CN103150625B CN201310060862.9A CN201310060862A CN103150625B CN 103150625 B CN103150625 B CN 103150625B CN 201310060862 A CN201310060862 A CN 201310060862A CN 103150625 B CN103150625 B CN 103150625B
Authority
CN
China
Prior art keywords
power
time
telegram
reply
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310060862.9A
Other languages
English (en)
Other versions
CN103150625A (zh
Inventor
时翔
赵生传
齐蔚海
江川
张宏伟
刘术波
崔潇
徐强
兰先明
徐鹏
王德东
郭英雷
潘滨
公伟勇
林晓礼
李保忠
张明财
梁涛
毕建鑫
郭建豪
陈明
樊秀娟
周建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410324720.3A priority Critical patent/CN104143824B/zh
Priority to CN201310060862.9A priority patent/CN103150625B/zh
Priority to CN201410325026.3A priority patent/CN104182815B/zh
Publication of CN103150625A publication Critical patent/CN103150625A/zh
Application granted granted Critical
Publication of CN103150625B publication Critical patent/CN103150625B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明的基于FTU的停电事件信息采集方法和系统,通过获取营销侧停复电信息与配电网采集的停复电信电进行校正,动态调整配电网采集的停复电信息;同时,对于配电网未反映出的单用户的停电信息在剔除用户侧设备造成的伪停电信息后添加到停电事件中,从配电网和用户营销侧全面采集停电事件信息,保证停电事件的准确和全面,基于此进行的可靠性分析的结果更准确。

Description

基于FTU的停电事件信息采集方法和系统
技术领域
本发明涉及到供电系统电能质量控制领域,具体是一种基于FTU的停电事件信息采集方法和系统。
背景技术
供电可靠性是指供电系统持续供电的能力,是考核供电系统电能质量的重要指标,反映了电力工业对国民经济电能需求的满足程度,已经成为衡量一个供电国家经济发达程度的标准之一;供电可靠性可以用如下一系列指标加以衡量:用户平均停电时间、用户平均停电次数、系统停电等效小时。停电事件的精确度直接决定可靠性分析的精确度,因此正确计量停电事件的相关信息是评估供电可靠性的关键。馈线自动化终端(FTU,英文全称为FeederTerminal Unit)是自动化系统与一次设备联结的接口,主要用于配电系统变压器、断路器、重合器、分段器、柱上负荷开关、环网柜、调压器、无功补偿电容器的监视和控制,与馈线主站通信,提供配电系统运行控制及管理所需的数据,执行主站给出的对配电设备的控制调节指令,以实现馈线自动化的各项功能。因此,利用馈线自动化终端中的停电信息即开关分合闸信息计量停电事件进而评价供电可靠性,在一定程度上克服了人工计算的弊端,但由于完全依据馈线自动化终端反馈的分合闸信息,同样存在计量不精确的问题。
中国专利文献CN102709905A公开了一种低压配电网供电可靠率自动计算分析装置及方法,智能剩余电流动作保护器实时检测及上传低压用户跳闸闭锁时间、合闸时间、失电时间、恢复送电时间的数据并上报告警信息至服务器网络最后存储在县局监控中心服务器的低压配电网可靠率的分析系统基础数据库中,监控终端输入低压用户数据、单户或多户检修、临时和抢修的停电事件并存储在低压配电网可靠率的分析系统基础数据库中,县局监控中心服务器将输入的数据进行处理分析并最终在监控终端上显示。该专利文献中的技术方案将智能剩余电流动作保护器实时检测上传的低压用户闭锁时间、合闸时间、失电时间、恢复送电时间的数据直接传给分析系统基础数据库,分合闸信息完全依赖于智能剩余电流动作保护器检测的开关动作状态,一旦智能剩余电流动作保护器上传的开关动作状态有误,将直接降低最终计算出的可靠率的准确率。
发明内容
为此,本发明所要解决的是现有低压配电网供电可靠率自动计算分析装置分合闸信息完全依赖于智能剩余电流动作保护器检测的开关动作状态带来的影响最终计算出的可靠率的准确率的技术问题,提供一种基于FTU的停电事件信息采集方法和系统。
为解决上述技术问题,本发明采用的技术方案如下:
一种基于FTU的停电事件信息采集方法,包括如下步骤:
S11:从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息;
S12:顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出,如有,则转入步骤S13;直到完成所述开关事件集合中所有开关事件的判断;
S13:从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,如对应,则判断相应线路存在故障,形成一条停电事件信息;
S14:将故障停电范围内的配电网的停电时间确定为停电事件的开始时间;
S15:采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间;
S21:采集营销侧停复电信息;
S22:判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将步骤S15中初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息;
S23:判断所述单用户的停电信息是否为用户侧设备造成的伪停电信息,如是,则将步骤S15中初步确定的复电时间作为最终的复电时间;如否,则继续采集营销侧停复电时间,直到采集得到的营销侧复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间;
S3:顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
在所述步骤S3之后还包括如下步骤:
S40:判断FTU反馈的开关动作与配电网自动化系统中的测量数据对应的开关动作是否一致,如不一致则转入步骤S41;
S41:分析生产管理系统中是否存在计划停电信息和临时停电信息,如有,则形成一次用户侧停电事件,并将计划停电和临时停电范围内的停电时刻确定为用户侧停电事件的开始时间;否则,转入步骤S44;
S42:采集配电网自动化系统中的测量数据进行拓扑分析,将计划停电和临时停电范围内的复电时刻作为用户侧停电事件的复电时间;
S43:计算所有用户侧停电事件影响到的时户数之和,并将步骤S3中获取的所有停电事件影响到的时户数之和减去用户侧停电事件影响到的时户数之和作为停电事件最终影响到的时户数;
步骤S44:结束。
所述步骤S12中,判断开关分闸前后10秒内是否存在二次保护动作发出。
同时,提供一种基于FTU的停电事件信息采集装置,包括:
开关事件集合建立模块,从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息;
二次保护动作判断模块,用于顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出;直到完成所述开关事件集合中所有开关事件的判断;
停电事件信息形成模块,用于从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,如对应,则判断相应线路存在故障,形成一条停电事件信息;
停电事件的开始时间确定模块,用于将故障停电范围内的配电网的停电时间确定为停电事件的开始时间;
停电事件的复电时间初步确定模块,用于采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间;
营销侧停复电信息采集模块,用于采集营销侧停复电信息;
停复电信息判断模块,用于判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息;
停电事件的最终复电时间确定模块,用于判断所述单用户的停电信息是否为用户侧设备造成的伪停电信息,如是,则将初步确定的复电时间作为最终的复电时间;如否,则继续采集营销侧停复电时间,直到采集得到的营销侧停复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间;
时户数之和求取模块,用于顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
所述二次保护动作判断模块,用于顺次判断每个所述开关事件中所述开关分闸前后10秒时间内是否有二次保护动作信息发出。
本发明的上述技术方案相比现有技术具有以下优点:
本发明的基于FTU的停电事件信息采集方法和系统,通过获取营销侧停复电信息与配电网采集的停复电信电进行校正,动态调整配电网采集的停复电信息;同时,对于配电网未反映出的单用户的停电信息在剔除用户侧设备造成的伪停电信息后添加到停电事件中,从配电网和用户营销侧全面采集停电事件信息,保证停电事件的准确和全面,基于此进行的可靠性分析的结果更准确。
附图说明
为了使本发明的内容更容易被清楚的理解,下面根据本发明的具体实施例并结合附图,对本发明作进一步详细的说明,其中
图1为本发明一个实施例的基于FTU的停电事件信息采集方法流程图。
具体实施方式
参见图1所示的流程图,本发明一个实施例的基于FTU的停电事件信息采集方法,具体包括如下步骤:
首先,获取停电事件信息,具体包括如下步骤:
S11:从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息,其中,动作类型包括开闸和合闸,开关动作时间指开闸时间和合闸时间,开关的分闸和合闸对应一个完整的停电事件,一般情况下,开闸时间对应于停电事件中的停电时间,合闸时间对应于停电事件中的复电时间。比如开关状态从合位到分位,代表开关断开;开关状态从分位到合位,代表开关闭合;所述预定时间等于可靠性分析的时间,即可靠性统计的统计期间。
S12:顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出,如有,则转入步骤S13;否则,重复本步骤继续判断,直到完成所述开关事件集合中所有开关事件的判断;作为一种具体实施方式,所述步骤S12中,判断开关分闸前后10秒内是否存在二次保护动作发出,其中的二次保护动作指分闸后的保护动作,比如中性点接地等,如果没有二次保护动作,则说明分闸后开关很快就又自动合闸,给用户带来的停电时间很短,此次分合闸可忽略,可认为没有线路故障停电,不构成一次停电事件。
S13:从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,所述对应,指当开关状态为分闸时,相应线路中电流为零,当开关状态为合闸时,相应线路中存在电流;如对应,即相应线路中电流为零,此时判断相应线路存在故障,形成一条停电事件信息。
S14:将故障停电范围内的配电网的停电时间确定为停电事件的开始时间。
S15:采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间。
然后,从用户营销侧获取停电事件信息,并对配电网获取的停电事件信息进行校正,具体包括如下步骤:
S21:从营销侧系统中采集营销侧停复电信息,其中,所述营销侧系统是对电力用户的用电信息进行采集、处理和实时监控的系统,实现用电信息自动采集、计量异常监测、电能质量监测、用电分析和管理、相关信息发布、分布式能源监控、智能用电设备的信息交互等功能。
S22:判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将步骤S15中初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息。
S23:判断所述单用户的停电信息是否为用户侧设备造成的伪停电信息,如是,则将步骤S15中初步确定的复电时间作为最终的复电时间;;如否,则继续采集营销侧停复电信息,直到采集得到的营销侧复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间。
S3:顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
作为本发明其它实施例的基于FTU的停电事件信息采集方法,在上述实施例中方法步骤的基础上,进一步包括如下步骤:
S40:判断FTU反馈的开关动作与配电网自动化系统中的测量数据对应的开关动作是否一致,如不一致则转入步骤S41。
S41:分析生产管理系统中是否存在计划停电信息和临时停电信息,如有,则形成一次用户侧停电事件,并将计划停电和临时停电范围内的停电时刻确定为用户侧停电事件的开始时间;否则,转入步骤S44。
S42:采集配电网自动化系统中的测量数据进行拓扑分析,将计划停电和临时停电范围内的复电时刻作为用户侧停电事件的复电时间。
S43:计算所有用户侧停电事件影响到的时户数之和,并将步骤S3中获取的所有停电事件影响到的时户数之和减去用户侧停电事件影响到的时户数之和作为停电事件最终影响到的时户数;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
步骤S44:结束。
本发明一个实施例的基于FTU的停电事件信息采集系统,具体包括:
开关事件集合建立模块,从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息。
二次保护动作判断模块,用于顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出;直到完成所述开关事件集合中所有开关事件的判断,作为具体的实施方式,所述二次保护动作判断模块,用于顺次判断每个所述开关事件中所述开关分闸前后5秒时间内是否有二次保护动作信息发出。
停电事件信息形成模块,用于从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,如对应,则判断相应线路存在故障,形成一条停电事件信息。
停电事件的开始时间确定模块,用于将故障停电范围内的配电网的停电时间确定为停电事件的开始时间。
停电事件的复电时间初步确定模块,用于采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间。
营销侧停复电信息采集模块,用于采集营销侧停复电信息。
停复电信息判断模块,用于判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息。
停电事件的最终复电时间确定模块,用于判断所述单用户的停电信息是否为用户侧设备造成的伪停电信息,如是,则将初步确定的复电时间作为最终的复电时间;如否,则继续采集营销侧停复电时间,直到采集得到的营销侧停复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间。
时户数之和求取模块,用于顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
本发明的基于FTU的停电事件信息采集方法和系统,通过获取营销侧停复电信息与配电网采集的停复电信电进行校正,动态调整配电网采集的停复电信息;同时,对于配电网未反映出的单用户的停电信息在剔除用户侧设备造成的伪停电信息后添加到停电事件中,从配电网和用户营销侧全面采集停电事件信息,保证停电事件的准确和全面,基于此进行的可靠性分析的结果更准确。
电网供电可靠性的分析完全依据于停电事件信息,停电事件信息越准确,则分析得到的电网供电可靠性越准确。通常,供电可靠性可通过供电可靠率、用户平均停电时间、用户平均停电次数、系统停电等效小时数确定,这些供电可靠性指标计算的基础都是停电事件信息,作为完整的技术方案,以下以停电事件信息计算供电可靠率进行说明:
首先,计算统计期间内用户的平均停电时间,用上述实施例中求取的所述时户数之和除以总用户数;然后,在统计期间内计算供电可靠率,所述供电可靠率等于对用户有效供电时间总小时数与统计期间总小时数的比值,按照以下公式求取:
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。

Claims (5)

1.一种基于FTU的停电事件信息采集方法,其特征在于,包括如下步骤:
S11:从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息;
S12:顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出,如有,则转入步骤S13;否则,重复本步骤,直到完成所述开关事件集合中所有开关事件的判断;
S13:从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,如对应,则判断相应线路存在故障,形成一条停电事件信息;
S14:将故障停电范围内的配电网的停电时间确定为停电事件的开始时间;
S15:采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间;
S21:采集营销侧停复电信息;
S22:判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将步骤S15中初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息;
S23:判断所述单用户的停电信息是否为用户侧采集设备造成的伪停电信息,如是,则将步骤S15中初步确定的复电时间作为最终的复电时间;如否,则继续采集营销侧停复电时间,直到采集得到的营销侧复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间;S3:顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
2.根据权利要求1所述的基于FTU的停电事件信息采集方法,其特征在于:在所述步骤S3之后还包括如下步骤:
S40:判断FTU反馈的开关动作与配电网自动化系统中的测量数据对应的开关动作是否一致,如不一致则转入步骤S41;
S41:分析生产管理系统中是否存在计划停电信息和临时停电信息,如有,则形成一次用户侧停电事件,并将计划停电和临时停电范围内的停电时刻确定为用户侧停电事件的开始时间;否则,转入步骤S44;
S42:采集配电网自动化系统中的测量数据进行拓扑分析,将计划停电和临时停电范围内的复电时刻作为用户侧停电事件的复电时间;
S43:计算所有用户侧停电事件影响到的时户数之和,并将步骤S3中获取的所有停电事件影响到的时户数之和减去用户侧停电事件影响到的时户数之和作为停电事件最终影响到的时户数;
步骤S44:结束。
3.根据权利要求1或2所述的基于FTU的停电事件信息采集方法,其特征在于:所述步骤S12中,所述顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出为顺次判断每个所述开关事件中所述开关分闸前后10秒内是否有二次保护动作信息发出。
4.一种基于FTU的停电事件信息采集装置,其特征在于,包括:
开关事件集合建立模块,从调度自动化系统中调取预定时间内FTU反馈的开关动作事件,得到开关事件集合,其中,所述开关事件至少包括开关动作类型和开关动作时间信息;
二次保护动作判断模块,用于顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出;直到完成所述开关事件集合中所有开关事件的判断;
停电事件信息形成模块,用于从调度自动化系统中采集所述开关事件所在线路的实时数据,并判断所述实时数据反映的电路情况是否与所述开关事件中的分闸动作相对应,如对应,则判断相应线路存在故障,形成一条停电事件信息;
停电事件的开始时间确定模块,用于将故障停电范围内的配电网的停电时间确定为停电事件的开始时间;
停电事件的复电时间初步确定模块,用于采集配电网自动化系统中的测量数据,将故障停电范围内线路恢复供电的时间初步确定为复电时间;
营销侧停复电信息采集模块,用于采集营销侧停复电信息;
停复电信息判断模块,用于判断采集得到的营销侧停复电信息与采集的配电网自动化系统中的停复电信息是否一致,如一致,则将初步确定的复电时间作为最终的复电时间;否则,增加单用户的停电信息;
停电事件的最终复电时间确定模块,用于判断所述单用户的停电信息是否为用户侧采集设备造成的伪停电信息,如是,则将初步确定的复电时间作为最终的复电时间;如否,则继续采集营销侧停复电时间,直到采集得到的营销侧停复电时间与配电网采集的复电时间一致,将此时营销侧复电时间作为最终的复电时间;
时户数之和求取模块,用于顺次获取每个停电事件影响到的时户数,并对获取的所有停电事件影响到的时户数求和得到时户数之和;其中,所述时户数指停电事件范围内的总用户数与停电时间的乘积,每个所述停电事件的停电时间等于所述停电事件的最终的复电时间与其开始时间之差。
5.根据权利要求4所述的一种基于FTU的停电事件信息采集装置,其特征在于:所述二次保护动作判断模块中,所述用于顺次判断每个所述开关事件中所述开关分闸前后5-15秒时间内是否有二次保护动作信息发出为用于顺次判断每个所述开关事件中所述开关分闸前后10秒时间内是否有二次保护动作信息发出。
CN201310060862.9A 2012-10-22 2013-02-26 基于ftu的停电事件信息采集方法和系统 Active CN103150625B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201410324720.3A CN104143824B (zh) 2012-10-22 2013-02-26 一种基于ftu的供电可靠性获取方法和系统
CN201310060862.9A CN103150625B (zh) 2012-10-22 2013-02-26 基于ftu的停电事件信息采集方法和系统
CN201410325026.3A CN104182815B (zh) 2012-10-22 2013-02-26 一种供电可靠性获取方法和系统

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201210403732 2012-10-22
CN201210403732.6 2012-10-22
CN201310060862.9A CN103150625B (zh) 2012-10-22 2013-02-26 基于ftu的停电事件信息采集方法和系统

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201410324720.3A Division CN104143824B (zh) 2012-10-22 2013-02-26 一种基于ftu的供电可靠性获取方法和系统
CN201410324719.0A Division CN104143823B (zh) 2012-10-22 2013-02-26 一种停电事件信息采集方法和系统
CN201410325026.3A Division CN104182815B (zh) 2012-10-22 2013-02-26 一种供电可靠性获取方法和系统

Publications (2)

Publication Number Publication Date
CN103150625A CN103150625A (zh) 2013-06-12
CN103150625B true CN103150625B (zh) 2014-08-06

Family

ID=48548684

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201310060862.9A Active CN103150625B (zh) 2012-10-22 2013-02-26 基于ftu的停电事件信息采集方法和系统
CN201410324720.3A Active CN104143824B (zh) 2012-10-22 2013-02-26 一种基于ftu的供电可靠性获取方法和系统
CN201410325026.3A Active CN104182815B (zh) 2012-10-22 2013-02-26 一种供电可靠性获取方法和系统
CN201410324719.0A Active CN104143823B (zh) 2012-10-22 2013-02-26 一种停电事件信息采集方法和系统

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201410324720.3A Active CN104143824B (zh) 2012-10-22 2013-02-26 一种基于ftu的供电可靠性获取方法和系统
CN201410325026.3A Active CN104182815B (zh) 2012-10-22 2013-02-26 一种供电可靠性获取方法和系统
CN201410324719.0A Active CN104143823B (zh) 2012-10-22 2013-02-26 一种停电事件信息采集方法和系统

Country Status (1)

Country Link
CN (4) CN103150625B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104143823A (zh) * 2012-10-22 2014-11-12 国网山东省电力公司青岛供电公司 一种停电事件信息采集方法和系统

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104022573A (zh) * 2014-06-05 2014-09-03 国网山东乳山市供电公司 一种线路开关保护跳闸的判断报警方法
CN105719035B (zh) * 2014-12-03 2019-09-06 国家电网公司 一种停电信息的推送方法及系统
CN104537492A (zh) * 2014-12-30 2015-04-22 国家电网公司 一种基于实时数据的电力高危重要用户在线监测方法
CN105203874A (zh) * 2015-09-14 2015-12-30 江苏省电力公司常州供电公司 电网末端供电可靠率监测统计方法
CN105488739A (zh) * 2015-12-17 2016-04-13 深圳供电局有限公司 一种基于回路、连接点的输变电系统可靠性统计评价方法
CN105590164B (zh) * 2015-12-17 2019-10-01 深圳供电局有限公司 基于停电事件自动集成的输变电系统可靠性分析装置
US10726341B2 (en) * 2016-03-21 2020-07-28 Schneider Electric USA, Inc. Method for inferring downtime from power quality data
CN106208042B (zh) * 2016-07-18 2017-10-13 国网河南省电力公司电力科学研究院 基于营配调融合的配电网停电信息共享方法
CN106451791B (zh) * 2016-11-21 2020-07-31 中国南方电网有限责任公司 供断电信息检测方法和系统
CN106960291B (zh) * 2017-04-17 2018-04-13 中国南方电网有限责任公司 一种停电影响用户信息获取方法及装置
CN107194562A (zh) * 2017-05-16 2017-09-22 国网山东省电力公司临清市供电公司 供电公司用台区停电分析系统
CN106992520B (zh) * 2017-05-25 2019-11-29 国网福建省电力有限公司 基于多源数据的配电网停复电监视方法
CN108596782A (zh) * 2018-04-15 2018-09-28 广东电网有限责任公司 一种大面积停电数据快速互通方法
CN108683176B (zh) * 2018-04-20 2021-05-28 国网宁夏电力有限公司吴忠供电公司 一种判定10千伏线路分支线路停电的方法
CN108539736B (zh) * 2018-04-26 2021-07-16 广东电网有限责任公司广州供电局 基于多源数据的停电事件分析方法、系统和计算机设备
CN108647328B (zh) * 2018-05-11 2022-04-01 国网安徽省电力有限公司淮南供电公司 可靠性停电事件采集完整性分析与自动补全方法
CN110212645B (zh) * 2019-06-20 2023-04-28 国网湖南省电力有限公司 一种用电信息采集终端停电事件上报方法及装置
CN110704500A (zh) * 2019-09-09 2020-01-17 深圳供电局有限公司 一种低压分支停电事件分析方法及系统
CN111222809B (zh) * 2020-03-30 2020-09-25 广东电网有限责任公司佛山供电局 基于模型驱动和数据驱动结合的用户用电可靠性分析方法
CN111553603A (zh) * 2020-04-30 2020-08-18 深圳供电局有限公司 一种低压用户供电可靠性评估方法、装置及计算机可读存储介质
CN113241746B (zh) * 2021-05-12 2022-03-25 国网江苏省电力有限公司南通供电分公司 缩短配网线路跳闸事故的平均应急响应时间的方法
CN113364050A (zh) * 2021-06-22 2021-09-07 山东交通职业学院 一种能源互联网配电系统中新能源可靠性评价方法
CN113759165A (zh) * 2021-08-13 2021-12-07 贵州电网有限责任公司遵义供电局 配电网故障停电感知分析方法及设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101154829A (zh) * 2006-09-27 2008-04-02 蓬莱市电业公司 一种利用ftu实现环网柜备用电源自动投切的方法
CN101662144A (zh) * 2009-04-30 2010-03-03 胡诚 一种配电网的馈线自动化处理方法及装置
CN202127495U (zh) * 2011-06-10 2012-01-25 沈阳易讯科技股份有限公司 配电网数据采集通信装置
CN102707198A (zh) * 2012-06-21 2012-10-03 冀北电力有限公司张家口供电公司 基于故障回推的馈线自动化故障定位方法
CN102710022A (zh) * 2012-06-13 2012-10-03 南京软核科技有限公司 基于智能馈线自动化终端的配电网馈线保护与重构方案

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09130963A (ja) * 1995-11-01 1997-05-16 Nemic Lambda Kk 力率改善ユニット
JP2002099770A (ja) * 2000-09-22 2002-04-05 Tokyo Gas Co Ltd エネルギの需給マッチング装置、システムおよび方法
CN101826725B (zh) * 2009-03-06 2012-07-18 四川华雁信息产业股份有限公司 基于最短路径求电力合环路径的方法
CN102185297B (zh) * 2011-05-10 2014-12-03 中国电力科学研究院 一种基于网络重构的系统恢复控制方法
CN102306929B (zh) * 2011-09-14 2014-03-12 宁波市鄞州供电局 一种实现故障自愈的方法和系统
CN103516054B (zh) * 2011-12-04 2015-09-16 江苏省电力公司南京供电公司 配用电网故障自动处理方法
CN102769338B (zh) * 2012-07-20 2014-04-30 国家电网公司 配电网合环运行控制方法
CN103150625B (zh) * 2012-10-22 2014-08-06 山东电力集团公司青岛供电公司 基于ftu的停电事件信息采集方法和系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101154829A (zh) * 2006-09-27 2008-04-02 蓬莱市电业公司 一种利用ftu实现环网柜备用电源自动投切的方法
CN101662144A (zh) * 2009-04-30 2010-03-03 胡诚 一种配电网的馈线自动化处理方法及装置
CN202127495U (zh) * 2011-06-10 2012-01-25 沈阳易讯科技股份有限公司 配电网数据采集通信装置
CN102710022A (zh) * 2012-06-13 2012-10-03 南京软核科技有限公司 基于智能馈线自动化终端的配电网馈线保护与重构方案
CN102707198A (zh) * 2012-06-21 2012-10-03 冀北电力有限公司张家口供电公司 基于故障回推的馈线自动化故障定位方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104143823A (zh) * 2012-10-22 2014-11-12 国网山东省电力公司青岛供电公司 一种停电事件信息采集方法和系统

Also Published As

Publication number Publication date
CN104143823A (zh) 2014-11-12
CN104143824A (zh) 2014-11-12
CN103150625A (zh) 2013-06-12
CN104143824B (zh) 2016-03-16
CN104182815B (zh) 2017-04-05
CN104143823B (zh) 2016-02-10
CN104182815A (zh) 2014-12-03

Similar Documents

Publication Publication Date Title
CN103150625B (zh) 基于ftu的停电事件信息采集方法和系统
CN110212645B (zh) 一种用电信息采集终端停电事件上报方法及装置
CN107453483A (zh) 一种电网调度控制系统
CN103941158B (zh) 基于多源信息的配电网故障诊断方法
JP5452613B2 (ja) 電力グリッドの供給停止および故障状況の管理
CN104810921B (zh) 基于配变终端信息的馈线断线停电范围识别系统及方法
CN103823433B (zh) 一种使用通讯过程分析实现继电保护设备在线监测的方法
CN104766185A (zh) 基于电网停电特性的地区电网停电信息研判系统及方法
CN201018284Y (zh) 经济智能型综合配电装置
CN103259333B (zh) 智能告警及故障综合分析系统
CN110474424A (zh) 一种配电房智能监控系统
CN107436393A (zh) 基于物联网通信的跌落式熔断器在线监测装置及方法
JP2009118541A (ja) 給電状態収集システム
CN109617238A (zh) 一种带测试功能的馈线自动化远程终端装置
CN106451791B (zh) 供断电信息检测方法和系统
CN203339659U (zh) 单相漏电保护及供电自动恢复装置
CN105867290A (zh) 办公场所安全用电监控系统及其方法
CN205753657U (zh) 一种基于局域网的多场站光伏发电微网系统减载装置
CN204906004U (zh) 一种网络分层分布式的智能区域电网
CN202735422U (zh) 一种变电站站用交直流一体化电源系统在线预警系统
CN208888613U (zh) 一种物联网防触电监控终端
CN103956828A (zh) 中低压配电智能终端
CN111142059A (zh) 户外环网柜pt单元智能检测装置及方法
KR102529846B1 (ko) 배전선로 정전관리 시스템 및 방법
CN206096281U (zh) 针对400v供电系统的监测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Shi Xiang

Inventor after: Xu Peng

Inventor after: Wang Dedong

Inventor after: Guo Yinglei

Inventor after: Pan Bin

Inventor after: Gong Weiyong

Inventor after: Lin Xiaoli

Inventor after: Li Baozhong

Inventor after: Zhang Mingcai

Inventor after: Liang Tao

Inventor after: Bi Jianxin

Inventor after: Zhao Shengchuan

Inventor after: Guo Jianhao

Inventor after: Chen Ming

Inventor after: Fan Xiujuan

Inventor after: Zhou Jianbo

Inventor after: Qi Weihai

Inventor after: Jiang Chuan

Inventor after: Zhang Hongwei

Inventor after: Liu Shubo

Inventor after: Cui Xiao

Inventor after: Xu Qiang

Inventor after: Lan Xianming

Inventor before: Shi Xiang

Inventor before: Xu Peng

Inventor before: Wang Dedong

Inventor before: Guo Yinglei

Inventor before: Gong Weiyong

Inventor before: Lin Xiaoli

Inventor before: Li Baozhong

Inventor before: Zhang Mingcai

Inventor before: Liang Tao

Inventor before: Bi Jianxin

Inventor before: Guo Jianhao

Inventor before: Zhao Shengchuan

Inventor before: Chen Ming

Inventor before: Fan Xiujuan

Inventor before: Zhou Jianbo

Inventor before: Qi Weihai

Inventor before: Jiang Chuan

Inventor before: Zhang Hongwei

Inventor before: Liu Shubo

Inventor before: Cui Xiao

Inventor before: Xu Qiang

Inventor before: Lan Xianming

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SHI XIANG ZHAO SHENGCHUAN QI WEIHAI JIANG CHUAN ZHANG HONGWEI LIU SHUBO CUI XIAO XU QIANG LAN XIANMING XU PENG WANG DEDONG GUO YINGLEI GONG WEIYONG LIN XIAOLI LI BAOZHONG ZHANG MINGCAI LIANG TAO BI JIANXIN GUO JIANHAO CHEN MING FAN XIUJUAN ZHOU JIANBO TO: SHI XIANG ZHAO SHENGCHUAN QI WEIHAI JIANG CHUAN ZHANG HONGWEI LIU SHUBO CUI XIAO XU QIANG LAN XIANMING XU PENG WANG DEDONG GUO YINGLEI PAN BIN GONG WEIYONG LIN XIAOLI LI BAOZHONG ZHANG MINGCAI LIANG TAO BI JIANXIN GUO JIANHAO CHEN MING FAN XIUJUAN ZHOU JIANBO

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: QINGDAO POWER SUPPLY COMPANY, STATE GRID SHANDONG

Free format text: FORMER NAME: QINGDAO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POWER CORPORATION

CP01 Change in the name or title of a patent holder

Address after: Shinan District 266003 Shandong city of Qingdao province Liujiaxia Road No. 17 in Qingdao power supply company

Patentee after: Qingdao Power Supply Company, State Grid Shandong Electric Power Company

Patentee after: State Grid Corporation of China

Address before: Shinan District 266003 Shandong city of Qingdao province Liujiaxia Road No. 17 in Qingdao power supply company

Patentee before: Qingdao Power Supply Co., Ltd., Shandong Electric Power Corporation

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Shinan District 266003 Shandong city of Qingdao province Liujiaxia Road No. 17 in Qingdao power supply company

Co-patentee after: State Grid Co., Ltd.

Patentee after: Qingdao Power Supply Company, State Grid Shandong Electric Power Company

Address before: Shinan District 266003 Shandong city of Qingdao province Liujiaxia Road No. 17 in Qingdao power supply company

Co-patentee before: State Grid Corporation

Patentee before: Qingdao Power Supply Company, State Grid Shandong Electric Power Company