CN205061995U - Five steps of preparation inert gas devices in fixed bed gas making stove - Google Patents

Five steps of preparation inert gas devices in fixed bed gas making stove Download PDF

Info

Publication number
CN205061995U
CN205061995U CN201520795754.0U CN201520795754U CN205061995U CN 205061995 U CN205061995 U CN 205061995U CN 201520795754 U CN201520795754 U CN 201520795754U CN 205061995 U CN205061995 U CN 205061995U
Authority
CN
China
Prior art keywords
gas
blowing
valve
blowpipe
fixed bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520795754.0U
Other languages
Chinese (zh)
Inventor
王远强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Feng Xihuarui Coal Chemical Industry Co Ltd
Original Assignee
Shanxi Feng Xihuarui Coal Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Feng Xihuarui Coal Chemical Industry Co Ltd filed Critical Shanxi Feng Xihuarui Coal Chemical Industry Co Ltd
Priority to CN201520795754.0U priority Critical patent/CN205061995U/en
Application granted granted Critical
Publication of CN205061995U publication Critical patent/CN205061995U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

The utility model relates to a five steps of preparation inert gas devices in fixed bed gas making stove, belong to intermittent type formula fixed bed gas making stove technical field, which has the advantages of simple structure, high durability and convenient use, it is low to go upward the temperature, consume lowly, high safety in operation, the labor intensity of personnel is effectively reduced five steps of preparation inert gas devices in fixed bed gas making stove, the technical scheme that adopts is linked together through last air flue and dust remover for the upper portion of gas stove, the dust remover top is provided with blow gas blowdown piping and last blowpipe way, the bottom of gas stove is provided with down the blowpipe way, it is linked together with coal gas main pipe respectively with lower blowpipe way to go up the blowpipe way, coal gas main pipe is linked together with the dry -type water seal, upward the blowpipe is provided with on the road and blows the gas valve, the blowpipe is provided with down on the road and blows the gas valve down, the last coal gas main valve that is provided with of coal gas main pipe, the front end that blows the gas valve down still is provided with down and blows the blowdown piping, under blow to be provided with down on the blowdown piping and blow the coal gas atmospheric valve, the utility model discloses extensively be used for fixed bed gas making stove.

Description

Static bed gas making furnace five step prepares inert gas plant
Technical field
The utility model relates to a kind of static bed gas making furnace five step and prepares inert gas plant, belongs to intermittent type static bed gas making furnace technical field.
Background technology
China take coal as the country of main energy sources, also account for about 70% of China at present, and this block cost of consumption of power coal accounts for about 60% of ammonia cost with the enterprise of fixed bed gasifier block coal synthesis ammonia, methanol feedstock gas.
At present, existing static bed gas making furnace three step manually rare gas element processed only do blowing up emptying, blowing emptying and blowing air (title noble gas) replace three steps, can cause trip temperature high, consume that high, indifferent gas qualification rate is low produces time long, dangerous, the problem such as personnel labor intensity is large.
Utility model content
For solving the technical problem that prior art exists, it is simple that the utility model provides a kind of structure, easy to use, and upper trip temperature is low, it is low to consume, operating safety, static bed gas making furnace five step that effectively reduces personnel labor intensity prepare inert gas plant.
For achieving the above object, the technical scheme that the utility model adopts is that static bed gas making furnace five step prepares inert gas plant, comprise: gas furnace and fly-ash separator, the top of described gas furnace is connected with fly-ash separator by epithelium healing, described dust remover roof is provided with blowing air blowdown piping and blowing up pipeline, the bottom of described gas furnace is provided with blowing down pipeline, described blowing up pipeline is connected with gas main respectively with blowing down pipeline, described gas main is connected with dry type water seal, described blowing up pipeline is provided with blowing up gas valve, blowing down pipeline is provided with blowing down gas valve, gas main is provided with coal gas main valve, the front end of described blowing down gas valve is also provided with blowing down blowdown piping, described blowing down blowdown piping is provided with blowing down coal gas blow-off valve.
Compared with prior art, the utility model has following technique effect: the utility model is simple and reasonable for structure, trip temperature in reduction, prevents from burning out equipment, reduce gas and take sensible heat out of, and the labour intensity effectively reducing feed coal consumption, reduce security risk, reduce personnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
In order to make technical problem to be solved in the utility model, technical scheme and beneficial effect clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, static bed gas making furnace five step prepares inert gas plant, comprise: gas furnace 1 and fly-ash separator 2, the top of gas furnace 1 is connected with fly-ash separator 2 by epithelium healing 3, fly-ash separator 2 top is provided with blowing air blowdown piping 5 and blowing up pipeline 6, the bottom of gas furnace 1 is provided with blowing down pipeline 7, blowing up pipeline 6 is connected with gas main 8 respectively with blowing down pipeline 7, gas main 8 is connected with dry type water seal 4, blowing up pipeline 6 is provided with blowing up gas valve 9, blowing down pipeline 7 is provided with blowing down gas valve 10, gas main 8 is provided with coal gas main valve 11, the front end of blowing down gas valve 10 is also provided with blowing down blowdown piping 12, blowing down blowdown piping 12 is provided with blowing down coal gas blow-off valve 13.
In actual use, oxygenation air and superheated vapour, interval or be mixed into gas furnace, blows off double teacher respectively through blowing emptying, blowing up, blowing down, secondary blowing up, air, and the oxygen in scorching hot charcoal and oxygenation air and steam reaction generate semi-water gas for synthetic ammonia.
Blowing emptying: the pure oxygen divided from sky and air are made into finite concentration (oxygenation air in oxygenation gas blower, enter gas furnace, carbon in oxygenation air and gas furnace reacts and generates high temperature blowing air, the sedimentation in fly-ash separator of high temperature blowing air entrained solid particle, High Temperature Gas carries out emptying through blowing air blowdown piping.
Blowing up: oxygenation air and low-pressure superheated steam mixing, gas furnace bottom portion is entered after mixing, carbon in oxygenation air, steam and gas furnace reacts the coal gas of high temperature generated and enters coal gas waste heat boiler through fly-ash separator, blowing up pipeline, blowing up gas valve, gas main, dry type water seal, reclaim the laggard scrubber tower of sensible heat, through washing, dedusting, cooling, coal gas enters gas holder.
Blowing down: oxygenation air and low-pressure superheated steam mixing, top, gas furnace bottom portion is entered after mixing, carbon in oxygenation air, steam and gas furnace reacts the coal gas of high temperature generated and enters coal gas waste heat boiler through blowing down pipeline, blowing down gas valve, dry type water seal, gas main, dry type water seal, reclaim the laggard scrubber tower of sensible heat, through washing, dedusting, cooling, coal gas enters gas holder.
Secondary blowing up: identical with blowing up principle.
Air blows off: identical with blowing emptying.
On blowing down pipeline, be wherein provided with blowing down blowdown piping and blowing down coal gas blow-off valve, when making lazy technique, close blowing down gas valve, opening blowing down coal gas blow-off valve, carry out emptying; When normally producing, closing blowing down coal gas blow-off valve, opening blowing down gas valve, proceed lower blow moulding.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should wrap within the scope of the utility model.

Claims (1)

1. static bed gas making furnace five step prepares inert gas plant, comprise: gas furnace and fly-ash separator, it is characterized in that: the top of described gas furnace is connected with fly-ash separator by epithelium healing, described dust remover roof is provided with blowing air blowdown piping and blowing up pipeline, the bottom of described gas furnace is provided with blowing down pipeline, described blowing up pipeline is connected with gas main respectively with blowing down pipeline, described gas main is connected with dry type water seal, described blowing up pipeline is provided with blowing up gas valve, blowing down pipeline is provided with blowing down gas valve, gas main is provided with coal gas main valve, the front end of described blowing down gas valve is also provided with blowing down blowdown piping, described blowing down blowdown piping is provided with blowing down coal gas blow-off valve.
CN201520795754.0U 2015-10-15 2015-10-15 Five steps of preparation inert gas devices in fixed bed gas making stove Active CN205061995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520795754.0U CN205061995U (en) 2015-10-15 2015-10-15 Five steps of preparation inert gas devices in fixed bed gas making stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520795754.0U CN205061995U (en) 2015-10-15 2015-10-15 Five steps of preparation inert gas devices in fixed bed gas making stove

Publications (1)

Publication Number Publication Date
CN205061995U true CN205061995U (en) 2016-03-02

Family

ID=55388575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520795754.0U Active CN205061995U (en) 2015-10-15 2015-10-15 Five steps of preparation inert gas devices in fixed bed gas making stove

Country Status (1)

Country Link
CN (1) CN205061995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112745967A (en) * 2020-12-11 2021-05-04 安徽金禾实业股份有限公司 Automatic temperature raising and inert making method of UGI furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112745967A (en) * 2020-12-11 2021-05-04 安徽金禾实业股份有限公司 Automatic temperature raising and inert making method of UGI furnace

Similar Documents

Publication Publication Date Title
CN204265712U (en) Gasification, pyrolysis combination producing activated carbon system
CN105062528A (en) Coal-pyrolysis polygeneration process and device applicable to pulverized coal furnace
WO2023097943A1 (en) Nitrogen-free combustion and carbon dioxide capture and utilization process for gas-fired boiler
CN204138607U (en) A kind of gasification residual neat recovering system
CN104355310B (en) A kind of combined coal pyrolysis produces the system and method for gac
CN201581943U (en) Device for recycling and utilizing waste heat of carbon-graphitized high-temperature flue gas
CN114151785A (en) Carbon-based oxygen-enriched combustion and CO (carbon monoxide) of coal-fired boiler2Trapping and utilizing process
CN205061995U (en) Five steps of preparation inert gas devices in fixed bed gas making stove
CN205170900U (en) Converter gas burns entirely, full recovery system of waste heat complementary energy
CN203940456U (en) A kind of high-efficient energy-saving environment friendly heat energy utilization system taking fine coal as fuel
CN202885576U (en) Waste heat utilization power generation system capable of converting coke oven chimney flue waste gas to high-quality waste gas
CN204211493U (en) A kind of combined coal pyrolysis produces the system of gac
CN201762361U (en) Flue gas purification and waste heat recovery system device of oxygen top-blown converter
CN205035321U (en) Pyrolysis of coal poly -generation device suitable for buggy stove
CN201653070U (en) Drying device for molded coal
CN201756539U (en) Two-section gas producer phenolic water treatment device
CN202769638U (en) Waste heat recovery device for boiler exhausted gas
CN107236575B (en) A kind of coupling fluidized bed pyrolysis gasifying device of inclination column plate type
CN204787212U (en) Energy saving and emission reduction boiler system
CN204543904U (en) A kind of flue device can removing harmful substance in coal-fired flue-gas
CN204474706U (en) Converter gas purification and residual neat recovering system
CN204125384U (en) A kind of dividing wall type material calcining device
CN204693388U (en) A kind of environment-protection boiler with waste heat recovery
CN216384152U (en) Carbon-based oxygen-enriched combustion and CO (carbon monoxide) of coal-fired boiler2Trapping and utilizing system
CN201801508U (en) Modified device improving calorific value of straw gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant