CN103117021A - Falling derrick construction technology teaching simulator - Google Patents

Falling derrick construction technology teaching simulator Download PDF

Info

Publication number
CN103117021A
CN103117021A CN2013100667792A CN201310066779A CN103117021A CN 103117021 A CN103117021 A CN 103117021A CN 2013100667792 A CN2013100667792 A CN 2013100667792A CN 201310066779 A CN201310066779 A CN 201310066779A CN 103117021 A CN103117021 A CN 103117021A
Authority
CN
China
Prior art keywords
operation platform
pole
teaching operation
earth anchor
teaching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100667792A
Other languages
Chinese (zh)
Other versions
CN103117021B (en
Inventor
董淑建
陈继祥
李世旭
秦景强
孙浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGHAI COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Original Assignee
DONGHAI COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGHAI COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co filed Critical DONGHAI COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN201310066779.2A priority Critical patent/CN103117021B/en
Publication of CN103117021A publication Critical patent/CN103117021A/en
Application granted granted Critical
Publication of CN103117021B publication Critical patent/CN103117021B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Electric Cable Installation (AREA)

Abstract

A falling derrick construction technology teaching simulator comprises a teaching operation platform. Two carrier grooves are arranged in the middle of the teaching operation platform, two simulation poles matched with the carrier grooves are arranged on the teaching operation platform, the upper ends of the simulation poles are connected with each other through a cross arm, a traction ground anchor is fixed onto the teaching operation platform on one side of the carrier grooves, a brake ground anchor fixed onto the teaching operation platform is arranged on the other side of the carrier grooves and is symmetric to the traction ground anchor, a brake cord is tied at the roots of the two simulation poles and is connected with the brake ground anchor through a brake, a vertical herringbone derrick is arranged between the two simulation poles, derrick caps are mounted at closed ends of the upper portions of two support legs of the herringbone derrick, and connectors are mounted on the derrick caps. The falling derrick construction technology teaching simulator is simple to operate and obvious in training effect, relevant training cost is reduced, and skill mastering proficiency of trainees is improved by methods including repeated operation, manual setting and the like.

Description

A kind of formula pole construction technology teaching simulating device that falls
Technical field
The present invention relates to the instructional device of a kind of electric system production line employee skill training, particularly a kind of formula pole construction technology teaching simulating device that falls.
Background technology
Whole vertical rod is the traditional handicraft of line construction, this construction technology continues into the present always, the installation group that can realize various bar types is vertical, special some high shaft towers that more are applicable to are constructed, has safe and efficient advantage, this technique is higher to the aspects such as the control requirement of on-the-spot Work tool configuration, Assembling, technology point assurance, process in practical operation, especially commander, process control, the safety notice of technique has been proposed strict demand.Because of a variety of causes impact, present this construction technology is desalinated gradually, particularly just gone on the young worker in work position, lack the direct training of this respect construction technology, there are larger difference between the two in simultaneously theoretical training and practical operation, when the daily various skills trainings that last line teams and groups carry out can not be carried out this type of real training training on operation because of reasons such as place, equipment, so form the blank of this skills in the process of construction training.
Summary of the invention
The technical problem to be solved in the present invention is for the deficiencies in the prior art, propose a kind of simple to operate and result of training is obvious, the formula that falls pole construction technology teaching simulating device that can Effective Raise producers associative skills.
The technical problem to be solved in the present invention is to realize by the following technical programs, a kind of formula pole construction technology teaching simulating device that falls, be characterized in: comprise the teaching operation platform, be provided with two chassis slots at the middle part of teaching operation platform, be provided with two simulation electric poles that cooperate with chassis slot at the teaching operation platform, the upper end of simulation electric pole links to each other by cross-arm, side teaching operation platform at chassis slot is fixed with the traction earth anchor, opposite side at chassis slot is symmetrically arranged with the braking earth anchor that is fixed on the teaching operation platform with the traction earth anchor, there is check band in root system at two simulation electric poles, check band links to each other with the braking earth anchor by detent, between two simulation electric poles, be provided with the herringbone holding pole of vertical setting, upper closed end at herringbone holding pole two supporting legs is equipped with pole holding cap, at pole holding cap connector is installed, one end of connector links to each other by the top of suspension centre rope with two simulation electric poles, the other end of connector links to each other with the traction earth anchor by the haul-in sheave group, described haul-in sheave group comprises a travelling block that links to each other with connector and a fixed pulley that links to each other with the traction earth anchor, between fixed pulley and travelling block, be wound with traction rope, side in the haul-in sheave group is provided with the deflection sheave that is fixed on the teaching operation platform, traction rope grinds earth anchor by deflection sheave with the strand on being fixed on the teaching operation platform and links to each other, and is provided with electric tackle between deflection sheave and strand mill earth anchor.
The technical problem to be solved in the present invention can also be come to realize that further the traction rope between deflection sheave and electric tackle is equipped with electronic scales by the following technical programs.
The technical problem to be solved in the present invention can also be come to realize that further the initial angle between described herringbone holding pole two supporting legs is the 60-65 degree by the following technical programs.
The technical problem to be solved in the present invention can also be come by the following technical programs further to realize, be provided with the anti-slip tank that cooperates with herringbone holding pole at the teaching operation platform.
Compared with prior art, the present invention is by being installed in simulation electric pole, herringbone holding pole, pole holding cap, connector, haul-in sheave group, deflection sheave and the electric tackle etc. on the teaching operation platform, can allow the start-up select as required related tool to make up, reproduce the construction technology of working-yard, so that the start-up can fully understand in practical training and use relevant knowwhy, well-known processes principle and main points, that strengthens the start-up starts and elaborative faculty enhancement training personnel associative skills.The present invention is simple to operate, result of training is obvious, has reduced the cost of relevant training, by repeatable operation with method artificially is set etc., has improved start-up's the skilled Grasping level of technical ability.
Description of drawings
Fig. 1 is site layout project synoptic diagram of the present invention.
Embodiment
A kind of formula pole construction technology teaching simulating device that falls, comprise teaching operation platform 1, be provided with two chassis slots at the middle part of teaching operation platform 1, be provided with two simulation electric poles 5 that cooperate with chassis slot at teaching operation platform 1, the upper end of simulation electric pole 5 links to each other by cross-arm 6, side teaching operation platform 1 at chassis slot is fixed with traction earth anchor 2, opposite side at chassis slot is symmetrically arranged with the braking earth anchor 13 that is fixed on the teaching operation platform 1 with traction earth anchor 2, there is check band 4 in root system at two simulation electric poles 5, check band 4 links to each other with braking earth anchor 2 by detent 3, between two simulation electric poles 5, be provided with the herringbone holding pole 9 of vertical setting, upper closed end at 9 liang of supporting legs of herringbone holding pole is equipped with pole holding cap, at pole holding cap connector 8 is installed, one end of connector 8 links to each other by the top of suspension centre rope 7 with two simulation electric poles 5, the other end of connector 8 links to each other with traction earth anchor 13 by the haul-in sheave group, described haul-in sheave group comprises a travelling block 10 that links to each other with connector 8 and a fixed pulley 12 that links to each other with traction earth anchor 13, between fixed pulley 12 and travelling block 10, be wound with traction rope 11, side in the haul-in sheave group is provided with the deflection sheave 14 that is fixed on the teaching operation platform 1, traction rope 11 grinds earth anchor 17 by deflection sheave 14 with the strand on being fixed on teaching operation platform 1 and links to each other, and is provided with electric tackle 16 between deflection sheave 14 and strand mill earth anchor 13.
Traction rope 11 between deflection sheave 14 and electric tackle 16 is equipped with electronic scales 15; Initial angle between 9 liang of supporting legs of described herringbone holding pole is the 60-65 degree; Be provided with the anti-slip tank that cooperates with herringbone holding pole 9 at teaching operation platform 1.When using operation, the start-up should carry out preparation and the inspection of Work tool as requested.Determine to adopt some lifting to fix, determine the significant height of herringbone holding pole 9 and the initial angle between 9 liang of supporting legs of definite herringbone holding pole according to the height of simulation electric pole 5.The pole-footing of simulation electric pole 5 is fixing should be finished before lifting, so that correlation distance requires to satisfy regulation.
Before simulation electric pole 5 stood up, reply equipment checked comprehensively whether correct such as the position of herringbone holding pole 9, whether the hoisting point position of suspension centre rope 7 is correct, and whether the colligations such as check band 4, suspension centre rope 7 and traction rope 11 are firm; After inspection is errorless, prepare standing up of simulation electric pole 5, when the liftoff 0.5-1.0 rice of bar head of simulation electric pole 5, stop traction, again whether crooked to simulation electric pole 5, whether braking earth anchor 2, traction earth anchor 13 and strand mill earth anchor 17 be firm, and whether check band 4, suspension centre rope 7 and traction rope 11 be firm does inspection; Checking without unusual follow-up continuous lifting, in that simulation electric pole 5 is vertical when spending to 50-60, herringbone holding pole 9 begins to lose efficacy, before herringbone holding pole 9 lost efficacy, the haulage speed that should slow down should stop when herringbone holding pole 9 lost efficacy the standing up of two simulation electric poles 5, and should operate herringbone holding pole 9 thereupon and land tricing line, so that herringbone holding pole 9 lands slowly, and then the simulation electric pole 5 that stands up; In that simulation electric pole 5 is vertical when spending to 60-70, must stamp reverse temporary guy, in order to cooperate standing up of simulation electric pole 5, adjust at any time its degree of tightness, it is met the requirements; Should slow down haulage speed vertical to 70 degree, while loosen the brake rope 4 is in order to avoid pull the bottom of simulation electric pole 5; When spending to 80, should stop traction vertical, utilize the deadweight of traction rope 11 and haul-in sheave group to make simulation electric pole 5 vertical, also can gently press traction rope 11 by manpower, make simulation electric pole 5 reach the upright position.In whole vertical rod process, must remain the center of the center of braking earth anchor 2, the center of simulating electric pole 5, herringbone holding pole 9 blind ends and traction earth anchor 13 point-blank, and braking earth anchor 2 and traction earth anchor 13 are also again on two mean lines of this center line, check band 4 is appropriate with the necessary degree of tightness of the operation of left and right sides temporary guy for this reason, tie in, stand up slowly with simulation electric pole 5 that symmetry eases out.

Claims (4)

1. formula pole construction technology teaching simulating device that falls, it is characterized in that: comprise the teaching operation platform, be provided with two chassis slots at the middle part of teaching operation platform, be provided with two simulation electric poles that cooperate with chassis slot at the teaching operation platform, the upper end of simulation electric pole links to each other by cross-arm, side teaching operation platform at chassis slot is fixed with the traction earth anchor, opposite side at chassis slot is symmetrically arranged with the braking earth anchor that is fixed on the teaching operation platform with the traction earth anchor, there is check band in root system at two simulation electric poles, check band links to each other with the braking earth anchor by detent, between two simulation electric poles, be provided with the herringbone holding pole of vertical setting, upper closed end at herringbone holding pole two supporting legs is equipped with pole holding cap, at pole holding cap connector is installed, one end of connector links to each other by the top of suspension centre rope with two simulation electric poles, the other end of connector links to each other with the traction earth anchor by the haul-in sheave group, described haul-in sheave group comprises a travelling block that links to each other with connector and a fixed pulley that links to each other with the traction earth anchor, between fixed pulley and travelling block, be wound with traction rope, side in the haul-in sheave group is provided with the deflection sheave that is fixed on the teaching operation platform, traction rope grinds earth anchor by deflection sheave with the strand on being fixed on the teaching operation platform and links to each other, and is provided with electric tackle between deflection sheave and strand mill earth anchor.
2. the formula pole construction technology teaching simulating device that falls according to claim 1, it is characterized in that: the traction rope between deflection sheave and electric tackle is equipped with electronic scales.
3. the formula pole construction technology teaching simulating device that falls according to claim 1, it is characterized in that: the initial angle between described herringbone holding pole two supporting legs is the 60-65 degree.
4. the formula pole construction technology teaching simulating device that falls according to claim 1 is characterized in that: be provided with the anti-slip tank that cooperates with herringbone holding pole at the teaching operation platform.
CN201310066779.2A 2013-03-04 2013-03-04 Falling derrick construction technology teaching simulator Active CN103117021B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310066779.2A CN103117021B (en) 2013-03-04 2013-03-04 Falling derrick construction technology teaching simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310066779.2A CN103117021B (en) 2013-03-04 2013-03-04 Falling derrick construction technology teaching simulator

Publications (2)

Publication Number Publication Date
CN103117021A true CN103117021A (en) 2013-05-22
CN103117021B CN103117021B (en) 2015-02-25

Family

ID=48415382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310066779.2A Active CN103117021B (en) 2013-03-04 2013-03-04 Falling derrick construction technology teaching simulator

Country Status (1)

Country Link
CN (1) CN103117021B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982073A (en) * 2014-05-06 2014-08-13 国家电网公司 Pipe tower removing method
CN114220323A (en) * 2021-12-08 2022-03-22 广西电网有限责任公司桂林供电局 Real model and system of instructing of transmission line group tower crane line
CN115258995A (en) * 2022-07-05 2022-11-01 广西电网有限责任公司桂林供电局 Releasable reconnection type herringbone holding pole cap

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201859587U (en) * 2010-10-29 2011-06-08 河北省电力公司职业技术培训中心 Erecting electric pole model for training
CN202383915U (en) * 2011-10-20 2012-08-15 辽宁省电力有限公司沈阳供电公司 Purler type holding pole integrally raising aluminium alloy multifunctional repair tower simulation teaching sand table

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201859587U (en) * 2010-10-29 2011-06-08 河北省电力公司职业技术培训中心 Erecting electric pole model for training
CN202383915U (en) * 2011-10-20 2012-08-15 辽宁省电力有限公司沈阳供电公司 Purler type holding pole integrally raising aluminium alloy multifunctional repair tower simulation teaching sand table

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982073A (en) * 2014-05-06 2014-08-13 国家电网公司 Pipe tower removing method
CN114220323A (en) * 2021-12-08 2022-03-22 广西电网有限责任公司桂林供电局 Real model and system of instructing of transmission line group tower crane line
CN115258995A (en) * 2022-07-05 2022-11-01 广西电网有限责任公司桂林供电局 Releasable reconnection type herringbone holding pole cap

Also Published As

Publication number Publication date
CN103117021B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CA2732544C (en) Mobile training trailer for electric transmission lines
CN103117021B (en) Falling derrick construction technology teaching simulator
CN204316007U (en) A kind of transmission line crossing construction device
CN203950346U (en) A kind of building safety is experienced training system
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN202466413U (en) A propelling drag machine tool for an assembled steel highway bridge
CN206580481U (en) A kind of indoor horizontal lifting pipeline erecting device
Sartori et al. Shake table test on 3-storey light-frame timber building
CN205145443U (en) Transformer upper portion construction safety belt hanging device
CN202383915U (en) Purler type holding pole integrally raising aluminium alloy multifunctional repair tower simulation teaching sand table
CN204040538U (en) A kind of elevator stage
CN110706544B (en) Rack for high-altitude rescue training of power transmission line and training system
CN205575534U (en) Lattice formula groined type support body lifting means
CN203798595U (en) Winching machine pulling force testing stand
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN114220323A (en) Real model and system of instructing of transmission line group tower crane line
CN104453330B (en) Multifunctional power transmission tower
CN204212519U (en) Electric pole aligning tool
CN203886149U (en) Tug-of-war training simulator
CN202876197U (en) Expanding training combination apparatus of ground net array hexahedron
CN105261999A (en) Simple pole assembling tool and pole assembling method therefor
CN206873948U (en) Integral slip type steel construction operating platform
CN201917462U (en) Jacking type shield tunnel structure prototype test hydraulic pressure application device
CN204343780U (en) Driving lever vertical rod bracing frame
CN206601891U (en) A kind of bracing wire makes training and teaching device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model