CN103195668B - 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 - Google Patents
一种新型的风力发电预制混凝土塔架构件接缝结构及方法 Download PDFInfo
- Publication number
- CN103195668B CN103195668B CN201310112541.9A CN201310112541A CN103195668B CN 103195668 B CN103195668 B CN 103195668B CN 201310112541 A CN201310112541 A CN 201310112541A CN 103195668 B CN103195668 B CN 103195668B
- Authority
- CN
- China
- Prior art keywords
- concrete tower
- tower member
- power generation
- wind power
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112541.9A CN103195668B (zh) | 2013-04-02 | 2013-04-02 | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112541.9A CN103195668B (zh) | 2013-04-02 | 2013-04-02 | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195668A CN103195668A (zh) | 2013-07-10 |
CN103195668B true CN103195668B (zh) | 2015-02-25 |
Family
ID=48718414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310112541.9A Active CN103195668B (zh) | 2013-04-02 | 2013-04-02 | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195668B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017174705A1 (de) * | 2016-04-08 | 2017-10-12 | Wobben Properties Gmbh | Verbindungskörper, windenergieanlagen-turmringsegment und verfahren zum verbinden von zwei windenergieanlagen-turmringsegmenten |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883482B (zh) * | 2014-03-28 | 2017-03-29 | 北京金风科创风电设备有限公司 | 预制混凝土筒节及其制造方法及风力发电机组塔筒 |
CN104742227B (zh) * | 2015-03-04 | 2017-08-01 | 北京金风科创风电设备有限公司 | 混凝土浇铸模具的开口密封装置及使用方法 |
CN110206375B (zh) * | 2018-02-28 | 2021-07-20 | 北京天杉高科风电科技有限责任公司 | 用于形成塔架的纵向节段、混凝土塔架及其拼装方法 |
CN112302881B (zh) * | 2020-09-15 | 2024-06-25 | 重庆大学 | 一种用于钢-混塔筒的预制混凝土管片连接构造 |
CN113339198B (zh) * | 2021-06-15 | 2024-04-12 | 中铁上海设计院集团有限公司 | 一种自紧高强螺栓连接的风电混塔预制塔筒及其施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1630763A (zh) * | 2002-02-12 | 2005-06-22 | 迈可应用机械有限公司 | 风轮机 |
CN102859189A (zh) * | 2010-01-27 | 2013-01-02 | 乌本普罗帕蒂斯有限公司 | 风能设备和风能设备塔架段 |
CN203189209U (zh) * | 2013-04-02 | 2013-09-11 | 中国水电顾问集团西北勘测设计研究院 | 一种新型的风力发电预制混凝土塔架构件接缝结构 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010057187A2 (en) * | 2008-11-17 | 2010-05-20 | Coben Larry F | Tower construct suitable for wind turbines along with methods for fabricating and erecting the same |
DE102009017586A1 (de) * | 2009-04-19 | 2010-10-28 | Timber Tower Gmbh | Turm für eine Windkraftanlage |
-
2013
- 2013-04-02 CN CN201310112541.9A patent/CN103195668B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1630763A (zh) * | 2002-02-12 | 2005-06-22 | 迈可应用机械有限公司 | 风轮机 |
CN102859189A (zh) * | 2010-01-27 | 2013-01-02 | 乌本普罗帕蒂斯有限公司 | 风能设备和风能设备塔架段 |
CN203189209U (zh) * | 2013-04-02 | 2013-09-11 | 中国水电顾问集团西北勘测设计研究院 | 一种新型的风力发电预制混凝土塔架构件接缝结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017174705A1 (de) * | 2016-04-08 | 2017-10-12 | Wobben Properties Gmbh | Verbindungskörper, windenergieanlagen-turmringsegment und verfahren zum verbinden von zwei windenergieanlagen-turmringsegmenten |
Also Published As
Publication number | Publication date |
---|---|
CN103195668A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195668B (zh) | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 | |
CN204024928U (zh) | 一种可装配自立式风力发电机组预应力混凝土钢组合塔架 | |
CN203783827U (zh) | 一种新型的风力发电预制混凝土塔架构件纵缝结构 | |
CN103867019B (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN206917805U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
CN203755778U (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN104121155A (zh) | 一种可装配自立式风力发电机组预应力混凝土钢组合塔架及其锚固方法 | |
CN103821677A (zh) | 装配式预应力活性粉末混凝土风电塔架 | |
CN205329526U (zh) | 一种混凝土预制拼装桥墩 | |
CN209636843U (zh) | 海上风机吸力桶导管架大直径单桩复合基础 | |
JP4494282B2 (ja) | プレキャスト工法による変断面塔状構造物 | |
CN104314776A (zh) | 一种用于海上和陆上风电机组的装配式预应力塔筒 | |
CN102192112A (zh) | 一种分片式混凝土风电塔架 | |
CN103573007B (zh) | 凭借多阶段式预应力的模块式风力塔 | |
CN203189209U (zh) | 一种新型的风力发电预制混凝土塔架构件接缝结构 | |
CN203640084U (zh) | 一种可恢复功能的叠合板式剪力墙 | |
CN101736751A (zh) | 海上风电场测风塔与桩基础之间的连接结构 | |
CN206190458U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
CN103291562B (zh) | 海上风电塔架结构 | |
CN203783826U (zh) | 一种新型的风力发电预制混凝土塔架构件的横缝结构 | |
CN202031370U (zh) | 一种混凝土-钢结构复合风电塔架 | |
CN204163937U (zh) | 一种风力发电机组混凝土塔架用体内预应力束张拉连接机构 | |
CN104153630A (zh) | 混合式风电塔架的过渡连接方法 | |
CN211116421U (zh) | 一种具有螺旋线连接缝的预制混凝土风机塔筒 | |
CN201963021U (zh) | 后张拉式预应力多段混凝土风电塔架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 Applicant after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd. Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: Northwest Hydro Consulting Engineers, CHECC |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA XIBEI ENGINEERING CORPORATION TO: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. Free format text: CORRECT: APPLICANT; FROM: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING TO: HYDROCHINA XIBEI ENGINEERING CORPORATION |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |