CN103161112B CN201310088225.2A CN201310088225A CN103161112B CN 103161112 B CN103161112 B CN 103161112B CN 201310088225 A CN201310088225 A CN 201310088225A CN 103161112 B CN103161112 B CN 103161112B
Authority
CN
China
Prior art keywords
granite
ramp
reinforcing bar
shaped reinforcing
reeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310088225.2A
Other languages
Chinese (zh)
Other versions
CN103161112A (en
Inventor
叶锡国
尤晓东
谢德胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANJIAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
SANJIAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANJIAN CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical SANJIAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201310088225.2A priority Critical patent/CN103161112B/en
Publication of CN103161112A publication Critical patent/CN103161112A/en
Application granted granted Critical
Publication of CN103161112B publication Critical patent/CN103161112B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of standing and plant granite ramp boundary coarse stone corner protector and construction method thereof, vertical plant granite ramp boundary coarse stone corner protector and comprise reinforced concrete structure layer, described reinforced concrete structure layer is provided with bar chair, bar chair is uniformly distributed some U-shaped reinforcing bar decks, in U-shaped reinforcing bar deck, card has granite reeding; Construction method comprises the following steps: material customizes; Base cleaning; Construction safety lay by; Installation, pre-buried U-shaped reinforcing bar deck; Granite reeding is installed; Concealment acceptance; Water moistening; Concreting; Floating, press polish; Maintenance.Beneficial effect of the present invention is: utilize granite hardness high, wear-resistant, the feature of beautiful appearance, and not by the restriction of ramp plane form, method is simple, easy to operate, and construction is connected compact, saves time, and improves ramp sawtooth quality; Stand and plant granite boundary coarse stone corner protector, adopt special U-shaped reinforcing bar deck to position and fix, and industrialization can be adopted to process.

Description

Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof
Technical field
The present invention relates to a kind of standing and plant granite ramp boundary coarse stone corner protector and construction technology thereof.
Background technology
At present, in building engineering, the traditional method of up and down ramp has: one, and adopt cement mortar to do toothing, because the frequency that strength of cement mortar is low and vehicle travels, cement mortar sawtooth is very easily damaged, and not easily repairs; Its two, adopt angle iron pre-buried, angle bar limit is exposed, and is laid to zigzag, but angle bar is laid and needed a large amount of being welded and fixed, and labor intensive is large, costly, exposes angle bar limit as just not easily processed because of crimp, and easy-to-rust, affects attractive in appearance; Its three, adopt the sheet material such as wood floor bolck, granite to lay, because sheet material is connected gap, sheet material and basic unit's adhesion strength reason, under wheel rolls, very easily come off, later period maintenance cost is high.
Summary of the invention
The object of this invention is to provide a kind of standing and plant granite ramp boundary coarse stone corner protector and construction technology thereof, to overcome currently available technology above shortcomings.
The object of the invention is to be achieved through the following technical solutions:
A kind of standing plants granite ramp boundary coarse stone corner protector, comprise reinforced concrete structure layer, described reinforced concrete structure layer is provided with bar chair, bar chair is uniformly distributed some U-shaped reinforcing bar decks, in U-shaped reinforcing bar deck, card has granite reeding, the distance at described two adjacent U-shaped reinforcing bar deck centers is 100-130mm, and U-shaped reinforcing bar deck is made up of the reinforcing bar of φ 10, and wherein the distance of two parallel edges is 32mm, length is 52mm; The width of described granite reeding is 30mm, is highly the stand out of the domatic layer thickness of automobile and this granite reeding, and the difference in height at granite reeding end face two ends is 3mm.
A kind of standing plants granite ramp boundary coarse stone corner protector construction technology, comprises the following steps:
1) material customization: make U-shaped reinforcing bar deck and granite reeding according to above-mentioned parameter;
2) base cleaning: cleaning is to meeting construction quality code requirement;
3) construction safety lay by: the safety siding of construction both sides, ramp and centre, adopts 500mm*600mm fired slab to lay;
4) install, pre-buried U-shaped reinforcing bar deck: by U-shaped reinforcing bar deck uniform welding on bar chair, weld complete carry out well pre-buried;
5) granite reeding is installed: granite reeding and U-shaped reinforcing bar deck one_to_one corresponding are installed, carry out pre-buried to granite reeding after installation, before pre-buried, reserve 50mm gutter channel in both sides, lay by;
6) concealment acceptance: pre-buriedly complete hidden inspection is carried out to whole ramp, granite reeding spacing allowable variation must not be greater than 1mm;
7) water moistening: within 2 hours, basic unit is watered moistening in advance;
8) concreting: select concrete skeletal grain particle diameter to be 5mm-20mm, concrete coarse-fine aggregate mud content meets national regulation requirement, and the slump is 80mm-130mm, sand adopts medium sand, builds, and adopts small size plate vibrator to build tamping;
9) floating, press polish: water after smashing, makes boundary coarse stone with trowel, then carries out Troweling press finishing, to avoid occurring shrinking cracks;
10) maintenance: curing time is no less than 7 days.
Beneficial effect of the present invention is: utilize granite hardness high, wear-resistant, the feature of beautiful appearance, and not by the restriction of ramp plane form, method is simple, easy to operate, and construction is connected compact, saves time, and improves ramp sawtooth quality; Stand and plant granite boundary coarse stone corner protector, adopt special U-shaped reinforcing bar deck to position and fix, and industrialization can be adopted to process; Vertical plant after granite corner protector installs, when building pea gravel concreten, surface is floating according to sawtooth port, once survives, no longer needs to modify sawtooth, both saved man-hour, improves effect, cost-saving again.
Accompanying drawing explanation
With reference to the accompanying drawings the present invention is described in further detail below.
Fig. 1 is the vertical structural representation of planting granite ramp boundary coarse stone corner protector described in the embodiment of the present invention;
Fig. 2 is the vertical syndeton schematic diagram of planting U-shaped reinforcing bar deck and granite reeding in the boundary coarse stone corner protector of granite ramp described in the embodiment of the present invention;
Fig. 3 is the vertical syndeton schematic diagram of planting U-shaped reinforcing bar deck and bar chair in the boundary coarse stone corner protector of granite ramp described in the embodiment of the present invention;
Fig. 4 is the vertical structural representation of planting granite reeding in the boundary coarse stone corner protector of granite ramp described in the embodiment of the present invention;
Fig. 5 is the vertical structural representation of planting U-shaped reinforcing bar deck in the boundary coarse stone corner protector of granite ramp described in the embodiment of the present invention;
Fig. 6 be vertical described in the embodiment of the present invention plant granite ramp boundary coarse stone corner protector lay after structural representation;
Fig. 7 is the vertical process chart of planting granite ramp boundary coarse stone corner protector construction technology described in the embodiment of the present invention.
In figure:
1, reinforced concrete structure layer; 2, bar chair; 3, U-shaped reinforcing bar deck; 4, granite reeding.
Detailed description of the invention
As shown in figures 1 to 6, one described in the embodiment of the present invention is vertical plants granite ramp boundary coarse stone corner protector, comprise reinforced concrete structure layer 1, described reinforced concrete structure layer 1 is provided with bar chair 2, bar chair 2 is uniformly distributed some U-shaped reinforcing bar decks 3, in U-shaped reinforcing bar deck 3, card has granite reeding 4, the distance at described two adjacent U-shaped reinforcing bar deck 3 centers is 100-130mm, U-shaped reinforcing bar deck 3 is made up of the reinforcing bar of φ 10, and wherein the distance of two parallel edges is 32mm, length is 52mm; The width of described granite reeding 4 is 30mm, is highly the stand out of the domatic layer thickness of automobile and this granite reeding 4, and the difference in height at granite reeding 4 end face two ends is 3mm.
As shown in Figure 7, a kind of standing plants granite ramp boundary coarse stone corner protector construction technology, comprises the following steps:
1) material customization: make U-shaped reinforcing bar deck and granite reeding according to above-mentioned parameter;
2) base cleaning: cleaning is to meeting construction quality code requirement;
3) construction safety lay by: the safety siding of construction both sides, ramp and centre, adopts 500mm*600mm fired slab to lay;
4) install, pre-buried U-shaped reinforcing bar deck: by U-shaped reinforcing bar deck uniform welding on bar chair, weld complete carry out well pre-buried;
5) granite reeding is installed: granite reeding and U-shaped reinforcing bar deck one_to_one corresponding are installed, carry out pre-buried to granite reeding after installation, before pre-buried, reserve 50mm gutter channel in both sides, lay by;
6) concealment acceptance: pre-buriedly complete hidden inspection is carried out to whole ramp, granite reeding spacing allowable variation must not be greater than 1mm;
7) water moistening: within 2 hours, basic unit is watered moistening in advance;
8) concreting: select concrete skeletal grain particle diameter to be 5mm-20mm, concrete coarse-fine aggregate mud content meets national regulation requirement, and the slump is 80mm-130mm, sand adopts medium sand, builds, and adopts small size plate vibrator to build tamping;
9) floating, press polish: water after smashing, makes boundary coarse stone with trowel, then carries out Troweling press finishing, to avoid occurring shrinking cracks;
10) maintenance: curing time is no less than 7 days.
Granite reeding hardness is high, wear-resistant, beautiful appearance, in car ramp construction, directly as ramp boundary coarse stone corner protector, construct compared with traditional construction technology and be connected reasonable, improve effect, reduction of erection time, cost-saving, save 60 ~ 90 yuan for every square metre, and efficiently solve the quality problems that cement mortar, angle iron, sheet material tiling etc. are existing, ensure that the construction quality in ramp, increase the service life, achieve good economic benefit and social benefit.
The present invention is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present invention; no matter but any change is done in its shape or structure; every have identical with the application or akin technical scheme, all drops within protection scope of the present invention.

Claims (1)

1. a vertical construction method of planting granite ramp boundary coarse stone corner protector, is characterized in that, comprise the following steps:
1) material customization: make U-shaped reinforcing bar deck and granite reeding;
2) base cleaning: cleaning is to meeting construction quality code requirement;
3) construction safety lay by: the safety siding of construction both sides, ramp and centre, adopts 500mm*600mm fired slab to lay;
4) install, pre-buried U-shaped reinforcing bar deck: by U-shaped reinforcing bar deck uniform welding on bar chair, weld complete carry out well pre-buried;
5) granite reeding is installed: granite reeding and U-shaped reinforcing bar deck one_to_one corresponding are installed, carry out pre-buried to granite reeding after installation, before pre-buried, expects 50mm gutter channel in both sides, lay by;
6) concealment acceptance: pre-buriedly complete hidden inspection is carried out to whole ramp, granite reeding spacing allowable variation must not be greater than 1mm;
7) water moistening: within 2 hours, basic unit is watered moistening in advance;
8) concreting: select concrete skeletal grain particle diameter to be 5mm-20mm, concrete coarse-fine aggregate mud content meets national regulation requirement, and the slump is 80mm-130mm, sand adopts medium sand, builds, and adopts small size plate vibrator to build tamping;
9) floating, press polish: water after smashing, makes small stone coarse stone with trowel, then carries out Troweling press finishing, to avoid occurring shrinking cracks;
10) maintenance: curing time is no less than 7 days.
CN201310088225.2A 2013-03-19 2013-03-19 Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof Active CN103161112B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310088225.2A CN103161112B (en) 2013-03-19 2013-03-19 Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310088225.2A CN103161112B (en) 2013-03-19 2013-03-19 Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof

Publications (2)

Publication Number Publication Date
CN103161112A CN103161112A (en) 2013-06-19
CN103161112B true CN103161112B (en) 2016-01-20

Family

ID=48584622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310088225.2A Active CN103161112B (en) 2013-03-19 2013-03-19 Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof

Country Status (1)

Country Link
CN (1) CN103161112B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010025330A (en) * 2000-12-15 2001-04-06 신승철 Car Overpass
CN201362944Y (en) * 2009-03-12 2009-12-16 汪柏川 Precasting type slip-resistance bar device
CN102041765A (en) * 2010-11-23 2011-05-04 湖南省第三工程有限公司 Antiskid lane
CN102535306A (en) * 2012-03-15 2012-07-04 昆明一建建设集团有限公司 Angle steel non-slip ramp
CN203145494U (en) * 2013-03-19 2013-08-21 三箭建设工程集团有限公司 Vertically-planted granite ramp border-rough-stone angle bead

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010025330A (en) * 2000-12-15 2001-04-06 신승철 Car Overpass
CN201362944Y (en) * 2009-03-12 2009-12-16 汪柏川 Precasting type slip-resistance bar device
CN102041765A (en) * 2010-11-23 2011-05-04 湖南省第三工程有限公司 Antiskid lane
CN102535306A (en) * 2012-03-15 2012-07-04 昆明一建建设集团有限公司 Angle steel non-slip ramp
CN203145494U (en) * 2013-03-19 2013-08-21 三箭建设工程集团有限公司 Vertically-planted granite ramp border-rough-stone angle bead

Also Published As

Publication number Publication date
CN103161112A (en) 2013-06-19

Similar Documents

Publication Publication Date Title
CN104372890A (en) Construction method of bare concrete prefabricated box beam with complicated structure
CN108343181B (en) Novel clay brick outer wall and construction method
CN103225406A (en) Seamless construction method of multi-layer super large-area reinforced concrete ground
CN102444066B (en) Asphalt pavement prefabricated block and construction method for prefabricated asphalt pavement
CN211646494U (en) Waterproof construction of underground garage foundation slab
CN110965655A (en) Overlength concrete construction crack control method
CN101503915B (en) Construction method for ultra-large area, ultra-thin non-agglutination pre-stress integral pond baseboard
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN114032724A (en) Assembled recycled concrete rural pavement
CN103161112B (en) Stand and plant granite ramp boundary coarse stone corner protector and construction technology thereof
CN203145494U (en) Vertically-planted granite ramp border-rough-stone angle bead
CN101666122B (en) Construction method of micro distance air crossbeam bottom board
CN104890434A (en) Plastic-stone landscape making method
CN202492858U (en) Concrete wear-resistant cover plate
CN111549690A (en) Low-cost and high-performance rainwater box culvert combined structure and construction method thereof
CN207761236U (en) The adjustable levelling cement pressure jigsaw of floating screed keel
CN203947493U (en) Assembling type device for detecting manhole
CN207499200U (en) Outdoor culture exhibition wall
CN110777854A (en) High-rise building basement roof structure, waterproof coiled material and construction method for protecting layer to survive in one step
CN115897589A (en) Waterproof concrete interval pouring construction method for buried sewage treatment plant
CN112942033B (en) Pre-splitting construction process for large-particle-size water-stable gravel base
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN103031793B (en) Fast in-place paving construction method for thick and heavy stone blocks
CN113513202A (en) Construction method for pouring clear water concrete of garbage pool
CN109838048A (en) The high straight wear-resisting reinforced concrete roof construction of degree large area one-pass molding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant