CN207499200U - Outdoor culture exhibition wall - Google Patents
Outdoor culture exhibition wall Download PDFInfo
- Publication number
- CN207499200U CN207499200U CN201721607824.0U CN201721607824U CN207499200U CN 207499200 U CN207499200 U CN 207499200U CN 201721607824 U CN201721607824 U CN 201721607824U CN 207499200 U CN207499200 U CN 207499200U
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel
- layer
- fixed
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model is related to a kind of outdoor culture exhibition walls, concrete cushion is laid on the Su Su soil of compacting, concrete foundation layer is laid on concrete cushion, setting steel bar layer in concrete foundation layer, U-shaped foundation bolt lower end is embedded in concrete foundation layer, fixed plate is fixed at steel bar layer upper end, concrete pad is set in fixed plate, several longitudinally disposed steel frames on concrete pad, steel frame lower end is fixed in concrete pad, it is connected between adjacent steel frame by connecting rod, steel wire is laid on the outside of steel frame, cement plate is laid on the outside of steel wire.By outdoor culture exhibition wall described in the utility model, underground fixed part fixes U-shaped foundation bolt using armored concrete, and U-shaped foundation bolt cooperation fixed plate is fixed, and fixed plate is fixedly connected with steel frame, sound construction;Steel frame is light securely to facilitate installation, convenient for construction, prevents from aoxidizing, and then prevents the external skin caused by internal steel construction aoxidizes from coming off.
Description
Technical field
The utility model is related to a kind of outdoor culture exhibition walls, belong to displaying wall technology field.
Background technology
Wall is shown outside conventional chamber, it is most of to be built using masonry, since outdoor environment is more severe, after masonry comes off
It is difficult to repair, and construction is complex, fastness can be deteriorated after erosion by wind and rain, often have pedestrian conveniently to stay before general displaying wall
Foot viewing, be easy to cause danger, and for steel construction in building trade with more and more extensive, steel frame is light securely, easy for installation.
Utility model content
According to the above-mentioned deficiencies in the prior art, the technical problems to be solved in the utility model is:A kind of outdoor text is provided
Change exhibition wall, solve the problems in above-mentioned background technology.
Outdoor culture exhibition wall described in the utility model, consolidates including underground fixed part, ground displaying portion and landfill portion underground
Determine to be configured displaying portion in portion, landfill portion be set around the fixed part of underground, it is characterised in that:The underground fixed part includes mixed
Solidifying soil padding, concrete foundation layer, steel bar layer and U-shaped foundation bolt, concrete cushion are laid on the Su Su soil of compacting, coagulation
Concrete foundation layer is laid on soil padding, steel bar layer is set in concrete foundation layer, U-shaped foundation bolt lower end is embedded in concrete
In basal layer, the ground displaying portion includes concrete pad, steel frame, connecting rod, fixed plate, steel wire and cement plate, Gu
Fixed board is fixed at steel bar layer upper end, sets concrete pad in fixed plate, several longitudinally disposed steel constructions on concrete pad
Frame, steel frame lower end are fixed in concrete pad, are connected between adjacent steel frame by connecting rod, steel frame
Outside is laid with steel wire, and cement plate is laid on the outside of steel wire.
The landfill portion includes blotter, concrete fixed bed, cement sand bed and marble layer, and blotter is laid with
On the Su Su soil of compacting, concrete fixed bed is laid on blotter, cement sand bed is laid on concrete fixed bed and mixes
Above solidifying earth foundation layer, marble layer is laid on cement sand bed.
The steel bar layer includes upper steel bar layer and lower steel bar layer, and upper steel bar layer and lower steel bar layer are located at concrete foundation respectively
The nearly upper end of layer and nearly lower end, upper steel bar layer and lower steel bar layer include being arranged in a mutually vertical manner several reinforcing bars.
The steel frame is built including square tube and is set among the rectangular frame structure being welded and rectangular frame structure
Crossbeam.
The connecting rod is angle steel, and connecting rod is arranged on crossbeam both ends.
The cement plate is wood cement board, and cement mortar is smeared on the outside of cement plate, cracking resistance sand is smeared on the outside of cement mortar
Slurry, smears putty layer outside anticracking grout, spraying and decorating paint on the outside of putty layer.
The concrete cushion is C15 concrete cushions.
The concrete foundation layer is C20 concrete layers.
The concrete pad is C15 concrete pads.
The blotter thickness is 100mm.
The concrete fixed bed is the C20 concrete layers of 100mm thickness.
The cement sand bed is thick 1 of 30mm:3 dry cement mortar.
The fixed plate is 12mm steel plates
Compared with prior art, the utility model has the advantages that:
By outdoor culture exhibition wall described in the utility model, underground fixed part fixes U-shaped lower margin using armored concrete
Bolt, U-shaped foundation bolt cooperation fixed plate are fixed, and fixed plate is fixedly connected with steel frame, and C15 concrete castings form mixed
Solidifying soil pedestal, makes decentralization structure more secured;Internal in the displaying portion of ground is steel frame, and steel frame is light securely,
Facilitate installation, convenient for construction, steel frame uses coating steel pipe, and outside applies antirust paint, prevents from aoxidizing, and then prevent because of inside again
External skin caused by steel construction aoxidizes comes off.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
In figure:1st, underground fixed part 1.1, concrete cushion 1.2, concrete foundation layer 1.3, steel bar layer 1.4,
U-shaped foundation bolt 2, ground displaying portion 2.1, concrete pad 2.2, steel frame 2.3, connecting rod 2.4, fixed plate
2.5th, steel wire 3, landfill portion 3.1, blotter 3.2, concrete fixed bed 3.3, cement sand bed 3.4, big
Reason stone layer
Specific embodiment
The utility model is described further below in conjunction with the accompanying drawings:
Below by way of specific embodiment, the utility model is described in further detail, but not to limit the utility model, all
Within spirit of the invention and principle, any modification, equivalent replacement, improvement and so on should be included in the utility model
Within protection domain.
Embodiment
As shown in Figure 1, the outdoor culture exhibition wall, consolidates including underground fixed part 1, ground displaying portion 2 and 3 underground of landfill portion
Determine to be configured displaying portion 2 in portion 1,1 surrounding of underground fixed part setting landfill portion 3, the underground fixed part 1 includes concrete mats
Layer 1.1, concrete foundation layer 1.2, steel bar layer 1.3 and U-shaped foundation bolt 1.4, concrete cushion 1.1 are laid on the Su Su of compacting
On soil, concrete foundation layer 1.2 is laid on concrete cushion 1.1, steel bar layer 1.3 is set in concrete foundation layer 1.2, U-shapedly
1.4 lower end of foot bolt is embedded in concrete foundation layer 1.2, and the ground displaying portion 2 includes concrete pad 2.1, steel frame
2.2nd, connecting rod 2.3, fixed plate 2.4, steel wire 2.5 and cement plate, fixed plate 2.4 are fixed at 1.3 upper end of steel bar layer, Gu
Concrete pad 2.1 is set on fixed board 2.4, several longitudinally disposed steel frames 2.2 on concrete pad 2.1, under steel frame 2.2
End is fixed in concrete pad 2.1, is connected between adjacent steel frame 2.2 by connecting rod 2.3, steel frame 2.2
Outside is laid with steel wire 2.5, and 2.5 outside of steel wire is laid with cement plate.
In the present embodiment, the landfill portion 3 includes blotter 3.1, concrete fixed bed 3.2,3.3 and of cement sand bed
Marble layer 3.4, blotter 3.1 are laid on the Su Su soil of compacting, and concrete fixed bed 3.2 is laid on blotter 3.1,
Cement sand bed 3.3 is laid on above concrete fixed bed 3.2 and concrete foundation layer 1.2, is laid on cement sand bed 3.3 big
Reason stone layer 3.4;The steel bar layer 1.3 includes upper steel bar layer and lower steel bar layer, and upper steel bar layer and lower steel bar layer are located at coagulation respectively
1.2 nearly upper end of earth foundation layer and nearly lower end, upper steel bar layer and lower steel bar layer include being arranged in a mutually vertical manner several reinforcing bars;It is described
Steel frame 2.2 includes square tube and builds the crossbeam set among the rectangular frame structure being welded and rectangular frame structure;Institute
Connecting rod 2.3 is stated as angle steel, connecting rod 2.3 is arranged on crossbeam both ends;Cement plate position wood cement board, cement plate outside apply
It smears cement mortar, anticracking grout is smeared on the outside of cement mortar, smear putty layer outside anticracking grout, spraying and decorating on the outside of putty layer
Paint;The concrete cushion 1.1 is C15 concrete cushions;The concrete foundation layer 1.2 is C20 concrete layers;The coagulation
Native seat 2.1 is C15 concrete pads;3.1 thickness of blotter is 100mm;The concrete fixed bed 3.2 is thick for 100mm
C20 concrete layers;The cement sand bed 3.3 is thick 1 of 30mm:Dry cement mortar.
The advantages of basic principle, main feature and the utility model of the utility model has been shown and described above.This
The technical staff of industry is retouched in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
That states merely illustrates the principles of the invention, and on the premise of not departing from the spirit and scope of the utility model, the utility model can also
There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model will
Protection domain is asked to be defined by the appending claims and its equivalent thereof.
Claims (5)
1. a kind of outdoor culture exhibition wall, including underground fixed part(1), ground displaying portion(2)With landfill portion(3)Underground fixed part
(1)On be configured displaying portion(2), underground fixed part(1)Surrounding setting landfill portion(3), it is characterised in that:The underground is fixed
Portion(1)Including concrete cushion(1.1), concrete foundation layer(1.2), steel bar layer(1.3)With U-shaped foundation bolt(1.4), coagulation
Soil padding(1.1)It is laid on the Su Su soil of compacting, concrete cushion(1.1)Upper laying concrete foundation layer(1.2), concrete
Basal layer(1.2)Interior setting steel bar layer(1.3), U-shaped foundation bolt(1.4)Lower end is embedded in concrete foundation layer(1.2)It is interior, institute
State ground displaying portion(2)Including concrete pad(2.1), steel frame(2.2), connecting rod(2.3), fixed plate(2.4), steel wire
(2.5)And cement plate, fixed plate(2.4)It is fixed at steel bar layer(1.3)Upper end, fixed plate(2.4)Upper setting concrete pad
(2.1), concrete pad(2.1)Several upper longitudinally disposed steel frames(2.2), steel frame(2.2)Lower end is fixed at
Concrete pad(2.1)Interior, adjacent steel frame(2.2)Between pass through connecting rod(2.3)Connection, steel frame(2.2)Outside
It is laid with steel wire(2.5), steel wire(2.5)Outside is laid with cement plate.
2. outdoor culture exhibition wall according to claim 1, it is characterised in that:The landfill portion(3)Including blotter
(3.1), concrete fixed bed(3.2), cement sand bed(3.3)And marble layer(3.4), blotter(3.1)It is laid on rammer
On real Su Su soil, blotter(3.1)Upper laying concrete fixed bed(3.2), cement sand bed(3.3)It is laid on concrete
Fixed bed(3.2)With concrete foundation layer(1.2)Above, cement sand bed(3.3)Upper laying marble layer(3.4).
3. outdoor culture exhibition wall according to claim 1, it is characterised in that:The steel bar layer(1.3)Including upper steel bar layer
With lower steel bar layer, upper steel bar layer and lower steel bar layer are located at concrete foundation layer respectively(1.2)Nearly upper end and nearly lower end, upper steel bar layer
Include being arranged in a mutually vertical manner several reinforcing bars with lower steel bar layer.
4. outdoor culture exhibition wall according to claim 1, it is characterised in that:The steel frame(2.2)It is taken including square tube
Build the crossbeam set among the rectangular frame structure being welded and rectangular frame structure.
5. outdoor culture exhibition wall according to claim 4, it is characterised in that:The connecting rod(2.3)For angle steel, connecting rod
(2.3)It is arranged on crossbeam both ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721607824.0U CN207499200U (en) | 2017-11-27 | 2017-11-27 | Outdoor culture exhibition wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721607824.0U CN207499200U (en) | 2017-11-27 | 2017-11-27 | Outdoor culture exhibition wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207499200U true CN207499200U (en) | 2018-06-15 |
Family
ID=62507095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721607824.0U Expired - Fee Related CN207499200U (en) | 2017-11-27 | 2017-11-27 | Outdoor culture exhibition wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207499200U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485592A (en) * | 2019-08-20 | 2019-11-22 | 广州市卓爵建筑工程有限公司 | Moisture-proof wall construction method |
CN110607938A (en) * | 2019-09-04 | 2019-12-24 | 杭州丹尼建材有限公司 | Combined wall structure |
-
2017
- 2017-11-27 CN CN201721607824.0U patent/CN207499200U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485592A (en) * | 2019-08-20 | 2019-11-22 | 广州市卓爵建筑工程有限公司 | Moisture-proof wall construction method |
CN110607938A (en) * | 2019-09-04 | 2019-12-24 | 杭州丹尼建材有限公司 | Combined wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103205979B (en) | Method for constructing large raft foundation under high temperature | |
CN104594387B (en) | Improved post-cast strip advance water stop construction method | |
CN103615110B (en) | Random oblique netted nine-squares beam Hyperbolic Roof construction method | |
CN100513717C (en) | Steel structure assisted layered installation and construction method for superhigh PRC partition plate | |
CN104405062A (en) | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment | |
CN204435404U (en) | The additional elevator foundation structure of a kind of old house | |
CN208933989U (en) | A kind of tower-crane foundation structure | |
CN204728160U (en) | The ecological granitic plaster road surface of a kind of crack resistence | |
CN207499200U (en) | Outdoor culture exhibition wall | |
CN103806647A (en) | Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case | |
CN106498973A (en) | A kind of assembled type base for power transmission line iron tower and its installation method | |
CN205804904U (en) | A kind of leveling unit | |
CN204000523U (en) | The prefabricated road surface of a kind of Novel reinforced concrete | |
CN206267495U (en) | A kind of architecture storey tolerant noise-insulating warm-keeping system | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN105821895A (en) | Raft board foundation steel reinforcement support frame water-proof treatment construction process | |
CN104890434A (en) | Plastic-stone landscape making method | |
KR101045629B1 (en) | High durability shotcrete composite for concrete structure, and retaining wall structure using the same and construction method thereof | |
CN218714288U (en) | Decoration-free building structure | |
CN218322884U (en) | Waterproof structure of basement bottom plate of pre-paved anti-sticking waterproof roll | |
CN109989417A (en) | Foundation structure in housing construction | |
CN109989554A (en) | A kind of skyscraper assembled piping shaft and preparation method thereof and installation method | |
CN104947948A (en) | Rammed earth wall reinforcing method | |
CN209585309U (en) | Subsided rest room waterproof construction | |
CN212294605U (en) | Former bamboo slip casting consolidates soft soil foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180615 Termination date: 20201127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |