CN103208035A - Energy-saving dispatching optimization method for sets - Google Patents

Energy-saving dispatching optimization method for sets Download PDF

Info

Publication number
CN103208035A
CN103208035A CN2013100955963A CN201310095596A CN103208035A CN 103208035 A CN103208035 A CN 103208035A CN 2013100955963 A CN2013100955963 A CN 2013100955963A CN 201310095596 A CN201310095596 A CN 201310095596A CN 103208035 A CN103208035 A CN 103208035A
Authority
CN
China
Prior art keywords
unit
coal consumption
consumption
energy
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100955963A
Other languages
Chinese (zh)
Inventor
张锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute Of Jilin Electric Power Co
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Original Assignee
Electric Power Research Institute Of Jilin Electric Power Co
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute Of Jilin Electric Power Co, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd filed Critical Electric Power Research Institute Of Jilin Electric Power Co
Priority to CN2013100955963A priority Critical patent/CN103208035A/en
Publication of CN103208035A publication Critical patent/CN103208035A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to an energy-saving dispatching optimization method for sets and belongs to power plant set dispatching methods. The energy-saving dispatching optimization method comprises selecting sets with lowest coal consumption for prior calling, obtaining coal consumption superior and inferior values through a consumption difference analysis method, and calculating the coal consumption of a certain set at a certain moment; and when sets with the lowest coal consumption is more than one, adopting the optimal set with superior CO2 emission in the sets. According to the energy-saving dispatching optimization method, through research and testing, energy saving and emission reduction, reduction of coal consumption and optimization dispatching are achieved, and direct and indirect economic benefits are achieved, so that economic benefits of power plant sets are fully improved.

Description

Unit energy-saving distribution optimization method
Technical field
The invention belongs to the Power Plant dispatching method.
Background technology
The comparison morning that western countries carry out for experiment and the research work of unit performance, the software system function that early stage design forms is fairly simple, and is mainly used in guaranteeing unit peace individual character aspect, comprises the supervision of operational factor, the record of historical data, operating index overload alarm etc.Nineteen seventies, western countries such as the U.S., Canada just begin to test the unit heat economy on-line analysis system, adopt thermal deviation analytic approach in-service monitoring and analytical calculation unit hear rate to change, thereby instruct unit to adjust the operation of some controllable parameters, cut down the consumption of energy, as steam turbine power generation unit AID status monitoring and the diagnostic system of U.S.'s Westinghouse Electrical Corp. development.
American-European countries is to the research of power plant optimization aspect and use the stage that has been in comparative maturity.Germany and the U.S. have the experience of more than ten years aspect the optimum management of large thermal power plant on-line operation.Operation optimum management system as German Siemens company can in real time, dynamically instruct the workman to operate, and equipment is moved under the optimization situation.The external advanced software systems that drop into commercial operation have functions such as the on-line analysis of unit economy energy, running status diagnosis, the judgement of equipment component performance decline situation mostly.
It is later that China introduces external large electric power plant unit, slower to the experimental study starting of unit performance aspect.And the work of beginning mainly concentrates on the device security aspect, and the research that relates to overall performance and performance driving economy is less, and simultaneously because the home-made machine assembly is equipped with the defective of early stage DCS system, system's design and installation difficulty is bigger.Up to the beginning of the nineties, along with improving constantly of power station operation level, the security of power station equipment has had enough safeguards, just rises gradually about the research of unit running optimization, and a part is also arisen at the historic moment in conjunction with the operation optimization system of China's fired power generating unit present situation exploitation simultaneously.
The Energy Loss Analysis method of being used widely in the power plant units economic analysis is the power consumption analysis method.Usually adopt net coal consumption rate, heat consumption rate or unit total power production cost as the overall target of estimating unit performance." thermal deviation method " and " power consumption analysis diagnostic method " are the eighties propositions and be applied to produce reality, and its basic thought is that performance driving economy index deviation is decomposed step by step, thereby obtains the energy loss that every deviation causes.
Load at present unit and optimize to divide a timing, usually obscure these two different concepts of unit coa consumption rate and coal consumption amount easily, and then draw some wrong conclusions in application when it is analyzed, this paper has carried out careful elaboration on this question.
Coa consumption rate is an important indicator estimating unit economy, and the unit coa consumption rate is more little, and economy is just more high.The unit coa consumption rate is tried to achieve by coal consumption amount generally speaking.Its relational expression is:
b i=F i/R i
Wherein: b i--be the coa consumption rate of unit;
F i-be the coal consumption amount of unit;
P i-be the load of unit correspondence.
As everyone knows, the research of energy saving for power plants tuning has 60 years of development history, the efficient method of main theory method, dynamic programming, etc. little gaining rate method etc.There is certain shortcoming in the distribution of domestic many genset energy-saving distribution system according to being the coal consumption curve that draws according to real time data, and is big and many as the desired data amount, and Data Source deficient in stability, accuracy are relatively poor.
Power consumption analysis claims the energy loss analysis again, is the analytical approach that the operating index deviation is decomposed step by step.Basic ideas be the total departure of unit net coal consumption rate be decomposed into each index deviation influence the item sum; Then at the influence factor of every deviation, further with each minute index the operation deviation be decomposed into various operation bias factors influence the item sum.Finally draw concrete reason, place and scale thereof that the operation energy loss produces.
The distribution of consumption difference
Total coal consumption deviation is in the coal consumption difference of fired power generating unit under actual operating mode and benchmark operating condition.Reasonable distribution to the total consumption of coal deviation is conducive to find out operational factor to coal consumption effect size, and determines respectively to move the occurrence positions of bias factor (operational factor and this operational factor reference value) influence item, is conducive to the expansion that operation is instructed.The operation bias factor influences the difference that item is defined as the coal consumption of unit when the coal consumption under the actual motion value moves under one parameter operation reference value with the supposition unit.Each operational factor is all done about moving the calculating of factor affecting item, and like this, total coal consumption deviation just can implement to the variation of each operational factor, just goes in each influence item.
The power consumption analysis computation model
In order to guarantee operation optimization guidance system real-time, need realization parameter and performance index to the online rapid calculation of unit net coal consumption rate influence degree, introduce the poor coefficient k of consumption El, will be to consuming poor Δ b sCalculating be converted into k ElCalculating: Δ b s=Δ xk ElB Bas, g/KWh.
Wherein: the difference of Δ x--parameter x actual value and reference value;
k El-consumption difference coefficient is defined as operational factor unit change amount to the contributive rate of unit net coal consumption rate;
b Bas-unit net coal consumption rate reference value.
The Δ b here sBe expressed as and suppose that when having only a parameter to change, this parameter changes the item that influences to coal consumption.According to following formula, consumption difference coefficient k ElCalculating can adopt boiler efficiency method, steam turbine hear rate method, equivalent enthalpy drop method and unit power supplying efficiency method etc.
1), boiler efficiency method
The boiler efficiency method is according to boiler efficiency η ElComputing formula, mainly concentrate on the calculating that boiler side and the relevant operational factor of burning consumption is differed from coefficient.
To boiler efficiency η ElAnti-EQUILIBRIUM CALCULATION FOR PROCESS formula carries out differentiate and calculates, and then obtains following relationship:
Δ ηel=-(Δq 2+Δq 3+Δq 4+Δq 5+Δq 6)
Ask for the consumption difference coefficient of the coal consumption influence of parameter carbon monoxide content changes delta CO below:
Under the situation of the influence of only considering carbon monoxide, to inflammable gas incomplete combustion loss Δ q 3The computing formula differentiate, can obtain:
Δq 3 = 126.36 · V gy Q r ΔCO
V wherein GyBe the dry flue gas volume, the variable quantity that can get carbon monoxide content to the consumption difference coefficient of coal consumption is: In like manner can calculate exhaust gas temperature θ PyThe consumption difference coefficient that the variable effect coal consumption changes
Figure BDA00002957947000032
Here K PyIt is 1 ° of C thermal loss of the every variation of boiler temperature modified value.Use the boiler efficiency method and can calculate exhaust gas temperature, oxygen amount, unburned carbon in flue dust, the isoparametric consumption difference of carbon monoxide content coefficient.
2), steam turbine hear rate method
Similar with the boiler efficiency method, utilize the basic representation of steam turbine heat consumption rate here:
q = 3600 T H ( T H - T L ) η oi η m η g
Wherein: T HThe average endothermic temperature of-thermodynamic cycle;
T LThe average exothermic temperature of-thermodynamic cycle;
η Oi, η m, η g--steam turbine internal efficiency, unit mechanical efficiency, efficiency of generator.
To the formula differentiate: Δq q = - T L ( T H - T L ) T H ΔT H + 1 T H - T L ΔT L - 1 η oi Δ η oi
Obtain T thus H, T L, η OiConsumption difference coefficient about coal consumption:
k T H = - T L ( T H - T L ) T H
k T L = 1 T H - T L
k η oi = - 1 η oi
To concrete operational factor, can carry out local linearization to the associated change curve of this operational factor variable quantity and above-mentioned three parameters, find out Δ x and Δ T H, Δ T LOr Δ η OiProportionate relationship, find the solution according to formula then.
The main unit parameter of using the calculating of power consumption analysis method mainly comprises: main steam pressure, main steam temperature, reheater crushing, reheat steam temperature, exhaust steam pressure etc.
3), equivalent enthalpy drop method
Equivalent enthalpy drop method is a kind of computing method of partial Quantitative Analysis.The characteristics of equivalent heat drop are: thermal technology's clear concept of local operation, and in full accord with one thermodynamic analysis; Secondly, calculates simple and directly, accurate, conform to suitable zooming with true therrmodynamic system.These characteristics of Equivalent Entropy Drop Method just its on-line monitoring and analysis to the unit economy energy have special significance.Based on the generation of thermal power plant's Quantitative Analysis of Thermal System universal model of Equivalent Entropy Drop Method, make the programing work that adopts Equivalent Entropy Drop Method to carry out on-line monitoring become convenient in recent years.
Utilize equivalent enthalpy drop method can derive the variation of steam turbine heat consumption rate, its expression formula is:
Δq q = Δb b = ΔQη i - ΔH o H o
In the formula: η i-steam turbine efficient;
Δ Q-parameter changes the variation of the caloric receptivity that causes;
H oThe equivalent enthalpy drop of-initial steam;
Δ H o--the variation of the equivalent enthalpy drop that parameter transformation causes.
Parameter changes caloric receptivity Q and steam equivalent enthalpy drop H oVariation also can derive by equivalent enthalpy drop method, calculate rendering parameter and Δ Q, Δ H oRelation curve and curve carried out linearization processing, obtain this operational factor and Δ Q, Δ H oFunction of first order corresponding relation, substitution following formula are asked for the consumption difference coefficient about this operational factor.
The consumption difference coefficient that adopts equivalent enthalpy drop method to calculate has:
Main, steam and steam turbine again: superheater spray water flux, reheater desuperheating water flow, continuous blowdown flow, high pressure cylinder efficient, intermediate pressure cylinder efficient, low pressure (LP) cylinder efficient, shaft gland steam leakage, secondary air amount;
Water supply system: poor, the at different levels crushing that draws gas of the upper and lower side of feed temperature, high-pressure heaters at different levels, the little steam turbine steam consumption of feed pump;
Condensate system: poor, the at different levels crushing that draws gas of the upper and lower side of condenser supercooling degree, supplementing water flow, low-pressure heaters at different levels;
Changes of operating modes: the high pressure turbine by of the excision of high-pressure heater, water supply system bypass, main steam.
4), unit power supplying efficiency method
The expression formula of unit power supplying efficiency is: η cp n = 1 b s = 3600 P e ( 1 - ξ ap ) Q cp
In the formula: R e-electric power; Q Cp-unit hear rate; ξ Ap-station service power consumption rate.
Station service power consumption rate ξ ApChanging the coal consumption that causes is changed to
Figure BDA00002957947000052
Then the consumption difference coefficient about station service power consumption rate is
Using the unit efficiency method can be used for determining: station service power consumption rate or its ingredient (as each blower fan power consumption, coal pulverizer power consumption, water circulating pump power consumption, condensate pump power consumption) are to the influence of net coal consumption rate.
Determining of initial baseline value
The initial baseline value has comprised each performance index and the operational factor of current optimized running situation.Determining based on design load and reference test value of initial value, (partial parameters value variable working condition weighted calculation obtains, and finally forms the initial value data storehouse).Every index and operational factor are done following classification according to definite method:
Design load: poor, the at different levels crushing that draws gas of the upper and lower end of main steam temperature, reheater crushing, shaft-packing leakage amount, secondary air amount, high-pressure heaters at different levels, condenser supercooling degree, supplementing water flow, the crushing that draws gas at different levels, EAT etc.
Trial value: net coal consumption rate, steam turbine hear rate, station service power consumption rate, main steam pressure, reheat steam temperature, superheater spray water flux, high pressure cylinder efficient, intermediate pressure cylinder efficient, low pressure (LP) cylinder efficient, feed temperature, the little steam turbine steam consumption of feed pump, condensate pump power consumption, exhaust gas temperature, oxygen amount, unburned carbon in flue dust, carbon monoxide content, each blower fan power consumption, coal pulverizer power consumption etc.
Major parameter calculates net coal consumption rate
If the variable quantity of a certain parameter is Δ M, the coal consumption of boiler benchmark is b before changing, and keeps other parameter constants, calculates every thermal loss and thermal efficiency b+ Δ b after changing, therefore wherein Δ b is caused by Δ M, and can obtain this parameter unit change amount influences amplitude, ao b/ Δ M to the unit coal consumption.Adopting uses the same method can obtain all parameters variations to the amplitude that influences of net coal consumption rate.
Based on CO 2Method is calculated the discharge capacity energy-saving distribution
Carbon dioxide comprises 1 carbon atom and 2 oxygen atoms, and molecular weight is 44 (C-l2, O-16).It is a kind of colorless and odorless gas that carbon dioxide is depressed at the normal temperature band, contains 1% carbon dioxide of having an appointment in the air.Liquid carbon and solid carbon are the chief components of biosome (component of animals and plants) and mineral fuel (rock gas, oil and coal).(molecular weight of C is that the molecular weight of 12, CO2 is 44,44/12=3.67) to produce about 3.67 tons of carbon dioxide after one ton of carbon burns in oxygen.
Having only generating electricity from manpower factory is the fossil energy of burning, just can produce carbon dioxide, and China be based on generating electricity from manpower country (according to statistics, whole nation generating total amount 2.83 trillion kWh in 2006, wherein people's electricity accounts for 83.2%, and water power accounts for 14.7%), simultaneously, the basic top of employed fuel, fuel-burning power plant is coal (big right gas and oil that fraction is arranged), and 49% of national consumption of coal total amount is used for generating.
Current, China's power generation dispatching is to send out [2007] No. 53 literary compositions " energy-saving power generation dispatching way " according to the Office of the State Council to carry out, and unit generation tagmeme table thermal power generation unit of the same type sorts energy conservation priority from low to high according to energy consumption level; When energy consumption level is identical, sort from low to high according to pollutant emission level.
CO2 emissions calculate
Carbon consumption is calculated in the coal-burning power plant, and establishing the electricity volume of being sent out every day the coal-burning power plant is P, and every big coal amount that consumes is B, converts the rate of standard coal consumption that can draw every degree electricity under the standard thermal value according to its net calorific value.Owing in the coal various elements are arranged, carbon content is just a part of, by industrial ultimate analysis, all is benchmark with the as received basis.Must reject the content that just draws carbon behind the various elements such as full moisture content contained in the coal, ash, fugitive constituent, element sulphur when calculating its carbon content.Because constituent contents such as hydrogen, nitrogen, oxygen are lower, easy to draw formula as follows after ignoring its influence in order to analyze herein
Carbon content=100-(moisture+ash content+volatile matter)-sulfur content.(1)
The carbon dioxide volume that produces
According to Theory of Combustion, the perfect combustion reaction equation of carbon is
C+O 2=CO 2
Namely will to produce volume be T to 1 mole of (12kg) carbon 0* R/p 0=22.4 (m 3) carbon dioxide (T 0And P 0Be gas absolute temperature and the pressure under the standard state; R is ideal gas constant).
Owing to substantially all change into carbon dioxide after the carbon burning, in addition, also have a spot of carbon imperfect combustion generation CO gas in stove to enter atmosphere with flue gas effusion boiler in the fuel.But consider that these carbon monoxide finally will be oxidized to carbon dioxide, therefore, this paper also is included into this a spot of carbon in the carbon amount of boiler combustion generation carbon dioxide.So the carbon dioxide volume that the carbon consumption of unit quantity of electricity is discharged is
V CO 2 = 22.4 12 Bm Car ( m 3 / h ) , - - - ( 2 )
In the formula: m CarBe the carbon content in the coal.
Consider heat loss due to incomplete combustion's correction
By Theory of Boiler Combustion as can be known, there is the heat loss due to incomplete combustion in the boiler coal burning.The carbon that enters boiler not exclusively exists because of oxidizing fire, fail fully to be converted to carbon dioxide, and still taken out of burner hearth and enter furnace hopper by flue gas with the form of carbon granule, there is inaccuracy so formula (2) directly consumes carbon amount calculating emission amount of carbon dioxide according to unit, should rejects this part in the actual metered.
Unburnt carbon total amount in the ashes (comprising slag and flying dust)
Theoretical dust burdening in the coal is
m A=B×/m Aar
In the formula: m ABe the theoretical total content of ash in the coal, t.
According to the grey balance principle as can be known: the total grey amount in the burner hearth fuel of entering should equal the ash amount sum in flying dust and the lime-ash.By the empirical data of actual measurement, the ratio that produces flying dust after the boiler combustion accounts for 90% of lime-ash total amount, and the slag content that produces accounts for 10% of lime-ash total amount, and unburned carbon in flue dust and ash content carbon refer to simple mass ratio.Flying dust carbon containing, lime-ash carbon containing should be pure carbons, and flying dust and grey quantity of slag sum should be the total content of ash in the coal, namely
m A=m Af+m Az
In the formula: m AfBe flying dust amount, t; m AzBe the grey quantity of slag, t.
Unburned carbon in flue dust is
M Fc = m cf BA f + m cf
Ash content carbon is
m Zc = m lz BA z + m lz
In the formula: m LzBe lime-ash carbon containing total amount, t; m CfBe the carbon containing total amount in the flying dust, t.
Total carbon content is in the ash
m C 1 ≈ m lf + m lz
Namely m C 1 = BA f m Fc 1 - m Fc + BA z m Zc 1 - m Zc - - - ( 3 )
The calculating of unburned carbon in flue dust and ash content carbon
Because boiler design and combustion conditions are different, the unburned carbon in flue dust of every boiler and ash content carbon are all different because ash content carbon can not onlinely detect, manual analysis not only lag behind and also the cycle longer.And by the on-line monitoring unburned carbon in flue dust, it is little to fluctuate substantially when operating condition is stablized.According to list of references [7]: to a certain concrete boiler, as the Q of boiler 2, Q 3, Q 5, Q 64 thermal loss with Σ Q iWhen equaling some special values, boiler is the amount of carbon dioxide and the mechanical imperfect combustion thermal loss Q that discharge of the unit's of confessing net heat whenever 4Irrelevant, only be decided by the ratio of the fuel used carbon content of this boiler and net calorific value.So unburned carbon in flue dust, ash content carbon can be chosen the mean value of historical record.
When not considering to leak coal and other heat loss due to combustibles in refuses, can draw its mean value according to above-mentioned 3 formulas.
Revise the calculating of back carbon emission total amount
Can get actual carbon amount of burning in the furnace coal weight according to formula (1) and formula (3)
Figure BDA00002957947000084
For
m C 2 = Bm Car - m C 1 = B ( m Car - m Af m Fc 1 - m Fc - m Az m Zc 1 - m Zc )
The carbon dioxide volume that produces is
C C O 2 ′ = 22.4 12 m C 2 = 22.4 B 12 ( m Car - m Af m Fc 1 - m Fc - m Az m Zc 1 - m Zc )
The discharge capacity of unit quantity of electricity carbon dioxide is
V ‾ CO 2 = V CO 2 ′ P rd 1
In the formula,
Figure BDA00002957947000093
Carbon emission amount for unit quantity of electricity.Expectation carbon emission total amount during dispatching of power netwoks unit is
V CO 2 ′ ′ = V ‾ CO 2 × P e . - - - ( 4 )
The machine unit scheduling mode exists a lot of weak points simultaneously in the frequency quality that improves electrical network at present, it is careful inadequately namely the economic performance difference between each unit to be considered, when needing increasing and decreasing load because of frequency modulation its instruction increment adjustable allowance between the distribution between each unit is often according to each Power Plant allocate voluntarily, principle distribution load such as the deviation of year generating completion rate, actual load and plan load, contract electricity price, scheduling is then because the economic performance data of each unit of shortage and can not effectively accomplish economy, energy-conservation scheduling.
Reducing coa consumption rate is the needs of fuel-burning power plant existence, produces, enhances productivity, optimizes allocation of resources in order to keep considerable competitive power to press for optimization, and its meaning is very great.
Summary of the invention
The invention provides a kind of unit energy-saving distribution optimization method, poor to solve the energy-saving effect that exists in the present unit energy-saving distribution, reach the problem that pollutant emission is not optimized.
The technical scheme that the present invention takes is: comprise the following steps:
One, select the minimum unit of coal consumption preferentially to call, obtain the good and bad value of coal consumption by the power consumption analysis method, influence the coal consumption parameters calculated and take following 12 parameters: main steam temperature, main steam pressure, reheat steam temperature, reheated steam pressure, unburned carbon in flue dust, hot desuperheating water mass rate, overheated desuperheating water mass rate, generator power, station service power consumption rate, exhaust gas temperature, oxygen content in exhaust smoke, feed temperature again, according to the influence degree of these 12 parameters of calculating to coal consumption, thereby calculate the coal consumption amount that certain unit is carved at a time;
Two, when the minimum unit of coal consumption amount surpasses one, then take CO in the unit 2The optimum unit of discharge capacity.
By using the present invention, can carry out unit energy saving optimizing scheduling mode at any time, carry out distribution load according to qualifications, how the optimal allocation load is made certain technological guidance for the dispatcher.Make operations staff and dispatcher break away from a large amount of, loaded down with trivial details data statistics and analytical work, and can analyze the rationality that network load distributes fully and effectively, indirect economic benefit is very considerable.
Patent of the present invention is tested after deliberation, has realized energy-saving and emission-reduction, reduces coal consumption, optimizes the purpose of scheduling, has obtained directly and indirect economic benefit; Make the economic benefit of Power Plant be able to sufficient raising; and make the management and running personnel full of confidence to how to optimize distribution load; make the dispatcher collect the most real unit coal consumption parameter in real time; simultaneously for implementing national energy-saving and emission-reduction strategy; improve unit efficiency; reduce CO2 emission, promote environmental protection.Enforcement of the present invention makes scheduling in optimization monitoring market proven technique support more arranged, and has increased stability and the reliability of machine unit scheduling distribution load simultaneously, and method is provided for unit is energy-saving and cost-reducing.
Embodiment
One, select the minimum unit of coal consumption preferentially to call, obtain the good and bad value of coal consumption by the power consumption analysis method, influence the coal consumption parameters calculated and take following 12 parameters: main steam temperature, main steam pressure, reheat steam temperature, reheated steam pressure, unburned carbon in flue dust, hot desuperheating water mass rate, overheated desuperheating water mass rate, generator power, station service power consumption rate, exhaust gas temperature, oxygen content in exhaust smoke, feed temperature again, according to the influence degree of these 12 parameters of calculating to coal consumption, thereby calculate the coal consumption amount that certain unit is carved at a time;
Two, when the minimum unit of coal consumption amount surpasses one, then take CO in the unit 2The optimum unit of discharge capacity.
Applicable cases:
The Datang Changchun second thermoelectric Ltd 4, No. 5 boilers are the Harbin Boiler Plant HG-670/13.7-YM9 type UHV (ultra-high voltage) of producing, resuperheat Natural Circulation, dry ash extraction pulverized coal firing boiler.4, every stove of No. 5 boilers is furnished with warehouse formula ball mill pulverizing systems in the middle of 2 covers, and combustion system adopts four jiaos, two circle of contact, single flow combustion system.
2012, for studying the power generation dispatching mode in existing Jilin Province, carry out the energy-saving power generation dispatching research work, our factory cooperates Jilin Electric Power Supply Company China Electric Power Research Institute actively to carry out energy-saving and emission-reduction scheduling research, with regard to 2012,4, No. 5 units are dispatched generating according to the coal consumption level, the low unit of coal consumption is multiple, the high unit of coal consumption is sent out less or is not sent out, monitoring CO when adopting the low unit of coal consumption 2Discharge capacity through the operation practice, has obtained good economic benefits and social benefit.
As calculated with statistics, No. 4 average net coal consumption rates of stove are 292.499/kWh (average load 12.5lMW), No. 5 average net coal consumption rates of stove are 302.339/kWh (average load 12.56MW), No. 4 relative No. 5 stoves of stove coal consumption level omit, therefore, according to machine unit scheduling technical research method, No. 4 low units of coal consumption should be multiple with respect to No. 5 units that are all 2OOMW, therefore, use this project, under little situation, No. 4 unit whole year operation hourage reaches 5391.55h in load difference, No. 5 unit whole year operation hourage reaches 4194.13h, be compared to unit No. 5, No. 4 unit has moved 1197.42h more, has obtained good economical operation effect.Unit Study on energy saving project provides reference and foundation for energy-saving power generation dispatching, the different coal consumption difference between the identical unit of analysis capacity and the justice of carrying out, just energy-saving distribution generating to seek to reduce coal consumption, energy-saving power generation dispatching research has great importance.The research of this project has improved economic benefit and the social benefit of genset greatly.Simultaneously, the present invention can direct scheduling concretely and the operations staff carries out selection generating with good conditionsi between the same capability unit, and effectively energy savings makes the set optimization scheduling become possibility.

Claims (1)

1. a unit energy-saving distribution optimization method comprises the following steps:
(1), select the minimum unit of coal consumption preferentially to call, obtain the good and bad value of coal consumption by the power consumption analysis method, influence the coal consumption parameters calculated and take following 12 parameters: main steam temperature, main steam pressure, reheat steam temperature, reheated steam pressure, unburned carbon in flue dust, hot desuperheating water mass rate, overheated desuperheating water mass rate, generator power, station service power consumption rate, exhaust gas temperature, oxygen content in exhaust smoke, feed temperature again, according to the influence degree of these 12 parameters of calculating to coal consumption, thereby calculate the coal consumption amount that certain unit is carved at a time;
(2), when the minimum unit of coal consumption amount surpasses one, then take CO in the unit 2The optimum unit of discharge capacity.
CN2013100955963A 2013-03-25 2013-03-25 Energy-saving dispatching optimization method for sets Pending CN103208035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100955963A CN103208035A (en) 2013-03-25 2013-03-25 Energy-saving dispatching optimization method for sets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100955963A CN103208035A (en) 2013-03-25 2013-03-25 Energy-saving dispatching optimization method for sets

Publications (1)

Publication Number Publication Date
CN103208035A true CN103208035A (en) 2013-07-17

Family

ID=48755252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100955963A Pending CN103208035A (en) 2013-03-25 2013-03-25 Energy-saving dispatching optimization method for sets

Country Status (1)

Country Link
CN (1) CN103208035A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103678915A (en) * 2013-12-12 2014-03-26 广东电网公司电力科学研究院 Thermal power plant generator set varying duty energy consumption analysis method based on approach method
CN104504532A (en) * 2014-12-31 2015-04-08 广东电网有限责任公司电力调度控制中心 Ordering method for energy saving generation dispatching
CN104869137A (en) * 2014-02-25 2015-08-26 联想(北京)有限公司 Data transmission method and electronic equipment
CN105160479A (en) * 2015-09-08 2015-12-16 东南大学 Method for measuring boiler dry flue gas volume based on coal caloric values and exhaust fume oxygen amount
CN106094740A (en) * 2016-05-09 2016-11-09 国网江西省电力科学研究院 A kind of fired power generating unit duty control method based on superheater accumulation of heat feedforward
CN108446828A (en) * 2018-02-12 2018-08-24 国网河南省电力公司 A kind of enterprise power generation completion rate harmony evaluation method and system
CN110161996A (en) * 2019-06-12 2019-08-23 中国大唐集团科学技术研究院有限公司华东电力试验研究院 Method and system for the analysis of power plant units consumption
CN113052717A (en) * 2020-07-31 2021-06-29 国电内蒙古东胜热电有限公司 Energy efficiency management method and system in thermal power generation system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102779322A (en) * 2012-06-29 2012-11-14 西安理工大学 Thermal power plant comprehensive scheduling method based on environment protection and economical benefit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102779322A (en) * 2012-06-29 2012-11-14 西安理工大学 Thermal power plant comprehensive scheduling method based on environment protection and economical benefit

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘凯锐,杨俊保: "基于耗差机理的300MW机组运行参数与煤耗分析", 《节能》 *
刘进雄: "燃煤机组碳排放计算及发电节能调度策略", 《华电技术》 *
朱斌帅: "燃煤发电机组耗差分析系统的开发与应用", 《华电技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103678915A (en) * 2013-12-12 2014-03-26 广东电网公司电力科学研究院 Thermal power plant generator set varying duty energy consumption analysis method based on approach method
CN104869137A (en) * 2014-02-25 2015-08-26 联想(北京)有限公司 Data transmission method and electronic equipment
CN104869137B (en) * 2014-02-25 2018-12-14 联想(北京)有限公司 A kind of method and electronic equipment for transmitting data
CN104504532A (en) * 2014-12-31 2015-04-08 广东电网有限责任公司电力调度控制中心 Ordering method for energy saving generation dispatching
CN104504532B (en) * 2014-12-31 2017-11-21 广东电网有限责任公司电力调度控制中心 The sort method of energy-saving power generation dispatching
CN105160479A (en) * 2015-09-08 2015-12-16 东南大学 Method for measuring boiler dry flue gas volume based on coal caloric values and exhaust fume oxygen amount
CN106094740A (en) * 2016-05-09 2016-11-09 国网江西省电力科学研究院 A kind of fired power generating unit duty control method based on superheater accumulation of heat feedforward
CN106094740B (en) * 2016-05-09 2019-05-21 国网江西省电力科学研究院 A kind of fired power generating unit duty control method based on superheater accumulation of heat feedforward
CN108446828A (en) * 2018-02-12 2018-08-24 国网河南省电力公司 A kind of enterprise power generation completion rate harmony evaluation method and system
CN108446828B (en) * 2018-02-12 2022-12-02 国网河南省电力公司 Enterprise power generation completion rate balance evaluation method and system
CN110161996A (en) * 2019-06-12 2019-08-23 中国大唐集团科学技术研究院有限公司华东电力试验研究院 Method and system for the analysis of power plant units consumption
CN113052717A (en) * 2020-07-31 2021-06-29 国电内蒙古东胜热电有限公司 Energy efficiency management method and system in thermal power generation system

Similar Documents

Publication Publication Date Title
CN103208035A (en) Energy-saving dispatching optimization method for sets
CN110111030B (en) Coal blending combustion evaluation method and system
Dong et al. Coal power flexibility, energy efficiency and pollutant emissions implications in China: A plant-level analysis based on case units
Knittel et al. Natural gas prices and coal displacement: Evidence from electricity markets
Campbell Increasing the efficiency of existing coal-fired power plants
Varbanov et al. Synthesis of industrial utility systems: cost-effective de-carbonisation
CN104390234B (en) Ultra supercritical unit control method for coordinating with double inlet and outlet coal mill
CN103679549B (en) Energy-saving for Thermal Power Units Potentials method
CN102734782B (en) Coal burning boiler energy efficiency monitoring method
CN106991515A (en) A kind of E grades of gas combustion-gas vapor combined cycle unit power consumption analysis method
CN104598761A (en) Method for analyzing impact of changes of multifuel fired boiler operating parameters on unit power generation coal consumption
Murehwa et al. Energy efficiency improvement in thermal power plants
CN103279658A (en) Thermal generator set working condition optimizing method
CN105318348A (en) Thermal power generating unit coal feeding amount feedback correction method based on coal-air ratio coal thermal value correction
CN104268433A (en) Method for monitoring unit power generation coal consumption deviation caused by variation of gas boiler operating parameters
CN103728071A (en) Maximum power output measuring method for thermal power generating unit
Maliarenko et al. An improved approach to evaluation of the efficiency of energy saving measures based on the indicator of products total energy intensity
Bidar et al. Energy and exergo-economic assessments of gas turbine based CHP systems: A case study of SPGC utility plant
CN110889638A (en) Thermal power plant operation evaluation method and related equipment
Erhart et al. Performance analysis of a biomass ORC poly-generation system
CN204665343U (en) The oxygen content control system of coal-burning boiler
CN110594780B (en) Online real-time combustion optimization technical method for coal-fired power plant boiler
Mati et al. Assessment of paper industry decarbonization potential via hydrogen in a multi-energy system scenario: A case study
Tańczuk et al. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis
CN107578167A (en) The electric boiler operational monitoring substituted using electric energy and performance evaluation system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130717