CN102337897A - 盾构整体式到达接收装置及利用该装置的施工方法 - Google Patents

盾构整体式到达接收装置及利用该装置的施工方法 Download PDF

Info

Publication number
CN102337897A
CN102337897A CN2011101691200A CN201110169120A CN102337897A CN 102337897 A CN102337897 A CN 102337897A CN 2011101691200 A CN2011101691200 A CN 2011101691200A CN 201110169120 A CN201110169120 A CN 201110169120A CN 102337897 A CN102337897 A CN 102337897A
Authority
CN
China
Prior art keywords
shield
receiving system
upper shell
arrives
whole formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101691200A
Other languages
English (en)
Inventor
周文波
张冠军
吴惠明
郑宜枫
段创峰
巴雅吉乎
魏林春
赵燕鹏
滕丽
吴列成
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN2011101691200A priority Critical patent/CN102337897A/zh
Publication of CN102337897A publication Critical patent/CN102337897A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明是一种盾构整体式到达接收装置,其是设置在盾构到达洞圈外侧的基坑工作井中,包括一下壳体,其底部置于设于工作井底的底座上,其一端部与设于工作井的内衬墙上的预埋钢板相连;一上壳体,置于所述下壳体之上,其底部与所述下壳体相连,其一端与所述预埋钢板相连,所述上壳体和下壳体构成一整体密封的空间。所述的下壳体上设有一排水口,所述的上壳体上设有一进水口、一排气口、一压力表和一观察孔。所述的上壳体和下壳体上各设有一安全溢流阀;本发明还提供一种利用盾构整体式到达接收装置的施工方法。本发明的装置及施工方法可有效防止洞圈发生漏水漏泥现象,从而降低盾构到达风险;并有效的节约盾构到达的成本。

Description

盾构整体式到达接收装置及利用该装置的施工方法
技术领域
本发明属于建筑工程隧道施工技术领域,涉及一种盾构整体式到达接收装置及利用该装置的施工方法。
背景技术
盾构法是软土地层隧道暗挖的施工方法,利用工作井使盾构掘进机能沿预定隧道轴线和标高位置进行施工。盾构法施工技术由于对地面结构影响较小,对环境无不良影响,工作人员劳动强度低,机械化程度高,工程进度快,隧洞形状准确,质量高等优点,现已成为我国城市轨道交通建设中的重要施工技术。
现有盾构到达接收方式一般包括三部分内容:一、先在基坑外围一定范围内采用适当的地层加固方式进行盾构到达段的土体加固改良;二、采用适当的地层降水方式对基坑外部、盾构到达段地下水位进行水工降低,从而防止盾构到达接收过程中地下水从缝隙中涌入接收基坑,造成破坏;三、一般在基坑内盾构到达预留的洞圈位置安装一圈密封止水垫圈来保证盾构到达接收的安全,洞圈密封垫圈虽有一定的封堵作用,但如果土体加固不好,降水不到位,容易发生泄漏,此外,密封圈在盾构机进工作井过程中容易发生外翻,损坏等问题,从而也导致洞圈漏水、漏泥,而且一旦发生破坏造成泄漏,现场处理非常困难,容易引发工程事故。
现有盾构法施工中盾构到达接收时的技术难度高,安全隐患多,容易出现坍塌、漏水等现象。为了解决这些问题和安全隐患,使盾构安全、快速进入工作井,需进一步改进。
发明内容
本发明针对现有技术的不足和缺陷,其要解决的技术问题是提供一种使施工安全的盾构整体式到达接收装置。
本发明的盾构整体式到达接收装置,其是设置在盾构到达洞圈外侧的基坑工作井中,包括一下壳体,其底部置于设于工作井底的底座上,其一端部与设于工作井的内衬墙上的预埋钢板相连;
一上壳体,置于所述下壳体之上,其底部与所述下壳体相连,其一端与所述预埋钢板相连,所述上壳体和下壳体构成一整体密封的空间。
所述盾构整体式到达接收装置远离预埋钢板的一端设有支撑。
所述的下壳体上设有一排水口,所述的上壳体上设有一进水口和一排气口。
所述的上壳体和下壳体上各设有一安全溢流阀。
所述上壳体上设有一压力表和一观察孔。
所述的下壳体上设有一进出门。
本发明还提供一种利用所述的盾构整体式到达接收装置的施工方法。
本发明采用盾构整体进工作井的方式,可有效防止洞圈发生漏水漏泥现象,从而降低盾构到达风险。另外,本发明无须对洞门外部进行较大区域的地层加固,甚至可以无须进行地层加固,可以有效的节约盾构到达的成本,采用预制结构,现场安装方便,可回收利用,适用于不同大小的各种隧道。在整个盾构到达过程中始终保证施工处于可控状态,并严格遵守安全、质量规范,确保盾构顺利、安全、快速到达接收。
附图说明
图1是本发明的盾构整体式到达接收装置未安装时的主视图。
图2是本发明的盾构整体式到达接收装置未安装时的侧视图。
图3是本发明的盾构整体式到达接收装置未安装时的俯视图。
图4是本发明采用盾构机切削洞门方式,盾构进入到达接收装置前示意图。
图5是本发明采用传统的凿除洞门方式,盾构进入到达接收装置前示意图。
图6是本发明的盾构整体式到达接收装置注浆封洞门局部示意图。
图7是本发明的盾构整体式到达接收装置盾构接收后示意图。
具体实施方式
参看图1~图3,本发明的盾构整体式到达接收装置由上壳体1、下壳体2、连接螺栓3、进水口4、安全溢流阀5、排气口6、压力表7、预留观察孔8、排水口9、安全溢流阀10、人员进出门23等组成。
参看图4~图5,各构件的安装顺序如下:下壳体2放置于底座11上,与内衬墙14上的预埋钢板15通过螺栓16安装到位,然后把上壳体1放置在下壳体2上,通过连接螺栓3连接,并通过螺栓16安装在内衬墙14的预埋钢板15上,最后安装整体装置的支撑12、进水口4、安全溢流阀5、排气口6、压力表7、预留观察孔8、排水口9、安全溢流阀10,完成盾构整体式到达接收装置的安装。
盾构整体式到达接收方法的实施过程:
在盾构机距洞口50-100m时,先对盾构机轴线进行复测,确保盾构偏心在设计范围之内,这是到达接收施工的前提条件。
盾构轴线复测完成之后,进行盾构到达接收前的准备工作,现场安装盾构整体式到达接收装置,拆除洞门,对于初期支护25上的洞门24的拆除的方式,可采用传统方式凿除或盾构机13直接切削洞门24的方式。安装完成后,通过进水口4将浆液或水注入并充满整个装置内,然后进行盾构机到达掘进施工。完成最后一片管片拼装后,继续推进盾构但不完全脱出管片,保持盾尾刷19与管片17间的密封作用,然后通过管片注浆孔18向外注浆,浆液凝固后,形成注浆帷幕20以保护施工安全。之后通过排水口9排出盾构整体式接收装置内浆液,推进盾构机13,使其完全进入整体式到达接收装置,最后拆除盾构整体式到达接收装置,盾构到达接收施工结束。由于施工中,盾构机13及土体均处于整个密封装置的保护下,因此整个施工过程十分安全。此外,装置预留人员进出门23,以备人员进出使用之需。
盾构整体到达接收方法的实施步骤如下:
1)复测盾构机轴线,确保盾构机偏心在设计范围内。
2)现场安装盾构整体到达接收装置,准备接收施工,如图4或图5。
3)通过进水口4将浆液或水注入并充满整个装置内,推进盾构,使得盾构缓慢进入密封的整体到达接收装置内。
4)完成最后一环管片17拼装,继续推进盾构但不完全脱出管片,保持盾尾刷19与管片17间的密封作用,常规洞圈密封圈21与盾构机壳体22密封作用,形成一个可以注浆的空间,如图6。
5)通过管片注浆孔18向外注浆,形成注浆帷幕20,封堵因盾构机壳体(22)脱出而形成的洞圈与管片17间的缝隙。
6)注浆帷幕20形成后,通过排水口9排出整体装置内浆液,然后推进盾构机13,使其完全进入整体式到达接收装置,然后对洞圈进行最后的处理,拆除盾构整体式到达接收装置,盾构到达接收施工结束,如图7。
本盾构整体式到达接收装置在盾构到达接收之前现场安装完成。盾构机13到达接收时,将进入到整个装置中,在盾构接收的整个过程中,都将在此装置内完成,整个密封装置能够抵挡巨大的水土压力,因洞圈漏泥、漏水而引发的危险因素将不再存在,保证盾构安全、顺利到达接收。
本方法具有突出的实质性特点和显著的进步,使用盾构整体式到达接收方法后的优点:
1)采用盾构整体式到达接收的方法可以有效的减少盾构到达接收施工风险,保证盾构顺利接收。
2)采用盾构整体式到达接收方法能够消除因盾构接收所引起的漏泥漏浆等危险情况,使其始终在一个密闭的空间内进行,不对外界产生危险。
3)采用盾构整体式到达接收方法无需对盾构到达区域进行加工和降水施工,减少工程成本。
4)盾构整体式到达接收方法可根据工程具体情况抵抗不同的水土压力,且装置可实现完全回收再利用。

Claims (7)

1.一种盾构整体式到达接收装置,其是设置在盾构到达洞圈外侧的基坑工作井中,其特征是包括:
一下壳体,其底部置于设于工作井底的底座上,其一端部与设于工作井的内衬墙上的预埋钢板相连;
一上壳体,置于所述下壳体之上,其底部与所述下壳体相连,其一端与所述预埋钢板相连,所述上壳体和下壳体构成一整体密封的空间。
2.如权利要求1所述的盾构整体式到达接收装置,其特征是所述盾构整体式到达接收装置远离预埋钢板的一端设有支撑。
3.如权利要求1或2所述的盾构整体式到达接收装置,其特征是所述的下壳体上设有一排水口,所述的上壳体上设有一进水口和一排气口。
4.如权利要求3所述的盾构整体式到达接收装置,其特征是所述的上壳体和下壳体上各设有一安全溢流阀。
5.如权利要求4所述的盾构整体式到达接收装置,其特征是所述上壳体上设有一压力表和一观察孔。
6.如权利要求5所述的盾构整体式到达接收装置,其特征是所述的下壳体上设有一进出门。
7.一种利用如权利要求1~6中任一种所述的盾构整体式到达接收装置的施工方法,包括步骤:
1)复测盾构机轴线,确保盾构机偏心在设计范围内;
2)现场安装如权利要求1~6中任一种所述的盾构整体到达接收装置,准备接收施工;
3)通过进水口将浆液或水注入并充满整个装置内,推进盾构,使得盾构进入密封的整体到达接收装置内;
4)完成最后一环管片拼装,继续推进盾构但不完全脱出管片,保持盾尾刷与管片间的密封作用,常规洞圈密封圈与盾构机壳体密封作用,形成一个可以注浆的空间;
5)通过管片注浆孔向外注浆,形成注浆帷幕,封堵因盾构机壳体脱出而形成的洞圈与管片间的缝隙;
6)注浆帷幕形成后,通过排水口排出整体装置内浆液,然后推进盾构机,使其完全进入整体式到达接收装置,然后对洞圈进行最后的处理,拆除盾构整体式到达接收装置。
CN2011101691200A 2011-06-21 2011-06-21 盾构整体式到达接收装置及利用该装置的施工方法 Pending CN102337897A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101691200A CN102337897A (zh) 2011-06-21 2011-06-21 盾构整体式到达接收装置及利用该装置的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101691200A CN102337897A (zh) 2011-06-21 2011-06-21 盾构整体式到达接收装置及利用该装置的施工方法

Publications (1)

Publication Number Publication Date
CN102337897A true CN102337897A (zh) 2012-02-01

Family

ID=45513820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101691200A Pending CN102337897A (zh) 2011-06-21 2011-06-21 盾构整体式到达接收装置及利用该装置的施工方法

Country Status (1)

Country Link
CN (1) CN102337897A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635365A (zh) * 2012-05-06 2012-08-15 上海城建市政工程(集团)有限公司 一种盾构机进洞的施工方法
CN102635361A (zh) * 2012-05-06 2012-08-15 上海城建市政工程(集团)有限公司 一种盾构机进洞及上井的施工方法
CN102748038A (zh) * 2012-07-11 2012-10-24 上海盾构设计试验研究中心有限公司 一种全回收式盾构进出洞止水装置
CN102797483A (zh) * 2012-08-07 2012-11-28 天津城建隧道股份有限公司 一种护筒及富水地层盾构护筒接收法
CN102889085A (zh) * 2012-10-14 2013-01-23 上海城建市政工程(集团)有限公司 一种盾构机进洞的施工方法
CN104047607A (zh) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN104806254A (zh) * 2014-01-26 2015-07-29 宏润建设集团股份有限公司 盾构机到达接收位置的辅助装置及辅助接收施工方法
CN105464671A (zh) * 2015-12-16 2016-04-06 中铁工程装备集团机电工程有限公司 一种轻量化盾构接收用钢套筒
CN111636882A (zh) * 2020-05-22 2020-09-08 中铁十四局集团有限公司 一种盾构机盾尾密封系统及控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH077341B2 (ja) * 1986-03-13 1995-01-30 富士通株式会社 パツクテ−ブル編集方式
JP4077341B2 (ja) * 2003-03-07 2008-04-16 株式会社錢高組 シールドマシンの立坑到達工法及びこれに使用する耐圧シール装置
CN101353965A (zh) * 2008-09-05 2009-01-28 上海隧道工程股份有限公司 盾构进洞接收装置及其进洞施工方法
CN101608551A (zh) * 2009-06-15 2009-12-23 广东华隧建设股份有限公司 一种盾构机密闭始发及到达的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH077341B2 (ja) * 1986-03-13 1995-01-30 富士通株式会社 パツクテ−ブル編集方式
JP4077341B2 (ja) * 2003-03-07 2008-04-16 株式会社錢高組 シールドマシンの立坑到達工法及びこれに使用する耐圧シール装置
CN101353965A (zh) * 2008-09-05 2009-01-28 上海隧道工程股份有限公司 盾构进洞接收装置及其进洞施工方法
CN101608551A (zh) * 2009-06-15 2009-12-23 广东华隧建设股份有限公司 一种盾构机密闭始发及到达的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李奕等: "泥水盾构到达施工新技术", 《建筑机械化》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635365A (zh) * 2012-05-06 2012-08-15 上海城建市政工程(集团)有限公司 一种盾构机进洞的施工方法
CN102635361A (zh) * 2012-05-06 2012-08-15 上海城建市政工程(集团)有限公司 一种盾构机进洞及上井的施工方法
CN102635361B (zh) * 2012-05-06 2014-04-30 上海城建市政工程(集团)有限公司 一种盾构机进洞及上井的施工方法
CN102635365B (zh) * 2012-05-06 2015-04-22 上海城建市政工程(集团)有限公司 一种盾构机进洞的施工方法
CN102748038A (zh) * 2012-07-11 2012-10-24 上海盾构设计试验研究中心有限公司 一种全回收式盾构进出洞止水装置
CN102797483A (zh) * 2012-08-07 2012-11-28 天津城建隧道股份有限公司 一种护筒及富水地层盾构护筒接收法
CN102889085A (zh) * 2012-10-14 2013-01-23 上海城建市政工程(集团)有限公司 一种盾构机进洞的施工方法
CN104047607A (zh) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN104047607B (zh) * 2013-03-14 2016-04-13 上海市城市建设设计研究总院 盾构机围护结构条件下吊出工法
CN104806254A (zh) * 2014-01-26 2015-07-29 宏润建设集团股份有限公司 盾构机到达接收位置的辅助装置及辅助接收施工方法
CN105464671A (zh) * 2015-12-16 2016-04-06 中铁工程装备集团机电工程有限公司 一种轻量化盾构接收用钢套筒
CN111636882A (zh) * 2020-05-22 2020-09-08 中铁十四局集团有限公司 一种盾构机盾尾密封系统及控制方法

Similar Documents

Publication Publication Date Title
CN102337897A (zh) 盾构整体式到达接收装置及利用该装置的施工方法
CN110821503B (zh) 一种超深盾构区间风井先隧后主体施工方法
CN102777189B (zh) 一种超长管幕无中继间顶进施工装置及方法
CN106869949A (zh) 一种用钢套筒接收盾构机的方法
CN106285693B (zh) 一种盾构钢套筒密闭接收施工方法
CN204266220U (zh) 一种基坑内降水井的封堵装置
CN107664035B (zh) 盾构管廊先盾后井的施工方法
CN102536250B (zh) 岩溶与瓦斯共生隧道施工方法
CN207777770U (zh) 一种预制拼接管件顶进系统
CN109736827B (zh) 城市地铁硬岩地层联络通道高压气体膨胀致裂开挖的方法
CN103821544A (zh) 隧道与地下工程高压大流量突涌水治理方法
CN202117686U (zh) 铁路隧道深埋富水软弱带围岩超前支护构造
CN104481588A (zh) 一种煤矿采空区的密封方法
CN109026012A (zh) 竖井围岩支护结构及其开挖支护方法
CN102094659A (zh) 盾构进洞弹簧铰链板密封装置
CN105240024A (zh) 一种平行盾构法扩建施工地铁车站的方法
CN105065009A (zh) 一种扩建盾构施工地铁车站的方法
CN107763362A (zh) 内涨圈法管道接口修复施工方法
CN108661652B (zh) 矿山法隧道内盾构始发和接收端头加固装置和方法
CN205117355U (zh) 一种代替隧道初衬的分仓式砂气合充衬砌结构
CN110685709A (zh) 一种叠线隧道联络通道施工方法及其结构
CN102720511A (zh) 隧道泄水沉沙施工结构
CN205206847U (zh) 盾构进出洞洞门环形冻结密封止水装置
CN108978709B (zh) 一种空间受限环境下城市综合管廊分支施工方法
CN204570696U (zh) 高架桥基础处废弃污水管道施工系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120201