CN103205778A - Emergency short circuit device and method of aluminum cell - Google Patents

Emergency short circuit device and method of aluminum cell Download PDF

Info

Publication number
CN103205778A
CN103205778A CN2013101520649A CN201310152064A CN103205778A CN 103205778 A CN103205778 A CN 103205778A CN 2013101520649 A CN2013101520649 A CN 2013101520649A CN 201310152064 A CN201310152064 A CN 201310152064A CN 103205778 A CN103205778 A CN 103205778A
Authority
CN
China
Prior art keywords
bus
crimping
short circuit
aluminium cell
electrolyzer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101520649A
Other languages
Chinese (zh)
Other versions
CN103205778B (en
Inventor
王有山
梁学民
刘静
冯冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou light metallurgy Polytron Technologies Inc
Original Assignee
ZHENGZHOU QINGYE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=48753179&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN103205778(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by ZHENGZHOU QINGYE TECHNOLOGY Co Ltd filed Critical ZHENGZHOU QINGYE TECHNOLOGY Co Ltd
Priority to CN201310152064.9A priority Critical patent/CN103205778B/en
Publication of CN103205778A publication Critical patent/CN103205778A/en
Application granted granted Critical
Publication of CN103205778B publication Critical patent/CN103205778B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the technical field of short circuit treatment of aluminum cells, and particularly relates to an emergency short circuit device and method of an aluminum cell. The emergency short circuit device disclosed by the invention comprises a guide bus, a crimping bus, a transitional soft connector and a clamp, wherein a support beam is supported and fixed together with the guide bus, the crimping bus and the transitional soft connector. The emergency short circuit device is simple in structure, convenient to install, reliable to crimp, and high in security, and can be accurately positioned. By adopting the device and the method disclosed by the invention, rapid short circuit operation of a worker is facilitated; the time is saved; the loss caused by power failure is reduced; the emergency short circuit device can be suitable for various accidents of the electrolytic cell; rapid recovery of production can be achieved; the time is saved; the connection part is easily dismantled; and the emergency short circuit device is simple to operate, fast and feasible, and has good maneuverability.

Description

The emergent short circuiting device of aluminium cell and method
Technical field
The present invention relates to the aluminium electrolytic bath short circuit processing technology field, particularly the emergent short circuiting device of a kind of aluminium cell and method.
Background technology
In the electrolysis of aluminum industry, electrolyzer is the main equipment of Aluminum Electrolysis Production, and generally being cascaded by hundreds of forms a production series.Under the ordinary production situation, opening, stopping of electrolyzer is to realize by operation of cells short circuit mouth behind the large current convertor switch indirect branch electric current, and this technology is progressively ripe at present.But because problems such as furnace building material, furnace building process or production management, the sidepiece that electrolyzer may occur, bottom runout thrust accidents such as short-circuit busbar and the blast of short circuit mouth and cause the electrolysis series power failure, cause the series aluminum electrolyzer can't resume production for a long time.The interior processing to this phenomenon of industry at present all is in time to repair bus-bar system after the accident, if the bus-bar system damage intensity is big, need more than 20 hours repair time.Generally speaking, in a single day have a power failure more than 6 hours at the aluminium cell that moves, " dead groove " phenomenon when restoring electricity, just may occur, cause heavy losses to enterprise.Therefore, inventing a kind of method and device of emergent short circuit after the electrolyzer accident, fast electrolysis series is restored electricity, has been pendulum great difficult problem in face of electrolysis of aluminum enterprise.
Summary of the invention
For overcoming deficiency of the prior art, we provide a kind of modern design, simple in structure, easy for installation, the emergent short circuiting device of aluminium cell and the method that can be applicable to various electrolyzer accidents and resume production fast.
According to design provided by the present invention, the device of the emergent short circuit of a kind of aluminium cell, comprise the water conservancy diversion bus, the crimping bus, transition is flexible coupling and anchor clamps, the two ends of described water conservancy diversion bus fixedly have transition to be flexible coupling respectively, the other end that transition is flexible coupling and the welding of crimping bus are fixing, described crimping bus is fastening by anchor clamps and anode large bus bar, two sides that the every end of described water conservancy diversion bus is relative fixedly have supporting beam respectively, the other end of described supporting beam is placed on the anode large bus bar of downstream slot or accident groove, described crimping bus is inboard fixedly range adjuster, and the other end of described range adjuster is fixed on the supporting beam.
Described range adjuster contains bearing, rotating threaded shaft, silk braid and handwheel, described bearing comprises first bearing, second bearing, one end of described first bearing and second bearing respectively is separately fixed on the supporting beam and crimping bus that is adjusted spacing, described rotating threaded shaft comprises the anticlockwise leading screw, the right rotation leading screw, the other end of first bearing and second bearing is connected with an end of anticlockwise leading screw and right rotation leading screw respectively, the other end of anticlockwise leading screw and right rotation leading screw is connected on and a left side by the silk cap sleeve respectively, in the silk braid that the right rotation leading screw is complementary, the medium position of silk braid outer wall is installed with handwheel.
On the described water conservancy diversion bus hanger is installed.
Described anchor clamps are " U " type frame groove, and an end of groove is provided with bolt hole and securing bolt is installed.
A kind of method that contains the emergent short circuit of aluminium cell of above-mentioned arbitrary short circuiting device, one or more electrolyzer breaks down and makes electrolytic series outage occur in electrolytic series, cause any position in original short-circuit busbar to damage, when bus did not possess operational condition around the short-circuit busbar damage of accident electrolyzer and the groove of this electrolyzer, the concrete operations step was as follows:
1) use driving with the device of the emergent short circuit of aluminium cell by the hanger handling and be placed on accident electrolyzer one electricity output side anode large bus bar and the downstream slot electricity input side anode large bus bar, by distance and the angle of range adjuster adjustment crimping bus and anode large bus bar, make the crimping face of crimping bus identical with the outside of anode large bus bar;
2) firm crimping bus and anode large bus bar crimping by jig;
3) progressively recover the series power supply;
4) electrolyzer is carried out large repairs, and repair the bus that damages;
5) closed accident electrolyzer short circuit mouth;
6) device of the emergent short circuit of dismounting aluminium cell.
This method can directly be connected to the emergent short circuiting device of aluminium cell anode large bus bar or the anode rod of two adjacent electrolyzers, realizes the urgent short circuit of electrolyzer, avoids long-time power failure.
The beneficial effect of the emergent short circuiting device of aluminium cell of the present invention and method:
1. the emergent short circuiting device of aluminium cell of the present invention comprises water conservancy diversion bus, crimping bus, transition is flexible coupling and anchor clamps, supporting beam and water conservancy diversion bus, crimping bus and the transition mutual support fixation that is flexible coupling, simple in structure, can accurately locate, easy for installation, crimping is reliable, security is higher, be conducive to the workman and carry out the operation of short circuit fast, save time, reduce the loss that has a power failure and cause.
2. the emergent short-circuiting method of aluminium cell of the present invention uses said apparatus, and modern design can be applicable to various electrolyzer accidents and can realize resuming production fast, save time, remove easily the connection portion, and row simple to operate, quick, easy has good operability.
3. the emergent short circuiting device of aluminium cell of the present invention and method are applied widely, have energy-conservation, consumption reduction and environmental-protection function, are easy to promotion and implementation.
Description of drawings:
Fig. 1 is the emergent short circuiting device structural representation of aluminium cell of the present invention;
Fig. 2 is the present invention's vertical view shown in Figure 1;
Fig. 3 is range adjuster structural representation of the present invention;
Fig. 4 is commutation supply voltage system schematic of the present invention;
Fig. 5 is installation reference view of the present invention.
Embodiment:
Number in the figure 1 represents anchor clamps, label 2 represents anode large bus bar, label 3 represents the crimping bus, and label 4 represents supporting beam, and label 5 represents transition and is flexible coupling, label 6 represents hanger, label 7 represents the water conservancy diversion bus, and label 8 represents riser bus bar, and label 9 represents range adjuster, label 9-1 represents bearing, label 9-2 represents rotating threaded shaft, and label 9-3 represents silk braid, and label 9-4 represents handwheel, label 12 represents groove bus on every side, label a represents the device of the emergent short circuit of aluminium cell, and label c represents into goddess of lightning's line, and label d represents the short circuit mouth, label e represents electrolyzer, and label f represents the vestibule corridor bus.
Embodiment one: referring to Fig. 1 ~ 5, the device of the emergent short circuit of a kind of aluminium cell, comprise water conservancy diversion bus 7, crimping bus 3, transition is flexible coupling 5 and anchor clamps 1, the two ends of described water conservancy diversion bus 7 fixedly have transition to be flexible coupling 5 respectively, be flexible coupling 5 the other end and 3 welding of crimping bus of transition are fixing, described crimping bus 3 is fastening by anchor clamps 1 and anode large bus bar 2, two relative sides of described water conservancy diversion bus 7 every ends fixedly have supporting beam 4 respectively, the other end of described supporting beam 4 is placed on the anode large bus bar 2 of downstream slot or accident groove, fixedly there is range adjuster 9 described crimping bus 3 inboards, and the other end of described range adjuster 9 is fixed on the supporting beam 4.
Described range adjuster 9 contains bearing 9-1, rotating threaded shaft 9-2, silk braid 9-3 and handwheel 9-4, described bearing 9-1 comprises first bearing, second bearing, one end of described first bearing and second bearing respectively is separately fixed on the supporting beam 4 and crimping bus 3 that is adjusted spacing, described rotating threaded shaft 9-2 comprises the anticlockwise leading screw, the right rotation leading screw, the other end of first bearing and second bearing is connected with an end of anticlockwise leading screw and right rotation leading screw respectively, the other end of anticlockwise leading screw and right rotation leading screw is connected on and a left side by the silk cap sleeve respectively, in the silk braid 9-3 that the right rotation leading screw is complementary, the medium position of silk braid 9-3 outer wall is installed with handwheel 9-4.
On the described water conservancy diversion bus 7 hanger 6 is installed.
Described anchor clamps 1 are " U " type frame groove, and an end of groove is provided with bolt hole and securing bolt is installed.
Embodiment two: referring to Fig. 1 ~ 5, one or more electrolyzer breaks down and makes electrolytic series outage occur in electrolytic series, cause any position in original short-circuit busbar to damage, the short-circuit busbar of accident electrolyzer damage and the groove of this electrolyzer around bus 12 because of accident (as around red-hot ionogen is arranged) when not possessing operational condition, the concrete operations step is as follows:
1) use driving with the device a of the emergent short circuit of aluminium cell by the hanger handling and be placed on accident electrolyzer one electricity output side anode large bus bar and the downstream slot electricity input side anode large bus bar, by distance and the angle of range adjuster adjustment crimping bus and anode large bus bar, make the crimping face of crimping bus identical with the outside of anode large bus bar;
2) firm crimping bus and anode large bus bar crimping by jig;
3) progressively recover the series power supply;
4) electrolyzer is carried out large repairs, and repair the bus that damages;
5) closed accident electrolyzer short circuit mouth;
6) device of the emergent short circuit of dismounting aluminium cell;
This method can directly be connected to the emergent short circuiting device of aluminium cell anode large bus bar or the anode rod of two adjacent electrolyzers, realizes the urgent short circuit of electrolyzer, avoids long-time power failure.
Embodiment three: basic identical with embodiment two, difference is: when electrolyzer has an accident and short-circuit busbar and riser bus bar when all damaging, operate according to the method described above.
Embodiment four: basic identical with embodiment two, difference is: the short circuit maintenance that realizes many adjacent electrolyzers by the emergent short circuiting device of a plurality of anode large bus bars.

Claims (6)

1. the emergent short circuiting device of an aluminium cell, it is characterized in that: comprise the water conservancy diversion bus, the crimping bus, transition is flexible coupling and anchor clamps, the two ends of described water conservancy diversion bus fixedly have transition to be flexible coupling respectively, the other end that transition is flexible coupling and the welding of crimping bus are fixing, described crimping bus is fastening by anchor clamps and anode large bus bar, two sides that the every end of described water conservancy diversion bus is relative fixedly have supporting beam respectively, the other end of described supporting beam is placed on the anode large bus bar of downstream slot or accident groove, described crimping bus is inboard fixedly range adjuster, and the other end of described range adjuster is fixed on the supporting beam.
2. the emergent short circuiting device of aluminium cell according to claim 1, it is characterized in that: described range adjuster contains bearing, rotating threaded shaft, silk braid and handwheel, described bearing comprises first bearing, second bearing, one end of described first bearing and second bearing respectively is separately fixed on the supporting beam and crimping bus that is adjusted spacing, described rotating threaded shaft comprises the anticlockwise leading screw, the right rotation leading screw, the other end of first bearing and second bearing is connected with an end of anticlockwise leading screw and right rotation leading screw respectively, the other end of anticlockwise leading screw and right rotation leading screw is connected on and a left side by the silk cap sleeve respectively, in the silk braid that the right rotation leading screw is complementary, the medium position of silk braid outer wall is installed with handwheel.
3. the emergent short circuiting device of aluminium cell according to claim 1 is characterized in that: on the described water conservancy diversion bus hanger is installed.
4. the emergent short circuiting device of aluminium cell according to claim 1, it is characterized in that: described anchor clamps are " U " type frame groove, an end of groove is provided with bolt hole and securing bolt is installed.
5. a right to use requires the emergent short-circuiting method of aluminium cell of the emergent short circuiting device of each described aluminium cell in 1 ~ 4, it is characterized in that: one or more electrolyzer breaks down and makes electrolytic series outage occur in electrolytic series, cause any position in original short-circuit busbar to damage, when bus did not possess operational condition around the short-circuit busbar damage of accident electrolyzer and the groove of this electrolyzer, the concrete operations step was as follows:
Step 1, use driving with the device of the emergent short circuit of aluminium cell by the hanger handling and be placed on accident electrolyzer one electricity output side anode large bus bar and the downstream slot electricity input side anode large bus bar, by distance and the angle of range adjuster adjustment crimping bus and anode large bus bar, make the crimping face of crimping bus identical with the outside of anode large bus bar;
Step 2, firm crimping bus and anode large bus bar crimping by jig;
Step 3, the power supply of progressively recovery series;
Step 4, electrolyzer is carried out large repairs, and repair the bus that damages;
Step 5, closed accident electrolyzer short circuit mouth;
The device of step 6, the emergent short circuit of dismounting aluminium cell.
6. the emergent short-circuiting method of aluminium cell according to claim 5, it is characterized in that: this method can directly be connected to the emergent short circuiting device of aluminium cell anode large bus bar or the anode rod of two adjacent electrolyzers, realize the urgent short circuit of electrolyzer, avoid long-time power failure.
CN201310152064.9A 2013-04-27 2013-04-27 Aluminium cell is met an urgent need short circuiting device and method Active CN103205778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310152064.9A CN103205778B (en) 2013-04-27 2013-04-27 Aluminium cell is met an urgent need short circuiting device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310152064.9A CN103205778B (en) 2013-04-27 2013-04-27 Aluminium cell is met an urgent need short circuiting device and method

Publications (2)

Publication Number Publication Date
CN103205778A true CN103205778A (en) 2013-07-17
CN103205778B CN103205778B (en) 2015-07-29

Family

ID=48753179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310152064.9A Active CN103205778B (en) 2013-04-27 2013-04-27 Aluminium cell is met an urgent need short circuiting device and method

Country Status (1)

Country Link
CN (1) CN103205778B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104388985A (en) * 2014-12-06 2015-03-04 江西瑞林电气自动化有限公司 Installation method of direct current short circuit switch and copper busbar employing connection
CN104674304A (en) * 2013-12-02 2015-06-03 贵阳铝镁设计研究院有限公司 Aluminum electrolytic cell emergency short circuit device
CN104846403A (en) * 2015-04-30 2015-08-19 山西华圣铝业有限公司 Emergency shunt method and shunt device of aluminum electrolysis cell
CN108277505A (en) * 2018-03-30 2018-07-13 河南中孚技术中心有限公司 Aluminium electrolytic cell short-circuit port energy saver and energy saving maintaining method
CN108531941A (en) * 2018-07-12 2018-09-14 洛阳斯维机电科技有限公司 A kind of two-part electrolytic cell emergency bus device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017174854A1 (en) * 2016-04-04 2017-10-12 Outotec (Finland) Oy Method and arrangement for controlling the electrical circuit in an electrolytic process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2723465Y (en) * 2004-05-27 2005-09-07 中国铝业股份有限公司 Fine aluminium slot bus shortcircuit device
CN2745957Y (en) * 2004-11-12 2005-12-14 贵阳铝镁设计研究院 Short circuit device of electrolytic tank
CN2835264Y (en) * 2005-08-05 2006-11-08 贵阳铝镁设计研究院 Short circuit device of electrolytic cell
WO2009092513A1 (en) * 2008-01-21 2009-07-30 Alcan International Limited Device and method for short-circuiting one or more cells in an arrangement of electrolysis cells intended for the production of aluminium
CN101880897A (en) * 2010-05-20 2010-11-10 河南中孚实业股份有限公司 Aluminum electrolytic cell temporary short-circuit busbar
WO2011060614A1 (en) * 2009-11-17 2011-05-26 中铝国际工程有限责任公司 Live welding method and device for aluminum electrolytic cell overhauling under series full current
CN102677096A (en) * 2012-05-21 2012-09-19 中国铝业股份有限公司 Aluminium electrolytic cell emergency short-circuit bus
CN203270064U (en) * 2013-04-27 2013-11-06 郑州轻冶科技有限公司 Emergency short-circuit device for aluminium electrolysis cell

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2723465Y (en) * 2004-05-27 2005-09-07 中国铝业股份有限公司 Fine aluminium slot bus shortcircuit device
CN2745957Y (en) * 2004-11-12 2005-12-14 贵阳铝镁设计研究院 Short circuit device of electrolytic tank
CN2835264Y (en) * 2005-08-05 2006-11-08 贵阳铝镁设计研究院 Short circuit device of electrolytic cell
WO2009092513A1 (en) * 2008-01-21 2009-07-30 Alcan International Limited Device and method for short-circuiting one or more cells in an arrangement of electrolysis cells intended for the production of aluminium
WO2011060614A1 (en) * 2009-11-17 2011-05-26 中铝国际工程有限责任公司 Live welding method and device for aluminum electrolytic cell overhauling under series full current
CN101880897A (en) * 2010-05-20 2010-11-10 河南中孚实业股份有限公司 Aluminum electrolytic cell temporary short-circuit busbar
CN102677096A (en) * 2012-05-21 2012-09-19 中国铝业股份有限公司 Aluminium electrolytic cell emergency short-circuit bus
CN203270064U (en) * 2013-04-27 2013-11-06 郑州轻冶科技有限公司 Emergency short-circuit device for aluminium electrolysis cell

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674304A (en) * 2013-12-02 2015-06-03 贵阳铝镁设计研究院有限公司 Aluminum electrolytic cell emergency short circuit device
CN104674304B (en) * 2013-12-02 2017-12-22 贵阳铝镁设计研究院有限公司 A kind of aluminium cell is met an urgent need short-circuiting means
CN104388985A (en) * 2014-12-06 2015-03-04 江西瑞林电气自动化有限公司 Installation method of direct current short circuit switch and copper busbar employing connection
CN104846403A (en) * 2015-04-30 2015-08-19 山西华圣铝业有限公司 Emergency shunt method and shunt device of aluminum electrolysis cell
CN108277505A (en) * 2018-03-30 2018-07-13 河南中孚技术中心有限公司 Aluminium electrolytic cell short-circuit port energy saver and energy saving maintaining method
CN108277505B (en) * 2018-03-30 2023-11-17 河南中孚技术中心有限公司 Energy-saving device and energy-saving maintenance method for short-circuit port of aluminum electrolysis cell
CN108531941A (en) * 2018-07-12 2018-09-14 洛阳斯维机电科技有限公司 A kind of two-part electrolytic cell emergency bus device
CN108531941B (en) * 2018-07-12 2024-03-26 洛阳斯维机电科技有限公司 Two-section type electrolytic tank emergency bus device

Also Published As

Publication number Publication date
CN103205778B (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN103205778B (en) Aluminium cell is met an urgent need short circuiting device and method
CN103606854A (en) Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode
CN204625806U (en) A kind of aluminium cell is met an urgent need part flow arrangement
CN203270064U (en) Emergency short-circuit device for aluminium electrolysis cell
CN203270063U (en) Bottom short-circuit device for aluminium electrolysis cell
CN203613280U (en) Emergency short circuit device for aluminum electrolytic cell
CN202954101U (en) Fast connecting device of aluminum electrolytic cell busbar and temporary short circuit busbar
CN203218756U (en) Special-purpose tool for live-line replacement of disconnecting switch operating mechanism
CN203270061U (en) Emergency short-circuit device for end-head groove of aluminium electrolysis cell
CN204947466U (en) Portable live line working line lifter
CN103825222B (en) A kind of charged for replacement 220kV narrow base tower strain insulator string instrument
CN204835318U (en) A assembly and disassembly tools for circuit breaker mechanism energy -stored spring
CN102953087A (en) Aluminum electrolytic end cell emergency short-circuit device
CN204376312U (en) A kind of masthead drainage thread insulator support
CN203200357U (en) Rapid shunting and cell stopping device for dealing with damages of insulation intersection of pre-baked aluminum electrolytic cell bus
CN104674304A (en) Aluminum electrolytic cell emergency short circuit device
CN109301530A (en) A kind of New Low Voltage cable plant distribution plate
CN105977860B (en) A kind of replacement overhead transmission line composite cross-arm insulator device and method
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN202671673U (en) Emergency short circuit bus of aluminum reduction cell
CN202643860U (en) Reliability-improved aluminum electrolysis industry power supply system
CN207259609U (en) First of potline work area groove is met an urgent need short-circuiting means
CN204012730U (en) A kind of high-efficient movable capacitor compensation cabinet
CN205529072U (en) Aluminium cell positive pole short -circuiting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450002, Fortune Plaza 32, three road, Jinshui District, Henan, Zhengzhou, 1304

Patentee after: Zhengzhou light metallurgy Polytron Technologies Inc

Address before: 450002, Fortune Plaza 32, three road, Jinshui District, Henan, Zhengzhou, 1304

Patentee before: Zhengzhou Qingye Technology Co., Ltd.