CN103114713B - The construction method of hollow ultrahigh template section steel platform - Google Patents
The construction method of hollow ultrahigh template section steel platform Download PDFInfo
- Publication number
- CN103114713B CN103114713B CN201310090282.4A CN201310090282A CN103114713B CN 103114713 B CN103114713 B CN 103114713B CN 201310090282 A CN201310090282 A CN 201310090282A CN 103114713 B CN103114713 B CN 103114713B
- Authority
- CN
- China
- Prior art keywords
- steel
- type girder
- girder steel
- template
- lateral type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of construction method of hollow ultrahigh template section steel platform, template scaffold building is on described section steel platform, described section steel platform comprises lateral type girder steel, longitudinal type girder steel, scaffold floor, support scaffolding and at least two contour lower template platforms, the two ends of described lateral type girder steel are set up respectively on two lower template platforms, and fixed by end winding support part, described longitudinal type girder steel vertical rack is located on lateral type girder steel, and be fixedly connected with lateral type girder steel, the plane that described longitudinal type girder steel and lateral type girder steel intertexture are formed lays scaffold floor, plane lower support has support scaffolding, described support scaffolding and lower template platform are by pull bar drawknot.Template scaffold by superelevation height is kept to individual layer height by this section steel platform, and can be the activity space that constructor provides larger, and easy construction, safety is high, can extensively adopt when the courtyard position construction level component of hollow.
Description
Technical field
The present invention relates to steel concrete horizontal member operation platform and the construction method thereof of a kind of building operations auxiliary part and construction method thereof, particularly a kind of superelevation.
Background technology
In public building design, usual employing courtyard forms the space of autonomous closure in building or architectural complex inside, both the function of daylighting can have been realized, building content can also be enriched, realize the function of public building exhibition, sightseeing and amusement and recreation, but in structure construction, herein beam-slab template conveniently way be set up Super High Form Formwork, need long-term to drop into a large amount of scaffolds, and in construction, there is the difficult points such as the narrow and difficulty of construction of haul inconvenience, the steel pipe spacing little workman scope of operation is large.
Summary of the invention
The object of this invention is to provide a kind of construction method of hollow ultrahigh template section steel platform, in the horizontal member constructions such as the courtyard place beam slab of the hollow that solve, template sets up the technical problem of difficulty.
For achieving the above object, the present invention adopts following technical scheme:
A kind of hollow ultrahigh template section steel platform, template scaffold building thereon, comprise lateral type girder steel, longitudinal type girder steel, scaffold floor, support scaffolding and at least two contour lower template platforms, the two ends of described lateral type girder steel are set up respectively on two lower template platforms, and fixed by end winding support part, described longitudinal type girder steel vertical rack is located on lateral type girder steel, and be fixedly connected with lateral type girder steel, the plane that described longitudinal type girder steel and lateral type girder steel intertexture are formed lays scaffold floor, plane lower support has support scaffolding, described support scaffolding and lower template platform are by pull bar drawknot.
Described lateral type girder steel and longitudinal type girder steel are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
Described lateral type girder steel end face is arranged at intervals with bar dowel, and the bottom of upright rod of described template scaffold inserts bar dowel.
The length of described bar dowel is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold matches.
Described end winding support part is anchor ring or U-shaped reinforcing bar.
The construction sequence of above-mentioned hollow ultrahigh template section steel platform is as follows:
Step one, is placed lateral type girder steel at lower one deck hollow place of the steel concrete horizontal member intending construction, and is fixed at lateral type girder steel two ends by end winding support part; Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member of constructing;
Step 2, divides into support scaffolding at lateral type girder steel; Support scaffolding is positioned at lateral type girder steel middle part, and support scaffolding sets up width depending on lateral type girder steel span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding, horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, with longitudinal type girder steel along being linked to be entirety perpendicular to lateral type girder steel length to welding, ensures section steel beam platform and integrally; Then completely scaffold floor is spread;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold of the steel concrete horizontal member of construction accurately drops on the bar dowel on lateral type girder steel; The stencil design of the steel concrete horizontal member of constructing according to the plan at top sets up template scaffold, lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member intending construction reaches 100% of design strength, carries out the dismounting of steel concrete horizontal member template; After dismounting, courtyard constructional appearance is carried out an acceptance inspection, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel, is removed by lateral type girder steel, finally remove support scaffolding from top to bottom by root.
Compared with prior art the present invention has following characteristics and beneficial effect:
The present invention can be placed in the template of one deck under construction layer and set up platform, falsework set up by this platform, to reduce the scaffolding height of formwork-support, for workman provide broad, working space easily, also can reduce the input of steel pipe scaffold simultaneously, difficulty of construction is reduced greatly.
The present invention makes formwork-support set up and is kept to individual layer height by superelevation height, and provides enough job platforms easily for workman, and platform can conveniently way be set up, simple operation, construction is simple.Support system below i-shape steel beam is compared with the support body of traditional construction mode, and scaffolding height is little, and it is little that support body sets up width, and the arrangement pitch of cross bar, vertical rod, bridging is slightly aobvious loose, and workman's easy construction, the steel pipe quantity of input is few.Scaffold floor above section steel platform be completely taped against position and fixing can rearward, the upper and lower support work of setting up of platform can be constructed simultaneously.The support system of this platform upper and lower dismountable after structure construction, retains this platform and continues to use in the decoration construction stage.Improve efficiency, accelerate speed of application, save the duration, save construction cost.Can similar across the construction of hollow structure in take the method.
The construction scaffolding that the present invention can be widely used in the horizontal members such as hollow position place beam slab is set up.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is elevation of the present invention.
Fig. 2 is platform plane detail drawing.
Fig. 3 is the bar dowel position view of template scaffold and the socket connection of lateral type girder steel.
Reference numeral: 1-lateral type girder steel, 2-end winding support part, 3-support scaffolding, 4-longitudinal type girder steel, 5-template scaffold, 6-bar dowel, 7-scaffold floor, 8-lower template platform, 9-intend steel concrete horizontal member, the 10-pull bar of construction.
Detailed description of the invention
Embodiment is see shown in Fig. 1 to Fig. 3, a kind of hollow ultrahigh template section steel platform, template scaffold 5 is set up thereon, comprise lateral type girder steel 1, longitudinal type girder steel 4, scaffold floor 7, support scaffolding 3 and at least two contour lower template platforms 8, the two ends of described lateral type girder steel 1 are set up respectively on two lower template platforms 8, and fixed by end winding support part 2, described longitudinal type girder steel 4 vertical rack is located on lateral type girder steel 1, and be fixedly connected with lateral type girder steel 1, the plane that described longitudinal type girder steel 4 and lateral type girder steel 1 intertexture are formed lays scaffold floor 7, plane lower support has support scaffolding 3, described support scaffolding 3 and lower template platform 8 are by pull bar 10 drawknot.
Described lateral type girder steel 1 and longitudinal type girder steel 4 are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
Described lateral type girder steel 1 end face is arranged at intervals with bar dowel 6, and the bottom of upright rod of described template scaffold 5 inserts bar dowel 6.
The length of described bar dowel 6 is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold 5 matches.
Described end winding support part 2 is anchor ring or U-shaped reinforcing bar.
The construction sequence of above-mentioned hollow ultrahigh template section steel platform is as follows:
Step one, is placed lateral type girder steel 1 at lower one deck hollow place of the steel concrete horizontal member 9 intending construction, and is fixed at lateral type girder steel 1 two ends by end winding support part 2; Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member 9 of constructing; The object arranging two fixed points is to prevent termination from tilting;
Step 2, divides into support scaffolding 3 at lateral type girder steel 1; Support scaffolding 3 is positioned at lateral type girder steel 1 middle part, and support scaffolding 3 sets up width depending on lateral type girder steel 1 span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding 3, horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, is linked to be entirety along perpendicular to lateral type girder steel 1 is long to welding with longitudinal type girder steel 4, ensures section steel beam platform and integrally; Then completely scaffold floor 7 is spread; Described scaffold floor 7 must be laid tightly, prevents falling object from high altitude;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel 1 end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold 5 of the steel concrete horizontal member 9 of construction accurately drops on the bar dowel 6 on lateral type girder steel 1; The stencil design of the steel concrete horizontal member 9 of constructing according to the plan at top sets up template scaffold 5, lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member 9 intending construction reaches more than the 100%(8M span of design strength), carry out the dismounting of steel concrete horizontal member template; After dismounting, can carry out an acceptance inspection to courtyard constructional appearance through supervisor, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel 4, is removed by lateral type girder steel 1 by root, finally removes support scaffolding 3 from top to bottom.
Claims (5)
1. the construction method of a hollow ultrahigh template section steel platform, it is characterized in that: template scaffold (5) is set up on described section steel platform, described section steel platform comprises lateral type girder steel (1), longitudinal type girder steel (4), scaffold floor (7), support scaffolding (3) and at least two contour lower template platforms (8), the two ends of described lateral type girder steel (1) are set up respectively on two lower template platforms (8), and fixed by end winding support part (2), described longitudinal type girder steel (4) vertical rack is located on lateral type girder steel (1), and be fixedly connected with lateral type girder steel (1), the plane that described longitudinal type girder steel (4) and lateral type girder steel (1) intertexture are formed lays scaffold floor (7), plane lower support has support scaffolding (3), described support scaffolding (3) and lower template platform (8) are by pull bar (10) drawknot,
Construction sequence is as follows:
Step one, is placed lateral type girder steel (1) at lower one deck hollow place of the steel concrete horizontal member (9) intending construction, and is fixed at lateral type girder steel (1) two ends by end winding support part (2); Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member (9) of constructing;
Step 2, divides into support scaffolding (3) at lateral type girder steel (1); Support scaffolding (3) is positioned at lateral type girder steel (1) middle part, and support scaffolding (3) sets up width depending on lateral type girder steel (1) span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding (3), horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, is linked to be entirety along perpendicular to lateral type girder steel (1) is long to welding with longitudinal type girder steel (4), ensures section steel beam platform and integrally; Then scaffold floor (7) is completely spread;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel (1) end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold (5) of the steel concrete horizontal member (9) of construction accurately drops on the bar dowel (6) on lateral type girder steel (1); The stencil design of the steel concrete horizontal member (9) of constructing according to the plan at top sets up template scaffold (5), lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member (9) intending construction reaches 100% of design strength, carries out the dismounting of steel concrete horizontal member template; After dismounting, courtyard constructional appearance is carried out an acceptance inspection, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel (4), is removed by lateral type girder steel (1), finally remove support scaffolding (3) from top to bottom by root.
2. the construction method of hollow ultrahigh template section steel platform according to claim 1, is characterized in that: described lateral type girder steel (1) and longitudinal type girder steel (4) are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
3. the construction method of hollow ultrahigh template section steel platform according to claim 1, is characterized in that: described lateral type girder steel (1) end face is arranged at intervals with bar dowel (6), and the bottom of upright rod of described template scaffold (5) inserts bar dowel (6).
4. the construction method of the hollow ultrahigh template section steel platform according to claim 1 or 3, is characterized in that: the length of described bar dowel (6) is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold (5) matches.
5. the construction method of the hollow ultrahigh template section steel platform according to claim 1 or 3, is characterized in that: described end winding support part (2) is anchor ring or U-shaped reinforcing bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310090282.4A CN103114713B (en) | 2013-03-21 | 2013-03-21 | The construction method of hollow ultrahigh template section steel platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310090282.4A CN103114713B (en) | 2013-03-21 | 2013-03-21 | The construction method of hollow ultrahigh template section steel platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103114713A CN103114713A (en) | 2013-05-22 |
CN103114713B true CN103114713B (en) | 2015-07-29 |
Family
ID=48413141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310090282.4A Active CN103114713B (en) | 2013-03-21 | 2013-03-21 | The construction method of hollow ultrahigh template section steel platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103114713B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953188A (en) * | 2014-04-09 | 2014-07-30 | 天津一建建筑工程有限公司 | High-altitude supporting mold of structureless floor slab |
CN111305582A (en) * | 2020-02-25 | 2020-06-19 | 南通四建集团有限公司 | Building falling prevention construction steel platform based on BIM and application method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101100902A (en) * | 2007-07-31 | 2008-01-09 | 龙信建设集团有限公司 | Inclined drawing steel truss high-supported formwork structure system and construction method thereof |
CN201158933Y (en) * | 2007-12-27 | 2008-12-03 | 上海市第七建筑有限公司 | High-rise maintaining scaffold device with extruding structure |
CN202090577U (en) * | 2011-05-24 | 2011-12-28 | 南通市中房建设工程有限公司 | Template supporting construction platform for lift wells in high-rise buildings |
CN103015693A (en) * | 2012-11-28 | 2013-04-03 | 泰兴市第一建筑安装工程有限公司 | Three-dimensional construction device for super high-rise core tube beam-slab structure |
CN203238948U (en) * | 2013-03-21 | 2013-10-16 | 北京六建集团有限责任公司 | Hollow ultrahigh formwork profile steel platform |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4154534B2 (en) * | 2005-09-20 | 2008-09-24 | 株式会社日立プラントテクノロジー | Construction method for inspection of large boiler parts |
-
2013
- 2013-03-21 CN CN201310090282.4A patent/CN103114713B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101100902A (en) * | 2007-07-31 | 2008-01-09 | 龙信建设集团有限公司 | Inclined drawing steel truss high-supported formwork structure system and construction method thereof |
CN201158933Y (en) * | 2007-12-27 | 2008-12-03 | 上海市第七建筑有限公司 | High-rise maintaining scaffold device with extruding structure |
CN202090577U (en) * | 2011-05-24 | 2011-12-28 | 南通市中房建设工程有限公司 | Template supporting construction platform for lift wells in high-rise buildings |
CN103015693A (en) * | 2012-11-28 | 2013-04-03 | 泰兴市第一建筑安装工程有限公司 | Three-dimensional construction device for super high-rise core tube beam-slab structure |
CN203238948U (en) * | 2013-03-21 | 2013-10-16 | 北京六建集团有限责任公司 | Hollow ultrahigh formwork profile steel platform |
Also Published As
Publication number | Publication date |
---|---|
CN103114713A (en) | 2013-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN103410320B (en) | The tower silo flexibility platform bitubular connects sliding construction method | |
CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
CN203238948U (en) | Hollow ultrahigh formwork profile steel platform | |
CN104018581A (en) | Prestress concrete F slab and framework structure system | |
CN103821376A (en) | Single-layer reticulated shell structure high-altitude inclined rail accumulated slide moving construction method | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN201506952U (en) | Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame | |
CN206352391U (en) | Socket joint type key slot type Quick Release support system | |
CN105298107B (en) | A kind of high carriage of High Large Cantilever structure | |
CN106284988A (en) | Oblique circular cylinder template and construction method thereof | |
CN103114713B (en) | The construction method of hollow ultrahigh template section steel platform | |
CN103603491A (en) | Beam plate post-cast strip form plate support frame and setting up method thereof | |
CN203769116U (en) | Prefabricated through hole assembly type reinforced concrete shear wall | |
CN102392532B (en) | Construction method for built-in hanging scaffold of high-rise building | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN204040437U (en) | Cantilever tripod and single protective frame system of encorbelmenting | |
CN105350761A (en) | Installation method of I-steel cantilevered external scaffolding | |
CN103147573A (en) | Natatorium roof beam slab high formwork construction method | |
CN204024010U (en) | The flat sliding platform of a kind of high long cornice construction water | |
CN202577802U (en) | Large-roof and large-span cornice bucket arch steel skeleton of archaized architecture | |
CN201915630U (en) | Combined platform of fire control joint gallery form supporting steel beam | |
CN203924655U (en) | A kind of novel elevator pit shaft operating platform frame | |
CN206529710U (en) | Bridge maintenance track supporting steel cantilever | |
CN206090309U (en) | A device that is used for outdoor portion of case roof beam case to be under construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |