CN103128474A - Tower crane boom tool - Google Patents

Tower crane boom tool Download PDF

Info

Publication number
CN103128474A
CN103128474A CN2013100720563A CN201310072056A CN103128474A CN 103128474 A CN103128474 A CN 103128474A CN 2013100720563 A CN2013100720563 A CN 2013100720563A CN 201310072056 A CN201310072056 A CN 201310072056A CN 103128474 A CN103128474 A CN 103128474A
Authority
CN
China
Prior art keywords
square tube
lower edge
positioning support
edge square
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100720563A
Other languages
Chinese (zh)
Other versions
CN103128474B (en
Inventor
姜超
张卫东
潘友杰
朱彦生
支有为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Group Construction Machinery Intelligent Manufacturing Co.,Ltd.
Original Assignee
ANHUI CONSTRUCTION MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CONSTRUCTION MACHINERY Co Ltd filed Critical ANHUI CONSTRUCTION MACHINERY Co Ltd
Priority to CN201310072056.3A priority Critical patent/CN103128474B/en
Publication of CN103128474A publication Critical patent/CN103128474A/en
Application granted granted Critical
Publication of CN103128474B publication Critical patent/CN103128474B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

A tower crane boom tool comprises a framework platform (1), wall plate components (2), a plurality of upper chord tube positioning supports (3), and a plurality of lower chord square tube positioning supports (4), wherein the wall plates components are detachably fixed on the left side and the right side of the framework platform (1). The tower crane boom tool is characterized in that upper joint positioning supports (5) and lower joint positioning supports (6) which are structured in left and right double side plates are arranged on the wall plate components, pin shaft holes are correspondingly arranged on the double side plates of the upper joint positioning supports, and square holes (7) are correspondingly arranged on the double side plates of the lower joint positioning supports and used for fixedly holding standardized modules (8) in different specifications. On one hand, precise positioning and butt jointing of variable cross sections of lower joints can be realized, on the other hand, deformation of the outer side surface and the upper surface of lower chord square tubes during splicing process of a tower crane boom is well controlled, good running conditions for amplitude-variable cars are provided, straightness of integral butt joint of the crane boom is effectively guaranteed, correcting workload is greatly reduced, and producing efficiency is improved.

Description

The jib for tower crane frock
Technical field
The present invention relates to the derrick crane technical field, say more specifically a kind of and be applied in jib for tower crane welding process, guarantee the device of its formed precision.
Background technology
Existing jib for tower crane frock adopts lower contact one-sided location more, and lower contact and top connection are respectively in two planes, and lower edge square tube upper surface is without the mode welding of control measure.Due to the one-sided location of lower contact, can make its with freely trickle movement of all directions in lower chord tube docks the fit-up gap, cause the timing of crane arm integral installation to produce the side sway phenomenon; Without control measure, crane arm integral installation timing linearity is reduced due to lower edge square tube on frock, gently bring great rectification workload, heavy cause the amplitude variation trolley running quality not high, the generation of the situations such as serious wear.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of jib for tower crane frock, it can realize the precise positioning of lower contact and the smooth transition in variable cross-section docking situation, can well control again crane arm in welding process lower edge square tube lateral surface and upper surface distortion, for amplitude variation trolley provides good service condition.
The technical solution adopted in the present invention is:
a kind of jib for tower crane frock, comprise a framework platform, detachably be fixed on wall panel assembly and a plurality of pipe positioning support that winds up of the framework platform left and right sides, lower edge square tube positioning support, its design feature is, described wall panel assembly is provided with the upper of left and right dual-sided board structure, the lower contact positioning support, on the dual-sided board of described top connection positioning support, correspondence is provided with pin shaft hole, on the dual-sided board of described lower contact, correspondence is provided with square hole, described square hole is used for the standardized module of fixed installation different size, the different size of described standardized module refers to that disparate modules is provided with the pin shaft hole of differing heights.
Design feature of the present invention also is:
also be provided with lower edge square tube detent mechanism on described framework platform, described lower edge square tube detent mechanism comprises lower edge square tube positioning support and jacking apparatus, described backspin square tube positioning support is by base, be vertically fixed on the left side on base, right plate, bearing pin, and be located at a left side, gripper shoe between right plate forms, a described left side, right plate has level trough near the top correspondence, and be provided with upward opening in a side, described bearing pin embeds in level trough by upper opening, the jacking apparatus that is fixed on base is used for from bottom surface jack-up lower edge square tube, jacking apparatus be fixed on the lower edge square tube directly over bearing pin coordinate, the lower edge square tube is carried out vertical direction locates, described left plate middle part is provided with screwed hole, and described screwed hole coordinates with screw rod and is used for holding out against to locate the lower edge square tube from sidepiece.
Compared with prior art, beneficial effect of the present invention is embodied in:
1, the present invention is in the design of wallboard lower contact positioning support, adopt modularized design, when the crane arm lower boom need to carry out the variable cross-section assembly unit, only need to change the embedded module of lower contact positioning support, change the standardized module of corresponding specification, can easily realize the smooth transition of variable cross-section joint.
2, lower contact positioning support of the present invention adopts the dual-sided board structure, and in lower contact was inserted in dual-sided board, then the bearing pin hallway was located, the one-sided location of lower contact before efficiently solving, the problem that the location is inaccurate.
3, the present invention has increased lower edge square tube positioning support structure, by this detent mechanism, the lower edge square tube is carried out vertical, horizontal both direction and accurately locates, and has effectively guaranteed the linearity of lower edge square tube, has reduced the crane arm integral installation timing improvement time.
Description of drawings
Fig. 1 is that the present invention uses view.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is wall panel assembly structural representation of the present invention.
Fig. 4 is the left view of Fig. 3.
Fig. 5 is lower edge square tube positioning support structural representation.
Fig. 6 is the left view of Fig. 5.
Fig. 7 is the top view of Fig. 5.
Number in the figure: 1 framework platform, 2 wall panel assemblies, 3 wind up and manage positioning support, 4 lower edge square tube positioning supports, 5 top connection positioning supports, 6 lower contact positioning supports, 7 square holes, 8 standardized modules, 9 bases, 10 left plates, 11 right plates, 12 bearing pins, 13 gripper shoes, 14 level troughs, 15 openings, 16 screwed holes, 17 jacking apparatus, 18 lower edge square tubes.
The present invention is further described below in conjunction with accompanying drawing.
The specific embodiment
as shown in the figure, the crane boom frock, comprise a framework platform 1, detachably be fixed on wall panel assembly 2 and a plurality of pipe positioning support 3 that winds up of horizontal frame platform 1 left and right sides, lower edge square tube positioning support 4, wall panel assembly 2 is provided with the upper of left and right dual-sided board structure, lower contact positioning support 5, 6, on the dual-sided board of top connection positioning support, correspondence is provided with pin shaft hole, on the dual-sided board of lower contact, correspondence is provided with square hole 7, square hole 7 is used for the standardized module 8 of fixed installation different size, the different size of standardized module refers to that disparate modules is provided with the pin shaft hole of differing heights, standardized module is embedded in square hole, and be fixed with bolt, when crane arm need to carry out the variable cross-section transition, only need to change and think corresponding module, can realize.
as shown in Fig. 5-7, also be provided with lower edge square tube detent mechanism on framework platform, comprise lower edge square tube positioning support 4 and jacking apparatus 16, backspin square tube positioning support is by base 9, be vertically fixed on the left side on base, right plate 10, 11, bearing pin 12, and be located at a left side, gripper shoe 13 between right plate forms, left, right plate has level trough 14 near the top correspondence, and be provided with upward opening 15 in a side, bearing pin 12 embeds in level trough by upper opening, be fixed on jacking apparatus 16 on base 9 from bottom surface jack-up lower edge square tube, jacking apparatus be fixed on the lower edge square tube directly over bearing pin coordinate, the lower edge square tube is carried out vertical direction locates, described left plate middle part is provided with screwed hole 16, and described screwed hole coordinates with screw rod 17 and is used for holding out against to locate the lower edge square tube from sidepiece.
During use, adjust two wallboard spacings, after up and down nipple orifice center distance satisfies drawing requirement, fixing wallboard.Then adjust both sides lower boom positioning support, make its positioning reference plane and lower contact positioning reference plane point-blank.When carrying out the crane arm assembly unit, at first lower edge square tube 18 is hung in the lower edge positioning support, after putting into level trough location upper surface with bearing pin, jacking apparatus jack-up, puller bolt coordinates simultaneously, and the vertical and horizontal direction of lower edge square tube is located simultaneously.In the time of can effectively solving like this frock assembly unit in the past, lower edge square tube upper surface is in the problem of free state.Then a section lower contact inserts in the lower edge square tube, and insert in the lower contact positioning support other end, and the rear point in frock bearing pin hallway location is solid, the problem that before can effectively controlling like this, lower contact location in one-sided location is forbidden.
In sum, one aspect of the present invention can realize the precise positioning of lower contact and the smooth transition in variable cross-section docking situation, well controlled on the other hand crane arm in the distortion of welding process lower edge square tube lateral surface and upper surface, for providing of amplitude variation trolley good service condition.In addition, all do accurate positioning control due to jib for tower crane frock of the present invention butt joint and chord member, effectively guaranteed the linearity of the whole docking of crane arm, greatly reduced the workload of correcting, improved production efficiency.

Claims (2)

1. jib for tower crane frock, comprise a framework platform (1), detachably be fixed on wall panel assembly (2) and a plurality of pipe positioning support (3) that winds up of framework platform (1) left and right sides, lower edge square tube positioning support (4), it is characterized in that, described wall panel assembly (2) is provided with the upper of left and right dual-sided board structure, lower contact positioning support (5, 6), on the dual-sided board of described top connection positioning support, correspondence is provided with pin shaft hole, on the dual-sided board of described lower contact, correspondence is provided with square hole (7), described square hole (7) is used for the standardized module (8) of fixed installation different size, the different size of described standardized module refers to that disparate modules is provided with the pin shaft hole of differing heights.
2. a kind of jib for tower crane frock according to claim 1, it is characterized in that, also be provided with lower edge square tube detent mechanism on described framework platform, described lower edge square tube detent mechanism comprises lower edge square tube positioning support (4) and jacking apparatus (16), described backspin square tube positioning support is by base (9), be vertically fixed on the left side on base, right plate (10, 11), bearing pin (12), and be located at a left side, gripper shoe between right plate (13) forms, a described left side, right plate has level trough (14) near the top correspondence, and be provided with upward opening (15) in a side, described bearing pin (12) embeds in level trough by upper opening, the jacking apparatus (16) that is fixed on base (9) is used for from bottom surface jack-up lower edge square tube, jacking apparatus be fixed on the lower edge square tube directly over bearing pin coordinate, the lower edge square tube is carried out vertical direction locates, described left plate middle part is provided with screwed hole (16), and described screwed hole coordinates with screw rod (17) and is used for holding out against to locate the lower edge square tube from sidepiece.
CN201310072056.3A 2013-03-07 2013-03-07 Tower crane boom tool Active CN103128474B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310072056.3A CN103128474B (en) 2013-03-07 2013-03-07 Tower crane boom tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310072056.3A CN103128474B (en) 2013-03-07 2013-03-07 Tower crane boom tool

Publications (2)

Publication Number Publication Date
CN103128474A true CN103128474A (en) 2013-06-05
CN103128474B CN103128474B (en) 2015-02-04

Family

ID=48489271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310072056.3A Active CN103128474B (en) 2013-03-07 2013-03-07 Tower crane boom tool

Country Status (1)

Country Link
CN (1) CN103128474B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103418973A (en) * 2013-08-26 2013-12-04 徐州建机工程机械有限公司 Welding fixture for climbing frame of tower crane
CN106865410A (en) * 2016-10-31 2017-06-20 徐州建机工程机械有限公司 A kind of loading trolley of derrick crane

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0288598A2 (en) * 1987-04-28 1988-11-02 Ludscheidt GmbH Flame-cutting table
JPH10297724A (en) * 1997-04-28 1998-11-10 Sugiyama Kensetsu Kogyo Kk Jig for manufacturing rack of automatic high-rise warehouse
CN101502924A (en) * 2009-03-17 2009-08-12 山东丰汇设备技术有限公司 Fixture for assembling and welding universal crane arm standard knot
CN201664829U (en) * 2010-01-28 2010-12-08 江麓机电科技有限公司 Jib welding fixture
CN201913420U (en) * 2011-04-08 2011-08-03 重庆建工工业有限公司 Assembling tool for single sections of lifting beam
CN202292013U (en) * 2011-11-11 2012-07-04 天津天易海上工程有限公司 External pipe aligning device for pipelines
CN102581536A (en) * 2012-03-08 2012-07-18 中联重科股份有限公司 Single boom section forming tool and single boom section production process of crane boom
CN203062174U (en) * 2013-03-07 2013-07-17 安徽建筑机械有限责任公司 Tool for boom of tower crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0288598A2 (en) * 1987-04-28 1988-11-02 Ludscheidt GmbH Flame-cutting table
JPH10297724A (en) * 1997-04-28 1998-11-10 Sugiyama Kensetsu Kogyo Kk Jig for manufacturing rack of automatic high-rise warehouse
CN101502924A (en) * 2009-03-17 2009-08-12 山东丰汇设备技术有限公司 Fixture for assembling and welding universal crane arm standard knot
CN201664829U (en) * 2010-01-28 2010-12-08 江麓机电科技有限公司 Jib welding fixture
CN201913420U (en) * 2011-04-08 2011-08-03 重庆建工工业有限公司 Assembling tool for single sections of lifting beam
CN202292013U (en) * 2011-11-11 2012-07-04 天津天易海上工程有限公司 External pipe aligning device for pipelines
CN102581536A (en) * 2012-03-08 2012-07-18 中联重科股份有限公司 Single boom section forming tool and single boom section production process of crane boom
CN203062174U (en) * 2013-03-07 2013-07-17 安徽建筑机械有限责任公司 Tool for boom of tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103418973A (en) * 2013-08-26 2013-12-04 徐州建机工程机械有限公司 Welding fixture for climbing frame of tower crane
CN103418973B (en) * 2013-08-26 2015-09-23 徐州建机工程机械有限公司 A kind of tower crane climbing frame welding tooling
CN106865410A (en) * 2016-10-31 2017-06-20 徐州建机工程机械有限公司 A kind of loading trolley of derrick crane

Also Published As

Publication number Publication date
CN103128474B (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN203793390U (en) Mobile car for mounting guide rail rack
CN204024092U (en) Novel shaped steel post locating component
CN103485458A (en) Connecting structure of glass curtain wall
CN104947958A (en) Adjustable support frame for truss assembly
CN103128474B (en) Tower crane boom tool
CN203062174U (en) Tool for boom of tower crane
CN202240215U (en) Horizontal adjusting mechanism for welding fixture mounting platform
CN203514578U (en) Glass curtain wall and connecting structure thereof
CN202371437U (en) Connecting piece for main frame profiles
CN203184872U (en) Downwards-rotating square tube locating mechanism applied to tower crane cargo boom tool
CN204504575U (en) A kind of process equipment of combined shaft frame
CN204098298U (en) A kind of metal energy-saving curtain wall
CN203509580U (en) Mounting structure for tool changer of vertical machining centre
CN103741709B (en) A kind of tower crane pre-embedded bolt mould
CN206488001U (en) Device for accurately adjusting height by utilizing inclined plane
CN203284103U (en) Guiding and spacing device for mounting balancing weight to crane
CN104647255B (en) Tail shaft bracket installation tool
CN201347525Y (en) Deck two-dimensional track plate adjustment device
CN102206965B (en) Mechanism for regulating bodies of communication lift tower
CN208276888U (en) A kind of device for the quick accurate integral marking of transverse and longitudinal beam
CN205046848U (en) Gate -type steel sheet mould holder
CN204358390U (en) A kind of two hanging groove display device suspension member
CN108080463B (en) A kind of support expansion device for Partition board for fuel tank floating screed
CN202559747U (en) Foot portion supporting and size control device of aluminum alloy shear wall template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 8, Jinxiu Avenue, Taohua Industrial Park, Economic and Technological Development Zone, Hefei City, Anhui Province, 230601

Patentee after: Anhui Construction Engineering Group Construction Machinery Intelligent Manufacturing Co.,Ltd.

Address before: 230601 No. 8 Jinxiu Avenue, Taohua Industrial Park, Hefei City, Anhui Province

Patentee before: ANHUI CONSTRUCTION MACHINERY Co.,Ltd.

CP03 Change of name, title or address