CN103160326A - Method for maintaining gas producer in hot stand-by state - Google Patents

Method for maintaining gas producer in hot stand-by state Download PDF

Info

Publication number
CN103160326A
CN103160326A CN2013101062551A CN201310106255A CN103160326A CN 103160326 A CN103160326 A CN 103160326A CN 2013101062551 A CN2013101062551 A CN 2013101062551A CN 201310106255 A CN201310106255 A CN 201310106255A CN 103160326 A CN103160326 A CN 103160326A
Authority
CN
China
Prior art keywords
gas generator
producer
producer gas
hot stand
stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101062551A
Other languages
Chinese (zh)
Inventor
赵金贵
彭军
刘建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Ductile Iron Pipes Co Ltd
Original Assignee
Xinxing Ductile Iron Pipes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Ductile Iron Pipes Co Ltd filed Critical Xinxing Ductile Iron Pipes Co Ltd
Priority to CN2013101062551A priority Critical patent/CN103160326A/en
Publication of CN103160326A publication Critical patent/CN103160326A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The invention relates to a method for maintaining a gas producer in a hot stand-by state. The method comprises the following steps of: (1) disconnecting an output pipe of the gas producer and a gas pipe network; (2) closing an air blast valve; (3) gradually opening a bell type valve of the gas producer and opening a dispersing pipe; (4) extinguishing the gas producer for 3-4h by using steam with the pressure of 0.2MPa, cooling a drying layer and a dry distillation layer in material layers, and slowing down the gasification reaction speed of a reduction layer and an oxide layer; and (5) enabling the gas producer to be in the hot stand-by state, and maintaining the gas outlet temperature to be within the range of 60-100 DEG C. According to the method, the energy waste is reduced, the labor intensity of workers is lightened, and the emission of waste gas and the pollution to the atmosphere are reduced.

Description

Foster stove method under the producer gas generator hot stand-by duty
Technical field
The present invention relates to a breeding stove method, the special standby foster stove that is fit under the producer gas generator hot stand-by duty.
Background technology
MQL3.0 shape coal-gas producer is that to adopt coal or coke be raw material, take air and steam as vaporized chemical, by the inflammable gas equipment of physical-chemical reaction production take an oxygen carbon as main component.Raw material is added by the feeding device on stove top, and then gas preheating, drying through rising pass through destructive distillation, reduction, a series of gasification reactions of oxidizing fire, produce coal gas in producer gas generator.The inside of producer gas generator is divided into the levels such as dead level, drying layer, destructive distillation layer, reducing zone, zone of oxidation and grieshoch, the inner bed of material is held by fire grate, the vaporized chemical of air and vapor composition is blown into from lower furnace, the coal gas of producing flows to the user by gas outlet tube, ash content is leaked down by the hole of fire grate, is discharged by mucking machine.
Generally, producer gas generator is carried out shove charge, some stove, coal, the operation such as be incorporated into the power networks, coal gas is qualified to be incorporated into the power networks.Along with the change of user's rhythm of production, the coal gas usage quantity changes, and need to withdraw from one or more operation producer gas generator (be generally withdraw from long period re-use).Be incorporated into the power networks for the producer gas generator that withdraws from can be dropped at any time, reduce rekindling producer gas generator number of times (owing to rekindling producer gas generator, expense is higher, and labour intensity is large), producer gas generator adopts hot stand-by duty.To producer gas generator, change the hot stand-by duty concrete operation step over to by running status: (1) uses two vertical tube water seals of producer gas generator, and producer gas generator output tube and pipe network are disconnected; (2) turn on the gas-fire the gradually belljar valve of producer is opened bleeder; (3) close gradually producer gas generator air blast (air) valve, out-of-blast; (4) stop producer gas generator ash discharge and coal, (5) open the natural ventilation valve, make producer gas generator be in hot stand-by duty.
Change the operation steps of the state of being incorporated into the power networks over to according to the producer gas generator hot stand-by duty: (1) closes the natural ventilation valve; (2) open air inlet valve, carry out air blast; (3) producer gas generator was supported stove 1~2 hour, coal 2~3 times, each coal is 800Kg approximately, understands level in stove by post librarian use drill rod, makes the producer level normal; (4) get coal gas sample chemical examination, chemically examine qualified after, remove pair vertical tube water seals of producer gas generator outlet pipe, producer gas generator outlet pipe and gaspipe network are incorporated into the power networks.
According to the operation technological requirement of producer gas generator, to the standby producer gas generator of Long Time Thermal, every 24 hours, should support stove according to the operation steps that coal gas generation hot stand-by duty changes the state of being incorporated into the power networks over to, to guarantee that producer gas generator can be incorporated into the power networks at any time.The producer gas generator hot stand-by duty is supported stove, increases post personnel's labour intensity; Support between the campaign, waste a large amount of fuel and wind energy; Because producer gas generator is not incorporated into the power networks, pull open bleeder, pollute to atmosphere.
Summary of the invention
In order to overcome the shortcoming of prior art, the invention provides a kind of foster stove method under producer gas generator hot stand-by duty, can reduce energy dissipation; Reduce the post personnel labor intensity; Reduce the discharging of waste gas and to topsoil.
The present invention solves the technical scheme that its technical problem takes: comprise the following steps: that (1) producer gas generator output tube and gaspipe network disconnect; (2) close the air blast valve; (3) turn on the gas-fire the gradually belljar valve of producer is opened bleeder; (4) use 0.2Mpa pressure steam, the stove 3~4 hours of going out reduces drying layer in the bed of material, destructive distillation layer temperature, slows down reducing zone, zone of oxidation gasification reaction speed; (5) make producer gas generator be in hot stand-by duty, stove goes out temperature and remains on 60~100 ℃.
1), according to the operation technological requirement of crude gas producer the present invention has following advantages:, needed 24 hours once support stove to the hot reserve producer gas generator.The present invention extends the interval time that producer gas generator is supported stove, reaches 480 hours most, reduces producer gas generator and supports the heat number.2), calculate according to producer gas generator hot reserve 480 hours, approximately 32000~48000Kg of coal economizes in raw materials; Reduce the post personnel and support stove 20 times; Simultaneously, also save a large amount of wind energies.3), improved efficiency, reduce the post personnel labor intensity; Reduce the energy consumption of producer gas generator; Simultaneously, reduce the discharging of waste gas and to topsoil.
Embodiment
To producer gas generator out of service, in advance that standby producer conditioning of BF is good when needing Long Time Thermal standby, keep normal gradation, the coal gas chemical examination is qualified.
Concrete operation step: (1) uses two vertical tube water seals of producer gas generator, and producer gas generator output tube and pipe network are disconnected; (2) turn on the gas-fire the gradually belljar valve of producer is opened bleeder; (3) close gradually producer gas generator air blast (air) valve, out-of-blast; (4) stop producer gas generator ash discharge and coal; (5) use 0.2Mpa pressure steam, the stove 3~4 hours of going out reduces drying layer in the bed of material, destructive distillation layer temperature, slows down reducing zone, zone of oxidation gasification reaction speed; (6) open the natural ventilation valve, make producer gas generator be in hot stand-by duty, stove goes out temperature and remains on 60~100 ℃.Adopt this working method, the producer gas generator hot reserve time is the longest 480 hours, and producer gas generator still can recover normal condition, produces qualified coal gas.

Claims (1)

1. the foster stove method under a producer gas generator hot stand-by duty, is characterized in that: comprise the following steps: that (1) producer gas generator output tube and gaspipe network disconnect; (2) close the air blast valve; (3) turn on the gas-fire the gradually belljar valve of producer is opened bleeder; (4) use 0.2Mpa pressure steam, the stove 3~4 hours of going out reduces drying layer in the bed of material, destructive distillation layer temperature, slows down reducing zone, zone of oxidation gasification reaction speed; (5) make producer gas generator be in hot stand-by duty, stove goes out temperature and remains on 60~100 ℃.
CN2013101062551A 2013-03-28 2013-03-28 Method for maintaining gas producer in hot stand-by state Pending CN103160326A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101062551A CN103160326A (en) 2013-03-28 2013-03-28 Method for maintaining gas producer in hot stand-by state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101062551A CN103160326A (en) 2013-03-28 2013-03-28 Method for maintaining gas producer in hot stand-by state

Publications (1)

Publication Number Publication Date
CN103160326A true CN103160326A (en) 2013-06-19

Family

ID=48583865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101062551A Pending CN103160326A (en) 2013-03-28 2013-03-28 Method for maintaining gas producer in hot stand-by state

Country Status (1)

Country Link
CN (1) CN103160326A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101270302A (en) * 2008-05-16 2008-09-24 兖矿鲁南化肥厂 Flameout method for fixed-bed gas producer
CN102534101A (en) * 2012-02-09 2012-07-04 九源天能(北京)科技有限公司昆明分公司 Method and device using convertor waste gas to produce high-quality steam needed by refining furnace in matching way

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101270302A (en) * 2008-05-16 2008-09-24 兖矿鲁南化肥厂 Flameout method for fixed-bed gas producer
CN102534101A (en) * 2012-02-09 2012-07-04 九源天能(北京)科技有限公司昆明分公司 Method and device using convertor waste gas to produce high-quality steam needed by refining furnace in matching way

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
国家机械委技工培训教材编审组: "《发生炉煤气生产原理(初级煤气工适用)》", 30 June 1989, 机械工业出版社 *
潘雄: "《关于两台或两台以上煤气发生炉脱网及并网操作的注意事项》", 《佛山陶瓷》 *
谢全安等: "《煤气安全防护技术》", 30 April 2007, 化学工业出版社 *

Similar Documents

Publication Publication Date Title
CN101705331B (en) Sensible heat recovering system and method of tail gas of converter with afterburning
CN108977213A (en) Novel straw carbonization device
CN203530218U (en) Heat transfer device of raw coke oven gas ascension pipe of coke oven
CN203718752U (en) Smokeless combustion furnace capable of using both straw and marsh gas
CN204901785U (en) Ultralow concentration gas combustion system
CN103074111B (en) Equipment and technology for producing synthesis gas through cooperating outer cylinder air gasification with inner cylinder steam gasification
CN202881201U (en) Hazardous waste gasifier with plasma torch heating system
CN102635940B (en) Gasification combined-combustion hot-blast stove
CN108313979B (en) Device for producing hydrogen by utilizing semi-coke waste heat coupled biomass gasification
CN203653484U (en) Coke-oven raw gas waste heat utilization scavenging device
CN203159541U (en) Continuous pollution-free low-energy consumption waste plastics oil refining device
CN103160326A (en) Method for maintaining gas producer in hot stand-by state
CN204400923U (en) A kind of gasifying biomass multi-joint-production apparatus
CN202328215U (en) High-efficiency biomass fuel combustor
CN109449454B (en) Solid oxide fuel cell device using raw coke oven gas
CN204400922U (en) A kind of biomass gasification burning is for the device of annealing furnace
CN204211686U (en) With the charring furnace of energy recovery
CN203730135U (en) Power generation device for producer gas combustion gas turbine
CN201636848U (en) Gas conversion stove
CN205133593U (en) Biological hydrogen preparation equipment
CN203159555U (en) Improved energy-saving coal gasification furnace
CN204529733U (en) Take rare gas element as the new Type Coke Oven ascending tube crude-gas residual neat recovering system of medium
CN204455027U (en) Gas generating system
CN205061995U (en) Five steps of preparation inert gas devices in fixed bed gas making stove
CN104388122B (en) Multi-coproduction biomass gasification method and device thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130619