, code block cascade, control information
Chnnel coding and rate-matched, business datum and control information multiplexing, channel interleaving and data ratio
Special scrambling etc..
Symbol level processes the channel volume specifically included that in each code word transmitted on the physical channel
Bit after Ma scrambles;Bit after scrambling is modulated, obtains complex modulation symbols;
Obtained complex modulation symbols is mapped in one or more transport layer;Complex modulation to every layer
Symbol carries out precoding;Complex modulation symbols on each antenna port is mapped to resource element (RE,
Resource Element) on;Each antenna port produces the time-domain signal of plural number.
Time domain is the fundamental property of signal, can understand the mutual shadow between reaction signal and interconnection line
Ring.The information that the channel of the downlink user that mainboard 102 is scheduled to main control module 101 is carried is entered
Row bit-level and the process of symbol level, it is thus achieved that the time domain data that mainboard 102 produces;Right from plate 103
The information that the channel of the downlink user that main control module 101 is scheduled is carried carries out bit-level and symbol
The process of level, it is thus achieved that the time domain data produced from plate 103.
LTE base station of the present invention at downgoing baseband resource pool, according to downlink user respectively to mainboard and from
Plate carries out configurating downlink user profile, mainboard and the channel from the plate downlink user to distributing to be compared
The superfine process with symbol level, in this way, it is possible to Appropriate application mainboard and the process from plate
Ability.
It is the structural representation of another embodiment of base station of the present invention refering to Figure 12, Figure 12, this base
Station includes: main control module 201, mainboard 202 and from plate 203.
Alternatively, the base station of Figure 12 can perform the operation in Fig. 5 to Fig. 7.
Main control module 201 is used for distinguishing the most configured downlink user according to mainboard 202 with from plate 203
Information, to mainboard 202 and the channel of dispatching corresponding downlink user from plate 203.
Mainboard 202 and from plate 203 for downlink user scheduled to main control module 201 respectively
The information that channel is carried carries out the process of bit-level and symbol level, it is thus achieved that mainboard 202 produce time
Numeric field data and the time domain data produced from plate 203.
Mainboard 202 includes mainboard baseband processing module 2021, includes from plate Base-Band Processing from plate 203
Module 2031.
Mainboard baseband processing module 2021 and from plate baseband processing module 2031 for respectively to master control
The information that the PDSCH channel of the downlink user that module 201 is scheduled is carried carry out bit-level and
The process of symbol level.
Or, mainboard baseband processing module 2021 and from plate baseband processing module 2031 for the most right
The information that the PDCCH channel of the downlink user that main control module 201 is scheduled is carried carries out bit
Level and the process of symbol level.
Main control module 201 includes scheduling unit 2011, and scheduling unit 2011 is for according to mainboard 202
The most configured downlink user information and load balancing is distinguished, to mainboard 202 with from plate with from plate 203
The current TTI of 203 scheduling its loading conditions corresponding needs the channel of downlink user to be processed.
Scheduling unit 2011 is used for distinguishing the most configured descending use according to mainboard 202 with from plate 203
Family information, and mainboard 202 and the disposal ability from plate 203 or the characteristic of support, to mainboard 202
Channel with the downlink user of the characteristic dispatching its disposal ability corresponding or support from plate 203.
Mainboard 202 is additionally operable to the control format instruction of downlink user allocated to main control module 201
CFI, hybrid automatic repeat-request instruction HI, Physical Broadcast Channel PBCH, synchronous channel SCH,
The information that location-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel are carried
Process.
Main control module 201 is additionally operable to respectively to mainboard 202 with from plate 203 configurating downlink user profile.
From plate 203 for transmitting, to mainboard 202, the time domain data produced from plate 203.
Mainboard 202 enters for the time domain data produced since time domain data and this plate of plate 203 in the future
Row superposition.
Mainboard 202 is for sending the time domain data after superposition to middle radio-frequency module.
The partial function of main control module in actual applications, can be shifted by the base station of present embodiment
To mainboard, such as, the information of the downlink user processed from plate is sent by mainboard MAC processing module
Give from plate, the function of the scheduling unit of main control module is held by the mainboard schedule process module of mainboard
OK, Figure 13 is seen.
LTE base station of the present invention at downgoing baseband resource pool, according to downlink user respectively to mainboard and from
Plate carries out configurating downlink user profile, mainboard and the channel from the plate downlink user to distributing to be compared
The superfine process with symbol level, in this way, it is possible to Appropriate application mainboard and the process from plate
Ability.
It is the structural representation of the another embodiment in base station of the present invention refering to Figure 14, Figure 14, this base
Station includes: main control module 301, mainboard 302 and from plate 303.
Alternatively, the base station of Figure 14 can perform the operation in Fig. 8 to Figure 10.
Main control module 301 is used for distinguishing the most configured different channels according to mainboard 302 with from plate 303,
To mainboard 302 and the uplink user of dispatching respective channel from plate 303.
Main control module 301 is to mainboard 302 with from plate 303 in LTE base station downgoing baseband resource pool
The module be controlled, dispatch, configured, such as: be respectively configured to mainboard 302 with from plate 303
The information of downlink user;To mainboard 302 and the channel from plate 303 respectively dispatching downlink user, with
For mainboard 302 and process from plate 303;It is respectively configured cell information to mainboard 302 with from plate 303;
According to and the disposal ability of baseband board (mainboard 302 or from plate 303), the parameter etc. of amendment community
Deng.After increasing baseband board in LTE base station, main control module 301 can identify the base newly increased automatically
Band plate and the disposal ability of this baseband board.
Mainboard 302 and be the baseband board of LTE base station from plate 303, typically represent new baseband board and
Old baseband board, mainboard 302 and the quantity from plate 303 are determined according to practical situations.
Uplink user refers to be sent to base station the user of information by subscriber equipment.Need explanation
It is that uplink user herein can be the uplink user of same community, it is also possible to be different districts
Uplink user.
In the present embodiment, main control module 301 is joined respectively to mainboard 302 with from plate 303 in advance
Put different channels.Main control module 301 according to mainboard 302 and from plate 303 respectively the most configured not
Cochannel, to mainboard 302 and the uplink user of dispatching respective channel from plate 303.
Mainboard 302 and the channel from scheduled to the main control module 301 respectively uplink user of plate 303
The information carried processes.
Main control module 301 to mainboard 302 with after the uplink user of respective channel dispatched by plate 303,
Mainboard 302 and the channel from scheduled to the main control module 301 respectively uplink user of plate 303 are held
The information carried processes.
LTE base station of the present invention, at uplink baseband resource pool, is entered to mainboard with from plate respectively according to channel
Row configuration, then scheduling respective channel on uplink user, mainboard and from plate to scheduling up use
The channel at family processes, in this way, it is possible to solve the coupling between user in channel, side
Just the operation of interference mitigation is done in COMP minizone.
It is the structural representation of the another embodiment in base station of the present invention refering to Figure 15, Figure 15, this base
Station includes: main control module 401, mainboard 402 and from plate 403.
Alternatively, the base station of Figure 15 can perform the operation in Fig. 9 to Figure 10.
Main control module 401 is used for distinguishing the most configured different channels according to mainboard 402 with from plate 403,
To mainboard 402 and the uplink user of dispatching respective channel from plate 403.
Mainboard 402 and the channel from scheduled to the main control module 401 respectively uplink user of plate 403
The information carried processes.
Main control module 401 includes mainboard scheduling unit 4011;Mainboard scheduling unit 4011 is for root
According to the different channels that mainboard 402 is configured, dispatch the uplink user of PUSCH to mainboard 402,
Or dispatch the uplink user of PUCCH to mainboard 402, or dispatch the up of SRS to mainboard 402
User, or the uplink user of PRACH is dispatched to mainboard 402.
Mainboard 402 includes mainboard baseband processing module 4021;
Mainboard baseband processing module 4021 is for the PUSCH scheduled to mainboard scheduling unit 4011
The information that carried of the channel of uplink user process;
Or, mainboard baseband processing module 4021 is for scheduled to mainboard scheduling unit 4011
The information that the channel of the uplink user of PUCCH is carried processes;
Or, mainboard baseband processing module 4021 is for the SRS scheduled to mainboard scheduling unit 4011
The information that carried of the channel of uplink user process;
Or, mainboard baseband processing module 4021 is for scheduled to mainboard scheduling unit 4011
The information that the channel of the uplink user of PRACH is carried processes.
Main control module 401 also includes from plate scheduling unit 4012;It is used for from plate scheduling unit 4012
According to the different channels configured from plate 403, to dispatching the uplink user of PUSCH from plate 403,
Or to dispatching the uplink user of PUCCH from plate 403, or dispatch the up of SRS to from plate 403
User, or to dispatching the uplink user of PRACH from plate 403.
Dispatching uplink user when, mainboard scheduling unit 4011 and from plate scheduling unit 4012
Between intercourse scheduled uplink user, i.e. mainboard scheduling unit 4011 and single from plate scheduling
The mutual of data is carried out so that mainboard and obtain each scheduling of correspondence from plate between unit 4012
Uplink user.
Include from plate baseband processing module 4031 from plate 403.
From plate baseband processing module 4031 for the PUSCH scheduled from plate scheduling unit 4012
The information that carried of the channel of uplink user process;
Or, from plate baseband processing module 4031 for scheduled from plate scheduling unit 4012
The information that the channel of the uplink user of PUCCH is carried processes;
Or, from plate baseband processing module 4031 for the SRS scheduled from plate scheduling unit 4012
The information that carried of the channel of uplink user process;
Or, from plate baseband processing module 4031 for scheduled from plate scheduling unit 4012
The information that the channel of the uplink user of PRACH is carried processes.
Main control module 401 is additionally operable to repeat to configure in community to mainboard 402 with from plate 403 respectively
The information of uplink user, main control module 401 is additionally operable to configure to mainboard 402 with from plate 403 respectively
Different channels.
Main control module 401 is additionally operable to believe according to mainboard 402 with from the difference that plate 403 is the most configured
Road, to mainboard 402 and from plate 403 dispatch respective channel TTI need uplink user to be processed.
Mainboard 402 and the information being additionally operable to be carried by channel from plate 403 process after result
Report to main control module 401.
Result after the information that mainboard 402 is additionally operable to be carried by channel processes is dispatched to mainboard
Unit 4011 is reported;The information being additionally operable to be carried by channel from plate 403 process after knot
Fruit is reported to from plate scheduling unit 4012.
The base station of present embodiment in actual applications, can be by the mainboard scheduling unit of main control module
It is arranged in mainboard, such as: mainboard L2MAC processing module, dispatching main control module from plate
Unit is arranged at from plate, such as: from plate L2MAC processing module, specifically refer to Figure 16.
In the base station of present embodiment, the implementation method flow chart of uplink baseband resource pool may refer to
Figure 17, including:
Step S501: main control module repeats to configure the uplink user in community to mainboard with from plate respectively
Information.
Step S502: main control module is respectively to mainboard with from the differently configured channel of plate.
Step S503a1: mainboard scheduling unit, according to the configured different channels of mainboard, is adjusted to mainboard
The TTI of degree respective channel needs uplink user to be processed.
Step S503a2: from plate scheduling unit according to the different channels configured from plate, adjust to from plate
The TTI of degree respective channel needs uplink user to be processed.
Step S503b1: mainboard scheduling unit, according to the configured different channels of mainboard, is adjusted to mainboard
The uplink user of degree PUSCH, mainboard processes the letter that the PUSCH channel of this uplink user is carried
Breath.
Or, step S503b2: mainboard scheduling unit is according to the configured different channels of mainboard, to master
The uplink user of plate scheduling PUCCH, mainboard processes the PUCCH channel of this uplink user and is held
The information carried.
Or, step S503b3: mainboard scheduling unit is according to the configured different channels of mainboard, to master
The uplink user of plate scheduling SRS, mainboard processes the letter that the SRS channel of this uplink user is carried
Breath.
Or, step S503b4: mainboard scheduling unit is according to the configured different channels of mainboard, to master
The uplink user of plate scheduling PRACH, mainboard processes the PRACH channel of this uplink user and is held
The information carried.
Step S503c1: from plate scheduling unit according to the different channels configured from plate, adjust to from plate
The uplink user of degree PUSCH, processes, from plate, the letter that the PUSCH channel of this uplink user is carried
Breath.
Or, step S503c2: from plate scheduling unit according to the different channels configured from plate, Xiang Cong
The uplink user of plate scheduling PUCCH, the PUCCH channel processing this uplink user from plate is held
The information carried.
Or, step S503c3: from plate scheduling unit according to the different channels configured from plate, Xiang Cong
The uplink user of plate scheduling SRS, processes, from plate, the letter that the SRS channel of this uplink user is carried
Breath.
Or, step S503c4: from plate scheduling unit according to the different channels configured from plate, Xiang Cong
The uplink user of plate scheduling PRACH, the PRACH channel processing this uplink user from plate is held
The information carried.
Step S504a: the result after the information that channel is carried by mainboard processes is adjusted to mainboard
Degree unit report.
Step S504b: the result after the information carried by channel from plate processes is adjusted to from plate
Degree unit report.
LTE base station of the present invention, at uplink baseband resource pool, is entered to mainboard with from plate respectively according to channel
Row configuration, then scheduling respective channel on uplink user, mainboard and from plate to scheduling up use
The channel at family processes, in this way, it is possible to solve the coupling between user in channel, side
Just the operation of interference mitigation is done in COMP minizone.
What the present invention also provided for downgoing baseband resource pool in a kind of LTE base station realizes device, device bag
Include processor and the memorizer coupled with processor.
Processor is for controlling main control module according to mainboard with from the respectively the most configured downlink user of plate
Information, to mainboard and from plate dispatch corresponding downlink user channel.
Processor is for controlling mainboard and from scheduled to the main control module respectively downlink user of plate
The information that channel is carried carries out the process of bit-level and symbol level, it is thus achieved that the time domain number that mainboard produces
According to the time domain data produced from plate.
What the present invention also provided for uplink baseband resource pool in a kind of LTE base station realizes device, device bag
Include processor and the memorizer coupled with processor.
Processor for controlling main control module according to mainboard with from the respectively the most configured different channels of plate,
To mainboard and the uplink user from plate scheduling respective channel.
Processor is for controlling mainboard and from scheduled to the main control module respectively uplink user of plate
The information that channel is carried processes.
LTE base station of the present invention at downgoing baseband resource pool, according to downlink user respectively to mainboard and from
Plate configurating downlink user profile, mainboard and the channel from the plate downlink user to distributing carry out bit-level
With the process of symbol level, in this way, it is possible to Appropriate application mainboard and the disposal ability from plate;
At uplink baseband resource pool, configure to mainboard with from plate respectively according to channel, then dispatch phase
The uplink user on channel, mainboard and the channel from the plate uplink user to dispatching is answered to process,
In this way, it is possible to solve the coupling between user in channel.
In several embodiments provided by the present invention, it should be understood that disclosed system,
Apparatus and method, can realize by another way.Such as, device described above is implemented
Mode is only schematically, such as, described module or the division of unit, it is only a kind of logic
Function divides, and actual can have other dividing mode when realizing, and the most multiple unit or assembly can
To combine or to be desirably integrated into another system, or some features can be ignored, or does not performs.
Another point, shown or discussed coupling each other or direct-coupling or communication connection can be
By INDIRECT COUPLING or the communication connection of some interfaces, device or unit, can be electrical, machinery
Or other form.
The described unit illustrated as separating component can be or may not be physically separate
, the parts shown as unit can be or may not be physical location, i.e. may be located at
One place, or can also be distributed on multiple NE.Can select according to the actual needs
Select some or all of unit therein to realize the purpose of present embodiment scheme.
It addition, each functional unit in each embodiment of the present invention can be integrated in a process
In unit, it is also possible to be that unit is individually physically present, it is also possible to two or more unit
Integrated in a unit.Above-mentioned integrated unit both can realize to use the form of hardware, it is possible to
To use the form of SFU software functional unit to realize.
If described integrated unit realizes and as independent product using the form of SFU software functional unit
When product are sold or use, can be stored in a computer read/write memory medium.Based on so
Understanding, part that prior art is contributed by technical scheme the most in other words or
Completely or partially can embodying with the form of software product of this technical scheme of person, this computer
Software product is stored in a storage medium, including some instructions with so that a computer sets
Standby (can be personal computer, server, or the network equipment etc.) or processor (processor)
Perform all or part of step of method described in each embodiment of the present invention.And aforesaid storage is situated between
Matter includes: USB flash disk, portable hard drive, read only memory (ROM, Read-Only Memory),
Random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are each
Plant the medium that can store program code.
The foregoing is only embodiments of the present invention, not thereby limit the patent model of the present invention
Enclosing, every equivalent structure utilizing description of the invention and accompanying drawing content to be made or equivalence flow process become
Change, or be directly or indirectly used in other relevant technical fields, be the most in like manner included in the present invention's
In scope of patent protection.
Claims (15)
1. an implementation method for downgoing baseband resource pool, its feature in Long Term Evolution LTE base station
Being, described method includes:
Main control module is according to mainboard and the information from the respectively the most configured downlink user of plate, to described
Mainboard and the described channel dispatching corresponding downlink user from plate;
The letter that the channel of the downlink user that described mainboard is scheduled to described main control module is carried
Breath carries out the process of bit-level and symbol level, it is thus achieved that the time domain data that described mainboard produces, described
The information carried from the channel of the plate downlink user scheduled to described main control module compares
The superfine process with symbol level, it is thus achieved that the described time domain data produced from plate.
Method the most according to claim 1, it is characterised in that described mainboard and described from
The information that the channel of the downlink user that plate is scheduled to described main control module respectively is carried is carried out
The step of the process of bit-level and symbol level, including:
Described mainboard and the described downlink user scheduled to described main control module respectively from plate
The information that Physical Downlink Shared Channel PDSCH is carried carries out the process of bit-level and symbol level;
Or, described mainboard and the described downlink user scheduled to described main control module respectively from plate
The information that carried of physical downlink control channel PDCCH carry out the place of bit-level and symbol level
Reason.
Method the most according to claim 1, it is characterised in that described main control module according to
Mainboard and from the respectively the most configured downlink user information of plate, to described mainboard with described dispatch from plate
The step of the channel of corresponding downlink user, including: described main control module is according to described mainboard and institute
State from the respectively the most configured downlink user information of plate and load balancing, to described mainboard and described from
The current Transmission Time Interval TTI of plate scheduling its loading condition corresponding needs descending use to be processed
The channel at family.
Method the most according to claim 1, it is characterised in that described main control module according to
Mainboard and from the respectively the most configured downlink user information of plate, to described mainboard with described dispatch from plate
The step of the channel of corresponding downlink user, including: described main control module is according to described mainboard and institute
State from the respectively the most configured downlink user information of plate, and described mainboard and the described process from plate
Ability or the characteristic of support, to described mainboard with described from plate dispatch its disposal ability corresponding or prop up
The channel of the downlink user of the characteristic held.
Method the most according to claim 1, it is characterised in that described method also includes:
The control format of described mainboard downlink user allocated to described main control module indicates CFI, mixes
Close HARQ instruction HI, Physical Broadcast Channel PBCH, synchronous channel SCH, determine
The information that position-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel are carried
Process.
Method the most according to claim 1, it is characterised in that described main control module according to
Mainboard and from the respectively the most configured downlink user information of plate, to described mainboard with described dispatch from plate
Before the step of the channel of corresponding downlink user, including:
Described main control module is respectively to described mainboard and the described information from plate configurating downlink user.
7. according to the method described in any one of claim 1 to 6, it is characterised in that described master
The channel of plate and the described downlink user scheduled to described main control module respectively from plate is carried
Information carry out the process of bit-level and symbol level, it is thus achieved that time domain data that described mainboard produces and
Described after the step of the time domain data of plate generation, including:
Described from plate to the described time domain data produced from plate of described mainboard transmission;
Described mainboard will enter from the described time domain data produced from the time domain data of plate and this plate
Row superposition;
Time domain data after described superposition is sent by described mainboard to middle radio-frequency module.
8. a base station, it is characterised in that described base station includes: main control module, mainboard and
From plate;
Described main control module is for according to described mainboard and described respectively the most configured descending from plate
User profile, to described mainboard and the described channel dispatching corresponding downlink user from plate;
Described mainboard is carried for the channel of the downlink user scheduled to described main control module
Information carry out the process of bit-level and symbol level, it is thus achieved that the time domain data that described mainboard produces,
The letter that the described channel being used for the downlink user scheduled to described main control module from plate is carried
Breath carries out the process of bit-level and symbol level, it is thus achieved that the described time domain data produced from plate.
Base station the most according to claim 8, it is characterised in that described mainboard includes mainboard
Baseband processing module, described includes from plate baseband processing module from plate;
Described mainboard baseband processing module and described from plate baseband processing module for respectively to institute
State the information that the PDSCH channel of the scheduled downlink user of main control module carried and carry out bit
Level and the process of symbol level;
Or, described mainboard baseband processing module and described from plate baseband processing module for the most right
The information that the PDCCH channel of the downlink user that described main control module is scheduled is carried compares
The superfine process with symbol level.
Base station the most according to claim 8, it is characterised in that described main control module bag
Including scheduling unit, described scheduling unit is for according to described mainboard and described respectively the most configured from plate
Downlink user information and load balancing, to described mainboard with described from plate scheduling corresponding its load
The current TTI of situation needs the channel of downlink user to be processed.
11. base stations according to claim 8, it is characterised in that described main control module bag
Including scheduling unit, described scheduling unit is for according to described mainboard and described respectively the most configured from plate
Downlink user information, and described mainboard and described disposal ability from plate or the characteristic of support,
Descending use to described mainboard with the described characteristic dispatching its disposal ability corresponding or support from plate
The channel at family.
12. base stations according to claim 8, it is characterised in that described mainboard is additionally operable to
The control format instruction CFI of downlink user allocated to described main control module, mixing weight automatically
Pass request instruction HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS
And the information that channel condition information-pilot tone CSI-RS common signal channel is carried processes.
13. base stations according to claim 8, it is characterised in that described main control module is also
For respectively to described mainboard and described from plate configurating downlink user profile.
14. according to Claim 8 to the base station described in 13 any one, it is characterised in that
Described from plate for the described time domain data produced from plate of described mainboard transmission;
Described mainboard is for by from the described time domain number produced from the time domain data of plate and this plate
According to being overlapped;
Described mainboard is for sending the time domain data after described superposition to middle radio-frequency module.
In 15. 1 kinds of LTE base station, downgoing baseband resource pool realizes device, it is characterised in that
Described device includes processor and the memorizer coupled with described processor;
Described processor is for controlling main control module according to mainboard with from plate is the most configured
The information of row user, to described mainboard and the described channel dispatching corresponding downlink user from plate;
Described processor is for controlling the descending use that described mainboard is scheduled to described main control module
The information that the channel at family is carried carries out the process of bit-level and symbol level, it is thus achieved that described mainboard produces
Raw time domain data, controls the letter of the described downlink user scheduled to described main control module from plate
The information that road is carried carries out the process of bit-level and symbol level, it is thus achieved that described from plate produce time
Numeric field data.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2012/085621 WO2014082281A1 (en) | 2012-11-30 | 2012-11-30 | Implementation method for downlink and uplink baseband resource pool and base station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103222325A CN103222325A (en) | 2013-07-24 |
CN103222325B true CN103222325B (en) | 2016-08-10 |
Family
ID=48818215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201280002552.5A Active CN103222325B (en) | 2012-11-30 | 2012-11-30 | Descending and the implementation method of uplink baseband resource pool and base station |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103222325B (en) |
WO (1) | WO2014082281A1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103841647B (en) * | 2014-03-07 | 2017-04-12 | 北京邮电大学 | Multi-granularity telescopic packaging device and method based on base station resource pool |
CN106063369B (en) * | 2015-02-13 | 2019-05-07 | 华为技术有限公司 | Baseband processing unit and base station system |
ES2901001T3 (en) * | 2015-07-28 | 2022-03-21 | Panasonic Ip Corp America | Terminal, base station, transmission procedure and reception procedure |
CN108476121B (en) * | 2016-02-03 | 2021-06-29 | 苹果公司 | Apparatus for physical downlink shared channel transmission with short transmission time interval |
CN107105452B (en) * | 2016-02-19 | 2019-12-06 | 大唐移动通信设备有限公司 | Load balancing method and device based on PUCCH |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101222773A (en) * | 2008-01-22 | 2008-07-16 | 中兴通讯股份有限公司 | Base station resource management method, system and equipment |
CN101232654A (en) * | 2007-01-25 | 2008-07-30 | 中兴通讯股份有限公司 | Base band resource pool system and control method thereof |
US7649927B1 (en) * | 2006-12-29 | 2010-01-19 | Kiomars Anvari | Equalizer filter with dynamically configurable convolution filter |
CN102547991A (en) * | 2010-12-29 | 2012-07-04 | 鼎桥通信技术有限公司 | Selection method for baseband boards |
CN102668613A (en) * | 2011-11-22 | 2012-09-12 | 华为技术有限公司 | Method and apparatus for realizing base band resource pool in lte base station |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102299735B (en) * | 2010-06-25 | 2014-03-12 | 普天信息技术研究院有限公司 | Method for decreasing bandwidth of Ir interface and distributed base station |
WO2013075283A1 (en) * | 2011-11-22 | 2013-05-30 | 华为技术有限公司 | Method and device for implementing baseband resource pool in lte base station |
-
2012
- 2012-11-30 WO PCT/CN2012/085621 patent/WO2014082281A1/en active Application Filing
- 2012-11-30 CN CN201280002552.5A patent/CN103222325B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7649927B1 (en) * | 2006-12-29 | 2010-01-19 | Kiomars Anvari | Equalizer filter with dynamically configurable convolution filter |
CN101232654A (en) * | 2007-01-25 | 2008-07-30 | 中兴通讯股份有限公司 | Base band resource pool system and control method thereof |
CN101222773A (en) * | 2008-01-22 | 2008-07-16 | 中兴通讯股份有限公司 | Base station resource management method, system and equipment |
CN102547991A (en) * | 2010-12-29 | 2012-07-04 | 鼎桥通信技术有限公司 | Selection method for baseband boards |
CN102668613A (en) * | 2011-11-22 | 2012-09-12 | 华为技术有限公司 | Method and apparatus for realizing base band resource pool in lte base station |
Also Published As
Publication number | Publication date |
---|---|
CN103222325A (en) | 2013-07-24 |
WO2014082281A1 (en) | 2014-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104955158B (en) | A kind of method and apparatus of aperiodic SRS | |
CN102356580B (en) | To the configuration of the transmission of the periodic feedback information on physical uplink link shared channels (PUSCH) | |
CN104769878B (en) | Distributed in a communications system for E PDCCH PUCCH resource | |
CN102668613B (en) | Method and apparatus for realizing base band resource pool in lte base station | |
CN102461301B (en) | Method for indicating dynamic allocation of component carriers in multi-component carrier systems | |
CN107027184A (en) | A kind of downlink control information transmission method and device | |
CN103517276A (en) | D2D communication method, user equipment and base station | |
CN110278062A (en) | Resource instruction determines method and device | |
CN103222325B (en) | Descending and the implementation method of uplink baseband resource pool and base station | |
CN103476121A (en) | Method and apparatus for bit-level PDSCH muting and/or receiver puncturing in LTE-advanced heterogeneous networks | |
CN108702267A (en) | Short physical uplink shared channel arrangement | |
CN104145521B (en) | The distribution of the communication resource | |
CN102065465A (en) | Method, system and device for transmitting data | |
CN101981979A (en) | Downlink power distributing method, apparatus and system | |
CN103326815B (en) | A kind of channel quality indicator (CQI) processing method, Apparatus and system | |
CN104601303B (en) | The sending method and device and method of reseptance and device of ascending control information | |
CN104754742B (en) | A kind of resource allocation methods and device | |
CN104811281A (en) | Feedback method, terminal device and base station | |
CN102595625A (en) | SDMA method and base station in super-cell | |
CN107770869A (en) | The collocation method and device of information of radio resource allocation | |
CN103687025A (en) | Resource allocation method used for LTE system | |
CN108352972A (en) | For the downlink assignment indexing in carrier aggregation(DAI)The technology of management | |
CN109392180A (en) | A kind of accidental access method, network side equipment and mobile communication terminal | |
CN107027177A (en) | A kind of transmission of Downlink Control Information, detection method and device | |
CN106561066A (en) | Method and device for reducing network delay in wireless communication |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |