Prior art keywords
girder
crossbeam
bracket
oil cylinder
dolly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101641713A
Other languages
Chinese (zh)
Inventor
秘嘉川
李文英
李震
王小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG BORUI HEAVY MACHINERY CO Ltd
Original Assignee
SHANDONG BORUI HEAVY MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG BORUI HEAVY MACHINERY CO Ltd filed Critical SHANDONG BORUI HEAVY MACHINERY CO Ltd
Priority to CN2013101641713A priority Critical patent/CN103215896A/en
Publication of CN103215896A publication Critical patent/CN103215896A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a novel variable-section beam moving die frame and a construction method thereof. After a box beam is poured, a girder is demolded through a jack and is deflected through a deflection device, and a beam is kept being fixed; then a longitudinal moving oil cylinder pushes the girder to drive the beam and a template to longitudinally move; in the longitudinal moving process, a transverse moving device adjusts the relative positions of the beam and the girder; when the girder longitudinally moves in place, the beam is subjected to die assembling, and the transverse position of the girder is adjusted again by the deflection device; and the jack jacks the girder to be adjusted in place. The variable-section box beam is constructed in a manner that two girders travel in an unparallel manner; a die opening distance is not required to be widened and the length of a bracket is not required to be prolonged; and therefore, a phenomenon of reduction of the stability of a penetration hole is avoided.

Description

A kind of novel non-uniform beam mobile formwork and job practices
Technical field
The present invention relates to the bridge construction field, be specifically related to a kind of mobile formwork and job practices thereof.
Background technology
Conventional mobile formwork via hole, because the influence that does not have the case beam to broaden, can realize the parallel walking of two Pin girders, but for the case beam is the situation of variable cross-section, and just there are many difficulties in the parallel walking of mould bases via hole two girders, for example because the variation of case beam section, if the parallel walking of two girders, need to increase the die sinking distance, increase bracket length, cause the via hole bad stability.In order to guarantee the lateral stability of mobile formwork walking process, must realize the oblique walking of two Pin girders, make the not parallel vertical shift via hole of girder.
Summary of the invention
The present invention provides a kind of novel non-uniform beam mobile formwork and job practices in order to overcome the deficiency of above technology.
The present invention overcomes the technical scheme that its technical problem adopts:
This novel non-uniform beam mobile formwork, comprise the bracket that is installed on the bridge pier, be arranged at the bracket top and lay respectively at the bridge pier both sides girder, be installed on some groups of crossbeams on two girders, be provided with between described girder and the bracket and make girder produce the arrangement for deflecting of skew, be provided with between described girder and the crossbeam and make crossbeam produce traversing Traverse Displacement Unit with respect to girder with respect to bracket.
Above-mentioned arrangement for deflecting comprises and is placed on the bracket dolly and the girder die sinking oil cylinder that can laterally move along bracket, described girder die sinking oil cylinder one end is fixed on the bracket, its other end is fixed on the described dolly, and described girder is positioned on the dolly and can vertically moves with respect to dolly.
Above-mentioned Traverse Displacement Unit comprises the crossbeam die sinking oil cylinder that is arranged at each crossbeam below, and described crossbeam die sinking oil cylinder one end is fixed on the girder, and its other end is fixed on the crossbeam.
Frictional resistance when reducing the girder vertical shift, above-mentioned dolly both sides are respectively arranged with rotating gear wheel, and the distance between described two gear wheels is complementary with the width of described girder.
The present invention also provides a kind of job practices of novel non-uniform beam mobile formwork, may further comprise the steps:
A). after the case beam was built and finished, girder was by the jack stamping die;
B). girder produces skew by arrangement for deflecting, and the crossbeam maintenance is motionless;
C). the vertical shift oil cylinder promotes girder and drives crossbeam and template vertical shift, adjusts relative position between crossbeam and the girder by Traverse Displacement Unit in the vertical shift process;
D). after the girder vertical shift put in place, the crossbeam matched moulds was adjusted the girder lateral attitude once more by arrangement for deflecting, and jack is adjusted the girder jacking to the right place;
In order to improve stability, also comprise by Traverse Displacement Unit some groups of crossbeams that approach bridge pier in the girder vertical shift process are progressively opened, by the process of closing up by Traverse Displacement Unit again behind the bridge pier.
The invention has the beneficial effects as follows: after the case beam was built and finished, girder was by the jack stamping die, and girder produces skew by arrangement for deflecting, and the crossbeam maintenance is motionless.The vertical shift oil cylinder promotes girder and drives crossbeam and template vertical shift afterwards, adjusts relative position between crossbeam and the girder by Traverse Displacement Unit in the vertical shift process.After the girder vertical shift put in place, the crossbeam matched moulds was adjusted the girder lateral attitude once more by arrangement for deflecting, and jack is adjusted the girder jacking to the right place.By making the not parallel walking construction of two girders box girder with variable cross section, do not need to increase the die sinking distance and increase bracket length, therefore can not cause the situation of via hole bad stability to take place.
 
Description of drawings
Fig. 1 is a cross-sectional configuration schematic diagram of the present invention;
Fig. 2 is a plan structure schematic diagram of the present invention;
Fig. 3 is the local structure for amplifying schematic diagram of A among Fig. 1;
Fig. 4 is the local structure for amplifying schematic diagram of B among Fig. 2;
Among the figure, 1. bridge pier 2. girder die sinking oil cylinders 3. dollies 4. crossbeams 5. girders 6. brackets 7. crossbeam die sinking oil cylinders 8. gear wheels.
The specific embodiment
Below in conjunction with accompanying drawing 1, accompanying drawing 2, accompanying drawing 3, the present invention will be further described for accompanying drawing 4.
Shown in accompanying drawing 1, accompanying drawing 2, this non-uniform beam mobile formwork, comprise the bracket 6 that is installed on the bridge pier 1, be arranged at bracket 6 tops and lay respectively at bridge pier 1 both sides girder 5, be installed on the some groups of crossbeams 4 on two girders 5, be provided with between described girder 5 and the bracket 6 and make girder 5 produce the arrangement for deflecting of skew, be provided with between described girder 5 and the crossbeam 4 and make crossbeam 4 with respect to the traversing Traverse Displacement Unit of girder 5 generations with respect to bracket 6.After the case beam was built and finished, girder 5 was by the jack stamping die, and girder 5 produces skew by arrangement for deflecting, and crossbeam 4 keeps motionless.The vertical shift oil cylinder promotes girder 5 and drives crossbeam 4 and template vertical shifts afterwards, adjusts relative position between crossbeam 4 and the girder 5 by Traverse Displacement Unit in the vertical shift process.After girder 5 vertical shifts put in place, the crossbeam matched moulds was adjusted girder 5 lateral attitudes once more by arrangement for deflecting, and jack is adjusted girder 5 jackings to the right place.By making the not parallel walking construction of two girders box girder with variable cross section, do not need to increase the die sinking distance and increase bracket length, therefore can not cause the situation of via hole bad stability to take place.
As shown in Figure 4, above-mentioned arrangement for deflecting comprises and is placed on the bracket 6 dolly 3 and the girder die sinking oil cylinders 2 that can laterally move along bracket 6, described girder die sinking oil cylinder 2 one ends are fixed on the bracket 6, its other end is fixed on the described dolly 3, and described girder 5 is positioned on the dolly 3 and can vertically moves with respect to dolly 3.As shown in Figure 3, the girder die sinking oil cylinder 2 on the right side bridge pier 1 outwards ejects, thereby driving trolley 3 laterally moves laterally along bracket 6, and the girder die sinking oil cylinder 2 on the left side bridge pier 1 is failure to actuate, and this moment, deflection laterally can appear in girder 5.Therefore the oblique walking of two Pin girders is provided, has made the effective solution of the not parallel vertical shift via hole of girder.
As shown in Figure 3, above-mentioned Traverse Displacement Unit comprises the crossbeam die sinking oil cylinder 7 that is arranged at each crossbeam 4 below, and described crossbeam die sinking oil cylinder 7 one ends are fixed on the girder 4, and its other end is fixed on the crossbeam 4.Crossbeam die sinking oil cylinder 7 can promote crossbeam 4 and move with respect to girder 5, and the some groups of crossbeams 4 that approach bridge pier 1 in the girder 5 vertical shift processes are progressively opened, and drives every group of crossbeam 4 matched moulds by bridge pier 1 rear cross beam die sinking oil cylinder 7.Because crossbeam 4 must could pass through bridge pier 1 after the die sinking, and the crossbeam 4 after the die sinking occurs thereby unsettled situation may occur owing to be cantilever position with respect to girder 5.Therefore crossbeam 4 matched moulds after crossing bridge pier 1 can effectively improve stability, thereby has guaranteed production safety.
Above-mentioned dolly 3 both sides are respectively arranged with rotating gear wheel 8, and the distance between described two gear wheels 8 is complementary with the width of described girder 5.Because girder 5 vertical shift meeting when heeling condition makes girder 5 with respect to dolly 3 length travel be arranged, therefore, gear wheel 8 can make girder 5 when dolly 3 moves, reduce resistance by being set, improved the stationarity that moves.

Claims (6)

1. novel non-uniform beam mobile formwork, it is characterized in that: comprise the bracket (6) that is installed on the bridge pier (1), be arranged at bracket (6) top and lay respectively at bridge pier (1) both sides girder (5), be installed on the some groups of crossbeams (4) on two girders (5), be provided with between described girder (5) and the bracket (6) and make girder (5) produce the arrangement for deflecting of skew, be provided with between described girder (5) and the crossbeam (4) and make crossbeam (4) with respect to the traversing Traverse Displacement Unit of girder (5) generation with respect to bracket (6).
2. novel non-uniform beam mobile formwork according to claim 1, it is characterized in that: described arrangement for deflecting comprises and is placed on the bracket (6) dolly (3) and the girder die sinking oil cylinder (2) that can laterally move along bracket (6), described girder die sinking oil cylinder (2) one ends are fixed on the bracket (6), its other end is fixed on the described dolly (3), and described girder (5) is positioned at dolly (3) and goes up and can vertically move with respect to dolly (3).
3. novel non-uniform beam mobile formwork according to claim 1 and 2, it is characterized in that: described Traverse Displacement Unit comprises the crossbeam die sinking oil cylinder (7) that is arranged at each crossbeam (4) below, described crossbeam die sinking oil cylinder (7) one ends are fixed on the girder (4), and its other end is fixed on the crossbeam (4).
4. novel non-uniform beam mobile formwork according to claim 2 is characterized in that: described dolly (3) both sides are respectively arranged with rotating gear wheel (8), and the distance between described two gear wheels (8) is complementary with the width of described girder (5).
5. the job practices of a novel non-uniform beam mobile formwork as claimed in claim 1 is characterized in that: may further comprise the steps:
A). after the case beam was built and finished, girder (5) was by the jack stamping die;
B). girder (5) produces skew by arrangement for deflecting, and crossbeam (4) maintenance is motionless;
C). the vertical shift oil cylinder promotes girder (5) and drives crossbeam (4) and template vertical shift, adjusts relative position between crossbeam (4) and the girder (5) by Traverse Displacement Unit in the vertical shift process;
D). after girder (5) vertical shift put in place, the crossbeam matched moulds was adjusted girder (5) lateral attitude once more by arrangement for deflecting, and jack is adjusted girder (5) jacking to the right place.
6. job practices according to claim 5, it is characterized in that: also comprise by Traverse Displacement Unit the some groups of crossbeams (4) that approach bridge pier (1) in girder (5) the vertical shift process are progressively opened, by the process of closing up by Traverse Displacement Unit again behind the bridge pier (1).
CN2013101641713A 2013-05-07 2013-05-07 Novel variable-section beam moving die frame and construction method thereof Pending CN103215896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101641713A CN103215896A (en) 2013-05-07 2013-05-07 Novel variable-section beam moving die frame and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101641713A CN103215896A (en) 2013-05-07 2013-05-07 Novel variable-section beam moving die frame and construction method thereof

Publications (1)

Publication Number Publication Date
CN103215896A true CN103215896A (en) 2013-07-24

Family

ID=48814021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101641713A Pending CN103215896A (en) 2013-05-07 2013-05-07 Novel variable-section beam moving die frame and construction method thereof

Country Status (1)

Country Link
CN (1) CN103215896A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528395A (en) * 2019-09-23 2019-12-03 中交第二航务工程局有限公司 A kind of grouping folding mobile formwork and its curve are crossed across construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113579A (en) * 2003-10-09 2005-04-28 Taisei Corp Movable form support
CN101806038A (en) * 2010-03-29 2010-08-18 山东省路桥集团有限公司 Curved box girder sliding mold frame and construction method
CN102660925A (en) * 2012-06-06 2012-09-12 长安大学 Moveable formwork for variable-width curved bridge
CN102953338A (en) * 2012-11-20 2013-03-06 山东省路桥集团有限公司 Open and close control system for mould
CN203200669U (en) * 2013-05-07 2013-09-18 山东博瑞重型机械有限公司 Novel movable framework for box girder with variable cross sections

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113579A (en) * 2003-10-09 2005-04-28 Taisei Corp Movable form support
CN101806038A (en) * 2010-03-29 2010-08-18 山东省路桥集团有限公司 Curved box girder sliding mold frame and construction method
CN102660925A (en) * 2012-06-06 2012-09-12 长安大学 Moveable formwork for variable-width curved bridge
CN102953338A (en) * 2012-11-20 2013-03-06 山东省路桥集团有限公司 Open and close control system for mould
CN203200669U (en) * 2013-05-07 2013-09-18 山东博瑞重型机械有限公司 Novel movable framework for box girder with variable cross sections

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528395A (en) * 2019-09-23 2019-12-03 中交第二航务工程局有限公司 A kind of grouping folding mobile formwork and its curve are crossed across construction method

Similar Documents

Publication Publication Date Title
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN101082280A (en) Single-track railway tunnel lining trolley
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN204663081U (en) A kind of overhead system three-dimensional parking device
CN206385565U (en) A kind of piping lane gate-type is from traveling hydraulic pressure exterior sheathing system and device
CN107558378A (en) A kind of Bridge Erector and its bridging method for being used to set up full precast beam
CN104695335B (en) Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device
CN203200669U (en) Novel movable framework for box girder with variable cross sections
AT515824A1 (en) Crane carrier for a crane
CN203320425U (en) Cast-in-situ box girder construction apparatus with slidingly movable side mold
CN203007850U (en) Transversely-movable overhead travelling crane of bridge erecting machine
CN103215896A (en) Novel variable-section beam moving die frame and construction method thereof
CN203270462U (en) Novel upward curve moving formwork
CN103628719B (en) A kind of parking apparatus riser guide navigation system
CN204591309U (en) The fixed tunnel lining trolley of a kind of triangle
CN103215895A (en) Novel uplink curve moving framework
CN204589820U (en) A kind of Xiang Liang external mold travel mechanism
CN204023423U (en) A kind of many truss-likes supper wide type hanging basket for bridge construction
CN204529208U (en) A kind of improved type wheel drop mechanism transfer bridge interlock system
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN204401473U (en) Upstroke movable framework steel bar overall binding lifting construction device
CN201865055U (en) Multifunctional bridge girder erection machine for highway and railway
CN203031187U (en) Positioning device for assembling tanker with walking board and handrail assembly
CN202358487U (en) Transportation rack of automobile instrument board beams
CN201998308U (en) Hydraulic internal mold of single-line box girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130724