CN103182731A - Vertical mould - Google Patents

Vertical mould Download PDF

Info

Publication number
CN103182731A
CN103182731A CN2013100919416A CN201310091941A CN103182731A CN 103182731 A CN103182731 A CN 103182731A CN 2013100919416 A CN2013100919416 A CN 2013100919416A CN 201310091941 A CN201310091941 A CN 201310091941A CN 103182731 A CN103182731 A CN 103182731A
Authority
CN
China
Prior art keywords
mould
mould bases
mould frame
guide rail
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100919416A
Other languages
Chinese (zh)
Other versions
CN103182731B (en
Inventor
张剑
刘艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
CHANGSHA YUANDA RESIDENTIAL INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA YUANDA RESIDENTIAL INDUSTRIAL Co Ltd filed Critical CHANGSHA YUANDA RESIDENTIAL INDUSTRIAL Co Ltd
Priority to CN201310091941.6A priority Critical patent/CN103182731B/en
Publication of CN103182731A publication Critical patent/CN103182731A/en
Application granted granted Critical
Publication of CN103182731B publication Critical patent/CN103182731B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention provides a vertical mould comprising a fixed mould frame, a movable mould frame, a driving mould frame, an adjustable lateral mould, a hydraulic locking oil cylinder, a foundation guide rail and an electric system, wherein the fixed mould frame is fixedly connected with a ground pre-embedded anchor bolt; a set of the vertical mould is formed by the fixed mould frame and the adjacent movable mould frame; panels are arranged on front and back faces of the movable mould frame; the bottom of the movable mould frame is provided with a moving wheel assembly to move on the foundation guide rail; the driving mould frame and one set of the movable mould frame are connected to form a whole body; a driving assembly is mounted at the bottom of the driving mould frame and is connected with the foundation guide rail; the adjustable lateral mould is formed by arranging a positioning and locking device on profile steel; and the hydraulic locking oil cylinder is mounted on the fixed mould frame. According to the vertical mould disclosed by the invention, industrial production and surface quality requirements of concrete prefabricated slabs can be met, the labor intensity is reduced and the labor productivity is improved.

Description

Formwork erection
Technical field
The present invention relates to the constructional engineering machinery technical field, be specifically related to a kind of formwork erection in the dwelling house industrialized building engineering machinery.
Background technology
In the precast concrete production of dwelling house industrialized building preparation, the precast concrete that the production line flow process is made has only the surface smoothness and the smoothness that contact with the chassis panel can reach requirement.And at the scene in the installation process, for example two faces of Side fascia all must be smooth, smooth for precast concrete, therefore needs a kind of new die apparatus of design solve this problem.
Summary of the invention
Technical problem to be solved by this invention is: solve the problem that above-mentioned prior art exists, and a kind of formwork erection is provided, satisfy the smooth smooth requirement in suitability for industrialized production concrete prefabricated board two sides, reduce labour intensity, raise labour productivity.
The technical solution used in the present invention is:
A kind of formwork erection, comprise fixedly mould bases, mobile formwork, driving mould bases, adjustable side mould, hydraulic locking oil cylinder, ground guide rail and electrical system, fixedly the pre-buried spiral shell crab-bolt in mould bases and ground is connected and fixed, fixedly welding template in the skeleton two sides of mould bases is as working face, and fixedly mould bases is formed one group of formwork erection with contiguous mobile formwork; Mobile formwork positive and negative two sides all has panel, and it is mobile at the ground guide rail that the travel wheel assembly is installed in the bottom; Drive the skeleton of mould bases with fixedly mould bases is identical, and drive mould bases and be connected to form integral body with one group of mobile formwork, drive mould bases bottom installation driving assembly, be connected with the ground guide rail; The adjustable side mould is shaped steel one face down bonding spreading bar shaped panel, and is provided with positioning and locking device; The hydraulic locking oil cylinder is installed on fixedly on the mould bases; Electrical system connects the whole formwork erection of control.
Operation principle:
During off working state, all mobile formworks are linked up with one group one group connection by the side, with fixedly mould bases and driving mould bases form an integral body; During work, earlier selected a certain group of mould unclamps corresponding hook, starts to drive mould bases and drive all mobile formworks of the outside and walk together and stop behind the 2m, and this 2m is as working space.The workman installs reinforcing bar and built-in fitting, installs according to the precast concrete width and leaves working space after the adjustable side mould is finished, and control drives mould bases closes up mould, buckles hook.Other respectively organize mould all install according to this method pre-buried, treat that all preparations are finished after, bearing pin connects hydraulic locking oil cylinder and connecting rod, controls the hydraulic system oil return, with all mold-locked.From the top casting concrete, open side surface vibration device vibrates, and finishes the making of precast concrete.After the precast concrete moulding, the suspender of will driving a vehicle earlier hooks the pre-buried nail that hangs in precast concrete plate top, unclamps hydraulic locking oil cylinder, connecting rod and corresponding hook successively, and control drives slowly walking laterally of mould bases, can finish the demoulding.
Advantageous effect:
Formwork erection of the present invention can satisfy concrete prefabricated board suitability for industrialized production and surface quality requirement, reduces labour intensity, raises labour productivity.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the fixing skeleton structure schematic diagram of mould bases;
Fig. 3 is the mobile formwork structural representation;
Fig. 4 is for driving the mould bases structural representation;
Fig. 5 is the structural representation of adjustable side mould after horizontal, and during work, the adjustable side mould should be erect installation.
The accompanying drawing marking explanation:
1-is mould bases fixedly, 2-mobile formwork, the two-sided mould bases of 21-, the 22-mini vibrator, the 23-hook, 24-carries out wheel assembly, 25-positioning and locking bar, 3-drives mould bases, and 31-drives the skeleton of mould bases, 32-drives assembly, 33-guiding assemblage, 4-adjustable side mould, 41-shaped steel, the 42-positioning and locking device, 5-hydraulic locking oil cylinder, 6-ground guide rail.
The specific embodiment
Participate in Fig. 1-Fig. 5, formwork erection of the present invention, comprise fixedly mould bases 1, mobile formwork 2, driving mould bases 3, adjustable side mould 4, hydraulic locking oil cylinder 5, ground guide rail 6 and electrical system, fixedly the pre-buried spiral shell crab-bolt in mould bases and ground is connected and fixed, fixedly welding template in the skeleton two sides of mould bases is formed one group of formwork erection as working face with contiguous mobile formwork 2; Mobile formwork 2 positive and negative two sides all have panel, and it is mobile at ground guide rail 6 that base plate is installed the travel wheel assembly; Drive the skeleton 31 of mould bases with fixedly mould bases 1 is identical, and drive mould bases 3 and be connected to form integral body with one group of mobile formwork 2, drive mould bases 3 bottoms installation driving assembly 32, be connected with ground guide rail 6; Adjustable side mould 4 is provided with positioning and locking device 42 for shaped steel 41; Hydraulic locking oil cylinder 5 is installed on fixedly on the mould bases 1; Electrical system connects the whole formwork erection of control.
Below in conjunction with accompanying drawing the present invention is made and to further specify:
As shown in Figure 1 and Figure 2, fixedly mould bases adopts I-steel as skeleton, is connected and fixed with the pre-buried spiral shell crab-bolt in ground, and one group of template is respectively welded as working face in the skeleton two sides, forms one group of formwork erection with contiguous mobile formwork; As Fig. 1, shown in Figure 3, mobile formwork adopts the shaped steel welding fabrication, and tow sides have panel, and the travel wheel assembly is installed in the bottom, moves at guide rail; The positioning and locking bar 25 of Fig. 3 is connected with the positioning and locking device 42 of adjustable side mould, and by its locking.
As Fig. 1, shown in Figure 4, drive the same fixedly mould bases of skeleton of mould bases, be connected to form integral body with one group of mobile formwork, the bottom is installed the driving assembly walking power is provided; Shaped steel is welded on the panel, cooperates positioning and locking device to form the adjustable side mould; The hydraulic locking oil cylinder is installed on fixedly on the mould bases, realizes the locking function of mould; The ground guide rail is the walking track of a whole set of formwork erection; Electrical system is the operation control system of formwork erection.

Claims (1)

1. formwork erection, it is characterized in that: comprise fixedly mould bases, mobile formwork, driving mould bases, adjustable side mould, hydraulic locking oil cylinder, ground guide rail and electrical system, fixedly the pre-buried spiral shell crab-bolt in mould bases and ground is connected and fixed, fixedly welding template in the skeleton two sides of mould bases is as working face, and fixedly mould bases is formed one group of formwork erection with contiguous mobile formwork; Mobile formwork positive and negative two sides all has panel, and it is mobile at the ground guide rail that the travel wheel assembly is installed in the bottom; Drive the skeleton of mould bases with fixedly mould bases is identical, and drive mould bases and be connected to form integral body with one group of mobile formwork, drive mould bases bottom installation driving assembly, be connected with the ground guide rail; The adjustable side mould is that shaped steel is provided with positioning and locking device; The hydraulic locking oil cylinder is installed on fixedly on the mould bases; Electrical system connects the whole formwork erection of control.
CN201310091941.6A 2013-03-21 2013-03-21 Vertical mould Active CN103182731B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310091941.6A CN103182731B (en) 2013-03-21 2013-03-21 Vertical mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310091941.6A CN103182731B (en) 2013-03-21 2013-03-21 Vertical mould

Publications (2)

Publication Number Publication Date
CN103182731A true CN103182731A (en) 2013-07-03
CN103182731B CN103182731B (en) 2015-07-22

Family

ID=48674304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310091941.6A Active CN103182731B (en) 2013-03-21 2013-03-21 Vertical mould

Country Status (1)

Country Link
CN (1) CN103182731B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105984025A (en) * 2015-02-09 2016-10-05 任丘市永基建筑安装工程有限公司 Assembled mold pulley controlled traveling technology
CN105984023A (en) * 2015-02-09 2016-10-05 任丘市永基建筑安装工程有限公司 Combined mold single-plate construction method
CN105984038A (en) * 2015-03-02 2016-10-05 任丘市永基建筑安装工程有限公司 Combination mold double-plate construction method
CN107520947A (en) * 2016-06-21 2017-12-29 中国十七冶集团有限公司 A kind of prefabricated column joint production mould and its application method
CN108748626A (en) * 2018-07-26 2018-11-06 承德绿建建筑节能科技有限公司 Precast wall body formwork erection pours device
CN109249521A (en) * 2018-10-29 2019-01-22 江苏华江祥瑞现代建筑发展有限公司 A kind of ground pit type side top prestressing force battery mould for producing wallboard
CN111761715A (en) * 2020-06-12 2020-10-13 扬州市职业大学(扬州市广播电视大学) Prefabricated sprayed concrete sandwich inner wall panel structure and production process thereof
KR20210119851A (en) * 2020-03-25 2021-10-06 선진정공 주식회사 Mold apparatus for vertically producing prestressed concrete members
KR20210120450A (en) * 2020-03-26 2021-10-07 선진정공 주식회사 Vertical producing method of prestressed concrete members

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953280A (en) * 1987-06-03 1990-09-04 Gifford-Hill & Company, Inc. Method of manufacturing prestressed concrete culverts
CN201300475Y (en) * 2008-03-14 2009-09-02 沈宪光 Light-weight composite wallboard forming machine
CN203125669U (en) * 2013-03-21 2013-08-14 长沙远大住宅工业有限公司 Vertical die

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953280A (en) * 1987-06-03 1990-09-04 Gifford-Hill & Company, Inc. Method of manufacturing prestressed concrete culverts
CN201300475Y (en) * 2008-03-14 2009-09-02 沈宪光 Light-weight composite wallboard forming machine
CN203125669U (en) * 2013-03-21 2013-08-14 长沙远大住宅工业有限公司 Vertical die

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105984025A (en) * 2015-02-09 2016-10-05 任丘市永基建筑安装工程有限公司 Assembled mold pulley controlled traveling technology
CN105984023A (en) * 2015-02-09 2016-10-05 任丘市永基建筑安装工程有限公司 Combined mold single-plate construction method
CN105984038A (en) * 2015-03-02 2016-10-05 任丘市永基建筑安装工程有限公司 Combination mold double-plate construction method
CN107520947A (en) * 2016-06-21 2017-12-29 中国十七冶集团有限公司 A kind of prefabricated column joint production mould and its application method
CN108748626A (en) * 2018-07-26 2018-11-06 承德绿建建筑节能科技有限公司 Precast wall body formwork erection pours device
CN109249521A (en) * 2018-10-29 2019-01-22 江苏华江祥瑞现代建筑发展有限公司 A kind of ground pit type side top prestressing force battery mould for producing wallboard
KR20210119851A (en) * 2020-03-25 2021-10-06 선진정공 주식회사 Mold apparatus for vertically producing prestressed concrete members
KR102357114B1 (en) 2020-03-25 2022-01-28 선진정공 주식회사 Mold apparatus for vertically producing prestressed concrete members
KR20210120450A (en) * 2020-03-26 2021-10-07 선진정공 주식회사 Vertical producing method of prestressed concrete members
KR102319524B1 (en) 2020-03-26 2021-11-01 선진정공 주식회사 Vertical producing method of prestressed concrete members
CN111761715A (en) * 2020-06-12 2020-10-13 扬州市职业大学(扬州市广播电视大学) Prefabricated sprayed concrete sandwich inner wall panel structure and production process thereof

Also Published As

Publication number Publication date
CN103182731B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN103182731B (en) Vertical mould
CN203125669U (en) Vertical die
CN103243838B (en) Connection structure of integrally assembled concrete frame and shear wall
CN109403374A (en) Factorial construction method for open trench tunnel integral tunnel lining
CN206937569U (en) A kind of long-line pedestal formula concrete double-T plate production mould
CN104260185A (en) Multi-function concrete prefabricated part group vertical framework production equipment and production line
CN203213346U (en) Connecting structure for assembling integral concrete frame and shear wall
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN109968516B (en) Comprehensive production system and production method for PC (polycarbonate) components
CN209408814U (en) A kind of PC track beam form system
CN208563991U (en) A kind of electric walking formwork assembling and disassembling system
CN204195939U (en) Multifunctional concrete prefabricated components battery mould production equipment and production line
CN104895279A (en) Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN103669872B (en) A kind of walling method and walling equipment
CN220218950U (en) Railway prefabricated box girder side form
CN109339098B (en) Portable support template of utility tunnel
CN205532629U (en) All -hydraulic central ditch die carrier
CN117103434A (en) Assembled box culvert steel template system and construction method
CN207554066U (en) The mobile formwork of a plurality of groove in one-time-concreting tunnel
CN105863261A (en) Universally-adjustable suspension formwork system
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN103821110A (en) Box culvert inner form steel form trolley
CN112160339A (en) Construction method for lifting and pouring concrete retaining wall
CN202865754U (en) Hydraulic pressure demould automatic walking trolley used for construction of metro platform
CN207419269U (en) A kind of integral movable type box beam external mold support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 410013 Changsha high tech Development Zone, Yuelu, Hunan Avenue, Changsha Yuanda Industrial Group Co., Ltd.

Applicant after: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO., LTD.

Address before: 410013 Changsha Yuanda residential industry Co., Ltd., Changsha 248, Yuelu District, Hunan, China

Applicant before: Changsha Yuanda Residential Industrial Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHANGSHA BROAD HOMES INDUSTRIAL CO., LTD. TO: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 410205 Hunan Changsha Hi-tech Development Zone foothill road and Dongfang Red Road intersection

Patentee after: Broad Homes Industrial International Co., Ltd.

Address before: 410013 Changsha high tech Development Zone, Yuelu, Hunan Avenue, Changsha Yuanda Industrial Group Co., Ltd.

Patentee before: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO., LTD.

CP03 Change of name, title or address