CN108446828A - A kind of enterprise power generation completion rate harmony evaluation method and system - Google Patents

A kind of enterprise power generation completion rate harmony evaluation method and system Download PDF

Info

Publication number
CN108446828A
CN108446828A CN201810146867.6A CN201810146867A CN108446828A CN 108446828 A CN108446828 A CN 108446828A CN 201810146867 A CN201810146867 A CN 201810146867A CN 108446828 A CN108446828 A CN 108446828A
Authority
CN
China
Prior art keywords
power generation
enterprise
completion rate
tagmeme
progression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810146867.6A
Other languages
Chinese (zh)
Other versions
CN108446828B (en
Inventor
薛盖超
王丹
镐俊杰
畅广辉
匡洪辉
周冰
荣金萍
房柯勇
李翔硕
李斌
刘建军
田光新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qing Qadrivium More Ltd By Share Ltd
State Grid Henan Electric Power Co Ltd
Original Assignee
Beijing Qing Qadrivium More Ltd By Share Ltd
State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qing Qadrivium More Ltd By Share Ltd, State Grid Henan Electric Power Co Ltd filed Critical Beijing Qing Qadrivium More Ltd By Share Ltd
Priority to CN201810146867.6A priority Critical patent/CN108446828B/en
Publication of CN108446828A publication Critical patent/CN108446828A/en
Application granted granted Critical
Publication of CN108446828B publication Critical patent/CN108446828B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of enterprise power generation completion rate harmony evaluation method and system, the method includes:Determine that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise based on the power generation tagmeme of each enterprise, the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the power generation completion rate Lorentz curve of enterprise, the power generation completion rate Gini coefficient and regression criterion that enterprise is determined according to the power generation completion rate Lorentz curve of the enterprise evaluate the power generation completion rate harmony of enterprise using the power generation completion rate Gini coefficient and regression criterion of the enterprise;Technical solution provided by the invention can objective and accurately evaluation enterprise power generation completion rate it is harmonious, wherein regression criterion is introduced on the basis of traditional Gini coefficient Equity Assessment, more fully evaluation violates the degree of power generation tagmeme dispatching principle.

Description

A kind of enterprise power generation completion rate harmony evaluation method and system
Technical field
The present invention relates to enterprise's generation evaluation fields, and in particular to a kind of enterprise power generation completion rate harmony evaluation method and System.
Background technology
With the deep propulsion of power system reform, the gradual perfection separated the factory and network with electricity market, safety is realized about Power plants generating electricity maximizing the benefits under beam, improving the economic operation level of power plant becomes the central task of power plant.And the warp of power plant The operation level that helps includes not only formulating rational scheduling scheme, it is also necessary to include the branch of the management means such as scheduling Benefit Examination evaluation It holds.Electricity power enterprise's electricity completion rate evaluation is to dispatch the pith of Benefit Examination, is the important indicator of scheduling fairness evaluation, Whether equilibrium determines whether power benefit reaches maximization to electricity power enterprise's electricity completion rate, has reacted scheduling water to a certain extent Flat height, the more balanced basic demand for showing more to meet " three public scheduling " of electricity completion rate.
Existing frequently-used electricity power enterprise's electricity completion rate evaluation method include minimax distance, standard deviation, Gini coefficient, Variance coefficient and Dell's index.
The accuracy of max-min distance means depends on the selection of parameter and starting point, it may be necessary to test of many times, it is subjective Property is larger;Standard deviation calculates complexity, and majority of case is completed by randomly drawing sample, and there are certain errors;Add The different coefficient ratio standard deviation calculating of adaptability in tactics is more complicated, and there are stronger subjectivities for the determination of weighting coefficient;Dell's index is inadequate Intuitively, conventional Gini coefficient is not accurate enough to the description of result.
Invention content
The present invention provides a kind of enterprise and generates electricity completion rate harmony evaluation method, the purpose is to it is objective, accurately and comprehensively comment The power generation completion rate of valence enterprise is harmonious.
The purpose of the present invention is what is realized using following technical proposals:
A kind of enterprise's power generation completion rate harmony evaluation method, it is improved in that the method includes:
Determine that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise based on the power generation tagmeme of each enterprise;
The power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the power generation completion rate Lip river of enterprise Human relations hereby curve;
Power generation completion rate Gini coefficient and the fitting of enterprise are determined according to the power generation completion rate Lorentz curve of the enterprise Residual error;
Using the enterprise power generation completion rate Gini coefficient and regression criterion to the power generation completion rate harmony of enterprise into Row evaluation.
Preferably, the power generation tagmeme based on each enterprise determines that each power generation tagmeme corresponds to the power generation completion rate progression of enterprise Data, including:
Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the tired of enterprise The progression power generation completion rate of enterprise is corresponded into installation ratio and each power generation tagmeme;
Determine that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
Determine that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
Wherein, Pj genIt is the installed capacity that power generation tagmeme j corresponds to enterprise, Wj equIt is the equivalent hair that power generation tagmeme j corresponds to enterprise Electricity, Wj equ=Wj rea+Wj plu, Wj reaIt is the actual power generation that power generation tagmeme j corresponds to enterprise, Wj pluIt is that power generation tagmeme j corresponds to enterprise Electricity, N are reduced in the approval of industryIIt is the whole network electricity power enterprise sum.
Preferably, the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the hair of enterprise Electric completion rate Lorentz curve, including:
Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, utilizes fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise is obtained, and using the cubic function as the hair of enterprise Electric completion rate Lorentz curve.
Preferably, the power generation completion rate Lorentz curve according to the enterprise determines the power generation completion rate Geordie of enterprise Coefficient and regression criterion, including:
The power generation completion rate Gini coefficient η of enterprise is determined as the following formula:
Regression criterion Δ δ is determined as the following formula:
Wherein, [0,1] η ∈, S1It is that power generation completion rate Lorentz curve section above straight line y=x is enclosed with straight line y=x At the area in region, S2It is the face of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x Product,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is the sequence that generates electricity on power generation completion rate Lorentz curve Position i corresponds to the corresponding functional value of enterprise, NIIt is the whole network electricity power enterprise sum.
Preferably, the power generation completion rate Gini coefficient of enterprise and the power generation completion rate of enterprise are harmonious negatively correlated;Enterprise Regression criterion and the degree positive correlation for violating power generation tagmeme dispatching principle.
A kind of enterprise's power generation completion rate harmony evaluation system, it is improved in that the system comprises:
First determination unit, for determining that the power generation that each power generation tagmeme corresponds to enterprise is completed based on the power generation tagmeme of each enterprise Rate progression data;
Fitting unit, the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted enterprise Generate electricity completion rate Lorentz curve;
Second determination unit, for determining that the power generation of enterprise is completed according to the power generation completion rate Lorentz curve of the enterprise Rate Gini coefficient and regression criterion;
Evaluation unit, the power generation completion rate Gini coefficient and regression criterion for utilizing the enterprise are complete to the power generation of enterprise It is evaluated at rate harmony.
Preferably, first determination unit, including:
Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the tired of enterprise The progression power generation completion rate of enterprise is corresponded into installation ratio and each power generation tagmeme;
First determining module, for determining that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
Second determining module, for determining that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
Wherein, Pj genIt is the installed capacity that power generation tagmeme j corresponds to enterprise, Wj equIt is the equivalent hair that power generation tagmeme j corresponds to enterprise Electricity, Wj equ=Wj rea+Wj plu, Wj reaIt is the actual power generation that power generation tagmeme j corresponds to enterprise, Wj pluIt is that power generation tagmeme j corresponds to enterprise Electricity, N are reduced in the approval of industryIIt is the whole network electricity power enterprise sum.
Preferably, the fitting unit, is used for:
Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, utilizes fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise is obtained, and using the cubic function as the hair of enterprise Electric completion rate Lorentz curve.
Preferably, second determination unit, including:
Third determining module, the power generation completion rate Gini coefficient η for determining enterprise as the following formula:
4th determining module, for determining regression criterion Δ δ as the following formula:
Wherein, [0,1] η ∈, S1It is that power generation completion rate Lorentz curve section above straight line y=x is enclosed with straight line y=x At the area in region, S2It is the face of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x Product,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is the sequence that generates electricity on power generation completion rate Lorentz curve Position i corresponds to the corresponding functional value of enterprise, NIIt is the whole network electricity power enterprise sum.
Preferably, the power generation completion rate Gini coefficient of enterprise and the power generation completion rate of enterprise are harmonious negatively correlated;Enterprise Regression criterion and the degree positive correlation for violating power generation tagmeme dispatching principle.
Compared with the immediate prior art, technical solution provided by the invention has the advantages that:
A kind of enterprise power generation completion rate harmony evaluation method provided by the invention includes:It is primarily based on the power generation of each enterprise Tagmeme determines that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise, is then fitted the power generation completion rate Lorentz of enterprise Curve, and then determine the power generation completion rate Gini coefficient and regression criterion of enterprise, finally utilize the power generation completion rate of the enterprise Gini coefficient and regression criterion evaluate the power generation completion rate harmony of enterprise;Technical solution provided by the invention can visitor It sees and the power generation completion rate for accurately evaluating enterprise is harmonious, wherein introduced on the basis of traditional Gini coefficient Equity Assessment Regression criterion, more fully evaluation violate the degree of power generation tagmeme dispatching principle.
Description of the drawings
Fig. 1 is a kind of flow chart of enterprise's power generation completion rate harmony evaluation method of the present invention;
Fig. 2 is a kind of structural schematic diagram of enterprise's power generation completion rate harmony evaluation system of the present invention.
Specific implementation mode
It elaborates below in conjunction with the accompanying drawings to the specific implementation mode of the present invention.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art The all other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Existing frequently-used electricity power enterprise's electricity completion rate evaluation method include minimax distance, standard deviation, Gini coefficient, Variance coefficient and Dell's index.The accuracy of max-min distance means depends on the selection of parameter and starting point, Ke Nengxu Want test of many times, subjectivity larger;Standard deviation calculates complexity, and majority of case is completed by randomly drawing sample, There are certain errors;Variance coefficient is more complicated than standard deviation calculating, and there are stronger subjectivities for the determination of weighting coefficient Property;Dell's index is not intuitive enough, and conventional Gini coefficient is not accurate enough to the description of result.
Electricity power enterprise's electricity completion rate is the important indicator of scheduling fairness evaluation, and electricity completion rate is more balanced to be shown more to accord with Close the basic demand of " three public scheduling ".Gini coefficient based on Lorentz curve is in economics for evaluating social welfare Distribute the important indicator of equilibrium degree.In Lorentz curve, bending degree is bigger, and distribution is more unequal;Bending degree is smaller, point With average, i.e., Gini coefficient is smaller, and assigned degree is average.
Assessment when it has to be noticed that electric system have the characteristics that self-operating requirement and.On the basis of " three public scheduling ", It is also noted that electricity power enterprise's generated energy must satisfy the ordering requirements of power generation tagmeme, that is, the forward power plant that sorts should be multiple Electricity, power generation completion rate should higher.
Therefore the comprehensive Lorentz curve of the present invention and power generation two aspect basic demand of tagmeme, in classic economics theory Gini coefficient based on Lorentz curve is improved, it is made to be more suitable for power generation completion rate evaluation.
A kind of enterprise's power generation completion rate harmony evaluation method provided by the invention, as shown in Figure 1, including:
Determine that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise based on the power generation tagmeme of each enterprise;
The power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the power generation completion rate Lip river of enterprise Human relations hereby curve;
Power generation completion rate Gini coefficient and the fitting of enterprise are determined according to the power generation completion rate Lorentz curve of the enterprise Residual error;
Using the enterprise power generation completion rate Gini coefficient and regression criterion to the power generation completion rate harmony of enterprise into Row evaluation.
The power generation tagmeme based on each enterprise determines that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise, packet It includes:
Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the tired of enterprise The progression power generation completion rate of enterprise is corresponded into installation ratio and each power generation tagmeme;
Determine that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
Determine that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
Wherein, Pj genIt is the installed capacity that power generation tagmeme j corresponds to enterprise, Wj equIt is the equivalent hair that power generation tagmeme j corresponds to enterprise Electricity, Wj equ=Wj rea+Wj plu, Wj reaIt is the actual power generation that power generation tagmeme j corresponds to enterprise, Wj pluIt is that power generation tagmeme j corresponds to enterprise Electricity, N are reduced in the approval of industryIIt is the whole network electricity power enterprise sum;
Specifically, sorting last N for power generation tagmemeICorresponding electricity power enterprise, progression installation ratio and progression The completion rate that generates electricity is 1.
The power generation that the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted enterprise is completed Rate Lorentz curve, including:
Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, utilizes fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise is obtained, and using the cubic function as the hair of enterprise Electric completion rate Lorentz curve;
Specifically, the Lorentz curve in classic economics theory, curve is below straight line y=x, due in the present invention Power generation completion rate Lorentz curve abscissa be according to power generation tagmeme sequence, it is thus possible to there is partial trace in straight line y=x The case where top.
The power generation completion rate Lorentz curve according to the enterprise determine enterprise power generation completion rate Gini coefficient and Regression criterion, including:
The power generation completion rate Gini coefficient η of enterprise is determined as the following formula:
Regression criterion Δ δ is determined as the following formula:
Wherein, [0,1] η ∈, S1It is that power generation completion rate Lorentz curve section above straight line y=x is enclosed with straight line y=x At the area in region, S2It is the face of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x Product,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is the sequence that generates electricity on power generation completion rate Lorentz curve Position i corresponds to the corresponding functional value of enterprise, NIIt is the whole network electricity power enterprise sum;
Specifically, determining the abscissa value of power generation the completion rate Lorentz curve and straight line y=x intersection points as the following formula:
F (x)-x=0
The power generation completion rate Lorentz curve section above straight line y=x and the surrounded regions straight line y=x are determined as the following formula Area S1
The power generation completion rate Lorentz curve section below straight line y=x and the surrounded regions straight line y=x are determined as the following formula Area S2
Wherein, f (x) is the expression formula of power generation completion rate Lorentz curve, and m, n indicate the power generation above straight line y=x respectively Initial value and end value of the completion rate Lorentz curve section in x-axis, p, q indicate the power generation completion rate below straight line y=x respectively Initial value and end value of the Lorentz curve section in x-axis.
The power generation completion rate Gini coefficient of enterprise and the power generation completion rate of enterprise are harmonious negatively correlated;The regression criterion of enterprise With the degree positive correlation for violating power generation tagmeme dispatching principle.
The present invention also provides a kind of enterprise power generation completion rate harmony evaluation systems, as shown in Fig. 2, the system comprises:
First determination unit, for determining that the power generation that each power generation tagmeme corresponds to enterprise is completed based on the power generation tagmeme of each enterprise Rate progression data;
Fitting unit, the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted enterprise Generate electricity completion rate Lorentz curve;
Second determination unit, for determining that the power generation of enterprise is completed according to the power generation completion rate Lorentz curve of the enterprise Rate Gini coefficient and regression criterion;
Evaluation unit, the power generation completion rate Gini coefficient and regression criterion for utilizing the enterprise are complete to the power generation of enterprise It is evaluated at rate harmony.
First determination unit, including:
Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the tired of enterprise The progression power generation completion rate of enterprise is corresponded into installation ratio and each power generation tagmeme;
First determining module, for determining that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
Second determining module, for determining that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
Wherein, Pj genIt is the installed capacity that power generation tagmeme j corresponds to enterprise, Wj equIt is the equivalent hair that power generation tagmeme j corresponds to enterprise Electricity, Wj equ=Wj rea+Wj plu, Wj reaIt is the actual power generation that power generation tagmeme j corresponds to enterprise, Wj pluIt is that power generation tagmeme j corresponds to enterprise Electricity, N are reduced in the approval of industryIIt is the whole network electricity power enterprise sum.
The fitting unit, is used for:
Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, utilizes fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise is obtained, and using the cubic function as the hair of enterprise Electric completion rate Lorentz curve.
Second determination unit, including:
Third determining module, the power generation completion rate Gini coefficient η for determining enterprise as the following formula:
4th determining module, for determining regression criterion Δ δ as the following formula:
Wherein, [0,1] η ∈, S1It is that power generation completion rate Lorentz curve section above straight line y=x is enclosed with straight line y=x At the area in region, S2It is the face of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x Product,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is the sequence that generates electricity on power generation completion rate Lorentz curve Position i corresponds to the corresponding functional value of enterprise, NIIt is the whole network electricity power enterprise sum.
The power generation completion rate Gini coefficient of enterprise and the power generation completion rate of enterprise are harmonious negatively correlated;The regression criterion of enterprise With the degree positive correlation for violating power generation tagmeme dispatching principle.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, the application can be used in one or more wherein include computer usable program code computer The computer program product implemented in usable storage medium (including but not limited to magnetic disk storage, CDROM, optical memory etc.) Form.
The application is with reference to method, the flow of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail with reference to above-described embodiment for pipe, those of ordinary skills in the art should understand that:Still The specific implementation mode of the present invention can be modified or replaced equivalently, and without departing from any of spirit and scope of the invention Modification or equivalent replacement should all cover within the claims of the present invention.

Claims (10)

  1. The completion rate harmony evaluation method 1. a kind of enterprise generates electricity, which is characterized in that the method includes:
    Determine that each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise based on the power generation tagmeme of each enterprise;
    The power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the power generation completion rate Lorentz of enterprise Curve;
    The power generation completion rate Gini coefficient and regression criterion of enterprise are determined according to the power generation completion rate Lorentz curve of the enterprise;
    The power generation completion rate harmony of enterprise is commented using the power generation completion rate Gini coefficient and regression criterion of the enterprise Valence.
  2. 2. the method as described in claim 1, which is characterized in that the power generation tagmeme based on each enterprise determines each power generation tagmeme The power generation completion rate progression data of corresponding enterprise, including:
    Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the progression dress of enterprise Machine ratio and each power generation tagmeme correspond to the progression power generation completion rate of enterprise;
    Determine that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
    Determine that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
    Wherein,It is the installed capacity that power generation tagmeme j corresponds to enterprise,It is the equivalent power generation that power generation tagmeme j corresponds to enterprise Amount, It is the actual power generation that power generation tagmeme j corresponds to enterprise,It is j pairs of tagmeme of power generation The approval of enterprise is answered to reduce electricity, NIIt is the whole network electricity power enterprise sum.
  3. 3. the method as described in claim 1, which is characterized in that the power generation for corresponding to enterprise according to each power generation tagmeme is complete The power generation completion rate Lorentz curve of enterprise is fitted at rate progression data, including:
    Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, is obtained using fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise, and the cubic function is complete as the power generation of enterprise At rate Lorentz curve.
  4. 4. the method as described in claim 1, which is characterized in that the power generation completion rate Lorentz curve according to the enterprise Determine the power generation completion rate Gini coefficient and regression criterion of enterprise, including:
    The power generation completion rate Gini coefficient η of enterprise is determined as the following formula:
    Regression criterion Δ δ is determined as the following formula:
    Wherein, [0,1] η ∈, S1It is the power generation completion rate Lorentz curve section above straight line y=x and the surrounded regions straight line y=x Area, S2It is the area of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is power generation tagmeme i on power generation completion rate Lorentz curve The corresponding functional value of corresponding enterprise, NIIt is the whole network electricity power enterprise sum.
  5. 5. the method as described in claim 1, which is characterized in that the power generation completion rate Gini coefficient of enterprise and the power generation of enterprise are complete It is harmonious negatively correlated at rate;The regression criterion of enterprise and the degree positive correlation for violating power generation tagmeme dispatching principle.
  6. The completion rate harmony evaluation system 6. a kind of enterprise generates electricity, which is characterized in that the system comprises:
    First determination unit, for determining that the power generation completion rate that each power generation tagmeme corresponds to enterprise is tired based on the power generation tagmeme of each enterprise Into data;
    Fitting unit, the power generation completion rate progression data for corresponding to enterprise according to each power generation tagmeme are fitted the power generation of enterprise Completion rate Lorentz curve;
    Second determination unit, the power generation completion rate base for determining enterprise according to the power generation completion rate Lorentz curve of the enterprise Buddhist nun's coefficient and regression criterion;
    Evaluation unit, for using the enterprise power generation completion rate Gini coefficient and regression criterion to the power generation completion rate of enterprise Harmony is evaluated.
  7. 7. system as claimed in claim 6, which is characterized in that first determination unit, including:
    Each power generation tagmeme corresponds to the power generation completion rate progression data of enterprise and includes:Each power generation tagmeme corresponds to the progression dress of enterprise Machine ratio and each power generation tagmeme correspond to the progression power generation completion rate of enterprise;
    First determining module, for determining that power generation tagmeme i corresponds to the progression installation ratio of enterprise as the following formula
    Second determining module, for determining that power generation tagmeme i corresponds to the progression power generation completion rate of enterprise as the following formula
    Wherein,It is the installed capacity that power generation tagmeme j corresponds to enterprise,It is the equivalent power generation that power generation tagmeme j corresponds to enterprise Amount, It is the actual power generation that power generation tagmeme j corresponds to enterprise,It is j pairs of tagmeme of power generation The approval of enterprise is answered to reduce electricity, NIIt is the whole network electricity power enterprise sum.
  8. 8. system as claimed in claim 6, which is characterized in that the fitting unit is used for:
    Ratio is installed as abscissa scale using progression, and completion rate is generated electricity as ordinate scale using progression, is obtained using fitting function The cubic function of the progression installation ratio of enterprise and the power generation completion rate of enterprise, and the cubic function is complete as the power generation of enterprise At rate Lorentz curve.
  9. 9. system as claimed in claim 6, which is characterized in that second determination unit, including:
    Third determining module, the power generation completion rate Gini coefficient η for determining enterprise as the following formula:
    4th determining module, for determining regression criterion Δ δ as the following formula:
    Wherein, [0,1] η ∈, S1It is the power generation completion rate Lorentz curve section above straight line y=x and the surrounded regions straight line y=x Area, S2It is the area of the power generation completion rate Lorentz curve section and the surrounded regions straight line y=x below straight line y=x,It is the progression power generation completion rate that power generation tagmeme i corresponds to enterprise, f (i) is power generation tagmeme i on power generation completion rate Lorentz curve The corresponding functional value of corresponding enterprise, NIIt is the whole network electricity power enterprise sum.
  10. 10. system as claimed in claim 6, which is characterized in that the power generation completion rate Gini coefficient of enterprise and the power generation of enterprise Completion rate is harmonious negatively correlated;The regression criterion of enterprise and the degree positive correlation for violating power generation tagmeme dispatching principle.
CN201810146867.6A 2018-02-12 2018-02-12 Enterprise power generation completion rate balance evaluation method and system Active CN108446828B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810146867.6A CN108446828B (en) 2018-02-12 2018-02-12 Enterprise power generation completion rate balance evaluation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810146867.6A CN108446828B (en) 2018-02-12 2018-02-12 Enterprise power generation completion rate balance evaluation method and system

Publications (2)

Publication Number Publication Date
CN108446828A true CN108446828A (en) 2018-08-24
CN108446828B CN108446828B (en) 2022-12-02

Family

ID=63192294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810146867.6A Active CN108446828B (en) 2018-02-12 2018-02-12 Enterprise power generation completion rate balance evaluation method and system

Country Status (1)

Country Link
CN (1) CN108446828B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111275305A (en) * 2020-01-16 2020-06-12 西南交通大学 Fair assessment method for traditional taxi and network appointment service in peak time
CN112396303A (en) * 2020-11-09 2021-02-23 中国南方电网有限责任公司 Power generation scheduling evaluation method, device and equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004013468A (en) * 2002-06-06 2004-01-15 Hokkaido Electric Power Co Inc:The Electricity generating and receiving plan creating system in connecting drainage system and recording medium whcih records processing program thereof
JP2005251139A (en) * 2004-03-01 2005-09-15 Human Maya:Kk Calculation method of income difference measure
JP2008084020A (en) * 2006-09-27 2008-04-10 Dokiyumento House:Kk Corporate risk assessment system and corporate risk sensitivity assessment system
CN103208035A (en) * 2013-03-25 2013-07-17 吉林省电力有限公司电力科学研究院 Energy-saving dispatching optimization method for sets
CN103617552A (en) * 2013-11-22 2014-03-05 冶金自动化研究设计院 Power generation cost optimization method for iron and steel enterprise
CN106156885A (en) * 2016-06-27 2016-11-23 国家电网公司 A kind of electrical network weaker overall integrated evaluating method
CN106570176A (en) * 2016-11-10 2017-04-19 华能澜沧江新能源有限公司 Power generation enterprise electric quantity statistic reporting method and electric quantity management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004013468A (en) * 2002-06-06 2004-01-15 Hokkaido Electric Power Co Inc:The Electricity generating and receiving plan creating system in connecting drainage system and recording medium whcih records processing program thereof
JP2005251139A (en) * 2004-03-01 2005-09-15 Human Maya:Kk Calculation method of income difference measure
JP2008084020A (en) * 2006-09-27 2008-04-10 Dokiyumento House:Kk Corporate risk assessment system and corporate risk sensitivity assessment system
CN103208035A (en) * 2013-03-25 2013-07-17 吉林省电力有限公司电力科学研究院 Energy-saving dispatching optimization method for sets
CN103617552A (en) * 2013-11-22 2014-03-05 冶金自动化研究设计院 Power generation cost optimization method for iron and steel enterprise
CN106156885A (en) * 2016-06-27 2016-11-23 国家电网公司 A kind of electrical network weaker overall integrated evaluating method
CN106570176A (en) * 2016-11-10 2017-04-19 华能澜沧江新能源有限公司 Power generation enterprise electric quantity statistic reporting method and electric quantity management system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
XINDA KE,ET AL.: "Control and size energy storage for managing energy balance of variable generation resources", 《2014 IEEE PES GENERAL MEETING | CONFERENCE & EXPOSITION》 *
戴俊良,王鹏等: "基于基尼系数的电力调度公平性指标探讨", 《电力系统自动化》 *
曾峰,王鹏: "华北区域调度公平性指标分析", 《现代电力》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111275305A (en) * 2020-01-16 2020-06-12 西南交通大学 Fair assessment method for traditional taxi and network appointment service in peak time
CN111275305B (en) * 2020-01-16 2022-04-29 西南交通大学 Fair assessment method for traditional taxi and network appointment service in peak time
CN112396303A (en) * 2020-11-09 2021-02-23 中国南方电网有限责任公司 Power generation scheduling evaluation method, device and equipment
CN112396303B (en) * 2020-11-09 2023-03-03 中国南方电网有限责任公司 Power generation scheduling evaluation method, device and equipment

Also Published As

Publication number Publication date
CN108446828B (en) 2022-12-02

Similar Documents

Publication Publication Date Title
Gonzalez et al. Forecasting power prices using a hybrid fundamental-econometric model
Ramos-Real et al. The evolution and main determinants of productivity in Brazilian electricity distribution 1998–2005: An empirical analysis
Jiang et al. Energy efficiency in the Chinese provinces: a fixed effects stochastic frontier spatial Durbin error panel analysis
Carmona et al. The valuation of clean spread options: linking electricity, emissions and fuels
CN107153880B (en) Allocation purchasing method, device and equipment
CN106779317A (en) A kind of grid equipment method for evaluating quality
CN108446828A (en) A kind of enterprise power generation completion rate harmony evaluation method and system
CN108460463A (en) High-end equipment flow line production dispatching method based on improved adaptive GA-IAGA
CN109784594A (en) A kind of sale of electricity quotient deferrable load decision-making technique and system
Valinejad et al. Stochastic unit commitment in the presence of demand response program under uncertainties
Jafaria Malmquist productivity index for multi time periods
CN110580542A (en) Power consumption prediction method and device
CN110648164A (en) Method and device for determining marginal electricity price interval of node
CN114139802B (en) Real-time optimization scheduling method based on basin water regime change trend analysis model
Schembri Environmentally adjusted domestic product and emission control policies; a dynamic simulation modelling approach: an example from the French carbon dioxide emission prospects
Swaminathan et al. Concentration and Efficiency in Indian Manufacturing: A Regional Study.
CN109509114A (en) A kind of region wind power output fluctuation tendency prediction technique and system
CN110991847A (en) Electric energy meter batch management method and device and readable storage medium
Sommer et al. Optimization of a Parametric Fundamental Model for Power Plant Deployment Planning
Gu et al. Exploiting Instance and Variable Similarity to Improve Learning-Enhanced Branching
Yang Short-term electric market dynamics and generation company decision-making in new deregulated environment
Fianu Portfolio optimization in zonal energy markets: Evidence from Italy
Khan et al. Energy resources, foreign exchange reserves and economic growth: Empirical evidence from Pakistan
Khodadad Kashi et al. The Impact of Learning on Technology Content of Iran’s Industrial Export
Zheng et al. Risk Control Optimization Models of Different Power Market Purchasing Combinations of Power Selling Companies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant