CN101666122B - Construction method of micro distance air crossbeam bottom board - Google Patents

Construction method of micro distance air crossbeam bottom board Download PDF

Info

Publication number
CN101666122B
CN101666122B CN2009100579189A CN200910057918A CN101666122B CN 101666122 B CN101666122 B CN 101666122B CN 2009100579189 A CN2009100579189 A CN 2009100579189A CN 200910057918 A CN200910057918 A CN 200910057918A CN 101666122 B CN101666122 B CN 101666122B
Authority
CN
China
Prior art keywords
sand
crossbeam
bottom board
brick
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100579189A
Other languages
Chinese (zh)
Other versions
CN101666122A (en
Inventor
曹培峰
王巍
谷志旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai City No4 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City No4 Building Co Ltd filed Critical Shanghai City No4 Building Co Ltd
Priority to CN2009100579189A priority Critical patent/CN101666122B/en
Publication of CN101666122A publication Critical patent/CN101666122A/en
Application granted granted Critical
Publication of CN101666122B publication Critical patent/CN101666122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Road Repair (AREA)

Abstract

The invention relates to a construction method of a micro distance air crossbeam bottom board, which comprises the following steps: setting out on a top plate of a basement of a subway station, marking a plane position of supporting and changing a crossbeam; bricking at two sides of the crossbeam, and enabling the side edge line of the crossbeam to coincide with the center line of bricks, wherein the bricking height is 19 cm; filling sand into brick walls at two sides and punning, enabling the sand level to be level with the brick wall; laying waterproof coiled materials on the brick walls at two sides and the filled sand, wherein the waterproof coiled materials are used for preventing concrete sludge flowing into the filled sand to cause the filled sand concretion; setting out on the waterproof coiled materials again, laying a five-layer plywood crossbeam bottom board; lapping a crossbeam side board; binding steel bars, laying a prestress rib, pouring concrete; after the maintenance period is ended, applying prestress to the crossbeam, dismantling the crossbeam side board; knocking the bricks at two sides of the crossbeam bottom off, dispelling the filled sand by using high-pressure current, and dismantling the bottom board. The invention replaces wood to complete the construction of the crossbeam bottom board by fully utilizing the characteristic that the sand can bear after being punned and can be dispersive when being subjected to water impaction, and successfully solves the difficulty of dismantling the crossbeam bottom board in a micro distance way.

Description

Construction method of micro distance air crossbeam bottom board
Technical field
The present invention relates to a kind of Construction Method of Metro Station, relate in particular to a kind of need and build the multilayer office occupancy in the top AT STATION, do not influence the subway station again, and carry out the method for conversion beam construction.
Background technology
Conventional Construction Method of Metro Station is at the direct earthing in basement top, becomes green land or road, to avoid the differential settlement of subway station.For making full use of the soil, according to the design planning requirement, the multilayer office occupancy is built in the top AT STATION in the metropolis.In order not influence the subway station, must carry out the vertical load conversion, promptly carry out the conversion beam construction.In this project, promptly smash the construction of super large conversion beam at subway station top board top-pour, maximum beam section is of a size of 2000 * 2400mm.Need to have certain distance (19cm) after this beam construction is finished, make the subway station basement roof not bear upper load, guarantee structural safety with basement roof.This kind construction, a maximum difficult problem is newly to water the construction problem of beam bottom board.Under this situation,, promptly on basement roof, set up flitch and lay template if adopt conventional beam bottom board construction, concrete beam water smash finish after, bed die then can't be removed, thus the function of forfeiture conversion beam shunting bearing capacity.
Summary of the invention
The present invention will provide a kind of construction method of micro distance air crossbeam bottom board, is used to solve the constructing technology problem that newly waters beam bottom board that the subway station basement roof does not bear upper load.
For achieving the above object, technical scheme of the present invention is as follows:
A kind of construction method of micro distance air crossbeam bottom board, concrete steps are as follows:
1. unwrapping wire on the basement roof of subway station marks the plan-position that underpins beam;
2. according to the unwrapping wire result,, be 19cm highly, and make beam side line and lay bricks central lines in two brick on edge of beam;
3. with back-up sand in two brick-on-edge walls, compacting makes the sand absolute altitude flush with brick wall;
4. on back-up sand and two brick-on-edge walls, lay the waterproof coiled material, be used for preventing that concrete slurry from flowing into back-up sand, cause that back-up sand is fixed;
5. unwrapping wire again on waterproof roll is laid the five-layer plywood beam bottom board;
6. set up beam side according to the beam absolute altitude;
7. assembling reinforcement is laid presstressed reinforcing steel, disturbing concrete;
8. after the maintenance expiration, beam is applied prestressing force, remove beam side;
9. knock out two brick on edge at the bottom of the beam, utilize High-Pressure Water that back-up sand is broken up, remove bed die.
In above-mentioned 6 steps: set up the side form of beam with five-layer plywood side template 7 and little wood stupefied 6, it is 48 steel pipe 8 that diameter is erect in the side form both sides, uses drawing reinforcing bar 9 to pass behind the side form fixing between the both sides steel pipe 8.
The invention has the beneficial effects as follows:
The then loose characteristic of water slug can be carried, be met to the present invention after making full use of the sand compacting, and alternative flitch is finished big beam bottom board construction, successfully solved the difficult problem that the big beam bottom board of distance element is removed, and construction effect is remarkable.This invention is once successful technological innovation, has augmented existing crossbeam mold method perfect, can effectively solve the construction difficult problem that multistory building is built on top, subway station, obvious social benefit.
Description of drawings
Fig. 1 is the generalized section of micro distance air crossbeam bottom board of the present invention.
The specific embodiment
The present invention is further illustrated below in conjunction with accompanying drawing and embodiment.
As shown in Figure 1, the execute-in-place process of construction method of micro distance air crossbeam bottom board of the present invention:
(1) unwrapping wire on subway station basement roof 1 marks the plan-position that underpins beam;
(2) according to the unwrapping wire result, in two brick on edge 3 of beam 10, highly be 19cm (removing wooden bed die thickness to the discrepancy in elevation of top board at the bottom of being beam), guarantee beam 10 side lines and lay bricks 3 central lines;
(3) with back-up sand 2 in two brick-on-edge walls, compacting makes sand 2 absolute altitudes flush with brick wall;
(4) on back-up sand 2 and two brick-on-edge walls, lay waterproof coiled material 4, prevent that concrete slurry from flowing in the back-up sand, causes that back-up sand is fixed;
(5) unwrapping wire again on waterproof roll 4 is laid five-layer plywood beam bottom board 5;
(6) set up the side form of beam according to the beam absolute altitude with five-layer plywood side template 7 and little wood stupefied 6, it is 48 steel pipe 8 that diameter is erect in the side form both sides, uses between the both sides steel pipe 8 drawing reinforcing bar 9 to pass fixing (identical with the normal concrete beams construction) behind the side form;
(7) assembling reinforcement is laid presstressed reinforcing steel, disturbing concrete;
(8) after the maintenance expiration, beam 10 is applied prestressing force, remove beam side;
(9) carefully knock out beam 10 ends two brick on edge 3, utilize High-Pressure Water that back-up sand 2 is broken up, finish the dismounting work of bed die.

Claims (1)

1. construction method of micro distance air crossbeam bottom board, it is characterized in that: concrete steps are as follows:
1) goes up unwrapping wire at subway station basement roof (1), mark the plan-position that underpins beam;
2), in two brick on edge (3) of beam (10), be 19cm highly, and make beam (10) side line and lay bricks (3) central lines according to the unwrapping wire result;
3) with back-up sand in two brick-on-edge walls (2), compacting makes the sand absolute altitude flush with brick wall;
4) on back-up sand (2) and two brick-on-edge walls, lay waterproof coiled material (4), be used for preventing that concrete slurry from flowing into back-up sand (2), cause that back-up sand (2) is fixed;
5) unwrapping wire again on waterproof roll (4) is laid five-layer plywood beam bottom board (5);
6) set up beam side according to beam (10) absolute altitude;
7) assembling reinforcement is laid presstressed reinforcing steel, disturbing concrete;
8) after the maintenance expiration, beam is applied prestressing force, remove beam side;
9) knock out beam (10) ends two brick on edge (3), utilize High-Pressure Water that back-up sand (2) is broken up, remove bed die.
CN2009100579189A 2009-09-18 2009-09-18 Construction method of micro distance air crossbeam bottom board Active CN101666122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100579189A CN101666122B (en) 2009-09-18 2009-09-18 Construction method of micro distance air crossbeam bottom board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100579189A CN101666122B (en) 2009-09-18 2009-09-18 Construction method of micro distance air crossbeam bottom board

Publications (2)

Publication Number Publication Date
CN101666122A CN101666122A (en) 2010-03-10
CN101666122B true CN101666122B (en) 2011-05-25

Family

ID=41802887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100579189A Active CN101666122B (en) 2009-09-18 2009-09-18 Construction method of micro distance air crossbeam bottom board

Country Status (1)

Country Link
CN (1) CN101666122B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864836B (en) * 2010-06-11 2011-08-03 中国二十二冶集团有限公司 Construction method for supporting template at construction joint of frame structure
CN102561710B (en) * 2012-02-27 2013-12-11 陕西建工集团第六建筑工程有限公司 Construction method of overhead stone plate of slope roof
CN110835973B (en) * 2019-10-23 2021-05-28 江苏兴厦建设工程集团有限公司 One-step forming construction method for modeling laminated beam of circular arch structure
CN113897999B (en) * 2021-11-03 2022-10-14 中建四局建设发展有限公司 Construction method for constructing elevator foundation structure on subway upper cover project

Also Published As

Publication number Publication date
CN101666122A (en) 2010-03-10

Similar Documents

Publication Publication Date Title
CN100572011C (en) Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN104746435B (en) A kind of construction method of great-angle Y type pier stud
CN103352400B (en) Prefabricated embedded tracks plate
CN202194317U (en) Guide rail structure for cast-in-site concrete slope surface
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
CN103924525B (en) Urban interchange industrialization short-term precast assembly construction method
CN104480810B (en) Low circuit continuous frame formula support rail girder construction and the construction method thereof of putting of middle low speed magnetic suspension
CN101666122B (en) Construction method of micro distance air crossbeam bottom board
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN103952979A (en) Bracket-free construction device and construction method for steel-concrete superposed beam top plate
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN104594654B (en) A kind of concrete structure reinforcement scheme generation method
CN102041918B (en) Construction method of hyperboloidal concrete structure of coal tower storage bunker incline wall
CN102733406A (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN202509449U (en) Pond, water channel or ditch slope protection
CN202148694U (en) Prefabricated T-shaped beam steel bar colligation positioning device
CN103882883A (en) Method for constructing foundation shared by tower crane and garage frame column
CN203947493U (en) Assembling type device for detecting manhole
CN207919582U (en) A kind of assembled pile foundation wharfs structure
CN207919848U (en) Top plate of underground parking garage is combined the unit with plastics diaphragm capsule
CN115948993A (en) Construction method of integral cast-in-place concrete bracket
CN206052565U (en) A kind of beam-column type bracket
CN210002441U (en) Box-type top plate structure for large-span urban tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Sun Mao

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CONSTRUCTION ENGINEERING NO. 4 CONSTRUCTI

Free format text: FORMER NAME: SHANGHAI NO.4 ARCHITECTURE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200126 Shanghai city Pudong New Area Yaohua Road No. 251

Patentee after: Shanghai Construction Engineering No.4 Construction Group Co., Ltd.

Address before: 200126 Shanghai city Pudong New Area Yaohua Road No. 251

Patentee before: Shanghai City No.4 Building Co., Ltd.