CN103195104B - A kind of building method adopting anti-row's combination at building structure waterproof position - Google Patents

A kind of building method adopting anti-row's combination at building structure waterproof position Download PDF

Info

Publication number
CN103195104B
CN103195104B CN201210006374.5A CN201210006374A CN103195104B CN 103195104 B CN103195104 B CN 103195104B CN 201210006374 A CN201210006374 A CN 201210006374A CN 103195104 B CN103195104 B CN 103195104B
Authority
CN
China
Prior art keywords
concrete
band drain
building
water
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210006374.5A
Other languages
Chinese (zh)
Other versions
CN103195104A (en
Inventor
邹新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sancai Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210006374.5A priority Critical patent/CN103195104B/en
Publication of CN103195104A publication Critical patent/CN103195104A/en
Application granted granted Critical
Publication of CN103195104B publication Critical patent/CN103195104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention provides a kind of building method adopting anti-row's combination at building structure waterproof position, first invented building have can also be non-leakage under the condition of gap theory, forever be immersed in the position in underground water for underground engineering wall surface, base plate, adopt and first prevent arranging structure afterwards; Bear rainwater position then adopt first row's rear defence measure for square greening, concrete flat roof deck.From material property, multi-pronged in the waterproof principle, structure way, forever can improve the waterproof quality of these structure positions.

Description

A kind of building method adopting anti-row's combination at building structure waterproof position
One, technical field
The invention belongs to buildings waterproof, relate generally to building structure position as underground engineering wall surface, base plate, top board and concrete flat roof deck, comprising the independent right of anti-row's combinatorial principle, construction method and product three aspect.
Two, background technology
These construction sites herein, belong to " Technical code for water proof in underground engineering " GB50108-2008 and " Technical code for roof engineering " GB50345-2004 technically.In these two specifications, classification of waterproof is divided into one ~ level Four, corresponding requirement is that waterproofing course sets up defences is 3 ~ 1 roads.Waterproof number of plies waterproof is only relied in GB technical specification, its theory is exactly require that building is seamless, this and Practical Project situation are had any different, so " construction engineering quality management regulations " only have 5 years to the guarantee of buildings waterproof seepage, can not meet the service life of engineering far away.And the waterproof roll of existing national standard adopts asphalt rubber on cohesive material, its viscosity time limit is not long, is one of reason of seepage yet.
Three, summary of the invention
The research of my long campaigns buildings waterproof, see that same roofing is little non-leakage in the rain, but meeting seepage in heavy rain, although illustrate that building has gap, also can be non-leakage if eliminate water pressure, having invented building is thus having under the condition of gap, and theory that can also be non-leakage is exactly anti-row's combinatorial principle and structure.Developed in the first with HDPE material quantity-produced band drain, and have developed with butyl rubber as not dry viscose top, be coated in two, band drain edge, overlap joint bonding becomes anti-row's combination product mutually, causes this thinking on self-adhesive waterproof web again.
In order to construction safety, waterproof construction all will cancel open firing operation, so I has redeveloped and has been coated with the thick butyl layers of 0.3 ~ 2.0mm with on the dull and stereotyped sheet material of the thick HDPE of 0.3 ~ 2.0mm, can cold construction at normal temperatures, and also this material can keep viscosity for a long time.
The exploitation of above bi-material, consider that the surface strength of concrete basic unit can be less than the viscous force of butyl rubber again, therefore select the interfacial agents of viscose glue type to be first coated in the surface of concrete basic unit again, and then be pasted with the adhesive waterproof coil of butyl layers, the above combination just completing material.For basement hollow plastering wall surface construction, be originally that job site is coated with glue, take very much artificial, also in factory, butyl rubber heating pole can be moved the surface being coated in band drain fulcrum now, then answer one deck release liners.On metope, first brushing one interfacial agents during construction, then will the fulcrum of butyl rubber be had directly to glue on the wall, and then do rendering layer, be exactly the self-adhesion band drain of metope hollow rendering layer.
Different anti-row's composite constructions is devised according to external source, adopt first prevent arranging principle afterwards for the underground construction base plate be forever immersed in underground water, wallboard, by any one waterproofing materials and the common waterproof of concrete structure, then make hollow at indoor any one plastic draining board to whitewash and hollow floor, ejectment trace percolating water, to collecting well, finally pumps.Best way can adopt HDPE sheet material to be coated with butyl rubber and make adhesive waterproof coil, be layered on the ground terrace of base plate in advance, coated face is inside, water concrete again, just bonding after the volatilization of concrete moisture content is common waterproofing course integrally, the waterproofing process of wall face can adopt same overlaying or glue two kinds of construction methods afterwards, overlays easy construction, the rear sticky casting pounding quality that can check concrete wall.And indoor have make hollow floor and hollow rendering layer from the PE band drain of stick.
The position of bearing rainwater for underground construction top board, concrete flat roof deck again, adopt and first arrange rear defence principle, any one plastic draining board is made in above techonosphere, first arrange rainwater, then arrange infiltration, cut off the transfer route of rainwater pressure, then any one waterproofing materials is made in the surface of sloping layer, not only can waterproof but also can ejectment percolating water, finally also have one waterproofing course looking on the structured base layer below slope, minimum trace infiltration can be blocked.Preferably selecting the PE band drain from stick, is that fulcrum upwards puts the multiple planting soil of geotextiles again at greening position; At upper people position, then fulcrum is downward, then waters concrete surface layer, and waterproofing materials adopts HDPE sheet material to be coated with the self-adhesive coiled material of butyl rubber, due to Concrete In Structures substrate surface strength deficiency, is then first coated in concrete substrate surface by viscose glue type interfacial agents, solid rear stickup adhesive waterproof coil.
Four, accompanying drawing explanation
Fig. 1 is the constructional drawing of the underground engineering wall surface be forever immersed in underground water, base plate.
Fig. 2 is the top board greening constructional drawing bearing rainwater.
Fig. 3 is the accessible roof constructional drawing bearing rainwater.
Fig. 4 has the PE band drain overlapped mutually from stick.
Fig. 5 is the PE band drain of precoating butyl rubber bonding agent on fulcrum.
Fig. 6 is the adhesive waterproof coil being coated with butyl rubber on PE flat board.
Five, specific implementation method
Paving adhesive waterproof coil 2 on concrete bed course 1 is seen from Fig. 1, sticky towards upper, then water concrete 4.Adhesive waterproof coil 2 is fixed in the inner side of outer wall template 3, sticky towards concrete, then water body of wall concrete 4; Or first water body of wall concrete 4, then folding is except after external mold 3, then coating self-adhering waterproof coiled material 2.After completing underground engineering structure, the PE band drain 5 from stick is covered with in flooring, fulcrum is downward, water surface layer concrete 4, inside metope, be pasted with the PE band drain 5 of stick, a spot printing butyl rubber 11 is sticky on the wall, then powder cement mortar 6, trace percolating water 15 can flow into collecting well from Stilt layer and pumps, completes underground construction and is forever immersed in the structure first preventing arranging afterwards in underground water.
First coating viscosity glue type interfacial agents 10 on structure roof 7 is seen from Fig. 2, solid rear stickup adhesive waterproof coil 2, then water concrete 4 formed look for domatic, look for domatic first coating viscosity glue type interfacial agents 10 paste adhesive waterproof coil 2 again, then be covered with the PE band drain 5 from stick, fulcrum upwards.Paving geotextiles 8, then answers planting soil 9, and the infiltration 15 through soil layer is discharged in geotextiles 8 with the space of PE band drain 5, has cut off the transfer route of rainwater pressure, completes the square greening bearing rainwater position and first arranges rear defence structure.
The difference of Fig. 3 and Fig. 2 is that earth backing greening changes people's concrete surface layer into, so last spread having from stick PE band drain 5 fulcrum downwards, then water concrete 4, the void layer of band drain can discharge percolating water 15, cut off the transfer route of rainwater pressure, complete bear rainwater position roofing first arrange rear defence structure.
Fig. 4 has to have two from stick 12 from the edge of the PE band drain 5 of stick, and overlap joint is exactly anti-row's combination product mutually.
Fig. 5 is the plan view of PE band drain, first in factory, is coated with one deck butyl rubber 11 on the fulcrum top of PE band drain 5, finally topped release liners 14 again, is metope self-adhesion band drain.
Fig. 6 be HDPE sheet material 13 surface layer on the butyl rubber 11 of compound one deck 0.3 ~ 2.0mm, can self-adhesion at normal temperatures, not doing for a long time, having from exceeding repair ability, surface one deck release liners 14 again again.

Claims (5)

1. adopt a building method for anti-row's combination at building structure waterproof position, it is characterized in that first setting up building have can also be non-leakage under the condition of gap theory,
Adopt for the base plate be forever immersed in underground water and wallboard and first prevent arranging principle afterwards, concrete bed course lays adhesive waterproof coil, gluing towards upper of described adhesive waterproof coil, then water concrete, bonding is common waterproofing course integrally; Lay adhesive waterproof coil in the inner side of outer wall template, gluing towards interior of described adhesive waterproof coil, then water body of wall concrete, bonding is common waterproofing course integrally; Or first water body of wall concrete, after then removing outer wall template, re-lay adhesive waterproof coil, by waterproofing materials and the common waterproof of concrete structure; After completing underground engineering structure, the PE band drain from stick is equipped with in flooring, fulcrum is downward, water concrete again, the PE band drain of stick is equipped with inside metope, then powder cement mortar, make hollow at indoor plastic draining board and whitewash and hollow floor, ejectment trace percolating water flows into collecting well from Stilt layer, finally pumps;
The position of bearing rainwater for underground construction top board, concrete flat roof deck adopts first arranges rear defence principle, first coating viscosity glue type interfacial agents in described structure roof, solid rear stickup adhesive waterproof coil, water again concrete formed look for domatic, look for domatic on coating viscosity glue type interfacial agents paste adhesive waterproof coil again, be then covered with from stick PE band drain, PE band drain is made in above structure roof, the void layer of PE band drain first can arrange rainwater, then arranges percolating water, has cut off the transfer route of rainwater pressure.
2. a kind of at the anti-building method arranging combination of building structure waterproof position employing as claimed in claim 1, it is characterized in that the position of bearing rainwater for underground construction top board, concrete flat roof deck adopts and first arrange rear defence principle, PE band drain upwards puts geotextiles earth backing again at greening position fulcrum, then again planting soil, the percolating water through soil layer is discharged in the gap of geotextiles and PE band drain; Then fulcrum is downward at upper people position for PE band drain, then waters concrete, and the void layer of PE band drain can discharge percolating water.
3. a kind of at the anti-building method arranging combination of building structure waterproof position employing as claimed in claim 1, the fulcrum top being layed in the PE band drain in metope described in it is characterized in that scribbles butyl rubber, and surface coverage has release liners.
4. a kind of at the anti-building method arranging combination of building structure waterproof position employing as claimed in claim 1, it is characterized in that described adhesive waterproof coil on HDPE sheet material, is coated with the thick butyl rubber of 0.3 ~ 2.0mm formed.
5. a kind of building method adopting anti-row's combination at building structure waterproof position as claimed in claim 2 or claim 3, it is characterized in that described PE band drain can adopt by two be made up of butyl rubber overlap mutually bonding from stick and become anti-row's combination product.
CN201210006374.5A 2012-01-10 2012-01-10 A kind of building method adopting anti-row's combination at building structure waterproof position Active CN103195104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210006374.5A CN103195104B (en) 2012-01-10 2012-01-10 A kind of building method adopting anti-row's combination at building structure waterproof position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210006374.5A CN103195104B (en) 2012-01-10 2012-01-10 A kind of building method adopting anti-row's combination at building structure waterproof position

Publications (2)

Publication Number Publication Date
CN103195104A CN103195104A (en) 2013-07-10
CN103195104B true CN103195104B (en) 2016-04-27

Family

ID=48717907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210006374.5A Active CN103195104B (en) 2012-01-10 2012-01-10 A kind of building method adopting anti-row's combination at building structure waterproof position

Country Status (1)

Country Link
CN (1) CN103195104B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912262A (en) * 2014-03-14 2015-09-16 邹新建 Method of adopting different prevention and drain combinations according to external water sources and self-adhesion drain plate
CN104652494B (en) * 2014-05-19 2018-05-25 邹新建 With the method for keel or stick installation plastic draining board
CN105089080B (en) * 2014-05-19 2018-06-29 邹新建 The hollow layer method of observable structural leakage is made in underground engineering wall surface bottom plate
CN104264716B (en) * 2014-09-05 2018-08-17 邹新建 A method of establishing the maintenance system of permanent ne-leakage in underground engineering
CN107700554B (en) * 2017-09-29 2021-12-14 上海三彩科技发展有限公司 Moisture insulation method for hollow terrace, wall and column of underground engineering
CN108612267B (en) * 2018-04-04 2022-02-11 上海三彩塑料排水板工程有限公司 Method for eliminating water pressure by using cut-off leakage water communicating pipe in roof
CN108532785A (en) * 2018-04-19 2018-09-14 上海三彩塑料排水板工程有限公司 A kind of plastic sandwich plate reaching B1 Fire retardant grades and hollow layer application process
CN111173046A (en) * 2019-09-16 2020-05-19 邹新建 Method for installing glass observation piece on hollow terrace in underground engineering room
CN111335345A (en) * 2020-03-03 2020-06-26 五冶集团上海有限公司 Drainage plate drainage leakage prevention construction method
CN111691467B (en) * 2020-06-22 2022-01-11 福建省华策建设集团有限公司 Construction method for basement water prevention and drainage combination

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1335442A (en) * 2000-07-20 2002-02-13 邹新建 Roofing-greening soil retaining, water draining, moisture maintaining, water separating and seepage preventing technique
WO2005068742A1 (en) * 2004-01-14 2005-07-28 Ewald Dörken Ag Membrane
CN2771365Y (en) * 2004-10-08 2006-04-12 邹新建 Plastic board with primary and secondary drainage passage and water storage for greening
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom board and wall surface and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO320438B1 (en) * 2004-04-15 2005-12-05 Isola As Bossed

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1335442A (en) * 2000-07-20 2002-02-13 邹新建 Roofing-greening soil retaining, water draining, moisture maintaining, water separating and seepage preventing technique
WO2005068742A1 (en) * 2004-01-14 2005-07-28 Ewald Dörken Ag Membrane
CN2771365Y (en) * 2004-10-08 2006-04-12 邹新建 Plastic board with primary and secondary drainage passage and water storage for greening
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom board and wall surface and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地下工程排水施工应用技术;邹新建;《中国建筑防水》;20111231(第24期);第11页左栏第一行-右栏最后一行,第12-14页的第2小节,图1-17 *
采用塑料夹层板消除水压力解决建筑渗漏;邹新建;《中国建筑防水》;20020131(第2期);第24页左栏第一行-右栏最后一行,第25页左栏第一行-右栏最后一行,第26页左栏第一行-右栏最后一行,图1-8 *

Also Published As

Publication number Publication date
CN103195104A (en) 2013-07-10

Similar Documents

Publication Publication Date Title
CN103195104B (en) A kind of building method adopting anti-row's combination at building structure waterproof position
KR100278173B1 (en) Double waterproof sheet for concrete structure
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
KR101286575B1 (en) Rubberized asphalt membrane and Felt sheet complex waterproofing material for the exterior waterproofing of the concrete structure
CN105089208A (en) Polyurethane waterproof roll, production equipment and process, composite waterproof layer and practice thereof
CN105201025B (en) Basement waterproofing construction and its construction method
CN204983421U (en) Polyurethane waterproofing membrane and production facility, composite waterproof layer thereof
CN203701446U (en) Roof structure for garage roof planting
KR100977160B1 (en) The method for waterproofing with synthetic butyl rubber mastic waterproofing sheet
CN203213318U (en) Waterproof layer for sump
CN205224122U (en) Basement waterproofing bottom plate
CN105442861B (en) Drainage conduit of toilet percolating water backwater surface repair method
CN205688670U (en) A kind of roofworks system structure
KR200233893Y1 (en) Waterproof sheet for concrete structure
KR101902836B1 (en) Concrete repair and joint construction method using organic and inorganic hybrid water proofing material laminated self-adhesive seal reinforcing and waterproofing sheet
CN206279639U (en) Vestibule movement joint
KR101254148B1 (en) Using pvc sheet and liquidity gel coating material composite waterproof sheet and using the same waterproof construction and method
TW201500617A (en) Man-made athletic field and athletic runway structure featuring eco-green building and construction method thereof
KR101752214B1 (en) Hybrid water proofing structure using infiltrative liquid waterproofing agent, asphalt and reinforce grid laminate and the method of its construction
CN205046589U (en) Waterproof structure of basement
CN209468688U (en) A kind of road bridge waterproof structure
CN208748690U (en) The waterproof slab structure of prefabricated piping lane
CN204585985U (en) The superposition macromolecule water-proof anti-corrosion coiled material of resistance to root system
RU2278202C1 (en) Control joint for water-tight channel and water pool lining
CN210367515U (en) Polymer modified asphalt self-adhesive waterproof coiled material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191230

Address after: 201824 room 404, No. 10, Lane 1930, Cao'an Road, Jiading District, Shanghai

Patentee after: SHANGHAI SANCAI TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 200444 Shanghai city Baoshan District Fengxiang Road 128 Lane 101

Patentee before: Zou Xinjian

TR01 Transfer of patent right
OL01 Intention to license declared