CN103145024B - Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler - Google Patents

Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler Download PDF

Info

Publication number
CN103145024B
CN103145024B CN201210525190.XA CN201210525190A CN103145024B CN 103145024 B CN103145024 B CN 103145024B CN 201210525190 A CN201210525190 A CN 201210525190A CN 103145024 B CN103145024 B CN 103145024B
Authority
CN
China
Prior art keywords
air cooler
main engine
cylinder block
bracket
cylinder body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210525190.XA
Other languages
Chinese (zh)
Other versions
CN103145024A (en
Inventor
马鸿顺
张治军
陈文汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201210525190.XA priority Critical patent/CN103145024B/en
Publication of CN103145024A publication Critical patent/CN103145024A/en
Application granted granted Critical
Publication of CN103145024B publication Critical patent/CN103145024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The invention discloses a method for integrally hoisting a marine main engine cylinder body and an air cooler. The method includes: (1), when a main engine is disassembled, the cylinder body and an air cooler assembly are placed on a special bracket; (2), oil seal is carried out on the lower flat surface of the main engine cylinder body to be ready for being transported ; (3), integrally, the main engine cylinder body and the air cooler assembly together with the special bracket are hoisted on a flat car; (4), after transported to a slipway, the oil seal of the lower flat surface of the main engine cylinder body is removed and the lower flat surface of the main engine cylinder body is cleaned on the flat car; and (5), the cylinder body and the air cooler assembly are hoisted on a main engine rack to be assembled. The invention further provides the special bracket used for the method. By utilization the special bracket, the whole hoisting and shipping of a main engine are achieved, the processes of disassembling and assembling the cylinder body and the air cooler assembly are saved, the utilization efficiency of a hoisting device is improved, meanwhile the assembling quality of the main engine is guaranteed, the labor intensity of workers is relieved, and safety potential hazards of site work are reduced.

Description

Marine main engine cylinder block and air cooler integral hoisting bracket and method
Technical field
A kind of method that the present invention relates to marine main engine lifting, particularly a kind of marine main engine cylinder block and air cooler integral hoisting bracket and method, belong to ship building technical field.
Background technology
The main frame of boats and ships will be lifted on building berth and install completing after manufacture, and for the heavy main frame of large ship, its lifting and transport are exactly a difficult job.Because the air cooler of main frame and auxiliary blower assembly are positioned at the below of cylinder band, and they do not have the unified plane of landing, and existing transportation means cannot meet the needs of both integral transportation thus.Existing way can only disassemble independent transport by air cooler from main frame at heavy-duty machine assembly shop, is assembled after having arrived general assembly scene by general assembly department again.While assembling due to both, taking the height time of hanging grows (at least 2 hours), and field operation workman is more, has increased personal safety hidden danger; In addition, air cooler is dismantled with dress and resumed a session and affect the leak tightness of contact surface between the two, cause scavenging to leak, also can cause rubbish to enter the hidden danger of air cooler inside simultaneously.
Summary of the invention
The object of the invention is to overcome the deficiency that above-mentioned prior art exists, a kind of marine main engine cylinder block and air cooler integral hoisting bracket and method are provided, the integral hoisting transport to realize main frame air cooler and auxiliary blower assembly and cylinder block not to dismantle, thus improve handling appliance service efficiency, ensure main frame assembly quality, reduce labor strength and reduce the potential safety hazard of field operation.
The present invention solves its technical matters by the following technical programs:
A kind of marine main engine cylinder block and air cooler integral hoisting bracket, be connected in the bottom surface of described cylinder block, it comprises base plate, both sides panel, some pipe links, some gussets, two top panels and two hangers, described both sides panel relatively stands on base plate and with it and fixes, described some pipe links are laterally fixedly connected between the panel of both sides, described some gussets stand on the outside of both sides panel symmetrically, and be fixedly connected with both sides panel with base plate, described two top panels respectively on even keel are arranged at the upper end of both sides panel, and be fixedly connected with both sides panel with gusset respectively, described two hangers are fixedly connected on the top of the gusset of both sides symmetrically.
Described bracket all adopts steel to be welded.
Another technical scheme of the present invention is:
Marine main engine cylinder block and the air cooler integral hoisting method realized by described bracket, it comprises the steps:
1. when main frame disintegrates, cylinder block and air cooler fabricate block are placed on described bracket;
2. main frame cylinder block lower plane is made to oil sealing and also wait ready for delivery;
3. by main frame cylinder block and air cooler fabricate block together with bracket Integral lifting to flat truck;
4. after being transported to building berth, on flat truck, main frame cylinder block lower plane being deoiled and seals and clean;
5. cylinder block and air cooler fabricate block being winched to the luggage of going forward side by side on main frame joins.
Advantage of the present invention and useful technique effect are as follows:
1, will air cooler when main frame disintegrates in internal field under cylinder block disintegrates, ensured the sealing requirements between scavenging box and air cooler, also avoided the possibility that in disintegration process, rubbish enters air cooler inside simultaneously; In addition, reduced making oil sealing and deoiling envelope clean work capacity in the future of main frame cylinder block and air cooler contact surface.
2, adopt after bracket, main frame cylinder block and air cooler can overall shippings, reduced transportation one time.
3, main frame cylinder block lower plane deoils and seals and clean and can directly on flat truck, carry out, and meanwhile, plays heavy industry lifting appliance for hoisting can be installed, thereby greatly shorten the lifting time.
4, save main frame cylinder block and the assembling process of air cooler before upper hull in the past, greatly improved high service efficiency of hanging the labour intensity that has reduced workman.
Brief description of the drawings
Fig. 1 is the front view of bracket of the present invention.
Fig. 2 is the lateral plan of Fig. 1.
Fig. 3 is the A portion partial enlarged drawing of Fig. 1.
Fig. 4 is the lifting schematic diagram of integral hoisting of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing and specific embodiment, technical scheme of the present invention is described in further detail, but can not limits protection domain of the presently claimed invention with this.
Incorporated by reference to consulting Fig. 1, Fig. 2 and Fig. 3, diagram marine main engine cylinder block and air cooler integral hoisting bracket 03 all adopt steel to be welded, and being connected in the bottom surface of described cylinder block 01, it comprises base plate 5, both sides panel 3, some pipe links 2, some gussets 4, two top panels 1 and two hangers.Described both sides panel 3 relatively stands on base plate 5 and with it and fixes; Described some pipe links 2 are angle steel, and it is laterally fixedly connected between both sides panel 3; Described some gussets 4 stand on the outside of both sides panel 3 symmetrically, and are fixedly connected with both sides panel 3 with base plate 5; Described two top panels 1 respectively on even keel are arranged at the upper end of both sides panel 3, and are fixedly connected with both sides panel 3 with gusset 4 respectively; Described two hanger (see figure 3)s are fixedly connected on the top of the gusset 4 of both sides symmetrically.
Marine main engine cylinder block of the present invention and air cooler integral hoisting method are realized by described bracket, and referring to Fig. 4, it comprises the steps:
1. when main frame disintegrates, cylinder block 01 and air cooler 02 fabricate block are placed on described bracket 03;
2. main frame cylinder block 01 lower plane is made to oil sealing and also wait ready for delivery;
3. by main frame cylinder block 01 and air cooler 02 fabricate block together with bracket 03 Integral lifting to flat truck;
4. after being transported to building berth, on flat truck, main frame cylinder block 01 lower plane being deoiled and seals and clean;
5. cylinder block 01 and air cooler 02 fabricate block being winched to the luggage of going forward side by side on main frame joins.
Embodiment
Illustrate the embodiment of the inventive method below with 76000 tonnes of bulk goods wheel main frame cylinder blocks and the overall shipping of air cooler and hoisting process.
Main frame model in the present embodiment is: 5S60MC-C, cylinder block 01 and air cooler 02 assembly gross weight: 131.8T(band bracket 03); Oad: 8700 × 7500 × 7600(length × wide × height); Center-of-gravity position: axially apart from 1# cylinder line of centers 2185mm(towards thrust end), laterally apart from cylinder center line 291mm(towards exhaust side), height apart from bracket 03 bottom 4000mm(wherein, the high 2500mm of bracket 03); Suspension centre is arranged: 1# cylinder and 5# cylinder (suspension centre is opened a grade 4080mm).
In the present embodiment, main frame cylinder block 01 is as follows with the overall shipping of air cooler 02 and lifting step:
The first step: before shipping, cylinder block 01 is disintegrated and is placed on bracket 03 from frame after main frame stand test; Totally three of brackets 03, are respectively rear end bracket, middle-end bracket and front end bracket, and wherein, on the bracket of rear end, planar support chain-wheel box lower plane, is lined with nine clamping plate therebetween, and by bolted; In, on front end bracket, planar support cylinder block 01 bottom surface, is lined with nine clamping plate therebetween, and by bolted; Because housing assembly center of gravity lateral runout cylinder centerline 255mm(is towards exhaust side), (the about 200mm of spacing) between air cooler 02 lower end and ground need be padded with sleeper;
Second step: be coated with hard oil oil sealings at all light base faces that expose of housing assembly, oil film should be complete, without omitting, and the machinework face of housing assembly inside, especially installs fitting surface and should scribble the dual-purpose oil of anti-rust and lubrication, and etc. ready for delivery;
The 3rd step: by main frame cylinder block 01 and air cooler 02 fabricate block together with the whole handling of bracket 03 to flat truck, due to assembly center of gravity higher (the about 4000mm of anomaly wooden handcart end face), the left and right face fore-and-aft direction of housing assembly need be held with 4 5T cucurbits, and air cooler 02 lower end pads with sleeper;
The 4th step: after block assembly is transported to building berth, on the pipe link 2 in the middle of bracket 03, spread plank and fasten with iron wire, people stands on plank main frame cylinder block 01 lower plane is deoiled and seals and clean, and meanwhile, carries out the installation of the hoisting appliance of housing assembly;
The 5th step: high hang side by side joined cylinder block 01 and air cooler 02 assembly handling to the luggage of going forward side by side on main frame with two at 1# cylinder, 5# cylinder place respectively.

Claims (3)

1. a marine main engine cylinder block and air cooler integral hoisting bracket, it is characterized in that: described bracket is connected in the bottom surface of described cylinder block, this bracket comprises base plate, both sides panel, some pipe links, some gussets, two top panels and two hangers, described both sides panel relatively stands on base plate and with it and fixes, described some pipe links are laterally fixedly connected between the panel of both sides, described some gussets stand on the outside of both sides panel symmetrically, and be fixedly connected with both sides panel with base plate, described two top panels respectively on even keel are arranged at the upper end of both sides panel, and be fixedly connected with both sides panel with gusset respectively, described two hangers are fixedly connected on the top of the gusset of both sides symmetrically.
2. marine main engine cylinder block according to claim 1 and air cooler integral hoisting bracket, is characterized in that: described bracket all adopts steel to be welded.
3. the marine main engine cylinder block of realizing by bracket claimed in claim 1 and an air cooler integral hoisting method, is characterized in that: described integral hoisting method comprises the steps:
1. when main frame disintegrates, cylinder block and air cooler fabricate block are placed on described bracket;
2. main frame cylinder block lower plane is made to oil sealing and also wait ready for delivery;
3. by main frame cylinder block and air cooler fabricate block together with bracket Integral lifting to flat truck;
4. after being transported to building berth, on flat truck, main frame cylinder block lower plane being deoiled and seals and clean;
5. cylinder block and air cooler fabricate block being winched to the luggage of going forward side by side on main frame joins.
CN201210525190.XA 2012-12-07 2012-12-07 Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler Active CN103145024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210525190.XA CN103145024B (en) 2012-12-07 2012-12-07 Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210525190.XA CN103145024B (en) 2012-12-07 2012-12-07 Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler

Publications (2)

Publication Number Publication Date
CN103145024A CN103145024A (en) 2013-06-12
CN103145024B true CN103145024B (en) 2014-11-05

Family

ID=48543415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210525190.XA Active CN103145024B (en) 2012-12-07 2012-12-07 Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler

Country Status (1)

Country Link
CN (1) CN103145024B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103612996B (en) * 2013-11-14 2015-08-19 上海中船三井造船柴油机有限公司 The installation method of marine low speed diesel engine air cooler core
CN112611441A (en) * 2020-11-24 2021-04-06 沪东中华造船(集团)有限公司 Large-scale hanging scale strorage device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2849580B2 (en) * 1996-12-02 1999-01-20 森実運輸株式会社 Carrier basket
JP3134117B1 (en) * 1999-10-01 2001-02-13 山九株式会社 Hanging equipment for ship handling
CN100542936C (en) * 2007-12-12 2009-09-23 大连理工大学 Hanging bracket for integral hoisting of ship superstructure and hoisting

Also Published As

Publication number Publication date
CN103145024A (en) 2013-06-12

Similar Documents

Publication Publication Date Title
CN102168858B (en) Manufacturing process for shipping chimney unit module
CN103145024B (en) Special bracket for integrally hoisting marine main engine cylinder body and air cooler and method for integrally hoisting marine main engine cylinder body and air cooler
CN109572928A (en) A kind of ship pipe lane cabin operating trolley
CN201793312U (en) Auxiliary device for overturning large articles with end flanges
CN112510930A (en) Method for moving generator rotor out of generator base in ship engine room
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN103302468A (en) Disassembling and assembling method for C-shaped hook assembly of wire rod suspending and conveying device
CN102530582A (en) Method for landing large-size ship loader entirely
CN205367486U (en) Toilet is with two roof beam overhead crane
CN202201007U (en) Hook barrel transporting vehicle
CN208883429U (en) A kind of city piping lane pipeline transportation trolley
CN103193161B (en) Movable large equipment tail lifting and tailing device
CN110329537B (en) Aircraft wing dismantling method
CN211895724U (en) Steel shotcrete ground is assembled and is disintegrated support
CN203158195U (en) Boarding ladder for shipbuilding
CN207451448U (en) A kind of Hoisting tackle
CN201573655U (en) Vehicle-mounted operation car
CN106185597A (en) A kind of large-scale Analytic Tower merogenesis special hanger for hoisting and hanging method
CN204720886U (en) Angle tower tension stringing three coaster unwrapping wire bracing frame
CN207002095U (en) Guide bearing block means of transport during one kind maintenance
CN207061159U (en) prefabricated box culvert transport vehicle
CN201024038Y (en) Suspension girder for two trolleys synchronous hoisting
CN104773650B (en) Tool used for overturning tire crane large beam
CN206734150U (en) A kind of efficient brick transport cart
CN217440058U (en) Slurry balance shield split starting trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant