CN103222325A - Uplink and downlink base-band resource pool realization method and base station - Google Patents

Uplink and downlink base-band resource pool realization method and base station Download PDF

Info

Publication number
CN103222325A
CN103222325A CN2012800025525A CN201280002552A CN103222325A CN 103222325 A CN103222325 A CN 103222325A CN 2012800025525 A CN2012800025525 A CN 2012800025525A CN 201280002552 A CN201280002552 A CN 201280002552A CN 103222325 A CN103222325 A CN 103222325A
Authority
CN
China
Prior art keywords
mainboard
slave plate
user
main control
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012800025525A
Other languages
Chinese (zh)
Other versions
CN103222325B (en
Inventor
符鸿亮
何伟
郑中亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN103222325A publication Critical patent/CN103222325A/en
Application granted granted Critical
Publication of CN103222325B publication Critical patent/CN103222325B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a LTE base station uplink/downlink base-band resource pool realization method and base station, and the method comprises: configuring downlink information to main board and slave board respectively according to downlink user in the downlink base-band resource pool, carrying out the bit level and symbol level processing of the channels of configured downlink users by the main board and the slave board; configuring the main board and the slave board respectively according the channels, and then scheduling uplink users on the corresponding channel, carrying out processing for the channels of the configured uplink user by the main board and the slave board. According to the mode, the processing abilites of the main board and the slave board can be reasonably used, thereby solving the coupling between channels.

Description

The implementation method and the base station of descending and uplink baseband resource pool
Technical field
The present invention relates to wireless communication technology field, particularly relate to the implementation method and the base station of descending and uplink baseband resource pool in a kind of Long Term Evolution LTE base station.
Background technology
In Long Term Evolution (LTE) system, baseband board is responsible for realizing physical layer protocol, algorithm and some relevant characteristics of product that base band is relevant in whole base station system.Along with the evolution of agreement, the application scenarios of the complexity of physical layer protocol, the complexity of algorithm and product becomes increasingly complex, and requires the disposal ability of baseband board more and more higher.
In the prior art,, have to have the baseband board of early version and the baseband board of redaction in some base station systems simultaneously owing to the progressively upgrading of technology and for cost consideration.The baseband board of early version can be supported some old agreements, algorithm and characteristic; The baseband board of the new redaction of buying is then supported new agreement, algorithm and characteristic.The collocation of above-mentioned new early version baseband board is used, and is that the baseband board with new early version all uses, particularly, the baseband board processing section user of early version, the baseband board of redaction is then handled other user, can save a lot of costs for operator like this.
Correspondingly, there are two baseband boards in the downlink resource pond of base station system: mainboard and slave plate, mainboard are the baseband board of redaction, and slave plate is the baseband board of early version.Mainboard is handled a part of user's channel, and slave plate is handled another part user's channel.The degree that slave plate is handled bit-level to user data promptly finishes, and gives mainboard with the bit-level transfer of data then, is finished all users' remainder by mainboard and handles.Equally, there are two baseband boards in the ascending resource pond of base station system: mainboard and slave plate, mainboard are handled a part of user's channel, and slave plate is handled another part user's channel.
The present inventor finds that in long-term research and development for the downlink resource pond, bit-level only accounts for 30% of whole operand, and slave plate can not well be shared the processing operand of whole downlink user; For the ascending resource pond, according to the user mainboard and slave plate are distributed, multiplexing the time, can cause double counting for a plurality of user's frequency domain resource, the waste hardware resource if be distributed on the different baseband boards.
Summary of the invention
The technical problem that the present invention mainly solves provides the implementation method and the base station of descending and uplink baseband resource pool in a kind of LTE base station, can rationally utilize the disposal ability of mainboard and slave plate, solves the coupling between the user in the channel.
An aspect of of the present present invention is: the implementation method of downgoing baseband resource pool in a kind of LTE base station is provided, comprises: the information of the downlink user that main control module has disposed respectively according to mainboard and slave plate, dispatch the channel of corresponding downlink user to described mainboard and described slave plate; The channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level, obtains the time domain data that time domain data that described mainboard produces and described slave plate produce.
Wherein, the step that the channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level comprises: the Physical Downlink Shared Channel PDSCH institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level; Or the physical downlink control channel PDCCH institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level.
Wherein, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate, the step of dispatching the channel of corresponding downlink user to described mainboard and described slave plate, comprise: downlink user information and load balancing that described main control module has disposed respectively according to described mainboard and described slave plate, the channel of the downlink user that need handle to the current Transmission Time Interval TTI of described mainboard and corresponding its loading condition of described slave plate scheduling.
Wherein, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate, the step of dispatching the channel of corresponding downlink user to described mainboard and described slave plate, comprise: the downlink user information that described main control module has disposed respectively according to described mainboard and described slave plate, and the characteristic of the disposal ability of described mainboard and described slave plate or support, to the channel of the downlink user of the characteristic of corresponding its disposal ability of described mainboard and described slave plate scheduling or support.
Wherein, described method also comprises: described mainboard is handled control format indication CFI, the automatic repeat requests indication of mixing HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and the channel condition information-pilot tone CSI-RS common signal channel institute loaded information of the downlink user that described main control module has distributed.
Wherein, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate, dispatch to described mainboard and described slave plate before the step of channel of corresponding downlink user, comprising: described main control module is respectively to described mainboard and described slave plate configurating downlink user's information.
Wherein, the channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level, obtain after the step of the time domain data of described mainboard generation and the time domain data that described slave plate produces, comprising: described slave plate transmits the time domain data that described slave plate produces to described mainboard; The time domain data that described mainboard will produce from time domain data and this plate of described slave plate superposes; The time domain data of described mainboard after with described stack sends to middle radio-frequency module.
Another aspect of the present invention is: the implementation method of uplink baseband resource pool in a kind of LTE base station is provided, comprises: the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of described mainboard and described slave plate scheduling respective channel; The up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled.
Wherein, the different channels that described main control module has disposed according to mainboard, dispatch the up user's of respective channel step to described mainboard, comprise: the different channels that described main control module has disposed according to described mainboard, up user to described mainboard scheduling Physical Uplink Shared Channel PUSCH, or the up user who dispatches Physical Uplink Control Channel PUCCH to described mainboard, or to the up user of described mainboard scheduling measurement reference signal SRS, or to the up user of described mainboard scheduling Physical Random Access Channel PRACH.
Wherein, the step that the up user's that described mainboard has been dispatched to described main control module channel institute loaded information is handled comprises: the up user's of the PUSCH that described mainboard has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the PUCCH that described mainboard has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the SRS that described mainboard has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the PRACH that described mainboard has been dispatched to described main control module channel institute loaded information is handled.
Wherein, the different channels that described main control module has disposed according to slave plate, dispatch the up user's of respective channel step to described slave plate, comprise: the different channels that described main control module has disposed according to described slave plate, up user to described slave plate scheduling PUSCH, or to the up user of described slave plate scheduling PUCCH, or to the up user of described slave plate scheduling SRS, or to the up user of described slave plate scheduling PRACH.
Wherein, the step that the up user's that described slave plate has been dispatched to described main control module channel institute loaded information is handled comprises: the up user's of the PUSCH that described slave plate has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the PUCCH that described slave plate has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the SRS that described slave plate has been dispatched to described main control module channel institute loaded information is handled; Or the up user's of the PRACH that described slave plate has been dispatched to described main control module channel institute loaded information is handled.
Wherein, the different channels that described main control module has disposed respectively according to mainboard and slave plate, before the up user's of described mainboard and described slave plate scheduling respective channel step, comprise: described main control module is the information of the up user in described mainboard and described slave plate repeated configuration sub-district respectively, and described main control module is respectively to described mainboard and the different channel of described slave plate configuration.
Wherein, the different channels that described main control module has disposed respectively according to mainboard and slave plate, step to the up user of described mainboard and described slave plate scheduling respective channel, comprise: the different channels that described main control module has disposed respectively according to described mainboard and described slave plate, the up user that need handle to the TTI of described mainboard and described slave plate scheduling respective channel.
Wherein, after the step that the up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled, comprising: the result after described mainboard and described slave plate are handled described channel institute loaded information reports to described main control module.
Another aspect of the present invention is: a kind of base station is provided, and described base station comprises: main control module, mainboard and slave plate; Described main control module is used for the downlink user information that disposed respectively according to described mainboard and described slave plate, dispatches the channel of corresponding downlink user to described mainboard and described slave plate; Described mainboard and described slave plate are used for respectively the channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level, obtain the time domain data that time domain data that described mainboard produces and described slave plate produce.
Wherein, described mainboard comprises the mainboard baseband processing module, and described slave plate comprises the slave plate baseband processing module; Described mainboard baseband processing module and described slave plate baseband processing module are used for respectively the PDSCH channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level; Or described mainboard baseband processing module and described slave plate baseband processing module are used for respectively the PDCCH channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level.
Wherein, described main control module comprises scheduling unit, described scheduling unit is used for the downlink user information and the load balancing that have disposed respectively according to described mainboard and described slave plate, the channel of the downlink user that need handle to the current TTI of described mainboard and corresponding its loading condition of described slave plate scheduling.
Wherein, described main control module comprises scheduling unit, described scheduling unit is used for the downlink user information that disposed respectively according to described mainboard and described slave plate, and the characteristic of the disposal ability of described mainboard and described slave plate or support, to the channel of the downlink user of the characteristic of corresponding its disposal ability of described mainboard and described slave plate scheduling or support.
Wherein, described mainboard also be used for downlink user that described main control module has been distributed control format indication CFI, mix automatic repeat requests indication HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel institute loaded information and handle.
Wherein, described main control module also is used for respectively to described mainboard and described slave plate configurating downlink user profile.
Wherein, described slave plate is used for transmitting the time domain data that described slave plate produces to described mainboard; Described mainboard is used for the time domain data that time domain data and this plate from described slave plate produce is superposeed; Described mainboard is used for the time domain data after the described stack is sent to radio-frequency module.
Another aspect of the present invention is: a kind of base station is provided, and described base station comprises: main control module, mainboard and slave plate; Described main control module is used for the different channels that disposed respectively according to described mainboard and described slave plate, to the up user of described mainboard and described slave plate scheduling respective channel; The up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled.
Wherein, described main control module comprises the mainboard scheduling unit; Described mainboard scheduling unit is used for the different channels that disposed according to described mainboard, up user to described mainboard scheduling PUSCH, or to the up user of described mainboard scheduling PUCCH, or to the up user of described mainboard scheduling SRS, or to the up user of described mainboard scheduling PRACH.
Wherein, described mainboard comprises the mainboard baseband processing module; Described mainboard baseband processing module is used for the up user's of PUSCH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled; Or described mainboard baseband processing module is used for the up user's of PUCCH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled; Or described mainboard baseband processing module is used for the up user's of SRS that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled; Or described mainboard baseband processing module is used for the up user's of PRACH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled.
Wherein, described main control module comprises the slave plate scheduling unit; Described slave plate scheduling unit is used for the different channels that disposed according to described slave plate, up user to described slave plate scheduling PUSCH, or to the up user of described slave plate scheduling PUCCH, or to the up user of described slave plate scheduling SRS, or to the up user of described slave plate scheduling PRACH.
Wherein, described slave plate comprises the slave plate baseband processing module; Described slave plate baseband processing module is used for the up user's of PUSCH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled; Or described slave plate baseband processing module is used for the up user's of PUCCH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled; Or described slave plate baseband processing module is used for the up user's of SRS that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled; Or described slave plate baseband processing module is used for the up user's of PRACH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled.
Wherein, described main control module also is used for the information of the up user in described mainboard and described slave plate repeated configuration sub-district respectively, and described main control module also is used for respectively to described mainboard and the different channel of described slave plate configuration.
Wherein, described main control module also is used for the different channels that disposed respectively according to described mainboard and described slave plate, the up user that need handle to the TTI of described mainboard and described slave plate scheduling respective channel.
Wherein, the result after described mainboard and described slave plate also are used for described channel institute loaded information handled reports to described main control module.
Wherein, the result after described mainboard also is used for described channel institute loaded information handled reports to described mainboard scheduling unit; Result after described slave plate also is used for described channel institute loaded information handled reports to described slave plate scheduling unit.
Another aspect of the present invention: the implement device of downgoing baseband resource pool in a kind of LTE base station is provided, and described device comprises processor and the memory that is coupled with described processor; Described processor is used to control the information of the downlink user that main control module disposed respectively according to mainboard and slave plate, dispatches the channel of corresponding downlink user to described mainboard and described slave plate; Described processor is used to control the channel institute loaded information of the downlink user that described mainboard and described slave plate dispatched to described main control module respectively and carries out the processing of bit-level and symbol level, obtains the time domain data that time domain data that described mainboard produces and described slave plate produce.
Another aspect of the present invention: the implement device of uplink baseband resource pool in a kind of LTE base station is provided, and described device comprises processor and the memory that is coupled with described processor; Described processor is used to control the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of described mainboard and described slave plate scheduling respective channel; Described processor is used to control the up user's that described mainboard and described slave plate dispatched to described main control module respectively channel institute loaded information to be handled.
The beneficial effect of embodiment of the present invention is: the situation that is different from prior art, LTE of the present invention base station is at the downgoing baseband resource pool, according to downlink user respectively to mainboard and slave plate configurating downlink user profile, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate; At the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel.
Description of drawings
Fig. 1 is the implementation method schematic diagram of downgoing baseband resource pool in the prior art LTE base station;
Fig. 2 is the implementation method schematic diagram of uplink baseband resource pool in the prior art LTE base station;
Fig. 3 is the flow chart of the implementation method of uplink baseband resource pool in the prior art LTE base station;
Fig. 4 is the flow chart of implementation method one execution mode of downgoing baseband resource pool in the LTE of the present invention base station;
Fig. 5 is the flow chart of other execution mode of implementation method of downgoing baseband resource pool in the LTE of the present invention base station;
Fig. 6 is the implementation method flow chart of execution mode again of downgoing baseband resource pool in the LTE of the present invention base station;
Fig. 7 is the implementation method flow chart of execution mode again of downgoing baseband resource pool in the LTE of the present invention base station;
Fig. 8 is the flow chart of implementation method one execution mode of uplink baseband resource pool in the LTE of the present invention base station;
Fig. 9 is the flow chart of another execution mode of implementation method of uplink baseband resource pool in the LTE of the present invention base station;
Figure 10 is the flow chart of the another execution mode of implementation method of uplink baseband resource pool in the LTE of the present invention base station;
Figure 11 is the structural representation of base station of the present invention one execution mode;
Figure 12 is the structural representation of another execution mode of base station of the present invention;
Figure 13 is the structural representation of base station of the present invention in a practical application;
Figure 14 is the structural representation of the another execution mode in base station of the present invention;
Figure 15 is the structural representation of the another execution mode in base station of the present invention;
Figure 16 is the structural representation of base station of the present invention in another practical application;
Figure 17 is the implementation method flow chart of uplink baseband resource pool in the base station of the present invention.
Embodiment
At present, descending for the LTE agreement, application along with increasing multi-antenna technology, Physical Downlink Shared Channel (PDSCH, Physical Downlink Shared Channel) becoming becomes increasingly complex, require the sub-district user online simultaneously and transmission also to get more and more, caused the PDSCH channel more and more higher like this requirement of the disposal ability of baseband board.
Up for the LTE agreement, subscriber equipment (UE, User Equipment) supports in many antenna transmission, multi-cell cooperating, the sub-district the online transmission of user also more and more etc., causes uplink demodulation also more and more higher for the requirement of the disposal ability of baseband board.
Consult Fig. 1, Fig. 1 is the implementation method schematic diagram of downgoing baseband resource pool in the prior art LTE base station, and the downgoing baseband resource pool has two baseband boards: mainboard and slave plate, mainboard are the baseband board of redaction, and slave plate is the baseband board of early version.The main control module of base station is managed mainboard and slave plate simultaneously, and main control module is assigned to mainboard with a part of downlink user and handles, and another part downlink user is assigned to slave plate handles.The processing of whole downlink user is divided into bit-level and symbol level, and slave plate can finish the data processing of the downlink user degree to bit-level, gives mainboard with the transfer of data of bit-level then, is finished the remainder of all downlink users by mainboard and handles.
In the such scheme, the mutual data that are the processing of downlink user to the bit-level degree between master.In the data handling procedure of whole downlink user, if will regard an integral body as to the processing operand of whole down user data, the processing operand of bit-level only accounts for 30% of whole operand, 70% operand all is-symbol level is handled, so slave plate can not be well shared the processing operand of the data of whole downlink user in the existing scheme.
Consult Fig. 2 and Fig. 3, Fig. 2 and Fig. 3 are the implementation methods of uplink baseband resource pool in the prior art LTE base station, and the uplink baseband resource pool has two baseband boards: mainboard and slave plate, mainboard are the baseband board of redaction, and slave plate is the baseband board of early version.Main control module is given mainboard and slave plate with the information repeated configuration of the up user in the sub-district; Perhaps, user profile is disposed respectively to mainboard and slave plate according to load balancing; Mainboard L2 scheduler module is according to load balancing, and the up user that current Transmission Time Interval (TTI, Transmission Time Interval) is needed to handle distributes to mainboard and slave plate is handled; Mainboard and slave plate are respectively to the up user's that distributes Physical Uplink Shared Channel (PUSCH, Physical Uplink Shared Channel), Physical Uplink Control Channel (PUCCH, Physical Uplink Control Channel) and measuring reference signals (SRS, Sounding Reference Signal) channel institute data carried by data handle.
The implementation in above-mentioned ascending resource pond, three problems are arranged: first, when a plurality of user's frequency domain resource are multiplexing, public processing section is arranged between a plurality of users, collaborative process also helps performance boost between a plurality of in addition users, if these a plurality of users are distributed on the different plates, will cause double counting, the waste hardware resource.Second, the PUSCH channel is considered coordinate multipoint (COMP, when Coordinated Multi-Point) cooperating scene, if doing resource pool according to the user distributes, and interior two users of channel are dispensed on different plates and handle, the COMP data need be transmitted many parts, and the interference mitigation (IC, Interference Canceling) of operation do to(for) the COMP minizone is also inconvenient.The 3rd, can only use the L2 scheduler module centralized dispatching of mainboard, each baseband board can not independently be dispatched, and resource is wasted in the scheduling that can not walk abreast easily.
The present invention is described in detail below in conjunction with drawings and embodiments.
Consult Fig. 4, Fig. 4 is the flow chart of implementation method one execution mode of downgoing baseband resource pool in the LTE of the present invention base station, comprising:
Step S101: the information of the downlink user that main control module has disposed respectively according to mainboard and slave plate, dispatch the channel of corresponding downlink user to mainboard and slave plate.
Main control module is the module of in the LTE base station down base band resource pool mainboard and slave plate being controlled, dispatch, being disposed, for example: to mainboard and slave plate difference configurating downlink user's information; To mainboard and slave plate difference dispatching downlink user's channel, handle for mainboard and slave plate; To mainboard and slave plate difference allocating cell information; According to the disposal ability that reaches baseband board (mainboard or slave plate), revise parameter of sub-district or the like.After increasing baseband board in the LTE base station, the baseband board that the automatic identification of main control module meeting increases newly and the disposal ability of this baseband board.
Mainboard and slave plate are the baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard and slave plate is determined according to practical situations.
Downlink user is meant that the base station sends the user of information to user's subscriber equipment.Need to prove that downlink user herein can be the downlink user of same sub-district, also can be the downlink user of different districts.
Channel is the passage of message transmission, when promptly information is transmitted a path of process.
The channel of downlink user includes but not limited to: Physical Downlink Shared Channel PDSCH, physical downlink control channel PDCCH, Physical Broadcast Channel PBCH etc.
Main control module is mainboard and slave plate configurating downlink user's a information respectively according to mainboard and the slave plate discerned in advance.According to the information of the downlink user that has disposed respectively, main control module is dispatched the channel of corresponding downlink user to mainboard and slave plate, so that mainboard and slave plate are handled data carried by data on the channel.
Step S102: the channel institute loaded information of the downlink user that mainboard and slave plate have been dispatched to main control module is respectively carried out the processing of bit-level and symbol level, obtains the time domain data that time domain data that mainboard produces and slave plate produce.
Bit-level is handled and mainly to be comprised: (Transport Block, CRC TB) is additional, sub-piece is cut apart and CRC is additional, the chnnel coding of chnnel coding, rate-matched, code block cascade, control information and rate-matched, business datum and control information are multiplexing, channel interleaving and data bit scrambling etc. for transmission block.
Symbol level is handled and is mainly comprised: the bit after the chnnel coding in each code word of transmitting on physical channel is carried out scrambling; Bit after the scrambling is modulated, obtained complex modulation symbols; Resulting complex modulation symbols is mapped in one or more transport layers; Every layer complex modulation symbols is carried out precoding; Complex modulation symbols on each antenna port is mapped in the resource unit (RE, Resource Element); On each antenna port, produce the time-domain signal of plural number.
Time domain is the fundamental property of signal, can know influencing each other between reaction signal and the interconnection line.Mainboard carries out the processing of bit-level and symbol level to the channel institute loaded information of the downlink user that main control module has been dispatched, obtains the time domain data that mainboard produces; Slave plate carries out the processing of bit-level and symbol level to the channel institute loaded information of the downlink user that main control module has been dispatched, obtains the time domain data that slave plate produces.
LTE of the present invention base station is at the downgoing baseband resource pool, respectively mainboard and slave plate are configured downlink user information according to downlink user, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate.
Consult Fig. 5 to Fig. 7, Fig. 5 to Fig. 7 is the flow chart of implementation method three execution modes of downgoing baseband resource pool in the LTE of the present invention base station, comprising:
Step S201: main control module is respectively to mainboard and slave plate configurating downlink user's information.
Main control module is mainboard and slave plate difference configurating downlink user's information according to mainboard and the slave plate discerned.
Main control module is the module of in the LTE base station down base band resource pool mainboard and slave plate being controlled, dispatch, being disposed.
Mainboard and slave plate are the baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard and slave plate is determined according to practical situations.
Downlink user is meant that the base station sends the user of information to user's subscriber equipment.Need to prove that downlink user herein can be the downlink user of same sub-district, also can be the downlink user of different districts.
Step S202: the information of the downlink user that main control module has disposed respectively according to mainboard and slave plate, dispatch the channel of corresponding downlink user to mainboard and slave plate.
Channel is the passage of message transmission, when promptly information is transmitted a path of process.
According to the information of the downlink user that has disposed respectively, main control module is dispatched the channel of corresponding downlink user to mainboard and slave plate, so that mainboard and slave plate are handled data carried by data on the channel.
Main control module can be dispatched the channel of corresponding downlink user according to two kinds of situations respectively to mainboard and slave plate when mainboard and slave plate are dispatched the channel of corresponding downlink user, be respectively:
First kind of foundation: downlink user information and load balancing that main control module has disposed respectively according to mainboard and slave plate, the channel of the downlink user that need handle to the current Transmission Time Interval TTI of mainboard and corresponding its loading condition of slave plate scheduling.
Transmission Time Interval (TTI) is at universal mobile telecommunications system (UMTS, Universal Mobile Telecommunications System) and a parameter in other digital telecommunication network (as the LTE system), be meant the length of an independent decoding transmission in Radio Link.TTI is relevant with the size of data block from higher network layer to radio link layer.It is the base unit of RRM (for example scheduling etc.) time of administering.The corresponding business of each transmission channel, owing to the requirement difference of miscellaneous service to time delay, so its TTI is different, TTI can be 10ms, 20ms, 40ms or 80ms etc.
Load balancing is meant the roughly equilibrium of downlink user number of load respectively of mainboard and slave plate, for example, the downlink user number that main control module disposes to the mainboard load is 10, it is 5 that the downlink user number of slave plate load is given in configuration, at this moment, according to load balancing, main control module is dispatched the channel of the downlink user that the current TTI of corresponding slave plate loading condition need handle to slave plate.
Second kind of foundation: the downlink user information that main control module has disposed respectively according to mainboard and slave plate, and the characteristic of the disposal ability of mainboard and slave plate or support, to the channel of the downlink user of the characteristic of mainboard and corresponding its disposal ability of slave plate scheduling or support.
The disposal ability of mainboard and slave plate, for example, the flow of mainboard is 500M, the flow of slave plate is 300M, at this moment, the channel dispatch that in the downlink user requirement of flow is lower than the downlink user of 300M can be handled to slave plate, the requirement to flow in the downlink user is handled to mainboard greater than the channel dispatch of the downlink user of 300M.
The characteristic that mainboard and slave plate are supported has for example been used the new characteristic of product in the downlink user, when slave plate can't be handled, can handle to mainboard to the channel that mainboard is dispatched this downlink user.
In actual applications, can take all factors into consideration the disposal ability of mainboard and slave plate and the characteristic of mainboard and slave plate support, perhaps only consider the disposal ability of mainboard and slave plate, perhaps only consider the characteristic that mainboard and slave plate are supported.
Main control module can be selected two kinds of above-mentioned foundations according to practical situations when mainboard and slave plate are dispatched the channel of corresponding downlink user.
Step S203: the channel institute loaded information of the downlink user that mainboard and slave plate have been dispatched to main control module is respectively carried out the processing of bit-level and symbol level, obtains the time domain data that time domain data that mainboard produces and slave plate produce.
Bit-level is handled and mainly to be comprised: the CRC of transmission block is additional, sub-piece is cut apart and CRC is additional, the chnnel coding of chnnel coding, rate-matched, code block cascade, control information and rate-matched, business datum and control information are multiplexing, channel interleaving and data bit scrambling etc.
Symbol level is handled and is mainly comprised: the bit after the chnnel coding in each code word of transmitting on physical channel is carried out scrambling; Bit after the scrambling is modulated, obtained complex modulation symbols; Resulting complex modulation symbols is mapped in one or more transport layers; Every layer complex modulation symbols is carried out precoding; Complex modulation symbols on each antenna port is mapped in the resource unit; On each antenna port, produce the time-domain signal of plural number.
Step S203 specifically comprises:
Step S203a: the Physical Downlink Shared Channel PDSCH institute loaded information of the downlink user that mainboard and slave plate have been dispatched to main control module is respectively carried out the processing of bit-level and symbol level.
Or step S203b: Physical Downlink Control Channel (PDCCH, Physical Downlink Control Channel) institute's loaded information of the downlink user that mainboard and slave plate have been dispatched to main control module is respectively carried out the processing of bit-level and symbol level.
Step S204: the time domain data that slave plate produces to mainboard transmission slave plate.
Slave plate carries out the processing of bit-level and symbol level to the channel institute loaded information of the downlink user that main control module has been dispatched, obtains the time domain data that slave plate produces.Slave plate is transferred to mainboard with the time domain data that produces.
Step S205: the time domain data that mainboard will produce from time domain data and this plate of slave plate superposes.
Step S206: the time domain data after mainboard will superpose sends to middle radio-frequency module.
Step S207: mainboard is handled control format indication CFI, the automatic repeat requests indication of mixing HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and the channel condition information-pilot tone CSI-RS common signal channel institute loaded information of the downlink user that main control module has distributed.
Step S207 carried out before step S206 and gets final product.
In a word, LTE of the present invention base station is at the downgoing baseband resource pool, respectively mainboard and slave plate are configured downlink user information according to downlink user, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate.
Consult Fig. 8, Fig. 8 is the flow chart of implementation method one execution mode of uplink baseband resource pool in the LTE of the present invention base station, comprising:
Step S301: the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of mainboard and slave plate scheduling respective channel.
Main control module is the module of in the LTE base station down base band resource pool mainboard and slave plate being controlled, dispatch, being disposed, for example: to mainboard and slave plate difference configurating downlink user's information; To mainboard and slave plate difference dispatching downlink user's channel, handle for mainboard and slave plate; To mainboard and slave plate difference allocating cell information; According to the disposal ability that reaches baseband board (mainboard or slave plate), revise parameter of sub-district or the like.After increasing baseband board in the LTE base station, the baseband board that the automatic identification of main control module meeting increases newly and the disposal ability of this baseband board.
Mainboard and slave plate are the baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard and slave plate is determined according to practical situations.
Up user is meant the user of the information that sends to the base station by subscriber equipment.Need to prove that up user herein can be the up user of same sub-district, also can be the up user of different districts.
In the present embodiment, main control module disposes different channels to mainboard respectively with slave plate in advance.The different channels that main control module has disposed respectively according to mainboard and slave plate is to the up user of mainboard and slave plate scheduling respective channel.
Step S302: the up user's that mainboard and slave plate have been dispatched to main control module respectively channel institute loaded information is handled.
Main control module is behind the up user of mainboard and slave plate scheduling respective channel, and the up user's that mainboard and slave plate have been dispatched to main control module respectively channel institute loaded information is handled.
LTE of the present invention base station is at the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel, make things convenient for the COMP minizone to do the operation of interference mitigation.
Consult Fig. 9 to Figure 10, Fig. 9 to Figure 10 is the flow chart of another execution mode of implementation method of uplink baseband resource pool in the LTE of the present invention base station, comprising:
Step S401: main control module is the information of the up user in mainboard and slave plate repeated configuration sub-district respectively.
Main control module is the module of in the LTE base station down base band resource pool mainboard and slave plate being controlled, dispatch, being disposed.
Mainboard and slave plate are the baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard and slave plate is determined according to practical situations.
Up user is meant the user of the information that sends to the base station by subscriber equipment.Need to prove that up user herein can be the up user of same sub-district, also can be the up user of different districts.
Repeated configuration is meant mainboard and the composite information of putting same up user of slave plate counterpoise.
Step S402: main control module is respectively to mainboard and the different channel of slave plate configuration.
Main control module disposes different channels according to channel to mainboard and slave plate.For example, main control module is given mainboard with the PUSCH channel configuration, gives slave plate with the PUCCH channel configuration.
Step S403: the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of mainboard and slave plate scheduling respective channel.
According to the different channels that mainboard and slave plate have disposed respectively, main control module is to the up user of mainboard and slave plate scheduling respective channel.For example, main control module is given mainboard, the up user who then dispatches this PUSCH channel to mainboard with the PUSCH channel configuration; Main control module is given slave plate, the up user who then dispatches this PUCCH channel to slave plate with the PUCCH channel configuration.
Wherein, step S403 comprises:
Step S403a: the different channels that main control module has disposed respectively according to mainboard and slave plate, the up user that need handle to the TTI of mainboard and slave plate scheduling respective channel.
TTI is the base unit of RRM (for example scheduling etc.) time of administering.The corresponding business of each transmission channel, owing to the requirement difference of miscellaneous service to time delay, so its TTI is different, TTI can be 10ms, 20ms, 40ms or 80ms etc.
For example, main control module is given mainboard with the PUSCH channel configuration, then dispatches the up user that the TTI of this PUSCH channel need handle to mainboard; Main control module is given slave plate with the PUCCH channel configuration, then dispatches the up user that the TTI of this PUCCH channel need handle to slave plate.
Specifically, the different channels that main control module has disposed according to mainboard, the step to the up user of mainboard scheduling respective channel comprises:
Step S403b: the different channels that main control module has disposed according to mainboard, up user to mainboard scheduling Physical Uplink Shared Channel PUSCH, or the up user who dispatches Physical Uplink Control Channel PUCCH to mainboard, or to the up user of mainboard scheduling measurement reference signal SRS, or to the up user of mainboard scheduling Physical Random Access Channel PRACH.
Specifically, the different channels that main control module has disposed according to slave plate, the step to the up user of slave plate scheduling respective channel comprises:
Step S403c: the different channels that main control module has disposed according to slave plate, to the up user of slave plate scheduling PUSCH, or to the up user of slave plate scheduling PUCCH, or to the up user of slave plate scheduling SRS, or to the up user of slave plate scheduling PRACH.
For example, the channel that mainboard has disposed is: PUSCH channel and PUCCH channel, and then the up user of main control module scheduling PUSCH channel and the up user of PUCCH channel give mainboard; The channel that slave plate has disposed is: SRS channel and PRACH channel, then the up user of main control module scheduling SRS channel and the up user of PRACH channel give slave plate.
Step S404: the up user's that mainboard and slave plate have been dispatched to main control module respectively channel institute loaded information is handled.
Specifically, the step that the up user's that mainboard has been dispatched to main control module channel institute loaded information is handled comprises:
Step S404a: the up user's of the PUSCH that mainboard has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the PUCCH that mainboard has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the SRS that mainboard has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the PRACH that mainboard has been dispatched to main control module channel institute loaded information is handled.
Specifically, the step that the up user's that slave plate has been dispatched to main control module channel institute loaded information is handled comprises:
Step S404b: the up user's of the PUSCH that slave plate has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the PUCCH that slave plate has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the SRS that slave plate has been dispatched to main control module channel institute loaded information is handled; Or the up user's of the PRACH that slave plate has been dispatched to main control module channel institute loaded information is handled.
Step S405: the result after mainboard and slave plate are handled channel institute loaded information reports to main control module.
LTE of the present invention base station is at the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel, make things convenient for the COMP minizone to do the operation of interference mitigation.
Consult Figure 11, Figure 11 is the structural representation of base station of the present invention one execution mode, and this base station comprises: main control module 101, mainboard 102 and slave plate 103.
Alternatively, the operation of the base station of Figure 11 in can execution graph 4 to Fig. 7.
Main control module 101 is used for the downlink user information that disposed respectively according to mainboard 102 and slave plate 103, to the channel of mainboard 102 and the corresponding downlink user of slave plate 103 scheduling.
Main control module 101 is modules of in the LTE base station down base band resource pool mainboard 102 and slave plate 103 being controlled, dispatch, disposed.
Mainboard 102 and slave plate 103 are baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard 102 and slave plate 103 is determined according to practical situations.
Downlink user is meant that the base station sends the user of information to user's subscriber equipment.Need to prove that downlink user herein can be the downlink user of same sub-district, also can be the downlink user of different districts.
Channel is the passage of message transmission, when promptly information is transmitted a path of process.
The channel of downlink user includes but not limited to: Physical Downlink Shared Channel PDSCH, physical downlink control channel PDCCH, Physical Broadcast Channel PBCH etc.
Main control module 101 is mainboard 102 and slave plate 103 configurating downlink user's a information respectively according to mainboard 102 and the slave plate 103 discerned in advance.According to the information of the downlink user that has disposed respectively, main control module 101 is to the channel of mainboard 102 and the corresponding downlink user of slave plate 103 scheduling, so that data carried by data is handled on 103 pairs of channels of mainboard 102 and slave plate.
Mainboard 102 and slave plate 103 are used for respectively the channel institute loaded information of downlink user that main control module 101 has been dispatched and carry out the processing of bit-level and symbol level, obtain the time domain data that time domain data that mainboard 102 produces and slave plate 103 produce.
Bit-level is handled and mainly to be comprised: (Transport Block, CRC TB) is additional, sub-piece is cut apart and CRC is additional, the chnnel coding of chnnel coding, rate-matched, code block cascade, control information and rate-matched, business datum and control information are multiplexing, channel interleaving and data bit scrambling etc. for transmission block.
Symbol level is handled and is mainly comprised: the bit after the chnnel coding in each code word of transmitting on physical channel is carried out scrambling; Bit after the scrambling is modulated, obtained complex modulation symbols; Resulting complex modulation symbols is mapped in one or more transport layers; Every layer complex modulation symbols is carried out precoding; Complex modulation symbols on each antenna port is mapped in the resource unit (RE, Resource Element); On each antenna port, produce the time-domain signal of plural number.
Time domain is the fundamental property of signal, can know influencing each other between reaction signal and the interconnection line.The channel institute loaded information of the downlink user that 102 pairs of main control modules 101 of mainboard have been dispatched is carried out the processing of bit-level and symbol level, obtains the time domain data that mainboard 102 produces; The channel institute loaded information of the downlink user that 103 pairs of main control modules 101 of slave plate have been dispatched is carried out the processing of bit-level and symbol level, obtains the time domain data that slave plate 103 produces.
LTE of the present invention base station is at the downgoing baseband resource pool, respectively mainboard and slave plate are configured downlink user information according to downlink user, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate.
Consult Figure 12, Figure 12 is the structural representation of another execution mode of base station of the present invention, and this base station comprises: main control module 201, mainboard 202 and slave plate 203.
Alternatively, the operation of the base station of Figure 12 in can execution graph 5 to Fig. 7.
Main control module 201 is used for the downlink user information that disposed respectively according to mainboard 202 and slave plate 203, to the channel of mainboard 202 and the corresponding downlink user of slave plate 203 scheduling.
Mainboard 202 and slave plate 203 are used for respectively the channel institute loaded information of downlink user that main control module 201 has been dispatched and carry out the processing of bit-level and symbol level, obtain the time domain data that time domain data that mainboard 202 produces and slave plate 203 produce.
Mainboard 202 comprises mainboard baseband processing module 2021, and slave plate 203 comprises slave plate baseband processing module 2031.
Mainboard baseband processing module 2021 and slave plate baseband processing module 2031 are used for respectively the PDSCH channel institute loaded information of downlink user that main control module 201 has been dispatched and carry out the processing of bit-level and symbol level.
Or mainboard baseband processing module 2021 and slave plate baseband processing module 2031 are used for respectively the PDCCH channel institute loaded information of downlink user that main control module 201 has been dispatched and carry out the processing of bit-level and symbol level.
Main control module 201 comprises scheduling unit 2011, scheduling unit 2011 is used for the downlink user information and the load balancing that have disposed respectively according to mainboard 202 and slave plate 203, the channel of the downlink user that need handle to the current TTI of mainboard 202 and corresponding its loading conditions of slave plate 203 scheduling.
Scheduling unit 2011 is used for the downlink user information that disposed respectively according to mainboard 202 and slave plate 203, and the disposal ability of mainboard 202 and slave plate 203 or the characteristic of support, to the channel of the downlink user of the characteristic of corresponding its disposal abilities of mainboard 202 and slave plate 203 scheduling or support.
Mainboard 202 also be used for downlink user that main control module 201 has been distributed control format indication CFI, mix automatic repeat requests indication HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel institute loaded information and handle.
Main control module 201 also is used for respectively to mainboard 202 and slave plate 203 configurating downlink user profile.
Slave plate 203 is used for the time domain data to 203 generations of mainboard 202 transmission slave plates.
Mainboard 202 is used for the time domain data that time domain data and this plate from slave plate 203 produce is superposeed.
Mainboard 202 is used for the time domain data after the stack is sent to radio-frequency module.
The base station of present embodiment in actual applications, the partial function of main control module can be transferred to mainboard, for example the information of the downlink user that slave plate is handled sends to slave plate by mainboard MAC processing module, the function of the scheduling unit of main control module is carried out by the mainboard schedule process module of mainboard, referring to Figure 13.
LTE of the present invention base station is at the downgoing baseband resource pool, respectively mainboard and slave plate are configured downlink user information according to downlink user, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate.
Consult Figure 14, Figure 14 is the structural representation of the another execution mode in base station of the present invention, and this base station comprises: main control module 301, mainboard 302 and slave plate 303.
Alternatively, the operation of the base station of Figure 14 in can execution graph 8 to Figure 10.
Main control module 301 is used for the different channels that disposed respectively according to mainboard 302 and slave plate 303, to the up user of mainboard 302 and slave plate 303 scheduling respective channel.
Main control module 301 is modules of in the LTE base station down base band resource pool mainboard 302 and slave plate 303 being controlled, dispatch, disposed, for example: to mainboard 302 and slave plate 303 configurating downlink users' information respectively; To mainboard 302 and slave plate 303 difference dispatching downlink users' channel, handle for mainboard 302 and slave plate 303; To mainboard 302 and slave plate 303 difference allocating cell information; According to the disposal ability that reaches baseband board (mainboard 302 or slave plate 303), revise parameter of sub-district or the like.After increasing baseband board in the LTE base station, the baseband board that the automatic identification of main control module 301 meetings increases newly and the disposal ability of this baseband board.
Mainboard 302 and slave plate 303 are baseband boards of LTE base station, represent new baseband board and old baseband board usually, and the quantity of mainboard 302 and slave plate 303 is determined according to practical situations.
Up user is meant the user of the information that sends to the base station by subscriber equipment.Need to prove that up user herein can be the up user of same sub-district, also can be the up user of different districts.
In the present embodiment, main control module 301 disposes different channels to mainboard 302 respectively with slave plate 303 in advance.The different channels that main control module 301 has disposed respectively according to mainboard 302 and slave plate 303 is to the up user of mainboard 302 and slave plate 303 scheduling respective channel.
The up user's that mainboard 302 and slave plate 303 have been dispatched to main control module 301 respectively channel institute loaded information is handled.
Main control module 301 is behind the up user of mainboard 302 and slave plate 303 scheduling respective channel, and the up user's that mainboard 302 and slave plate 303 have been dispatched to main control module 301 respectively channel institute loaded information is handled.
LTE of the present invention base station is at the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel, make things convenient for the COMP minizone to do the operation of interference mitigation.
Consult Figure 15, Figure 15 is the structural representation of the another execution mode in base station of the present invention, and this base station comprises: main control module 401, mainboard 402 and slave plate 403.
Alternatively, the operation of the base station of Figure 15 in can execution graph 9 to Figure 10.
Main control module 401 is used for the different channels that disposed respectively according to mainboard 402 and slave plate 403, to the up user of mainboard 402 and slave plate 403 scheduling respective channel.
The up user's that mainboard 402 and slave plate 403 have been dispatched to main control module 401 respectively channel institute loaded information is handled.
Main control module 401 comprises mainboard scheduling unit 4011; Mainboard scheduling unit 4011 is used for the different channels that disposed according to mainboard 402, up user to mainboard 402 scheduling PUSCH, or to the up user of mainboard 402 scheduling PUCCH, or to the up user of mainboard 402 scheduling SRS, or to the up user of mainboard 402 scheduling PRACH.
Mainboard 402 comprises mainboard baseband processing module 4021;
Mainboard baseband processing module 4021 is used for the up user's of PUSCH that mainboard scheduling unit 4011 has been dispatched channel institute loaded information to be handled;
Or mainboard baseband processing module 4021 is used for the up user's of PUCCH that mainboard scheduling unit 4011 has been dispatched channel institute loaded information to be handled;
Or mainboard baseband processing module 4021 is used for the up user's of SRS that mainboard scheduling unit 4011 has been dispatched channel institute loaded information to be handled;
Or mainboard baseband processing module 4021 is used for the up user's of PRACH that mainboard scheduling unit 4011 has been dispatched channel institute loaded information to be handled.
Main control module 401 also comprises slave plate scheduling unit 4012; Slave plate scheduling unit 4012 is used for the different channels that disposed according to slave plate 403, up user to slave plate 403 scheduling PUSCH, or to the up user of slave plate 403 scheduling PUCCH, or to the up user of slave plate 403 scheduling SRS, or to the up user of slave plate 403 scheduling PRACH.
In the dispatching uplink user, intercourse the up user who is dispatched between mainboard scheduling unit 4011 and the slave plate scheduling unit 4012, be carry out data between mainboard scheduling unit 4011 and the slave plate scheduling unit 4012 mutual, make mainboard and slave plate obtain the up user of each corresponding scheduling.
Slave plate 403 comprises slave plate baseband processing module 4031.
Slave plate baseband processing module 4031 is used for the up user's of PUSCH that slave plate scheduling unit 4012 has been dispatched channel institute loaded information to be handled;
Or slave plate baseband processing module 4031 is used for the up user's of PUCCH that slave plate scheduling unit 4012 has been dispatched channel institute loaded information to be handled;
Or slave plate baseband processing module 4031 is used for the up user's of SRS that slave plate scheduling unit 4012 has been dispatched channel institute loaded information to be handled;
Or slave plate baseband processing module 4031 is used for the up user's of PRACH that slave plate scheduling unit 4012 has been dispatched channel institute loaded information to be handled.
Main control module 401 also is used for the information of the up user in mainboard 402 and slave plate 403 repeated configuration sub-districts respectively, and main control module 401 also is used for respectively to mainboard 402 and the different channel of slave plate 403 configurations.
Main control module 401 also is used for the different channels that disposed respectively according to mainboard 402 and slave plate 403, the up user that need handle to the TTI of mainboard 402 and slave plate 403 scheduling respective channel.
Result after mainboard 402 and slave plate 403 also are used for channel institute loaded information handled is to main control module 401 reports.
Result after mainboard 402 also is used for channel institute loaded information handled is to 4011 reports of mainboard scheduling unit; Result after slave plate 403 also is used for channel institute loaded information handled is to 4012 reports of slave plate scheduling unit.
The base station of present embodiment in actual applications, the mainboard scheduling unit of main control module can be arranged in the mainboard, for example: mainboard L2MAC processing module is arranged at the slave plate scheduling unit of main control module in the slave plate, for example: slave plate L2MAC processing module specifically sees also Figure 16.
The implementation method flow chart of uplink baseband resource pool can comprise referring to Figure 17 in the base station of present embodiment:
Step S501: main control module is the information of the up user in mainboard and slave plate repeated configuration sub-district respectively.
Step S502: main control module is respectively to mainboard and the different channel of slave plate configuration.
Step S503a1: the different channels that the mainboard scheduling unit has disposed according to mainboard, the up user that need handle to the TTI of mainboard scheduling respective channel.
Step S503a2: the different channels that the slave plate scheduling unit has disposed according to slave plate, the up user that need handle to the TTI of slave plate scheduling respective channel.
Step S503b1: the different channels that the mainboard scheduling unit has disposed according to mainboard, to the up user of mainboard scheduling PUSCH, mainboard is handled this up user's PUSCH channel institute loaded information.
Or step S503b2: the different channels that the mainboard scheduling unit has disposed according to mainboard, to the up user of mainboard scheduling PUCCH, mainboard is handled this up user's PUCCH channel institute loaded information.
Or step S503b3: the different channels that the mainboard scheduling unit has disposed according to mainboard, to the up user of mainboard scheduling SRS, mainboard is handled this up user's SRS channel institute loaded information.
Or step S503b4: the different channels that the mainboard scheduling unit has disposed according to mainboard, to the up user of mainboard scheduling PRACH, mainboard is handled this up user's PRACH channel institute loaded information.
Step S503c1: the different channels that the slave plate scheduling unit has disposed according to slave plate, to the up user of slave plate scheduling PUSCH, slave plate is handled this up user's PUSCH channel institute loaded information.
Or step S503c2: the different channels that the slave plate scheduling unit has disposed according to slave plate, to the up user of slave plate scheduling PUCCH, slave plate is handled this up user's PUCCH channel institute loaded information.
Or step S503c3: the different channels that the slave plate scheduling unit has disposed according to slave plate, to the up user of slave plate scheduling SRS, slave plate is handled this up user's SRS channel institute loaded information.
Or step S503c4: the different channels that the slave plate scheduling unit has disposed according to slave plate, to the up user of slave plate scheduling PRACH, slave plate is handled this up user's PRACH channel institute loaded information.
Step S504a: the result after mainboard is handled channel institute loaded information reports to the mainboard scheduling unit.
Step S504b: the result after slave plate is handled channel institute loaded information reports to the slave plate scheduling unit.
LTE of the present invention base station is at the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel, make things convenient for the COMP minizone to do the operation of interference mitigation.
The present invention also provides the implement device of downgoing baseband resource pool in a kind of LTE base station, and device comprises processor and the memory that is coupled with processor.
Processor is used to control the information of the downlink user that main control module disposed respectively according to mainboard and slave plate, dispatches the channel of corresponding downlink user to mainboard and slave plate.
Processor is used for the channel institute loaded information of the downlink user that control main board and slave plate dispatched to main control module respectively and carries out the processing of bit-level and symbol level, obtains the time domain data that time domain data that mainboard produces and slave plate produce.
The present invention also provides the implement device of uplink baseband resource pool in a kind of LTE base station, and device comprises processor and the memory that is coupled with processor.
Processor is used to control the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of mainboard and slave plate scheduling respective channel.
Processor is used for the up user's that control main board and slave plate dispatched to main control module respectively channel institute loaded information to be handled.
LTE of the present invention base station is at the downgoing baseband resource pool, according to downlink user respectively to mainboard and slave plate configurating downlink user profile, mainboard and slave plate carry out the processing of bit-level and symbol level to the channel of the downlink user of distribution, in this way, can rationally utilize the disposal ability of mainboard and slave plate; At the uplink baseband resource pool, respectively mainboard and slave plate are configured according to channel, dispatch the up user on the respective channel then, mainboard and slave plate are handled the up user's of scheduling channel, in this way, can solve the coupling between the user in the channel.
In several embodiments provided by the present invention, should be understood that, disclosed system, apparatus and method can realize by other mode.For example, device embodiments described above only is schematic, for example, the division of described module or unit, only be that a kind of logic function is divided, during actual the realization other dividing mode can be arranged, for example a plurality of unit or assembly can in conjunction with or can be integrated into another system, or some features can ignore, or do not carry out.Another point, the shown or coupling each other discussed or directly to be coupled or to communicate to connect can be by some interfaces, the indirect coupling of device or unit or communicate to connect can be electrically, machinery or other form.
Described unit as separating component explanation can or can not be physically to separate also, and the parts that show as the unit can be or can not be physical locations also, promptly can be positioned at a place, perhaps also can be distributed on a plurality of network element.Can select wherein some or all of unit to realize the purpose of present embodiment scheme according to the actual needs.
In addition, each functional unit in each execution mode of the present invention can be integrated in the processing unit, also can be that the independent physics in each unit exists, and also can be integrated in the unit two or more unit.Above-mentioned integrated unit both can adopt the form of hardware to realize, also can adopt the form of SFU software functional unit to realize.
If described integrated unit is realized with the form of SFU software functional unit and during as independently production marketing or use, can be stored in the computer read/write memory medium.Based on such understanding, part or all or part of of this technical scheme that technical scheme of the present invention contributes to prior art in essence in other words can embody with the form of software product, this computer software product is stored in the storage medium, comprise that some instructions are with so that a computer equipment (can be a personal computer, server, the perhaps network equipment etc.) or processor (processor) carry out all or part of step of the described method of each execution mode of the present invention.And aforesaid storage medium comprises: various media that can be program code stored such as USB flash disk, portable hard drive, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD.
The above only is embodiments of the present invention; be not so limit claim of the present invention; every equivalent structure or equivalent flow process conversion that utilizes specification of the present invention and accompanying drawing content to be done; or directly or indirectly be used in other relevant technical fields, all in like manner be included in the scope of patent protection of the present invention.

Claims (33)

1. the implementation method of downgoing baseband resource pool in the Long Term Evolution LTE base station is characterized in that described method comprises:
The information of the downlink user that main control module has disposed respectively according to mainboard and slave plate is dispatched the channel of corresponding downlink user to described mainboard and described slave plate;
The channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level, obtains the time domain data that time domain data that described mainboard produces and described slave plate produce.
2. method according to claim 1 is characterized in that, the step that the channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level comprises:
The Physical Downlink Shared Channel PDSCH institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level;
Or the physical downlink control channel PDCCH institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level.
3. method according to claim 1, it is characterized in that, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate, the step of dispatching the channel of corresponding downlink user to described mainboard and described slave plate, comprise: downlink user information and load balancing that described main control module has disposed respectively according to described mainboard and described slave plate, the channel of the downlink user that need handle to the current Transmission Time Interval TTI of described mainboard and corresponding its loading condition of described slave plate scheduling.
4. method according to claim 1, it is characterized in that, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate, the step of dispatching the channel of corresponding downlink user to described mainboard and described slave plate, comprise: the downlink user information that described main control module has disposed respectively according to described mainboard and described slave plate, and the characteristic of the disposal ability of described mainboard and described slave plate or support, to the channel of the downlink user of the characteristic of corresponding its disposal ability of described mainboard and described slave plate scheduling or support.
5. method according to claim 1, it is characterized in that described method also comprises: described mainboard is handled control format indication CFI, the automatic repeat requests indication of mixing HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and the channel condition information-pilot tone CSI-RS common signal channel institute loaded information of the downlink user that described main control module has distributed.
6. method according to claim 1 is characterized in that, the downlink user information that described main control module has disposed respectively according to mainboard and slave plate is dispatched to described mainboard and described slave plate before the step of channel of corresponding downlink user, comprising:
Described main control module is respectively to described mainboard and described slave plate configurating downlink user's information.
7. according to each described method of claim 1 to 6, it is characterized in that, the channel institute loaded information of the downlink user that described mainboard and described slave plate have been dispatched to described main control module is respectively carried out the processing of bit-level and symbol level, obtain to comprise after the step of the time domain data of described mainboard generation and the time domain data that described slave plate produces:
Described slave plate transmits the time domain data that described slave plate produces to described mainboard;
The time domain data that described mainboard will produce from time domain data and this plate of described slave plate superposes;
The time domain data of described mainboard after with described stack sends to middle radio-frequency module.
8. the implementation method of uplink baseband resource pool in the LTE base station is characterized in that described method comprises:
The different channels that main control module has disposed respectively according to mainboard and slave plate is to the up user of described mainboard and described slave plate scheduling respective channel;
The up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled.
9. method according to claim 8 is characterized in that, the different channels that described main control module has disposed according to mainboard, and the step to the up user of described mainboard scheduling respective channel comprises:
The different channels that described main control module has disposed according to described mainboard, up user to described mainboard scheduling Physical Uplink Shared Channel PUSCH, or the up user who dispatches Physical Uplink Control Channel PUCCH to described mainboard, or to the up user of described mainboard scheduling measurement reference signal SRS, or to the up user of described mainboard scheduling Physical Random Access Channel PRACH.
10. method according to claim 9 is characterized in that, the step that the up user's that described mainboard has been dispatched to described main control module channel institute loaded information is handled comprises:
The up user's of the PUSCH that described mainboard has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the PUCCH that described mainboard has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the SRS that described mainboard has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the PRACH that described mainboard has been dispatched to described main control module channel institute loaded information is handled.
11. method according to claim 8 is characterized in that, the different channels that described main control module has disposed according to slave plate, and the step to the up user of described slave plate scheduling respective channel comprises:
The different channels that described main control module has disposed according to described slave plate, up user to described slave plate scheduling PUSCH, or to the up user of described slave plate scheduling PUCCH, or to the up user of described slave plate scheduling SRS, or to the up user of described slave plate scheduling PRACH.
12. method according to claim 11 is characterized in that, the step that the up user's that described slave plate has been dispatched to described main control module channel institute loaded information is handled comprises:
The up user's of the PUSCH that described slave plate has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the PUCCH that described slave plate has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the SRS that described slave plate has been dispatched to described main control module channel institute loaded information is handled;
Or the up user's of the PRACH that described slave plate has been dispatched to described main control module channel institute loaded information is handled.
13. method according to claim 8 is characterized in that, the different channels that described main control module has disposed respectively according to mainboard and slave plate before the up user's of described mainboard and described slave plate scheduling respective channel step, comprising:
Described main control module is the information of the up user in described mainboard and described slave plate repeated configuration sub-district respectively,
Described main control module is respectively to described mainboard and the different channel of described slave plate configuration.
14. according to Claim 8 to 13 each described methods, it is characterized in that, the different channels that described main control module has disposed respectively according to mainboard and slave plate, step to the up user of described mainboard and described slave plate scheduling respective channel, comprise: the different channels that described main control module has disposed respectively according to described mainboard and described slave plate, the up user that need handle to the TTI of described mainboard and described slave plate scheduling respective channel.
15. to 13 each described methods, it is characterized in that according to Claim 8, after the step that the up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled, comprising:
Result after described mainboard and described slave plate are handled described channel institute loaded information reports to described main control module.
16. a base station is characterized in that, described base station comprises: main control module, mainboard and slave plate;
Described main control module is used for the downlink user information that disposed respectively according to described mainboard and described slave plate, dispatches the channel of corresponding downlink user to described mainboard and described slave plate;
Described mainboard and described slave plate are used for respectively the channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level, obtain the time domain data that time domain data that described mainboard produces and described slave plate produce.
17. base station according to claim 16 is characterized in that, described mainboard comprises the mainboard baseband processing module, and described slave plate comprises the slave plate baseband processing module;
Described mainboard baseband processing module and described slave plate baseband processing module are used for respectively the PDSCH channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level;
Or described mainboard baseband processing module and described slave plate baseband processing module are used for respectively the PDCCH channel institute loaded information of downlink user that described main control module has been dispatched and carry out the processing of bit-level and symbol level.
18. base station according to claim 16, it is characterized in that, described main control module comprises scheduling unit, described scheduling unit is used for the downlink user information and the load balancing that have disposed respectively according to described mainboard and described slave plate, the channel of the downlink user that need handle to the current TTI of described mainboard and corresponding its loading condition of described slave plate scheduling.
19. base station according to claim 16, it is characterized in that, described main control module comprises scheduling unit, described scheduling unit is used for the downlink user information that disposed respectively according to described mainboard and described slave plate, and the characteristic of the disposal ability of described mainboard and described slave plate or support, to the channel of the downlink user of the characteristic of corresponding its disposal ability of described mainboard and described slave plate scheduling or support.
20. base station according to claim 16, it is characterized in that, described mainboard also be used for downlink user that described main control module has been distributed control format indication CFI, mix automatic repeat requests indication HI, Physical Broadcast Channel PBCH, synchronous channel SCH, location-pilot tone P-RS and channel condition information-pilot tone CSI-RS common signal channel institute loaded information and handle.
21. base station according to claim 16 is characterized in that, described main control module also is used for respectively to described mainboard and described slave plate configurating downlink user profile.
22. according to each described base station of claim 16 to 21, it is characterized in that,
Described slave plate is used for transmitting the time domain data that described slave plate produces to described mainboard;
Described mainboard is used for the time domain data that time domain data and this plate from described slave plate produce is superposeed;
Described mainboard is used for the time domain data after the described stack is sent to radio-frequency module.
23. a base station is characterized in that, described base station comprises: main control module, mainboard and slave plate;
Described main control module is used for the different channels that disposed respectively according to described mainboard and described slave plate, to the up user of described mainboard and described slave plate scheduling respective channel;
The up user's that described mainboard and described slave plate have been dispatched to described main control module respectively channel institute loaded information is handled.
24. base station according to claim 23 is characterized in that, described main control module comprises the mainboard scheduling unit;
Described mainboard scheduling unit is used for the different channels that disposed according to described mainboard, up user to described mainboard scheduling PUSCH, or to the up user of described mainboard scheduling PUCCH, or to the up user of described mainboard scheduling SRS, or to the up user of described mainboard scheduling PRACH.
25. base station according to claim 24 is characterized in that, described mainboard comprises the mainboard baseband processing module;
Described mainboard baseband processing module is used for the up user's of PUSCH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled;
Or described mainboard baseband processing module is used for the up user's of PUCCH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled;
Or described mainboard baseband processing module is used for the up user's of SRS that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled;
Or described mainboard baseband processing module is used for the up user's of PRACH that described mainboard scheduling unit has been dispatched channel institute loaded information to be handled.
26. base station according to claim 23 is characterized in that, described main control module comprises the slave plate scheduling unit;
Described slave plate scheduling unit is used for the different channels that disposed according to described slave plate, up user to described slave plate scheduling PUSCH, or to the up user of described slave plate scheduling PUCCH, or to the up user of described slave plate scheduling SRS, or to the up user of described slave plate scheduling PRACH.
27. base station according to claim 26 is characterized in that, described slave plate comprises the slave plate baseband processing module;
Described slave plate baseband processing module is used for the up user's of PUSCH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled;
Or described slave plate baseband processing module is used for the up user's of PUCCH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled;
Or described slave plate baseband processing module is used for the up user's of SRS that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled;
Or described slave plate baseband processing module is used for the up user's of PRACH that described slave plate scheduling unit has been dispatched channel institute loaded information to be handled.
28. according to the described base station of claim 23, it is characterized in that,
Described main control module also is used for the information of the up user in described mainboard and described slave plate repeated configuration sub-district respectively,
Described main control module also is used for respectively to described mainboard and the different channel of described slave plate configuration.
29. according to each described base station of claim 23 to 28, it is characterized in that, described main control module also is used for the different channels that disposed respectively according to described mainboard and described slave plate, the up user that need handle to the TTI of described mainboard and described slave plate scheduling respective channel.
30., it is characterized in that the result after described mainboard and described slave plate also are used for described channel institute loaded information handled reports to described main control module according to each described base station of claim 23 to 28.
31., it is characterized in that the result after described mainboard also is used for described channel institute loaded information handled reports to described mainboard scheduling unit according to claim 24 or 26 each described base stations; Result after described slave plate also is used for described channel institute loaded information handled reports to described slave plate scheduling unit.
32. the implement device of downgoing baseband resource pool is characterized in that in the LTE base station, described device comprise processor and with the memory of described processor coupling;
Described processor is used to control the information of the downlink user that main control module disposed respectively according to mainboard and slave plate, dispatches the channel of corresponding downlink user to described mainboard and described slave plate;
Described processor is used to control the channel institute loaded information of the downlink user that described mainboard and described slave plate dispatched to described main control module respectively and carries out the processing of bit-level and symbol level, obtains the time domain data that time domain data that described mainboard produces and described slave plate produce.
33. the implement device of uplink baseband resource pool is characterized in that in the LTE base station, described device comprise processor and with the memory of described processor coupling;
Described processor is used to control the different channels that main control module has disposed respectively according to mainboard and slave plate, to the up user of described mainboard and described slave plate scheduling respective channel;
Described processor is used to control the up user's that described mainboard and described slave plate dispatched to described main control module respectively channel institute loaded information to be handled.
CN201280002552.5A 2012-11-30 2012-11-30 Descending and the implementation method of uplink baseband resource pool and base station Active CN103222325B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/085621 WO2014082281A1 (en) 2012-11-30 2012-11-30 Implementation method for downlink and uplink baseband resource pool and base station

Publications (2)

Publication Number Publication Date
CN103222325A true CN103222325A (en) 2013-07-24
CN103222325B CN103222325B (en) 2016-08-10

Family

ID=48818215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280002552.5A Active CN103222325B (en) 2012-11-30 2012-11-30 Descending and the implementation method of uplink baseband resource pool and base station

Country Status (2)

Country Link
CN (1) CN103222325B (en)
WO (1) WO2014082281A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103841647A (en) * 2014-03-07 2014-06-04 北京邮电大学 Multi-granularity telescopic packaging device and method based on base station resource pool
WO2016127380A1 (en) * 2015-02-13 2016-08-18 华为技术有限公司 Baseband processing unit and base station system
CN107006001A (en) * 2015-07-28 2017-08-01 松下电器(美国)知识产权公司 Terminal, base station, sending method and method of reseptance
CN107105452A (en) * 2016-02-19 2017-08-29 大唐移动通信设备有限公司 A kind of method and device of the load balancing based on PUCCH
CN108476121A (en) * 2016-02-03 2018-08-31 英特尔Ip公司 Physical down link sharing channel transmission with short transmission time interval

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101222773A (en) * 2008-01-22 2008-07-16 中兴通讯股份有限公司 Base station resource management method, system and equipment
CN101232654A (en) * 2007-01-25 2008-07-30 中兴通讯股份有限公司 Base band resource pool system and control method thereof
US7649927B1 (en) * 2006-12-29 2010-01-19 Kiomars Anvari Equalizer filter with dynamically configurable convolution filter
CN102547991A (en) * 2010-12-29 2012-07-04 鼎桥通信技术有限公司 Selection method for baseband boards
CN102668613A (en) * 2011-11-22 2012-09-12 华为技术有限公司 Method and apparatus for realizing base band resource pool in lte base station

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102299735B (en) * 2010-06-25 2014-03-12 普天信息技术研究院有限公司 Method for decreasing bandwidth of Ir interface and distributed base station
WO2013075283A1 (en) * 2011-11-22 2013-05-30 华为技术有限公司 Method and device for implementing baseband resource pool in lte base station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7649927B1 (en) * 2006-12-29 2010-01-19 Kiomars Anvari Equalizer filter with dynamically configurable convolution filter
CN101232654A (en) * 2007-01-25 2008-07-30 中兴通讯股份有限公司 Base band resource pool system and control method thereof
CN101222773A (en) * 2008-01-22 2008-07-16 中兴通讯股份有限公司 Base station resource management method, system and equipment
CN102547991A (en) * 2010-12-29 2012-07-04 鼎桥通信技术有限公司 Selection method for baseband boards
CN102668613A (en) * 2011-11-22 2012-09-12 华为技术有限公司 Method and apparatus for realizing base band resource pool in lte base station

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103841647A (en) * 2014-03-07 2014-06-04 北京邮电大学 Multi-granularity telescopic packaging device and method based on base station resource pool
CN103841647B (en) * 2014-03-07 2017-04-12 北京邮电大学 Multi-granularity telescopic packaging device and method based on base station resource pool
WO2016127380A1 (en) * 2015-02-13 2016-08-18 华为技术有限公司 Baseband processing unit and base station system
CN107006001A (en) * 2015-07-28 2017-08-01 松下电器(美国)知识产权公司 Terminal, base station, sending method and method of reseptance
CN108476121A (en) * 2016-02-03 2018-08-31 英特尔Ip公司 Physical down link sharing channel transmission with short transmission time interval
CN108476121B (en) * 2016-02-03 2021-06-29 苹果公司 Apparatus for physical downlink shared channel transmission with short transmission time interval
CN107105452A (en) * 2016-02-19 2017-08-29 大唐移动通信设备有限公司 A kind of method and device of the load balancing based on PUCCH

Also Published As

Publication number Publication date
CN103222325B (en) 2016-08-10
WO2014082281A1 (en) 2014-06-05

Similar Documents

Publication Publication Date Title
RU2563626C1 (en) Method and apparatus for realising resource pool in lte baseband
CN103561475B (en) Signaling for downlink coordinated multipoint in a wireless communication system
CN105792363B (en) Dispatching method and device in a kind of carrier aggregation of enhancing
CN104955158B (en) A kind of method and apparatus of aperiodic SRS
CN102404055B (en) Method, system and device for measuring interference
CN103517276A (en) D2D communication method, user equipment and base station
CN103476121A (en) Method and apparatus for bit-level PDSCH muting and/or receiver puncturing in LTE-advanced heterogeneous networks
CN105682243A (en) Scheduling signaling configuration method, receiving method associated equipment
CN108702267A (en) Short physical uplink shared channel arrangement
CN103155437A (en) Method and apparatus for coordinated multi-point communication for each sub-band based on long-term channel state information
CN104145521B (en) The distribution of the communication resource
CN102065465A (en) Method, system and device for transmitting data
CN113225751B (en) Monitoring method and device for search space
CN103222325B (en) Descending and the implementation method of uplink baseband resource pool and base station
CN105682244A (en) Scheduling signaling configuration method, receiving method associated equipment
CN103650558A (en) Carrier selection method and device
CN106561066A (en) Method and device for reducing network delay in wireless communication
US10667266B2 (en) Resource indication for bandwidth allocation in wireless communication
CN104125647A (en) Interference coordination method and base station
CN103517439A (en) Position processing method, base station and terminal
CN105898869B (en) Transmission method and device in a kind of D2D communication
CN103650610A (en) Method and device for data transmission
CN102111889A (en) Method and equipment for judging whether to adopt physical resource block bundling technology
CN102523586A (en) Cell interference inhibiting method and equipment based on control channel
CN110192416A (en) A kind of resource allocation method and device for coverage enhancement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant