CN103147562B - 地面水泥沙浆找平的施工方法 - Google Patents

地面水泥沙浆找平的施工方法 Download PDF

Info

Publication number
CN103147562B
CN103147562B CN201210509890.XA CN201210509890A CN103147562B CN 103147562 B CN103147562 B CN 103147562B CN 201210509890 A CN201210509890 A CN 201210509890A CN 103147562 B CN103147562 B CN 103147562B
Authority
CN
China
Prior art keywords
cement mortar
cement
mortar
ground
levelling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210509890.XA
Other languages
English (en)
Other versions
CN103147562A (zh
Inventor
袁志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Construction Group Ltd
Original Assignee
SHANGHAI XINLAI BUILDING DECORATION DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XINLAI BUILDING DECORATION DESIGN CO Ltd filed Critical SHANGHAI XINLAI BUILDING DECORATION DESIGN CO Ltd
Priority to CN201210509890.XA priority Critical patent/CN103147562B/zh
Publication of CN103147562A publication Critical patent/CN103147562A/zh
Application granted granted Critical
Publication of CN103147562B publication Critical patent/CN103147562B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明公开了一种地面水泥沙浆找平的施工方法,由下述步骤组成:1)弹找平控制线:确定找平厚度2-4mm,在墙面弹出找平控制线2)洒水3)做找平面标高泥饼4)水泥浆结合层:按1:0.5的比例配制素水泥浆,形成结合层5)对室内设施根部包扎或隔挡保护6)水泥砂浆满铺:水泥砂浆配合比为水泥:砂=1:2,满铺水泥砂浆后用木刮杠拍实搓平7)表面压光:用铁抹子压三遍8)淋水养护:面层覆盖吸水材料,每天淋水不少于2次,养护时间7-14天。本发明地面水泥沙浆找平的施工方法,操作简单,水泥砂浆面层与基层粘结牢固,水泥砂浆面层表面密实压光,不存在裂缝、脱皮、起沙等缺陷,用2m靠尺检查表面平整度,偏差小于2mm。

Description

地面水泥沙浆找平的施工方法
技术领域
本发明涉及一种卫生间施工方法,尤其涉及一种地面水泥沙浆找平的施工方法。
背景技术
家庭装修又称:家庭装潢、家庭装饰。是指在居室内进行的,包括走水电施工、墙体、地板、天花板、景观等所实现的依据一定设计理念和美观规则形成的一整套施工和解决方案。小到家具摆放到门的朝向,大到房间配饰和灯具的定制处理,都是装修的体现。装修和装饰不同,装饰是对生活用品或生活环境进行艺术加工的手法。加强审美效果,并提高其功能、经济价值和社会效益,并以环保为设计理念。完美的装饰应与客体的功能紧密结合,适应制作工艺,发挥物质材料的性能,并具有良好的艺术效果。
家庭装修是把生活的各种情形“物化”到房间之中,买的一般房间的设计业已完成,不能做大的调整了,所以剩下可以动的就是装修装点(大的装修概念包括房间设计、装修、家具布置、富有情趣的小装点)。因为生活是自己的,所以自己必须亲自介入到装修过程中,不仅在装修设计施工期间,还包括住进去之后的长期的不断改进。是件浩大而琐碎的工程,无论是大到地板、家具的定制还是几颗镙丝钉的购买,办理开工手续到组织水电、木工等多个工种的协调工作,都需要业主用智慧去整合。
发明内容
本发明所要解决的技术问题是提供一种地面水泥沙浆找平的施工方法。
本发明所要解决的技术问题,是通过如下技术方案实现的:
一种地面水泥沙浆找平的施工方法,由下述步骤组成:
1)弹找平控制线:确定找平厚度2-4mm,在墙面弹出找平控制线;
2)洒水:将地面基层均匀洒水一遍;
3)做找平面标高泥饼:依据找平控制线沿墙四周作出泥饼,并拉线按两边泥饼高度作出中间泥饼,泥饼间距1000-1500mm;
4)水泥浆结合层:按1:0.5的比例配制素水泥浆,用扫帚扫涂地面,形成结合层;
5)对室内设施根部包扎或隔挡保护;
6)水泥砂浆满铺:水泥砂浆配合比为水泥:砂=1:2,搅拌均匀,满铺水泥砂浆后用木刮杠拍实搓平,并随时用靠尺检查其平整度,使砂浆与基层结合密实;
7)表面压光:用铁抹子压第一遍,直到出浆为止,面层砂浆初凝后,用铁抹子压第二遍,表面压平压光,在水泥砂浆终凝前进行第三遍压光;
8)淋水养护:地面压光完工24小时后,面层覆盖吸水材料,每天淋水不少于2次,保持覆盖材料潮湿,养护时间7-14天。
本发明地面水泥沙浆找平的施工方法,操作简单,水泥砂浆面层与基层粘结牢固,水泥砂浆面层表面密实压光,不存在裂缝、脱皮、起沙等缺陷,用2m靠尺检查表面平整度,偏差小于2mm。
具体实施方式
下面通过具体实施例对本发明作进一步说明,但本发明并不受以下实施例所限定。
实施例1
一种地面水泥沙浆找平的施工方法,由下述步骤组成:
1)弹找平控制线:确定找平厚度2-4mm,在墙面弹出找平控制线;
2)洒水:将地面基层均匀洒水一遍;
3)做找平面标高泥饼:依据找平控制线沿墙四周作出泥饼,并拉线按两边泥饼高度作出中间泥饼,泥饼间距1000-1500mm;
4)水泥浆结合层:按1:0.5的比例配制素水泥浆,用扫帚扫涂地面,形成结合层;
5)对室内设施根部包扎或隔挡保护;
6)水泥砂浆满铺:水泥砂浆配合比为水泥:砂=1:2,搅拌均匀,满铺水泥砂浆后用木刮杠拍实搓平,并随时用靠尺检查其平整度,使砂浆与基层结合密实;
7)表面压光:用铁抹子压第一遍,直到出浆为止,面层砂浆初凝后,用铁抹子压第二遍,表面压平压光,在水泥砂浆终凝前进行第三遍压光;
8)淋水养护:地面压光完工24小时后,面层覆盖吸水材料,每天淋水不少于2次,保持覆盖材料潮湿,养护时间7-14天。
本发明地面水泥沙浆找平的施工方法,操作简单,水泥砂浆面层与基层粘结牢固,水泥砂浆面层表面密实压光,不存在裂缝、脱皮、起沙等缺陷,用2m靠尺检查表面平整度,偏差小于2mm。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本领域的技术人员在本发明所揭露的技术范围内,可不经过创造性劳动想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书所限定的保护范围为准。

Claims (1)

1.一种地面水泥沙浆找平的施工方法,其特征在于,由下述步骤组成:
1)弹找平控制线:确定找平厚度2-4mm,在墙面弹出找平控制线;
2)洒水:将地面基层均匀洒水一遍;
3)做找平面标高泥饼:依据找平控制线沿墙四周作出泥饼,并拉线按两边泥饼高度作出中间泥饼,泥饼间距1000-1500mm;
4)水泥浆结合层:按1:0.5的比例配制素水泥浆,用扫帚扫涂地面,形成结合层;
5)对室内设施根部包扎或隔挡保护;
6)水泥砂浆满铺:水泥砂浆配合比为水泥:砂=1:2,搅拌均匀,满铺水泥砂浆后用木刮杠拍实搓平,并随时用靠尺检查其平整度,使砂浆与基层结合密实;
7)表面压光:用铁抹子压第一遍,直到出浆为止,面层砂浆初凝后,用铁抹子压第二遍,表面压平压光,在水泥砂浆终凝前进行第三遍压光;
8)淋水养护:地面压光完工24小时后,面层覆盖吸水材料,每天淋水不少于2次,保持覆盖材料潮湿,养护时间7-14天。
CN201210509890.XA 2012-12-02 2012-12-02 地面水泥沙浆找平的施工方法 Active CN103147562B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210509890.XA CN103147562B (zh) 2012-12-02 2012-12-02 地面水泥沙浆找平的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210509890.XA CN103147562B (zh) 2012-12-02 2012-12-02 地面水泥沙浆找平的施工方法

Publications (2)

Publication Number Publication Date
CN103147562A CN103147562A (zh) 2013-06-12
CN103147562B true CN103147562B (zh) 2015-05-27

Family

ID=48545853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210509890.XA Active CN103147562B (zh) 2012-12-02 2012-12-02 地面水泥沙浆找平的施工方法

Country Status (1)

Country Link
CN (1) CN103147562B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533091A (zh) * 2015-01-03 2015-04-22 李�浩 一种快速平整室内地面的方法
CN104763127B (zh) * 2015-04-09 2017-03-08 中国联合工程公司 一种耐重载防酸地坪及其施工方法
CN104831898B (zh) * 2015-05-19 2017-05-03 天津天一建设集团有限公司 暗埋电伴热地砖铺贴施工方法
CN109138353A (zh) * 2017-06-15 2019-01-04 五冶集团上海有限公司 一种干硬性水泥砂浆地面施工方法
CN109057356A (zh) * 2018-08-02 2018-12-21 上海聚通装饰集团有限公司 一种地面平整度精细找平方法
CN111119445A (zh) * 2020-01-03 2020-05-08 云南维度装饰工程有限公司 一种基于预应力对建筑薄层找平层的施工方法
CN114180893B (zh) * 2021-12-25 2022-09-09 广东中都建筑集团有限公司 一种混凝土砂浆及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614069A (zh) * 2009-04-23 2009-12-30 浙江省建工集团有限责任公司 浮筑地面施工方法
JP2010019009A (ja) * 2008-07-11 2010-01-28 Ube Ind Ltd コンクリート床構造体及びその施工方法
CN102140836A (zh) * 2010-01-29 2011-08-03 华煜建设集团有限公司 大规格地砖施工方法
CN102358693A (zh) * 2011-08-22 2012-02-22 天津市贝乐建筑材料有限公司 一种找平砂浆及基于该找平砂浆的地面施工工艺

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505831B (zh) * 2011-12-22 2014-01-08 深圳市深装总装饰工程工业有限公司 一种地面人造石胶泥铺贴施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010019009A (ja) * 2008-07-11 2010-01-28 Ube Ind Ltd コンクリート床構造体及びその施工方法
CN101614069A (zh) * 2009-04-23 2009-12-30 浙江省建工集团有限责任公司 浮筑地面施工方法
CN102140836A (zh) * 2010-01-29 2011-08-03 华煜建设集团有限公司 大规格地砖施工方法
CN102358693A (zh) * 2011-08-22 2012-02-22 天津市贝乐建筑材料有限公司 一种找平砂浆及基于该找平砂浆的地面施工工艺

Also Published As

Publication number Publication date
CN103147562A (zh) 2013-06-12

Similar Documents

Publication Publication Date Title
CN103147562B (zh) 地面水泥沙浆找平的施工方法
CN101948278A (zh) 一种彩色砂浆涂料
CN102704635A (zh) 一种涂料粉刷施工的方法
CN103375000A (zh) 一种水性氟碳金属漆在弹性中涂拉毛表面的施工工艺
CN102094496A (zh) 仿砖墙面的制作方法
CN103147552B (zh) 砖墙铺贴瓷砖的施工方法
CN103147547B (zh) 卫生间防水施工方法
CN103147563B (zh) 防潮水泥地面的环保施工方法
CN103147544A (zh) 砖墙壁纸的环保粘贴方法
CN103291024A (zh) 一种新型水泥基抹灰砂浆的施工方法
CN103755219B (zh) 仿澳洲砂岩硅藻土壁材及其施工方法
CN103147553B (zh) 马赛克地面的环保施工方法
KR101459992B1 (ko) 다양한 표현을 할 수 있는 바닥 마감재 시공방법
CN204940903U (zh) 一种建筑旧墙外墙体改造结构
CN203626162U (zh) 仿火烧石涂层结构
CN103147558A (zh) 加气混凝土墙铺贴瓷砖的环保施工方法
CN202969701U (zh) 一种复合墙板
CN203019770U (zh) 一种环保石头板材
CN107152103A (zh) 一种清水砖装饰墙
CN103144493A (zh) 混凝土墙壁纸的环保粘贴方法
CN104746829A (zh) 铺贴瓷砖的环保施工方法
CN103787613B (zh) 仿大理石硅藻土壁材及其施工方法
CN103161288B (zh) 家庭装修粘贴式地板的铺设方法
CN109424191A (zh) 基于对建筑物内的大理石、花岗岩铺设工艺
CN101936060A (zh) 一种用于墙体表面的艺术装饰板的制造方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC POWER CONSTRUCTION BUILDING GROUP C

Free format text: FORMER OWNER: SHANGHAI XINLAI BUILDING DECORATION DESIGN CO., LTD.

Effective date: 20150526

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200137 PUDONG NEW AREA, SHANGHAI TO: 100011 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20150526

Address after: 100011, Beijing, Xicheng District six paved south side street, No. 1

Patentee after: Middle electricity building Group Co., Ltd

Address before: 200137, 4A28, room 14, 528 Yang Gao Bei Road, Shanghai, Pudong New Area

Patentee before: Shanghai Xinlai Building Decoration Design Co., Ltd.