CN103195133B - 捅泉机井的施工方法 - Google Patents

捅泉机井的施工方法 Download PDF

Info

Publication number
CN103195133B
CN103195133B CN201310122283.2A CN201310122283A CN103195133B CN 103195133 B CN103195133 B CN 103195133B CN 201310122283 A CN201310122283 A CN 201310122283A CN 103195133 B CN103195133 B CN 103195133B
Authority
CN
China
Prior art keywords
pit shaft
inwall
dig
pumped well
revolve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310122283.2A
Other languages
English (en)
Other versions
CN103195133A (zh
Inventor
柴普祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310122283.2A priority Critical patent/CN103195133B/zh
Publication of CN103195133A publication Critical patent/CN103195133A/zh
Application granted granted Critical
Publication of CN103195133B publication Critical patent/CN103195133B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本发明涉及机井开凿技术,具体是一种捅泉机井的施工方法。本发明解决了现有机井涌水量小和储水量小的问题。捅泉机井的施工方法,该方法是采用如下步骤实现的:a.从地面竖直向下开凿井筒,并保持井筒的直径为1m;b.在井筒即将开凿至含水层前,将井筒的直径逐渐扩大至5m,并在井筒的内壁逐层旋挖,在井筒的内壁自上而下逐层旋砌砖层;c.当井筒开凿至含水层时,继续竖直向下开凿井筒,并保持井筒的直径为5m,同时继续在井筒的内壁逐层旋挖,继续在井筒的内壁自上而下逐层旋砌砖层;待井筒的水深达到30m时,停止竖直向下开凿井筒;d.在位于含水层的井筒的内壁沿径向开凿若干个泉眼。本发明适用于各个领域的生产、生活用水。

Description

捅泉机井的施工方法
技术领域
本发明涉及机井开凿技术,具体是一种捅泉机井的施工方法。
背景技术
机井广泛应用于各个领域的生产、生活用水。在现有技术条件下,机井主要分为由打井队开凿而成的深机井和采用锅锤开凿而成的浅机井。实践表明,现有机井由于自身结构所限,无论是深机井还是浅机井,均存在涌水量小和储水量小的问题。基于此,有必要发明一种全新的机井开凿技术,以解决现有机井涌水量小和储水量小的问题。
发明内容
本发明为了解决现有机井涌水量小和储水量小的问题,提供了一种捅泉机井的施工方法。
本发明是采用如下技术方案实现的:捅泉机井的施工方法,该方法是采用如下步骤实现的:a.从地面竖直向下开凿井筒,并保持井筒的直径为1m;b.在井筒即将开凿至含水层前,将井筒的直径逐渐扩大至5m,并在井筒的内壁逐层旋挖,在井筒的内壁自上而下逐层旋砌砖层;c.当井筒开凿至含水层时,继续竖直向下开凿井筒,并保持井筒的直径为5m,同时继续在井筒的内壁逐层旋挖,继续在井筒的内壁自上而下逐层旋砌砖层;待井筒的水深达到30m时,停止竖直向下开凿井筒;d.在位于含水层的井筒的内壁沿径向开凿若干个泉眼,并保证每个泉眼围绕井筒的轴线等距分布,同时保证每个泉眼的深度均为150m。
与现有机井相比,采用本发明所述的捅泉机井的施工方法开凿而成的机井具有如下优点:一、本发明所述的捅泉机井的施工方法通过在井筒的内壁开凿泉眼,使得井筒方圆300m内的地下水能够通过泉眼迅速汇集到井筒内,由此有效增大了机井的涌水量。二、本发明所述的捅泉机井的施工方法通过扩大位于含水层的井筒的直径,并在位于含水层的井筒的内壁自上而下逐层旋砌砖层,使得井筒的容积得以扩大,由此有效增大了机井的储水量。
本发明有效解决了现有机井涌水量小和储水量小的问题,适用于各个领域的生产、生活用水。
附图说明
图1是本发明中捅泉机井的施工方法的示意图。
图2是图1的A-A剖视图。
图中:1-井筒,2-砖层,3-泉眼,4-含水层。
具体实施方式
捅泉机井的施工方法,该方法是采用如下步骤实现的:
a.从地面竖直向下开凿井筒1,并保持井筒1的直径为1m;
b.在井筒1即将开凿至含水层4前,将井筒1的直径逐渐扩大至5m,并在井筒1的内壁逐层旋挖,在井筒1的内壁自上而下逐层旋砌砖层2;
c.当井筒1开凿至含水层4时,继续竖直向下开凿井筒1,并保持井筒1的直径为5m,同时继续在井筒1的内壁逐层旋挖,继续在井筒1的内壁自上而下逐层旋砌砖层2;待井筒1的水深达到30m时,停止竖直向下开凿井筒1;
d.在位于含水层4的井筒1的内壁沿径向开凿若干个泉眼3,并保证每个泉眼3围绕井筒1的轴线等距分布,同时保证每个泉眼3的深度均为150m。
具体实施时,所述步骤d中,泉眼3的数目为4-8个。

Claims (1)

1.一种捅泉机井的施工方法,其特征在于:该方法是采用如下步骤实现的:
a.从地面竖直向下开凿井筒(1),并保持井筒(1)的直径为1m;
b.在井筒(1)即将开凿至含水层(4)前,将井筒(1)的直径逐渐扩大至5m,并在井筒(1)的内壁逐层旋挖,在井筒(1)的内壁自上而下逐层旋砌砖层(2);
c.当井筒(1)开凿至含水层(4)时,继续竖直向下开凿井筒(1),并保持井筒(1)的直径为5m,同时继续在井筒(1)的内壁逐层旋挖,继续在井筒(1)的内壁自上而下逐层旋砌砖层(2);待井筒(1)的水深达到30m时,停止竖直向下开凿井筒(1);
d.在位于含水层(4)的井筒(1)的内壁沿径向开凿若干个泉眼(3),并保证每个泉眼(3)围绕井筒(1)的轴线等距分布,同时保证每个泉眼(3)的深度均为150m。
CN201310122283.2A 2013-04-10 2013-04-10 捅泉机井的施工方法 Expired - Fee Related CN103195133B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310122283.2A CN103195133B (zh) 2013-04-10 2013-04-10 捅泉机井的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310122283.2A CN103195133B (zh) 2013-04-10 2013-04-10 捅泉机井的施工方法

Publications (2)

Publication Number Publication Date
CN103195133A CN103195133A (zh) 2013-07-10
CN103195133B true CN103195133B (zh) 2015-11-18

Family

ID=48717936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310122283.2A Expired - Fee Related CN103195133B (zh) 2013-04-10 2013-04-10 捅泉机井的施工方法

Country Status (1)

Country Link
CN (1) CN103195133B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1431375A (zh) * 2003-02-25 2003-07-23 梁林华 井壁墙体模块以及采用该模块构筑井壁墙体的方法
CN2637714Y (zh) * 2003-07-17 2004-09-01 程小虎 用于提高机井出水量和出水速度的机井密封装置
KR20090127565A (ko) * 2008-06-09 2009-12-14 성원콘크리트(주) 맨홀 및 맨홀 제조장치
CN101737054A (zh) * 2009-12-11 2010-06-16 张连魁 一种打井新方法
CN102011592A (zh) * 2010-11-29 2011-04-13 中国矿业大学 环向可压缩的复合井壁及其施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2480417Y (zh) * 2001-05-31 2002-03-06 张根兴 沉井构件

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1431375A (zh) * 2003-02-25 2003-07-23 梁林华 井壁墙体模块以及采用该模块构筑井壁墙体的方法
CN2637714Y (zh) * 2003-07-17 2004-09-01 程小虎 用于提高机井出水量和出水速度的机井密封装置
KR20090127565A (ko) * 2008-06-09 2009-12-14 성원콘크리트(주) 맨홀 및 맨홀 제조장치
CN101737054A (zh) * 2009-12-11 2010-06-16 张连魁 一种打井新方法
CN102011592A (zh) * 2010-11-29 2011-04-13 中国矿业大学 环向可压缩的复合井壁及其施工方法

Also Published As

Publication number Publication date
CN103195133A (zh) 2013-07-10

Similar Documents

Publication Publication Date Title
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN101994312B (zh) 一种土质边坡或尾矿坝排渗施工方法
CN102777185A (zh) 一种斜井井筒施工工艺
CN206768861U (zh) 一种加筋环挡土墙
CN202834382U (zh) 一种适用于淤泥质粘土条件下的顶管机头
CN203866858U (zh) 一种河道驳岸植生挡土墙
CN104234682B (zh) 一种适用于多、薄煤层的连续油管分层压裂方法
CN103628898B (zh) 一种用于防止巷道底鼓的连续墙支护方法
CN103195133B (zh) 捅泉机井的施工方法
CN204609897U (zh) 一种管幕冻结法支护结构
CN203846519U (zh) 一种玻璃钢灌注桩基础
CN102691295A (zh) 丁齿混凝土管桩及其施工方法
CN202659174U (zh) 一种单锥单螺螺旋钻
CN204401615U (zh) 一种适用于剥蚀残丘地貌管桩施工的桩尖
CN102953684A (zh) 一种带扩大钻头的钻杆
CN203755326U (zh) 一种软土地基建筑基坑的止水围护结构
CN203334267U (zh) 塑料排水板头部结构
CN203769663U (zh) 一种螺旋钻头
CN201908576U (zh) 一种油田钻井用的保径接头
CN204608814U (zh) 一种芯柱嵌岩海上风机高桩承台基础
CN204851136U (zh) 多套压力体系井磨铣打通道用尾管铣鞋
CN204402377U (zh) 防缩径卡钻钻杆
CN204327185U (zh) 一种矿山充填钻孔插管
CN102496325B (zh) 变截面立体洞腔模型制作模具及压制方法
CN202745034U (zh) 一种用于深厚软基处理的双向不对穿的有孔管桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20190410