CN103195068A - 由岩土本构折线段确定基坑挖深的方法 - Google Patents

由岩土本构折线段确定基坑挖深的方法 Download PDF

Info

Publication number
CN103195068A
CN103195068A CN2013101152721A CN201310115272A CN103195068A CN 103195068 A CN103195068 A CN 103195068A CN 2013101152721 A CN2013101152721 A CN 2013101152721A CN 201310115272 A CN201310115272 A CN 201310115272A CN 103195068 A CN103195068 A CN 103195068A
Authority
CN
China
Prior art keywords
sigma
broken line
stress
delta
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101152721A
Other languages
English (en)
Other versions
CN103195068B (zh
Inventor
白福波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute Of Technology Architectural Design And Research Institute Co ltd
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201410566691.1A priority Critical patent/CN104452770B/zh
Priority to CN201310115272.1A priority patent/CN103195068B/zh
Publication of CN103195068A publication Critical patent/CN103195068A/zh
Application granted granted Critical
Publication of CN103195068B publication Critical patent/CN103195068B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

由岩土本构折线段确定基坑挖深的方法,涉及基坑侧壁直立开挖深度,属于地基岩土工程技术领域。当应用已有的本构模型进行场地土体内力、应力分析时,由于场地土体本构条件状况变异离散,过程运算繁杂,只能粗略简化为概念确定,影响设计的准确性,存在难以满足经济性要求等问题,进而提供了由岩土本构折线段确定基坑挖深的方法。技术要点:将与应力相关的土工实验曲线,按要求的精确度采用割线或切线模拟方式;在坐标系内进行区间划分。形成一多段折线形状,每段折线的折点坐标或斜率为已知,建立折线段方程可得主应力圆与抗剪强度关系式及土体中内力与变位的折线性设计方法。本发明方法相对准确有效地解决了岩土非线性问题。作法适用合理,节能省材。

Description

由岩土本构折线段确定基坑挖深的方法
技术领域
本发明涉及一种基坑挖深的确定方法,属于地基岩土工程技术领域。
背景技术
岩土是一种由天然介质混合构成的弹塑性材料,本构关系随自然条件而变。一般是在现场勘探取出原状土样试件,在实验室内由土工实验获得物理力学性能指标及相应参数,如:应力与抗剪强度包线、压缩曲线、侧限变形模量等。当前的做法是将变异离散的实验数据(坐标点),用数学方法统计回归后取过坐标原点近于直线那一段,这段线性特征在材料上被视为具有弹性性能,并作为土体中内力与变位的设计依据,也是建立解算线性方程的广义物理条件。这一表述说明:这种线性设计实质是一种简化方法,对一些土工实验中非线性特征明显的土体材料,产生的误差较大,也不适用。目前对这一土工实验中的非线性问题,已构建了许多本构模型的表达式,但用于场地土体内力、应力分析时,则是一极繁琐的行为,难以满足要求。当场地土体本构条件复杂时,只能粗略简化为概念确定。
发明内容
本发明为了解决利用已有的本构模型进行场地土体内力、应力分析(进行地基承载、基坑侧壁土压、岩土结构设计等),当场地土体本构条件变异离散运算繁杂时,只能粗略简化分析,影响设计的准确性,难以满足工程要求等问题,进而提供了一种由岩土本构折线段确定基坑挖深的方法。
本发明为解决上述技术问题采取的技术方案是:
技术方案一:一种由岩土本构折线段确定基坑挖深的方法,所述方法是按照以下步骤实现的:
步骤一、选取折线段:
折线各折点左右线段判定式为:
Figure BDA00003010948700011
当σ3,i≤σ3j取左L j-1,σ3,i>σ3j取右Lj;
σ 3 , i = Σ i = 0 i + 1 Δ σ 3 , i ; i=0;Δσ3,0=0;
步骤二、根据选取的折线段利用式(1)或式(4)求得Δσ1,Δσ1表示基坑侧壁的土体单元垂直向压应力增量,即折线段大主压应力增量;
Δ σ 1 = Σ i = 1 n Δ σ 13 , i - - - ( 1 )
Δ σ 13 , i = ( σ 3 , i k j - σ 3 , i - 1 k j - 1 ) +
式中:                          (2)
2 ( C j k j - C j - 1 k j - 1 )
σ1,i=σ1,0+Δσ1 σ 1,0 = 2 C 0 k 0
Δ σ 1 = σ 3 , i k j + 2 ( C j k j - C 0 k 0 ) - - - ( 4 ) ;
大主压应力增量公式(1)可写成公式(4);式(1)用于电算,式(4)用于手算;σ1,j、σ3,j、τf1,j、τf3,j:折线各折点的应力、剪应力(坐标值);
字符下标i:坐标轴上i点应力。下标j:第j条折线段Lj;
步骤三、求侧压应力下基坑侧壁深度增量ΔH1:ΔH1=Δσ1
式中:γ表示土重度;
ΔH1,将用于确定基坑侧壁直立总深度H。
技术方案二:一种由岩土本构折线段确定基坑挖深的方法,所述方法是按照以下步骤实现的:
步骤一、选取折线段:
折线各折点左右线段判定式为:
当σ1,i≤σ1j取左L j-1,σ1,i>σ1j取右L j;
σ 1 , i = Σ i = 0 i + 1 Δ σ 1 , i ; i=0;Δσ1,0=0;
步骤二、根据选取的折线段利用式(5)或式(8)求得Δσ3,Δσ3表示
基坑侧壁的土体单元水平向压应力增量,即折线段小主压应力增量;
Δ σ 3 = Σ i = 1 n Δ σ 31 , i - - - ( 5 )
Δσ 31 , i = ( σ 1 , i k j - σ 1 , i - 1 k j - 1 ) - 2 ( C j k j - C j - 1 k j - 1 ) - - - ( 6 )
Δ σ 3 = σ 1 , i k j - 2 ( C j k j - C 0 k 0 ) - - - ( 8 )
小主压应力增量公式(5)可写成公式(8);式(5)用于电算,式(8)用于手算;式中:
Figure BDA00003010948700032
σ1,i、σ3,i:大、小主压应力;
Δσ1、Δσ3:大、小主压应力增量;
Cj
Figure BDA00003010948700033
:土体内粘聚力、摩擦角;
σ1,j、σ3,j、τf1,j、τf3,j:折线各折点的应力、剪应力(坐标值);
字符下标i:坐标轴上i点应力;下标j:第j条折线段Lj;
步骤三、求侧压应力下基坑侧壁深度减量ΔH3:ΔH3=Δσ3
式中:γ表示土重度;
由技术方案一得到的ΔH1及ΔH3,可求得基坑侧壁直立总深度H。
技术方案三:本技术方案也适于确定基坑挖深,一种由岩土本构折线段刚度选定确定土体内力的方法,所述方法是按照以下步骤实现的:
步骤一、先选择一条实刚度线段,得线刚度方程S=S0+R/K,由已知外荷载按线性关系求解内力R(r)。
步骤二、若内力R(r)或R(r′)落在实刚度线段Li所对应的内力范围内,如:Ri≤R(r)≤Ri+1,则计算值R(r)即是所求内力值;取R(r)值再按材料力学求解基坑土体内:正应力、剪应力、主应力;
步骤三、若计算的内力R(r)或R(r′)未落在选择的Li所对应的内力范围内,那么r或r′点必对应出现在Li线段左或右端点以外延伸线的虚刚度线段上一点a或a′;由a或a′对内力轴引垂线必与此相交有一条实刚度线段b或b′点,可再得实刚度线段方程,然后重复步骤一、二。
本发明的有益效果是:
利用已有的线弹性设计法,将与应力相关的土工实验曲线,按要求的精确度采用割线或切线方式;在坐标系内进行区间划分。形成一多段折线形状,每段折线的折点坐标或斜率为已知,建立直线方程可得主应力圆与抗剪强度关系式及土体中内力与变位的非线性设计方法。它相对准确有效的解决岩土非线性问题,如:用于确定地基承载、基坑侧壁土压、岩土结构设计等。作法适用合理,节能省材。
附图说明
图1是折线性大主压应力图,图2是折线性小主压应力图,图3是选折线刚度设计方法示意图(图3中,①:实刚度线段、②:虚刚度线段);图4、图5为平面坐标应力图解(图4表示:大主压应力图解;图5表示小主压应力图解)。
本发明方法的实施例:
由锚杆担梁双桩单元对基坑侧壁施加预压力。采用PC管桩,桩直径0.3m,桩距1.0m,锚杆水平间距2.0m。土重度:19.数值单位:KN,Kpa,m.
土工试验得抗剪强度包线为一曲线,再化分模拟成三段直线呈折线形。
线段L1:
Figure BDA00003010948700041
C1=17;L2:
Figure BDA00003010948700042
C2=11;L3:
Figure BDA00003010948700043
C3=24。三折线段有两个交点(折点)坐标:(σ3,1,τf3,1)=(σ1,1,τf1,1)=(30,23);(σ3,2,τf3,2)=(σ1,2,τf1,2)=(63,37)。侧压应力P=26(Δσ3);q=22(Δσ1)。有:σ3,i=3·Δσ3=3×26=78;σ1,i=3·Δσ1=3×22=66Kpa
实施例1:求侧压应力下基坑侧壁深度增量ΔH1。
由式(2)与判别式(3),取第二折点坐标值(63,37)左侧线段L2.
σ3j=63-37/cos23°(1-sin23°)=63-37/0.92(1-0.39)=38.47Kpaσ3,i=78>σ3j=38.47,取右侧折线段L3
k1=tg2(45°+10°/2)=1.1922=1.42;k2=tg2(45°+23°/2)=1.5112=2.283k3=tg2(45°+12°/2)=1.2352=1.525.
由式(1),(2)或式(4)得:
Δσ1=78×1.525+2×(24×√1.525-17×√1.42)=118.95+18.76=137.71Kpa基坑深度增量:ΔH1=Δσ1/γ=137.71/19=7.25m
实施例2:求竖向压应力作用下,基坑侧壁深度减量ΔH3。
由式(6)与判别式(7),取第一折点坐标值(30,23)右侧线段L2σ1j=30+23/cos23°(1+sin23°)=30+23/0.921×(1+0.391)=64.74Kpaσ1,i=66>σ1j=64.74,取右侧折线段L2.
由式(5),(6)或式(8)得:
Δσ3=66/2.283-2×(11/√2.283-17/√1.42)=28.91+13.96=42.87Kpa基坑深度减量:ΔH3=Δσ3/γ=42.87/19=2.26m
实施例3:求基坑侧壁深度H
基坑初始临界深度:H0c=2×17/19×tg(45°+10°/2)=2.13m;基坑顶放坡深1.5m。基坑侧壁深度:H=H0c+ΔH1-ΔH3=2.13+7.25-2.26=7.12m(取两道锚杆)基坑侧壁开挖深度:h=7.12+1.5=8.62mΔH1/H×P=7.25/7.12×26=26.48;Npi=26.48×1.0×7.12/3=62.85kN单束锚杆侧向预拉力取2Npi=126kN。(选一根钢铰线)
图4、图5为实施例平面坐标图解应力。
本发明内容的论证:
一、由土工试验抗剪强度曲线(为非线性可含有突变断点),它可由一系列满足精度要求的切线或割线线段包络,得到一模拟接近广义非线性曲线的多段折线。因多段折线斜率一点座标为已知,按截距式方程,对于单直线段:
Figure BDA00003010948700051
j=1对于广义折线段: Δ σ 1 = Σ i = 1 n Δ σ 13 , i - - - ( 1 )
Δ σ 13 , i = ( σ 3 , i k j - σ 3 , i - 1 k j - 1 ) +
式中:                      (2)
2 ( C j k j - C j - 1 k j - 1 )
式中: Δ σ 3 , i = 3 · Δ σ 3 n ; n≥3;n:增量分段。
Δσ3,i=σ3,13,i,1;i=1;σ3,0=0;j=1,2,3,…。图3中,Lj为折线线段。
σ1,i=σ1,0+Δσ1 σ 1,0 = 2 C 0 k 0
图1为莫尔圆与非线性抗剪强度折线图,也是公式(1)的几何图解。应力圆在向右按增量(步长)移动时,须确定圆与折线的切点位于折点左右那一侧线段上,对折线各折点j左右线段Lj的选取判定,可由几何关系得折线分界点左右线段判定式。由已知折点坐标(σ3j,τf3,j),见图1可写得算式:
Figure BDA00003010948700057
当σ3,i≤σ3j取左L j-1,σ3,j>σ3j取右L j。
σ 3 , i = Σ i = 0 i + 1 Δ σ 3 , i ; i=0;Δσ3,0=0
图1表明剪切包线在平面坐标系内可以是任意折线段,折线上一点的应力状态与主应力增量步长路径累加无关。可由式(3)判定主应力对应的折线线段,得主应力增量式(4)。
大主压应力增量公式也可写成:
Δ σ 1 = σ 3 , i k j + 2 ( C j k j - C 0 k 0 ) - - - ( 4 )
二、按上述方法由图2可得小主压应力公式:
Δ σ 3 = Σ i = 1 n Δ σ 31 , i - - - ( 5 )
Δσ 31 , i = ( σ 1 , i k j - σ 1 , i - 1 k j - 1 ) - 2 ( C j k j - C j - 1 k j - 1 ) - - - ( 6 )
折线各折点j左右线段Lj的判定式:
Figure BDA00003010948700065
当σ1,i≤σ1j取左L j-1,σ1,i>σ1j取右L j。
小主压应力增量公式也可写成:
Δ σ 3 = σ 1 , i k j - 2 ( C j k j - C 0 k 0 ) - - - ( 8 )
注:图1,2中,圆弧虚线与应力轴交点为分界圆应力点。
三、折线刚度选定法:图3为内力R与位移S曲线的折线性模拟,折线段包络角与根数满足精度要求。在外荷载作用下折线上一点处于平衡状态。通过折线(实刚度线段)上的某一点求解唯一对应内力R。计算步骤是:
1、先选择一条实刚度线段,得线刚度方程:S=S0+R/K由已知外荷载按线性关系求解内力R(r)。
2、若内力R(r)或R(r′)落在实刚度线段Li所对应的内力范围内,如:Ri≤R(r)≤Ri+1,则计算值R(r)是所求内力。再按材料力学求解正应力、剪应力、主应力。
3、若计算的内力R(r)或R(r′)未落在选择的Li所对应的内力范围内,那么r或r′点必对应出现在Li线段左或右端点以外延伸线上的虚刚度线段②一点a或a′。由a或a′对内力轴引垂线必与此相交有一条实刚度线段①上一点b或b′,可再得实刚度线段方程,重复步骤1、2。
选择一条实刚度线段的过程为:先将曲线模拟化分成三条折线段,分别运算必有一条可选择为“实刚度线段”。

Claims (3)

1.一种由岩土本构折线段确定基坑挖深的方法,其特征在于:所述方法是按照以下步骤实现的:
步骤一、选取折线段:
折线各折点左右线段判定式为:
当σ3,i≤σ3j取左L j-1,σ3,i>σ3j取右L j;
σ 3 , i = Σ i = 0 i + 1 Δ σ 3 , i ; i=0;Δσ3,0=0;
步骤二、根据选取的折线段利用式(1)或式(4)求得Δσ1,Δσ1表示基坑侧壁的土体单元垂直向压应力增量,即折线段大主压应力增量;
Δ σ 1 = Σ i = 1 n Δ σ 13 , i - - - ( 1 )
Δ σ 13 , i = ( σ 3 , i k j - σ 3 , i - 1 k j - 1 ) +
式中:                        (2)
2 ( C j k j - C j - 1 k j - 1 )
σ1,i=σ1,0+Δσ1 σ 1,0 = 2 C 0 k 0
Δ σ 1 = σ 3 , i k j + 2 ( C j k j - C 0 k 0 ) - - - ( 4 ) ;
σ1,j、σ3,j、τf1,j、τf3,j:折线各折点的应力、剪应力(坐标值);
字符下标i:坐标轴上i点应力。下标j:第j条折线段Lj;
步骤三、求侧压应力下基坑侧壁深度增量ΔH1:ΔH1=Δσ1
式中:γ表示土重度;
ΔH1,将用于确定基坑侧壁直立总深度H。
2.一种由岩土本构折线段确定基坑挖深的方法,其特征在于:所述方法是按照以下步骤实现的:
步骤一、选取折线段:
折线各折点左右线段判定式为:
Figure FDA00003010948600018
当σ1,i≤σ1j取左L j-1,σ1,i>σ1j取右L j;
σ 1 , i = Σ i = 0 i + 1 Δ σ 1 , i ; i=0;Δσ1,0=0;
步骤二、根据选取的折线段利用式(5)或式(8)求得Δσ3,Δσ3表示
基坑侧壁的土体单元水平向压应力增量,即折线段小主压应力增量;
Δ σ 3 = Σ i = 1 n Δ σ 31 , i - - - ( 5 )
Δσ 31 , i = ( σ 1 , i k j - σ 1 , i - 1 k j - 1 ) - 2 ( C j k j - C j - 1 k j - 1 ) - - - ( 6 )
Δ σ 3 = σ 1 , i k j - 2 ( C j k j - C 0 k 0 ) - - - ( 8 )
式中:
Figure FDA00003010948600025
σ1,i、σ3,i:大、小主压应力;
Δσ1、Δσ3:大、小主压应力增量;
Cj
Figure FDA00003010948600026
:土体内粘聚力、摩擦角;
σ1,j、σ3,j、τf1,j、τf3,j:折线各折点的应力、剪应力(坐标值);
字符下标i:坐标轴上i点应力;下标j:第j条折线段Lj;
步骤三、求侧压应力下基坑侧壁深度减量ΔH3:ΔH3=Δσ3
式中:γ表示土重度;
由权利要求1得到的ΔH1及ΔH3,可求得基坑侧壁直立总深度H。
3.一种由岩土本构折线段刚度选定确定土体内力的方法,其特征在于:所述方法是按照以下步骤实现的:
步骤一、先选择一条实刚度线段,得线刚度方程S=S0+R/K,由已知外荷载按线性关系求解内力R(r)。
步骤二、若内力R(r)或R(r′)落在实刚度线段Li所对应的内力范围内,如:Ri≤R(r)≤Ri+1,则计算值R(r)即是所求内力值;取R(r)值再按材料力学求解基坑土体内:正应力、剪应力、主应力;
步骤三、若计算的内力R(r)或R(r′)未落在选择的L i所对应的内力范围内,那么r或r′点必对应出现在Li线段左或右端点以外延伸线的虚刚度线段上一点a或a′;由a或a′对内力轴引垂线必与此相交有一条实刚度线段b或b′点,可再得实刚度线段方程,然后重复步骤一、二。
CN201310115272.1A 2013-04-03 2013-04-03 由岩土本构折线段确定基坑挖深的方法 Expired - Fee Related CN103195068B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410566691.1A CN104452770B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定土体内力的方法
CN201310115272.1A CN103195068B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定基坑挖深的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310115272.1A CN103195068B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定基坑挖深的方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201410566691.1A Division CN104452770B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定土体内力的方法

Publications (2)

Publication Number Publication Date
CN103195068A true CN103195068A (zh) 2013-07-10
CN103195068B CN103195068B (zh) 2015-05-13

Family

ID=48717871

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410566691.1A Expired - Fee Related CN104452770B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定土体内力的方法
CN201310115272.1A Expired - Fee Related CN103195068B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定基坑挖深的方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410566691.1A Expired - Fee Related CN104452770B (zh) 2013-04-03 2013-04-03 由岩土本构折线段确定土体内力的方法

Country Status (1)

Country Link
CN (2) CN104452770B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938636A (zh) * 2014-04-21 2014-07-23 国家电网公司 一种输电线路工程岩石基础利用液压劈裂机开挖的方法
CN104328787A (zh) * 2014-10-30 2015-02-04 水利部交通运输部国家能源局南京水利科学研究院 一种土的开挖回弹过程模拟方法
CN112557218A (zh) * 2020-12-24 2021-03-26 中国建筑第八工程局有限公司 通过比较截距判断黏土是否受力破坏的方法
CN114032973A (zh) * 2021-11-24 2022-02-11 上海建工集团股份有限公司 一种基坑深层土体变形监测装置及计算方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878785B (zh) * 2015-05-18 2017-06-30 卢里尔 桩土相互作用及桩端土本构模型和模型参数确定方法
CN104915574B (zh) * 2015-07-03 2017-08-29 长江水利委员会长江科学院 一种适用于加卸载全过程的软岩蠕变本构模型的建立方法
CN107103168B (zh) * 2017-06-23 2020-11-06 哈尔滨工业大学建筑设计研究院 基坑侧壁挡土结构设计方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0776840A (ja) * 1993-09-06 1995-03-20 Sabukon Syst:Kk 山留め計算処理支援システム
JP3353273B2 (ja) * 2001-05-09 2002-12-03 パシフィックコンサルタンツ株式会社 掘削工事用シミュレーション装置に用いる背面側の水平地盤反力係数設定方法及び最小土圧設定方法
CN101615212A (zh) * 2009-07-28 2009-12-30 武汉理工大学 一种排桩-内支撑支护体系简化设计计算方法
CN101871776A (zh) * 2009-04-27 2010-10-27 温兆东 一种排桩桩身变形量的计算方法
CN102251524A (zh) * 2011-04-25 2011-11-23 哈尔滨工业大学 基坑侧壁预应力锚杆担梁排桩围护结构
CN102383433A (zh) * 2011-08-22 2012-03-21 同济大学建筑设计研究院(集团)有限公司 一种超高层建筑深大基坑的设计方法
CN102561293A (zh) * 2010-12-17 2012-07-11 上海市电力公司 软土深基坑水土压力测试方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103234473A (zh) * 2013-04-12 2013-08-07 哈尔滨工业大学深圳研究生院 一种可观测土体内部的渗水力模型试验装置和试验方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0776840A (ja) * 1993-09-06 1995-03-20 Sabukon Syst:Kk 山留め計算処理支援システム
JP3353273B2 (ja) * 2001-05-09 2002-12-03 パシフィックコンサルタンツ株式会社 掘削工事用シミュレーション装置に用いる背面側の水平地盤反力係数設定方法及び最小土圧設定方法
CN101871776A (zh) * 2009-04-27 2010-10-27 温兆东 一种排桩桩身变形量的计算方法
CN101615212A (zh) * 2009-07-28 2009-12-30 武汉理工大学 一种排桩-内支撑支护体系简化设计计算方法
CN102561293A (zh) * 2010-12-17 2012-07-11 上海市电力公司 软土深基坑水土压力测试方法
CN102251524A (zh) * 2011-04-25 2011-11-23 哈尔滨工业大学 基坑侧壁预应力锚杆担梁排桩围护结构
CN102383433A (zh) * 2011-08-22 2012-03-21 同济大学建筑设计研究院(集团)有限公司 一种超高层建筑深大基坑的设计方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
白福波等: "狭窄土体侧向作用计算方法", 《低温建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938636A (zh) * 2014-04-21 2014-07-23 国家电网公司 一种输电线路工程岩石基础利用液压劈裂机开挖的方法
CN104328787A (zh) * 2014-10-30 2015-02-04 水利部交通运输部国家能源局南京水利科学研究院 一种土的开挖回弹过程模拟方法
CN112557218A (zh) * 2020-12-24 2021-03-26 中国建筑第八工程局有限公司 通过比较截距判断黏土是否受力破坏的方法
CN112557218B (zh) * 2020-12-24 2024-03-19 中国建筑第八工程局有限公司 通过比较截距判断黏土是否受力破坏的方法
CN114032973A (zh) * 2021-11-24 2022-02-11 上海建工集团股份有限公司 一种基坑深层土体变形监测装置及计算方法

Also Published As

Publication number Publication date
CN103195068B (zh) 2015-05-13
CN104452770B (zh) 2016-06-01
CN104452770A (zh) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103195068B (zh) 由岩土本构折线段确定基坑挖深的方法
Mašín et al. A hypoplastic model for mechanical response of unsaturated soils
CN104314108B (zh) 一种确定桩基础桩周土强度参数的反分析方法
Wang et al. Behaviour of pile-anchor reinforced landslides under varying water level, rainfall, and thrust load: Insight from physical modelling
Ding et al. Flexural toppling mechanism and stability analysis of an anti-dip rock slope
Madabhushi et al. LEAP-GWU-2015: Centrifuge and numerical modelling of slope liquefaction at the University of Cambridge
Liu et al. Cracking risk analysis of face slabs in concrete face rockfill dams during the operation period
Wang et al. Undrained bearing capacity of suction caissons for offshore wind turbine foundations by numerical limit analysis
Yin et al. Modelling of suction bucket foundation in clay: From finite element analyses to macro-elements
Zhu et al. Rheological properties of soil: A review
Karim et al. Numerical analysis of piled raft foundation on clayey soil
Zhang et al. Numerical analysis of the brittle–ductile transition of deeply buried marble using a discrete approach
Otsmane et al. An efficient FE model for SSI: Theoretical background and assessment by predicting the response of large diameter monopiles supporting OWECs
Tao et al. Failure and stability analysis of Jinping-I arch dam based on geomechanical model test and nonlinear numerical analysis
Lu et al. Numerical and experimental analyses for bearing capacity of rigid strip footing subjected to eccentric load
Yang et al. Computation and analysis of high rocky slope safety in a water conservancy project
Dram et al. Performance of retaining walls with compressible inclusions under seismic loading
He et al. Evaluating the safety of high arch dams with fractures based on numerical simulation and geomechanical model testing
Sultanov et al. Method for assessing the reliability of earth dams in irrigation systems
Chi et al. An elasto-plastic constitutive model for agricultural cohesive soil
Posse et al. Validation of a 3D numerical model for piled raft systems founded in soft soils undergoing regional subsidence
Ayuluri et al. Settlement analysis of Piled Raft Foundation System (PRFS) in soft clay
Önder Çetin et al. Recent advances in seismic soil liquefaction engineering
Lu et al. Three-dimensional limit equilibrium analysis of open pits
Abuhajar et al. The effect of soil depth and box culvert geometry on the static soil-culvert interaction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CONSTRUCTION DESIGN RESEARCH INST., HARBIN POLYTEC

Free format text: FORMER OWNER: HARBIN INDUSTRY UNIVERSITY

Effective date: 20150521

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150521

Address after: 150001 No. 73, the Yellow River Road, Nangang District, Heilongjiang, Harbin

Patentee after: BUILDING DESIGN Research Institute HARBIN INSTITUTE OF TECHNOLOGY

Address before: 150001 Harbin, Nangang, West District, large straight street, No. 92

Patentee before: Harbin Institute of Technology

CP01 Change in the name or title of a patent holder

Address after: 150001 No. 73, Huanghe Road, Nangang District, Harbin City, Heilongjiang Province

Patentee after: Harbin Institute of Technology Architectural Design and Research Institute Co.,Ltd.

Address before: 150001 No. 73, Huanghe Road, Nangang District, Harbin City, Heilongjiang Province

Patentee before: BUILDING DESIGN Research Institute HARBIN INSTITUTE OF TECHNOLOGY

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

CF01 Termination of patent right due to non-payment of annual fee