CN103132530B - Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions - Google Patents

Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions Download PDF

Info

Publication number
CN103132530B
CN103132530B CN201110387090.0A CN201110387090A CN103132530B CN 103132530 B CN103132530 B CN 103132530B CN 201110387090 A CN201110387090 A CN 201110387090A CN 103132530 B CN103132530 B CN 103132530B
Authority
CN
China
Prior art keywords
stake
relay
campshed
yan
conjunction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110387090.0A
Other languages
Chinese (zh)
Other versions
CN103132530A (en
Inventor
余振栋
滕海渤
漏家俊
张哲彬
袁芬
李耀良
王涛
张福民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201110387090.0A priority Critical patent/CN103132530B/en
Publication of CN103132530A publication Critical patent/CN103132530A/en
Application granted granted Critical
Publication of CN103132530B publication Critical patent/CN103132530B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to the construction method of a kind of Tu Yan in conjunction with guard relay pile under geological conditions, comprise 1, survey report rock stratum height line chart according to Tu Yan in conjunction with the ground of geology and determine first campshed length and arrangement of reinforcement; 2, the position of absolute altitude distance 1m at the bottom of excavation of foundation pit to stake, the partial section for rock stratum not yet exposure is investigated; 3, after investigation, for the position needing construction relay stake, vacate first campshed 500mm clear distance and set up row's castinplace pile; 4, relay pile head arranges a corral purlin, encloses purlin near first campshed, fills in space with pea gravel concreten; 5, one support is added at collar tie beam position, for relay stake before and after consolidation.Present invention decreases design and construction difficulty, be specially adapted to coastal area Tu Yan in conjunction with geological conditions; It is long that relay stake effectively reduces stake, reduces verticality problem rambunctious under such geological conditions; Being excavated to after at the bottom of first campshed, can dig on a wide area be proceeded, only in local location slot milling construction relay stake, the duration need have been saved.

Description

Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions
Technical field
The present invention relates to a kind of for coastal area Tu Yan in conjunction with the fender post construction method under geological conditions.
Background technology
In coastal area, under sea terrestrial facies replace geological conditions, bedrock surface rises and falls very large, adopt conventional single bored pile as going along with sb. to guard him form, the determination of static parameter of holing has difficulties, the discrete type of geological prospecting is also difficult to that the stake of each pile is long to be determined to provide conclusive foundation, and this also can affect Force Calculation and the Reinforcement Design of fender post greatly.The requirement of longer stake long very difficult guarantee verticality, is also unfavorable for the whole cycle of constructing.
For this situation, carry out special design in conjunction with this type of situation run in three nuclear power station project construction processes, proposed the method for designing of guard relay pile.Three nuclear power first stage of the project are that China introduces third generation compressed water reactor nuclear power technology autonomy-oriented Project Cooperation, and construction project to be built geological conditions is multiple, and upper strata is backfill ragstone layer, and lower floor is tuff and sandstone, and whole rock stratum rises and falls very large, and the most shallow crop out, can reach 20m the most deeply.Especially in 1# siphonic water-collecting well region, violent rock stratum rises and falls and all brings very large difficulty to absolute altitude and Reinforcement Design at the bottom of the stake of bored pile.Therefore by the design of guard relay pile, solve this difficulty, save the duration.
Summary of the invention
The present invention will provide a kind of Tu Yan in conjunction with the construction method of guard relay pile under geological conditions, rising and falling large, going along with sb. to guard him the technical problem of constructional difficulties for solving Tu Yan in conjunction with regional rock stratum.
For achieving the above object, technical scheme of the present invention is: a kind of Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions, and concrete steps are as follows:
1) survey report rock stratum height line chart according to Tu Yan in conjunction with the ground of geology and determine first campshed length and arrangement of reinforcement;
2) position of absolute altitude distance 1m at the bottom of excavation of foundation pit to stake, the partial section for rock stratum not yet exposure is investigated;
3), after investigation, for the position needing construction relay stake, vacate first campshed 500mm clear distance and set up row's castinplace pile;
4) relay pile head arranges a corral purlin, encloses purlin near first campshed, fills in space with pea gravel concreten;
5) one support is added at collar tie beam position, for relay stake before and after consolidation.
The invention has the beneficial effects as follows:
1, when considering average buried depth of bedrock, position large for bedrock relief being separated, reducing design and construction difficulty, being specially adapted to coastal area Tu Yan in conjunction with geological conditions;
2, effectively to reduce stake long in relay stake, reduces verticality problem rambunctious under such geological conditions;
3, being excavated to after at the bottom of first campshed, can dig on a wide area be proceeded, only in local location slot milling construction relay stake, the duration need have been saved;
4, between relay stake by enclose purlin, support system formed pin joint, ensure that the safety of front and back campshed.
Accompanying drawing explanation
Fig. 1 is working drawing of the present invention;
Fig. 2 is the sectional view along A-A in Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the present invention is further illustrated.
As Fig. 1, shown in 2, Tu Yan of the present invention is in conjunction with the construction method of guard relay pile under geological conditions, and concrete steps are as follows:
1) survey report rock stratum height line chart according to Tu Yan in conjunction with the ground of geology and determine first campshed 1 length and arrangement of reinforcement;
2) position of absolute altitude distance 1m at the bottom of excavation of foundation pit to stake, the partial section for rock stratum not yet exposure is investigated;
3), after investigation, for the position needing construction relay stake 2, vacate first campshed 1,500mm clear distance and set up row's castinplace pile;
4) relay stake 2 pile crown arranges a corral purlin, encloses purlin near first campshed 1, fills in space with pea gravel concreten;
5) one support 3(anchor pole is added at collar tie beam position) for relay stake 2 before and after consolidation, make its stress performance reasonable.

Claims (1)

1. Tu Yan is in conjunction with a construction method for guard relay pile under geological conditions, it is characterized in that, concrete steps are as follows:
1) survey report rock stratum height line chart according to Tu Yan in conjunction with the ground of geology and determine first campshed (1) length and arrangement of reinforcement;
2) position of absolute altitude distance 1m at the bottom of excavation of foundation pit to stake, the partial section for rock stratum not yet exposure is investigated;
3), after investigation, for the position needing construction relay stake (2), vacate first campshed 1, set up row's castinplace pile at 500mm clear distance;
4) relay stake (2) pile crown arranges a corral purlin, encloses purlin near first campshed (1), fills in space with pea gravel concreten;
5) one support (3) is added at collar tie beam position, for relay stake (2) before and after consolidation.
CN201110387090.0A 2011-11-29 2011-11-29 Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions Active CN103132530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110387090.0A CN103132530B (en) 2011-11-29 2011-11-29 Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110387090.0A CN103132530B (en) 2011-11-29 2011-11-29 Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions

Publications (2)

Publication Number Publication Date
CN103132530A CN103132530A (en) 2013-06-05
CN103132530B true CN103132530B (en) 2015-10-14

Family

ID=48492936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110387090.0A Active CN103132530B (en) 2011-11-29 2011-11-29 Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions

Country Status (1)

Country Link
CN (1) CN103132530B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012874A (en) * 2017-05-07 2017-08-04 中铁十八局集团有限公司 A kind of upper-soft lower-hard ground subway station building enclosure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE885538A (en) * 1979-10-03 1981-02-02 Ashford Supplies Ltd TEMPORARY DEDUCTION SYSTEM
CN1399040A (en) * 2002-06-25 2003-02-26 孙学毅 Deformation controlling method for ground-excavating engineering
CN1563605A (en) * 2004-03-23 2005-01-12 孙学毅 Constructing method for controlling deformation on ground excavated
JP4123058B2 (en) * 2003-02-05 2008-07-23 株式会社大林組 Construction method of wall structure with permanent anchor construction, Wall structure with permanent anchor construction
CN101250878A (en) * 2008-03-11 2008-08-27 青建集团股份公司 Method for supporting deep building pit using non bulit-in end pile anchor in combination with anchor slab wall
CN101408023A (en) * 2008-11-11 2009-04-15 天津大学 Method for supporting and protecting row pile pit
CN201801872U (en) * 2010-07-30 2011-04-20 中铁四局集团第六工程有限公司 Deep foundation pit excavated on corrode geology through combined support

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11222861A (en) * 1998-02-04 1999-08-17 Shimizu Corp Execution of retaining wall to existing banking and retaining wall executed by the same
JP2007270461A (en) * 2006-03-30 2007-10-18 Takenaka Komuten Co Ltd Earth retaining method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE885538A (en) * 1979-10-03 1981-02-02 Ashford Supplies Ltd TEMPORARY DEDUCTION SYSTEM
CN1399040A (en) * 2002-06-25 2003-02-26 孙学毅 Deformation controlling method for ground-excavating engineering
JP4123058B2 (en) * 2003-02-05 2008-07-23 株式会社大林組 Construction method of wall structure with permanent anchor construction, Wall structure with permanent anchor construction
CN1563605A (en) * 2004-03-23 2005-01-12 孙学毅 Constructing method for controlling deformation on ground excavated
CN101250878A (en) * 2008-03-11 2008-08-27 青建集团股份公司 Method for supporting deep building pit using non bulit-in end pile anchor in combination with anchor slab wall
CN101408023A (en) * 2008-11-11 2009-04-15 天津大学 Method for supporting and protecting row pile pit
CN201801872U (en) * 2010-07-30 2011-04-20 中铁四局集团第六工程有限公司 Deep foundation pit excavated on corrode geology through combined support

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"深基坑围护桩施工偏位处理";田增勇;《浙江建筑》;20080125;第25卷(第1期);第27-29页 *
"超大面积深基坑土方开挖施工技术";徐国;《建筑施工》;20110325;第33卷(第3期);第168-170页 *

Also Published As

Publication number Publication date
CN103132530A (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN102852525B (en) Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN102966108B (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN202969392U (en) Complex geology deep excavation pit combined support
CN105257301A (en) Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN109593957B (en) Active extraction method for in-situ leaching of ionic rare earth ore
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN105735345A (en) Composite type supporting and retaining structure and construction method adopting supporting and retaining structure
CN102162250A (en) Protective construction method of excavating large area deep foundation pit in running sand confined water soil layer
CN110206038A (en) Supporting construction and construction method at a kind of concave foundation pit external corner
CN103321233B (en) The preparation method of groundwater resources retracting device in landslide deep layer draining and sliding mass
CN114033388B (en) Shaft construction method for water-rich silty sand layer underground tunnel roof pipe
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN204825923U (en) Relay formula underground structure
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN103132530B (en) Tu Yan is in conjunction with the construction method of guard relay pile under geological conditions
CN209669900U (en) Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer
CN204715364U (en) A kind of foundation pit support device
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN202543946U (en) Supporting structure for drainage type fender posts in soft soil area
CN202359564U (en) Arch steel sheet pile supporting structure
CN202954373U (en) Pile foundation structure of photovoltaic power station
CN103089272B (en) A kind of construction method being positioned at mountain slope toe tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant before: Shanghai Foundation Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI FOUNDATION ENGINEERING CO., LTD. TO: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant