CN103215912B - 软体排浅滩陡坡对铺方法及对铺系统 - Google Patents

软体排浅滩陡坡对铺方法及对铺系统 Download PDF

Info

Publication number
CN103215912B
CN103215912B CN201310089021.0A CN201310089021A CN103215912B CN 103215912 B CN103215912 B CN 103215912B CN 201310089021 A CN201310089021 A CN 201310089021A CN 103215912 B CN103215912 B CN 103215912B
Authority
CN
China
Prior art keywords
working ships
ships
locking plate
ship
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310089021.0A
Other languages
English (en)
Other versions
CN103215912A (zh
Inventor
刘德进
吴利科
张庆文
曲俐俐
徐加峰
单国辉
冯海暴
梁萌
李增军
单辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201310089021.0A priority Critical patent/CN103215912B/zh
Publication of CN103215912A publication Critical patent/CN103215912A/zh
Application granted granted Critical
Publication of CN103215912B publication Critical patent/CN103215912B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种在航道整治铺排作业中的软体排浅滩陡坡对铺方法及对铺系统,该系统由一艘高滩铺排船和一艘深水铺排船组成,两艘铺排船的滑板相对,在每一铺排船的甲板上还包括有驱动滚筒和设置在驱动滚筒远离滑板一侧的摩擦滚筒;该对铺方法包括两艘船同时铺排以及两艘船非同时铺排,通过运用上述的联锁片对铺系统及对铺方法,可以实现对高滩和深水交界区域进行快速铺排作业。

Description

软体排浅滩陡坡对铺方法及对铺系统
技术领域
本发明涉及航道整治铺排作业,特别涉及在铺排作业中使用的一种软体排浅滩陡坡对铺方法及对铺系统。
背景技术
航道整治铺排作业是深水航道治理中的核心部分,在深水航道治理中起着“导流、挡沙、减淤、护滩”的作用,对持续保持总体河势的稳定起着至关重要的作用。
在铺排作业的过程中会出现既存在高滩区域,又存在深水区域,且高滩区域至深水区域的过渡段变化相对较快的铺排区域,其典型断面如图1所示。高滩铺排船设计满载吃水一般不大于1m,作业水深不大于10m;深水铺排船设计满载吃水一般不小于2.5m,最大作业水深30m左右。受地形变化及船舶性能影响,同一艘铺排船无法满足现场铺排需求,且倘若分幅断开施工,分幅位置既不满足设计要求,船机性能也不满足铺排需求。
发明内容
本发明所要解决的技术问题就是提供一种实现对上述的铺排区域进行快速铺排作业的软体排浅滩陡坡对铺方法及对铺系统。
本发明采用如下技术方案:
一种软体排浅滩陡坡对铺方法,包括如下步骤:
(1)一艘高滩铺排船和一艘深水铺排船滑板相对停靠于铺排对接点处;
(2)将软体排吊至铺排船滑板上并进行卷排;
(31)如两艘铺排船同时进行铺排,则:
(311)两艘铺排船的滑板保持水平对接,并同时进行联锁片吊安,在位于对接点处的联锁片上系好一对浮漂;
(312)两艘铺排船的滑板同时向下倾斜,联锁片下滑,铺排作业开始;
(313)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(314)移动船体直至铺排作业完成,移船距离应与铺排长度一致;
(32)如两艘铺排船非同时进行铺排,则:
(321)两艘铺排船滑板保持水平对接,并同时进行联锁片吊安,在位于对接点处的联锁片上系好一对浮漂;
(322)一艘铺排船滑板向下倾斜,另一艘铺排船滑板仍保持水平状态,联锁片下滑,该船的铺排作业开始;
(323)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(324)移动船体直至该船的铺排作业完成后,另一艘铺排船滑板再开始向下倾斜,该船的铺排作业开始;
(325)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(326)移动船体直至该船的铺排作业完成,两船的移船距离应与整体铺排长度一致。
进一步的,在步骤(2)中,既可以两艘铺排船同时卷排,也可以一艘铺排船先将软体排卷完,再放排至另一艘铺排船,此时一艘铺排船放排,另一艘铺排船卷排,同步进行。
进一步的,两艘铺排船非同时卷排时,先铺排船应多卷排5m-20m。
一种软体排浅滩陡坡对铺系统,该系统由一艘高滩铺排船和一艘深水铺排船组成,两艘铺排船的滑板相对,在每一铺排船的甲板上还包括有驱动滚筒和设置在驱动滚筒远离滑板一侧的摩擦滚筒。
本发明的有益效果为:
本发明所公开的软体排浅滩陡坡对铺方法,利用上述的对铺系统,可以实现对高滩和深水交界区域进行快速铺排作业。
附图说明
图1是铺排区域的典型断面图;
图2是本发明实施例1和实施例2所公开的对铺方法的步骤(1)的示意图;
图3是本发明实施例1和实施例2所公开的对铺方法的步骤(311)及(321)的示意图;
图4是本发明实施例1所公开的对铺方法的步骤(312)的示意图;
图5是本发明实施例2所公开的对铺方法的步骤(322)的示意图;
图6是本发明实施例2所公开的对铺方法的步骤(323)的示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图和实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
实施例1,本实施例公开了一种软体排浅滩陡坡对铺方法,包括如下步骤:
(1)如图2所示,一艘高滩铺排船2和一艘深水铺排船1的滑板3相对停靠于铺排对接点9处;
(2)将软体排4吊至铺排船滑板上并进行卷排,既可以两艘铺排船同时卷排,也可以一艘铺排船先将软体排卷完,再放排至另一艘铺排船,此时一艘铺排船放排,另一艘铺排船卷排,同步进行;
(31)两艘铺排船同时进行铺排,则:
(311)如图3所示,两艘铺排船的滑板3保持水平对接,并同时进行联锁片5吊安,在位于对接点9处的联锁片上系好一对浮漂;
(312)如图4所示,两艘铺排船的滑板3同时向下倾斜,联锁片5下滑,铺排作业开始;
(313)通过浮漂测量联锁片5的入水位置,如有偏差则通过移动船体进行调整;
(314)两艘铺排船分别向相反方向移动船体直至铺排作业完成,两船的移船距离应与整体铺排长度一致。
本实施例还公开了一种软体排浅滩陡坡对铺系统,如图2所示,该系统由一艘高滩铺排船2和一艘深水铺排船1组成,两艘铺排船的滑板3相对,在每一铺排船的甲板上还包括有驱动滚筒6和设置在驱动滚筒远离滑板一侧的摩擦滚筒7。
本实施例所公开的软体排浅滩陡坡对铺方法,利用上述的对铺系统,可以实现对浅滩陡坡交界区域进行快速铺排作业。
实施例2,本实施例公开了一种软体排浅滩陡坡对铺方法,包括如下步骤:
(1)如图2所示,一艘高滩铺排船2和一艘深水铺排船1的滑板3相对停靠于铺排对接点处;
(2)将软体排4吊至铺排船滑板上并进行卷排,既可以两艘铺排船同时卷排,也可以一艘铺排船先将软体排卷完,再放排至另一艘铺排船,此时一艘铺排船放排,另一艘铺排船卷排,同步进行;
(32)两艘铺排船非同时进行铺排,则:
(321)如图3所示,两艘铺排船滑板3保持水平对接,并同时进行联锁片5吊安,在位于对接点9处的联锁片5上系好一对浮漂;
(322)如图5所示,深水铺排船1的滑板向下倾斜,高滩铺排船2的滑板仍保持水平状态,联锁片5下滑,深水铺排船1的铺排作业开始;
(323)通过浮漂测量联锁片5的入水位置,如有偏差则通过移动船体进行调整;
(324)如图6所示,移动船体直至深水铺排船1的铺排作业完成后,高滩铺排船2的滑板3再开始向下倾斜,该船的铺排作业开始;
(325)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(326)移动船体直至高滩铺排船2的铺排作业完成,两船的移船距离应与整体铺排长度一致。
本实施例所公开的软体排浅滩陡坡对铺方法,利用上述对铺系统,可以实现对浅滩陡坡交界区域进行快速铺排作业。

Claims (3)

1.一种软体排浅滩陡坡对铺方法,其特征在于,包括如下步骤:
(1)一艘高滩铺排船和一艘深水铺排船滑板相对停靠于铺排对接点处;
(2)将软体排吊至铺排船滑板上并进行卷排;
(3)判断两艘铺排船是否同时进行铺排;
(31)如两艘铺排船同时进行铺排,则:
(311)两艘铺排船的滑板保持水平对接,并同时进行联锁片吊安,在位于对接点处的联锁片上系好一对浮漂;
(312)两艘铺排船的滑板同时向下倾斜,联锁片下滑,铺排作业开始;
(313)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(314)移动船体直至铺排作业完成,移船距离应与铺排长度一致;
(32)如两艘铺排船非同时进行铺排,则:
(321)两艘铺排船滑板保持水平对接,并同时进行联锁片吊安,在位于对接点处的联锁片上系好一对浮漂;
(322)一艘铺排船滑板向下倾斜,另一艘铺排船滑板仍保持水平状态,联锁片下滑,该船的铺排作业开始;
(323)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(324)移动船体直至该船的铺排作业完成后,另一艘铺排船滑板再开始向下倾斜,该船的铺排作业开始;
(325)通过浮标测量联锁片的入水位置,如有偏差则通过移动船体进行调整;
(326)移动船体直至该船的铺排作业完成,两船的移船距离应与整体铺排长度一致。
2.根据权利要求1所述的软体排浅滩陡坡对铺方法,其特征在于:在步骤(2)中,既可以两艘铺排船同时卷排,也可以一艘铺排船先将软体排卷完,再放排至另一艘铺排船,此时一艘铺排船放排,另一艘铺排船卷排,同步进行。
3.根据权利要求2所述的软体排浅滩陡坡对铺方法,其特征在于:两艘铺排船非同时卷排时,先铺排船应多卷排5m-20m。
CN201310089021.0A 2013-03-19 2013-03-19 软体排浅滩陡坡对铺方法及对铺系统 Active CN103215912B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310089021.0A CN103215912B (zh) 2013-03-19 2013-03-19 软体排浅滩陡坡对铺方法及对铺系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310089021.0A CN103215912B (zh) 2013-03-19 2013-03-19 软体排浅滩陡坡对铺方法及对铺系统

Publications (2)

Publication Number Publication Date
CN103215912A CN103215912A (zh) 2013-07-24
CN103215912B true CN103215912B (zh) 2015-06-17

Family

ID=48814037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310089021.0A Active CN103215912B (zh) 2013-03-19 2013-03-19 软体排浅滩陡坡对铺方法及对铺系统

Country Status (1)

Country Link
CN (1) CN103215912B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452117B (zh) * 2013-09-10 2015-07-08 中交上航局航道建设有限公司 一种深水袋装砂施工装置的施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1403954A (en) * 1972-08-18 1975-08-28 Bitumarin Bv Method of and apparatus for laying a protective mattress under water
CN2863635Y (zh) * 2006-07-25 2007-01-31 中国水利水电科学研究院 组合退放铺排船
CN102277853A (zh) * 2011-04-26 2011-12-14 中交四航工程研究院有限公司 一种快速可靠的水下铺排新技术
CN102758419A (zh) * 2012-07-31 2012-10-31 长江南京航道工程局 基于活动加筋条的深水铺设联锁排施工方法
CN203238592U (zh) * 2013-03-19 2013-10-16 中交一航局第二工程有限公司 软体排浅滩陡坡对铺系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1403954A (en) * 1972-08-18 1975-08-28 Bitumarin Bv Method of and apparatus for laying a protective mattress under water
CN2863635Y (zh) * 2006-07-25 2007-01-31 中国水利水电科学研究院 组合退放铺排船
CN102277853A (zh) * 2011-04-26 2011-12-14 中交四航工程研究院有限公司 一种快速可靠的水下铺排新技术
CN102758419A (zh) * 2012-07-31 2012-10-31 长江南京航道工程局 基于活动加筋条的深水铺设联锁排施工方法
CN203238592U (zh) * 2013-03-19 2013-10-16 中交一航局第二工程有限公司 软体排浅滩陡坡对铺系统

Also Published As

Publication number Publication date
CN103215912A (zh) 2013-07-24

Similar Documents

Publication Publication Date Title
CN203238592U (zh) 软体排浅滩陡坡对铺系统
KR101236940B1 (ko) 풍력 발전기 설치용 선박
MY168408A (en) Floating offshore platform with pontoon-coupled extension plates for reduced heave motion
CN103215912B (zh) 软体排浅滩陡坡对铺方法及对铺系统
CN103482026B (zh) 一种用于超深水浮式结构物的混合式系泊系统及系泊方法
CN204771269U (zh) 一种用于制作船舶艏楼舷墙的专用胎架
CN103910041A (zh) 高精度海上风机吊装船
AU2015318819A1 (en) Wave generating systems
CN201941943U (zh) 一种隐形船艏结构
CN204527580U (zh) 一种船坞的船舶进出导向装置
CN101817393A (zh) 利用浮船坞造船的方法
CN105539733A (zh) 非标浅槽闸刀掣链器
CN103615016A (zh) 超大沉箱安装工艺
CN103723240B (zh) 球鼻艏组件
CN106184615B (zh) 半潜式平台的建造方法
CN204452784U (zh) 一种用于打桩船的可调节旋转甲板
CN103174108B (zh) 无滑板铺排船传动式铺排装置及铺排方法
CN207566740U (zh) A形架横向移动装置
CN203473207U (zh) 一种铝合金登船梯
CN203625846U (zh) 一种水上浮式作业平台固桩装置
CN203238594U (zh) 铺排船滑板支撑装置
CN204452839U (zh) 一种打桩船船体
CN103215921B (zh) 铺排船顶升滑板装置及铺排方法
CN104477325B (zh) 双浮体结构物浮体分体进坞坐墩方法
CN204435338U (zh) 一种用于海洋平台的锁紧机构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Dejin

Inventor after: Dan Hui

Inventor after: Wu Like

Inventor after: Zhang Qingwen

Inventor after: Qu Lili

Inventor after: Xu Jiafeng

Inventor after: Dan Guohui

Inventor after: Feng Haibao

Inventor after: Liang Meng

Inventor after: Li Zengjun

Inventor before: Liu Dejin

Inventor before: Zhang Qingwen

Inventor before: Qu Lili

Inventor before: Xu Jiafeng

Inventor before: Dan Guohui

Inventor before: Feng Haibao

Inventor before: Liang Meng

Inventor before: Li Zengjun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN ZHANG QINGWEN QU LILI XU JIAFENG DAN GUOHUI FENG HAIBAO LIANG MENG LI ZENGJUN TO: LIU DEJIN WU LIKE ZHANG QINGWEN QU LILI XU JIAFENG DAN GUOHUI FENG HAIBAO LIANG MENG LI ZENGJUN DAN HUI

C14 Grant of patent or utility model
GR01 Patent grant