CN103161143A - 一种设置在隐体中的导流洞竖井闸室结构 - Google Patents
一种设置在隐体中的导流洞竖井闸室结构 Download PDFInfo
- Publication number
- CN103161143A CN103161143A CN2013101101857A CN201310110185A CN103161143A CN 103161143 A CN103161143 A CN 103161143A CN 2013101101857 A CN2013101101857 A CN 2013101101857A CN 201310110185 A CN201310110185 A CN 201310110185A CN 103161143 A CN103161143 A CN 103161143A
- Authority
- CN
- China
- Prior art keywords
- lock chamber
- vertical shaft
- diversion tunnel
- diversion
- shaft lock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310110185.7A CN103161143B (zh) | 2013-04-01 | 2013-04-01 | 一种设置在隐体中的导流洞竖井闸室结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310110185.7A CN103161143B (zh) | 2013-04-01 | 2013-04-01 | 一种设置在隐体中的导流洞竖井闸室结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103161143A true CN103161143A (zh) | 2013-06-19 |
CN103161143B CN103161143B (zh) | 2016-02-03 |
Family
ID=48584652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310110185.7A Active CN103161143B (zh) | 2013-04-01 | 2013-04-01 | 一种设置在隐体中的导流洞竖井闸室结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161143B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120692A (zh) * | 2014-07-01 | 2014-10-29 | 浙江省水利水电勘测设计院 | 一洞双层导流、放空洞相结合的施工布置方法 |
CN105839603A (zh) * | 2016-05-16 | 2016-08-10 | 中国电建集团成都勘测设计研究院有限公司 | 水电中闸室补气结构 |
CN114687322A (zh) * | 2022-05-10 | 2022-07-01 | 中国电建集团成都勘测设计研究院有限公司 | 适用于竖井闸室抛物孔快速封堵的封堵装置及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57137513A (en) * | 1981-02-19 | 1982-08-25 | Tohoku Electric Power Co Inc | Construction for power station |
JP2004204601A (ja) * | 2002-12-26 | 2004-07-22 | Ube Machinery Corporation Ltd | 集水枡内設型フラップゲート及びその設置工法 |
CN101824814A (zh) * | 2010-05-19 | 2010-09-08 | 葛洲坝集团第一工程有限公司 | 现浇钢筋混凝土闸门不断流封堵导流隧洞的方法及闸门 |
CN203247556U (zh) * | 2013-04-01 | 2013-10-23 | 中国水电顾问集团成都勘测设计研究院 | 一种设置在隐体中的导流洞竖井闸室结构 |
-
2013
- 2013-04-01 CN CN201310110185.7A patent/CN103161143B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57137513A (en) * | 1981-02-19 | 1982-08-25 | Tohoku Electric Power Co Inc | Construction for power station |
JP2004204601A (ja) * | 2002-12-26 | 2004-07-22 | Ube Machinery Corporation Ltd | 集水枡内設型フラップゲート及びその設置工法 |
CN101824814A (zh) * | 2010-05-19 | 2010-09-08 | 葛洲坝集团第一工程有限公司 | 现浇钢筋混凝土闸门不断流封堵导流隧洞的方法及闸门 |
CN203247556U (zh) * | 2013-04-01 | 2013-10-23 | 中国水电顾问集团成都勘测设计研究院 | 一种设置在隐体中的导流洞竖井闸室结构 |
Non-Patent Citations (2)
Title |
---|
卢天文: "兴义木浪河水库一期导流洞的灌浆封堵方法", 《贵州地质》, no. 03, 30 September 1999 (1999-09-30) * |
吴玮等: "木浪河水库大坝导流隧洞的封堵方法", 《贵州水力发电》, no. 04, 30 November 2005 (2005-11-30) * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120692A (zh) * | 2014-07-01 | 2014-10-29 | 浙江省水利水电勘测设计院 | 一洞双层导流、放空洞相结合的施工布置方法 |
CN105839603A (zh) * | 2016-05-16 | 2016-08-10 | 中国电建集团成都勘测设计研究院有限公司 | 水电中闸室补气结构 |
CN114687322A (zh) * | 2022-05-10 | 2022-07-01 | 中国电建集团成都勘测设计研究院有限公司 | 适用于竖井闸室抛物孔快速封堵的封堵装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103161143B (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2014308405A1 (en) | An artificial dam of distributed coal mine underground reservoir and its constructing method | |
CN107191197A (zh) | 一种盾构管片及其在盾构空推通过矿山法隧道中的应用 | |
CN206942783U (zh) | 一种盾构管片 | |
CN103939109B (zh) | 与隧道隔离的永久封堵斜井结构 | |
CN204002831U (zh) | 一种螺旋机防喷结构 | |
CN103321256A (zh) | 防污染立体复合防渗屏障系统 | |
CN102337897A (zh) | 盾构整体式到达接收装置及利用该装置的施工方法 | |
CN103161143A (zh) | 一种设置在隐体中的导流洞竖井闸室结构 | |
CN105178285A (zh) | 一种扩大岩土注浆加固和防渗堵塞范围的方法 | |
CN203925513U (zh) | 边仰坡陡峻地段的隧道洞口衬砌结构 | |
CN103266594A (zh) | 一种抗滑桩 | |
CN106640191B (zh) | 一种用于隧道抗洪抢险的自锁式水气双舱橡胶囊装置 | |
CN206438471U (zh) | 水利工程护坡 | |
CN206592151U (zh) | 一种富水岩溶隧洞堵排结合结构 | |
CN203247556U (zh) | 一种设置在隐体中的导流洞竖井闸室结构 | |
CN206668313U (zh) | 一种隧道的瓦斯抽放系统及隧道结构 | |
CN103244073A (zh) | 松软煤层区域封闭式瓦斯抽放钻孔的封孔方法 | |
CN207597377U (zh) | 水利水电建筑衬砌排水结构 | |
CN103790223B (zh) | 一种岩溶洼地排水系统 | |
CN105525928B (zh) | 一种盾构斜井管片壁后封堵环的施工方法 | |
CN203429609U (zh) | 一种有压水工隧洞大流量地下水控排结构 | |
CN203374309U (zh) | 倒截锥式大水压矿山防水闸门硐室 | |
CN104900132A (zh) | 盾构法施工斜井管片壁后填充的模拟试验装置 | |
CN202000365U (zh) | 地下连续墙防渗结构 | |
CN104695980B (zh) | 用于高埋深、高地温、高地应力岩爆地区的发电引水隧洞衬砌结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC |
|
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |