CN103195071A - 骑管钢板土填心围堰结构及其施工工艺 - Google Patents
骑管钢板土填心围堰结构及其施工工艺 Download PDFInfo
- Publication number
- CN103195071A CN103195071A CN2013100988613A CN201310098861A CN103195071A CN 103195071 A CN103195071 A CN 103195071A CN 2013100988613 A CN2013100988613 A CN 2013100988613A CN 201310098861 A CN201310098861 A CN 201310098861A CN 103195071 A CN103195071 A CN 103195071A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- pipe
- siphon
- buried
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明涉及一种围堰结构及其施工工艺,公开了骑管钢板土填心围堰结构及其施工工艺。其包括挡墙(6),挡墙(6)内设有第一预埋虹吸管(7)、第二预埋虹吸管(13),第一预埋虹吸管(7)与第一虹吸钢管(4)连通,第二预埋虹吸管(13)与第二虹吸钢管(9)连通,第一钢板(10)连接到第一虹吸钢管(4)和第二虹吸钢管(9)的端部,第二钢板(11)连接到第一预埋虹吸管(7)和第二预埋虹吸管(13)的端部,第一钢板(10)和第二钢板(11)之间设有对接管(14),第一钢板(10)和第二钢板(11)的距离与相邻两沟槽(5)的距离相等,第一钢板(10)和第二钢板(11)之间袋装粘土(8)的高度与相邻两沟槽(5)两侧顶部平齐。使其具有成本低,速度快,安全可靠的特性。
Description
技术领域
本发明涉及一种围堰结构,尤其涉及一种骑管钢板土填心围堰结构。本发明涉及一种围堰施工工艺,尤其涉及一种骑管钢板土填心围堰施工工艺。
背景技术
在水下焊接虹吸钢管与预埋钢管,由于受水的影响焊接方法比陆上复杂,骑管钢板土填心围堰结构及其施工工艺,是为保证虹吸钢管与预埋钢管的无水焊接而设计的,围堰的结构和施工工艺直接影响虹吸钢管与预埋钢管焊接的质量和效率。目前的围堰结构及其施工工艺,主要是在虹吸钢管与预埋钢管周围设置堤坝之后形成围堰。该围堰结构及其施工工艺能实现虹吸钢管与预埋钢管焊接施工,但是仍存在很多缺点,如成本高、速度慢、不安全、施工方法复杂等。
发明内容
本发明针对现有技术中成本高、速度慢、不安全、施工方法复杂的缺点,提供了一种成本低、速度快、安全可靠、施工方法简单的骑管钢板土填心围堰结构及其施工工艺。
为了解决上述技术问题,本发明通过下述技术方案得以解决。
骑管钢板土填心围堰结构,包括挡墙,挡墙内设有第一预埋虹吸管、第二预埋虹吸管,第一预埋虹吸管与第一虹吸钢管连通,第二预埋虹吸管与第二虹吸钢管连通。施工方法简单快捷,安全可靠。
作为优选,第一钢板连接到第一虹吸钢管和第二虹吸钢管的端部,第二钢板连接到第一预埋虹吸管和第二预埋虹吸管的端部。结构合理、安装便利。
作为优选,第一钢板和第二钢板之间设有对接管。保障了施工质量。
作为优选,第一钢板和第二钢板的距离与相邻两沟槽的距离相等。施工安全可靠。
作为优选,第一钢板和第二钢板之间袋装粘土的高度与相邻两沟槽两侧顶部平齐。结构合理紧凑。
骑管钢板土填心围堰施工工艺,包括如下步骤:
作为优选,第一步、将第一预埋虹吸管和第二预埋虹吸管端部连接上与相邻两沟槽距离相等的第二钢板之后放入挡墙内,灌注柱插入岩层,再通过支撑梁支撑起上部的第一虹吸钢管、第二虹吸钢管,第一虹吸钢管、第二虹吸钢管的端部连接上与相邻两沟槽距离相等的第一钢板,放入相邻两沟槽内。增加围堰强度,使其更牢固;
作为优选,第二步、将第一预埋虹吸管、第二预埋虹吸管放入对接部位,在第一钢板和第二钢板之间焊入一段对接管。加快施工速度,减少工作量;
作为优选,第三步、将第一虹吸钢管和第二虹吸钢管同时沉入水下,第一钢板和第二钢板构成围堰,在第一钢板和第二钢板构成的围堰内填入袋装粘土,填至与相邻两沟槽两侧顶部的高度平齐。成本低,且结构安全稳固。
本发明由于采用了以上技术方案,第一预埋虹吸管与第一虹吸钢管连通,第二预埋虹吸管与第二虹吸钢管连通,第一虹吸钢管、第二虹吸钢管的端部连接上与相邻两沟槽距离相等的第一钢板;第一预埋虹吸管与第二预埋虹吸管的端部连接上与相邻两沟槽距离相等的第二钢板,把第一钢板和第二钢板放入相邻两沟槽内,在第一钢板和第二钢板构成的围堰内填入袋装粘土,袋装粘土高度与相邻两沟槽两侧顶部平齐,使其具有成本低,速度快,安全可靠的特性。
附图说明
图1是骑管钢板土填心围堰的俯视图。
图2是骑管钢板土填心围堰的纵向剖视图。
图3是骑管钢板土填心围堰的局部放大图B。
图4是骑管钢板土填心围堰的局部放大图A。
以上附图中各数字标号所指代的部位名称如下。
1—喇叭口、2—支撑梁、3—灌注柱、4—第一虹吸钢管、5—相邻两沟槽、6—挡墙、7—第一预埋虹吸管、8—袋装粘土、9—第二虹吸钢管、10—第一钢板、11—第二钢板、12—岩层、13—第二预埋虹吸管、14—对接管。
具体实施方式
下面结合附图与实施例对本发明作进一步详细描述。
实施例
骑管钢板土填心围堰结构,包括挡墙6,挡墙6内设有第一预埋虹吸管7、第二预埋虹吸管13,第一预埋虹吸管7与第一虹吸钢管4连通,第二预埋虹吸管13与第二虹吸钢管9连通,第一钢板10连接到第一虹吸钢管4和第二虹吸钢管9的端部,第二钢板11连接到第一预埋虹吸管7和第二预埋虹吸管13的端部,第一钢板10和第二钢板11之间设有对接管14,第一钢板10和第二钢板11的距离与相邻两沟槽5的距离相等,第一钢板10和第二钢板11之间袋装粘土8的高度与相邻两沟槽5两侧顶部平齐,喇叭口1口部向下。
骑管钢板土填心围堰施工工艺,施工步骤如下:
第一步、将第一预埋虹吸管7和第二预埋虹吸管13端部连接上与相邻两沟槽5距离相等的第二钢板11之后放入挡墙6内,灌注柱3插入岩层12,再通过支撑梁2支撑起上部的第一虹吸钢管4、第二虹吸钢管9,第一虹吸钢管4、第二虹吸钢管9的端部连接上与相邻两沟槽5距离相等的第一钢板10,放入相邻两沟槽5内;
第二步、将第一预埋虹吸管7、第二预埋虹吸管13放入对接部位,在第一钢板10和第二钢板11之间焊入一段对接管14;
第三步、将第一虹吸钢管4和第二虹吸钢管9同时沉入水下,第一钢板10和第二钢板11构成围堰,在第一钢板10和第二钢板11构成的围堰内填入袋装粘土8,填至与相邻两沟槽5两侧顶部的高度平齐。
总之,以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所作的均等变化与修饰,皆应属本发明专利的涵盖范围。
Claims (6)
1.骑管钢板土填心围堰结构,包括挡墙(6),挡墙(6)内设有第一预埋虹吸管(7)、第二预埋虹吸管(13),其特征在于:第一预埋虹吸管(7)与第一虹吸钢管(4)连通,第二预埋虹吸管(13)与第二虹吸钢管(9)连通。
2.根据权利要求1所述的骑管钢板土填心围堰结构,其特征在于:第一钢板(10)连接到第一虹吸钢管(4)和第二虹吸钢管(9)的端部,第二钢板(11)连接到第一预埋虹吸管(7)和第二预埋虹吸管(13)的端部。
3.根据权利要求2所述的骑管钢板土填心围堰结构,其特征在于:第一钢板(10)和第二钢板(11)之间设有对接管(14)。
4.根据权利要求3所述的骑管钢板土填心围堰结构,其特征在于:第一钢板(10)和第二钢板(11)的距离与相邻两沟槽(5)的距离相等。
5.根据权利要求4所述的骑管钢板土填心围堰结构,其特征在于:第一钢板(10)和第二钢板(11)之间袋装粘土(8)的高度与相邻两沟槽(5)两侧顶部平齐。
6.骑管钢板土填心围堰施工工艺,其特征在于包括如下步骤:
第一步、将第一预埋虹吸管(7)和第二预埋虹吸管(13)端部连接上与相邻两沟槽(5)距离相等的第二钢板(11)之后放入挡墙(6)内,灌注柱(3)插入岩层(12),再通过支撑梁(2)支撑起上部的第一虹吸钢管(4)、第二虹吸钢管(9),第一虹吸钢管(4)、第二虹吸钢管(9)的端部连接上与相邻两沟槽(5)距离相等的第一钢板(10),放入相邻两沟槽(5)内;
第二步、将第一预埋虹吸管(7)、第二预埋虹吸管(13)放入对接部位,在第一钢板(10)和第二钢板(11)中间接入一段对接管(14);
第三步、将第一虹吸钢管(4)和第二虹吸钢管(9)同时沉入水下,第一钢板(10)和第二钢板(11)构成围堰,在第一钢板(10)和第二钢板(11)构成的围堰内填入袋装粘土(8),填至与相邻两沟槽(5)两侧顶部的高度平。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100988613A CN103195071A (zh) | 2013-03-25 | 2013-03-25 | 骑管钢板土填心围堰结构及其施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100988613A CN103195071A (zh) | 2013-03-25 | 2013-03-25 | 骑管钢板土填心围堰结构及其施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103195071A true CN103195071A (zh) | 2013-07-10 |
Family
ID=48717874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100988613A Pending CN103195071A (zh) | 2013-03-25 | 2013-03-25 | 骑管钢板土填心围堰结构及其施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195071A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201132960Y (zh) * | 2007-11-05 | 2008-10-15 | 上海勘测设计研究院 | 一种轻型钢结构组合围堰 |
US20090297280A1 (en) * | 2008-05-28 | 2009-12-03 | Mcbride Todd | Shiftable Fluid Diversion Conduit |
CN201843143U (zh) * | 2010-09-15 | 2011-05-25 | 中国建筑第二工程局有限公司 | 深水单壁钢吊箱围堰 |
CN102140801A (zh) * | 2010-02-02 | 2011-08-03 | 中交二公局第五工程有限公司 | 一种深水墩承台施工中围堰施工方法 |
CN202440787U (zh) * | 2012-02-03 | 2012-09-19 | 葛洲坝集团第二工程有限公司 | 一种河道导流装置 |
-
2013
- 2013-03-25 CN CN2013100988613A patent/CN103195071A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201132960Y (zh) * | 2007-11-05 | 2008-10-15 | 上海勘测设计研究院 | 一种轻型钢结构组合围堰 |
US20090297280A1 (en) * | 2008-05-28 | 2009-12-03 | Mcbride Todd | Shiftable Fluid Diversion Conduit |
CN102140801A (zh) * | 2010-02-02 | 2011-08-03 | 中交二公局第五工程有限公司 | 一种深水墩承台施工中围堰施工方法 |
CN201843143U (zh) * | 2010-09-15 | 2011-05-25 | 中国建筑第二工程局有限公司 | 深水单壁钢吊箱围堰 |
CN202440787U (zh) * | 2012-02-03 | 2012-09-19 | 葛洲坝集团第二工程有限公司 | 一种河道导流装置 |
Non-Patent Citations (2)
Title |
---|
刘刚: "贵阳市西郊水厂大口径虹吸管沉管施工技术", 《岩土钻掘工程实录选辑》, 31 December 2002 (2002-12-31) * |
刘刚等: "虹吸管水下对接方案的探讨与实施", 《西部探矿工程》, 31 December 2009 (2009-12-31) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204552783U (zh) | 一种黄土隧道竖向变形控制结构 | |
CN104389610B (zh) | 一种穿越运营高速公路隧道超短台阶施工方法 | |
CN206928305U (zh) | 一种刚性被动区扶壁式支护结构 | |
CN103775095A (zh) | 山岭软基隧道超前双导洞及其施工方法 | |
CN103104102A (zh) | 一种地下增层改造施工方法 | |
CN202628123U (zh) | 大断面断层破碎带隧道突泥处理结构 | |
CN204343306U (zh) | 滑坡隧道一体化加固治理装置 | |
CN104195956B (zh) | 膺架式水域连续梁现浇支架及其搭建方法 | |
CN203238642U (zh) | 基坑支护挡墙 | |
CN104632228B (zh) | 横通道进入正线施工方法及横通道 | |
CN208328666U (zh) | 一种带锚杆的扩大基础座板式桥台结构 | |
CN205152983U (zh) | 地下空间施工的地层预加固处理结构 | |
CN104005414B (zh) | 大直径钢筋混凝土灌注桩支撑立柱的施工方法 | |
CN105971608A (zh) | 一种厚煤层大采高沿空留巷方法 | |
CN105525624A (zh) | 一种拼装钢管柱式塔吊基础与结构底板的连接及防水方法 | |
CN208917850U (zh) | 一种微型钢管桩加格栅喷锚深基坑联合支护体系 | |
CN203846503U (zh) | 一种两条已建地铁隧道中部明挖区间基坑支护体系 | |
CN104131535B (zh) | 一种高聚物复合加筋土石坝抗震结构及其施工方法 | |
CN203583501U (zh) | 一种抵抗岩体滑动的深层抗剪装置 | |
CN103195071A (zh) | 骑管钢板土填心围堰结构及其施工工艺 | |
CN204311457U (zh) | 一种地铁车站基坑开挖施工用组合式支护体系 | |
CN203716126U (zh) | 囱式导管架 | |
CN102619248B (zh) | 岩石成槽机及成槽方法 | |
CN115506807A (zh) | 隧道下方跨越溶洞的支护结构及其施工方法 | |
CN203835410U (zh) | 一种围护桩与暗挖隧道拱顶和底板结构的槽口式铰接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130710 |