CN103114713B - The construction method of hollow ultrahigh template section steel platform - Google Patents

The construction method of hollow ultrahigh template section steel platform Download PDF

Info

Publication number
CN103114713B
CN103114713B CN201310090282.4A CN201310090282A CN103114713B CN 103114713 B CN103114713 B CN 103114713B CN 201310090282 A CN201310090282 A CN 201310090282A CN 103114713 B CN103114713 B CN 103114713B
Authority
CN
China
Prior art keywords
steel
type girder
girder steel
template
lateral type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310090282.4A
Other languages
Chinese (zh)
Other versions
CN103114713A (en
Inventor
苏群
朱宇
韩继亮
陈连义
胡颖红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Original Assignee
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd filed Critical BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201310090282.4A priority Critical patent/CN103114713B/en
Publication of CN103114713A publication Critical patent/CN103114713A/en
Application granted granted Critical
Publication of CN103114713B publication Critical patent/CN103114713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of construction method of hollow ultrahigh template section steel platform, template scaffold building is on described section steel platform, described section steel platform comprises lateral type girder steel, longitudinal type girder steel, scaffold floor, support scaffolding and at least two contour lower template platforms, the two ends of described lateral type girder steel are set up respectively on two lower template platforms, and fixed by end winding support part, described longitudinal type girder steel vertical rack is located on lateral type girder steel, and be fixedly connected with lateral type girder steel, the plane that described longitudinal type girder steel and lateral type girder steel intertexture are formed lays scaffold floor, plane lower support has support scaffolding, described support scaffolding and lower template platform are by pull bar drawknot.Template scaffold by superelevation height is kept to individual layer height by this section steel platform, and can be the activity space that constructor provides larger, and easy construction, safety is high, can extensively adopt when the courtyard position construction level component of hollow.

Description

The construction method of hollow ultrahigh template section steel platform
Technical field
The present invention relates to steel concrete horizontal member operation platform and the construction method thereof of a kind of building operations auxiliary part and construction method thereof, particularly a kind of superelevation.
Background technology
In public building design, usual employing courtyard forms the space of autonomous closure in building or architectural complex inside, both the function of daylighting can have been realized, building content can also be enriched, realize the function of public building exhibition, sightseeing and amusement and recreation, but in structure construction, herein beam-slab template conveniently way be set up Super High Form Formwork, need long-term to drop into a large amount of scaffolds, and in construction, there is the difficult points such as the narrow and difficulty of construction of haul inconvenience, the steel pipe spacing little workman scope of operation is large.
Summary of the invention
The object of this invention is to provide a kind of construction method of hollow ultrahigh template section steel platform, in the horizontal member constructions such as the courtyard place beam slab of the hollow that solve, template sets up the technical problem of difficulty.
For achieving the above object, the present invention adopts following technical scheme:
A kind of hollow ultrahigh template section steel platform, template scaffold building thereon, comprise lateral type girder steel, longitudinal type girder steel, scaffold floor, support scaffolding and at least two contour lower template platforms, the two ends of described lateral type girder steel are set up respectively on two lower template platforms, and fixed by end winding support part, described longitudinal type girder steel vertical rack is located on lateral type girder steel, and be fixedly connected with lateral type girder steel, the plane that described longitudinal type girder steel and lateral type girder steel intertexture are formed lays scaffold floor, plane lower support has support scaffolding, described support scaffolding and lower template platform are by pull bar drawknot.
Described lateral type girder steel and longitudinal type girder steel are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
Described lateral type girder steel end face is arranged at intervals with bar dowel, and the bottom of upright rod of described template scaffold inserts bar dowel.
The length of described bar dowel is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold matches.
Described end winding support part is anchor ring or U-shaped reinforcing bar.
The construction sequence of above-mentioned hollow ultrahigh template section steel platform is as follows:
Step one, is placed lateral type girder steel at lower one deck hollow place of the steel concrete horizontal member intending construction, and is fixed at lateral type girder steel two ends by end winding support part; Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member of constructing;
Step 2, divides into support scaffolding at lateral type girder steel; Support scaffolding is positioned at lateral type girder steel middle part, and support scaffolding sets up width depending on lateral type girder steel span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding, horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, with longitudinal type girder steel along being linked to be entirety perpendicular to lateral type girder steel length to welding, ensures section steel beam platform and integrally; Then completely scaffold floor is spread;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold of the steel concrete horizontal member of construction accurately drops on the bar dowel on lateral type girder steel; The stencil design of the steel concrete horizontal member of constructing according to the plan at top sets up template scaffold, lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member intending construction reaches 100% of design strength, carries out the dismounting of steel concrete horizontal member template; After dismounting, courtyard constructional appearance is carried out an acceptance inspection, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel, is removed by lateral type girder steel, finally remove support scaffolding from top to bottom by root.
Compared with prior art the present invention has following characteristics and beneficial effect:
The present invention can be placed in the template of one deck under construction layer and set up platform, falsework set up by this platform, to reduce the scaffolding height of formwork-support, for workman provide broad, working space easily, also can reduce the input of steel pipe scaffold simultaneously, difficulty of construction is reduced greatly.
The present invention makes formwork-support set up and is kept to individual layer height by superelevation height, and provides enough job platforms easily for workman, and platform can conveniently way be set up, simple operation, construction is simple.Support system below i-shape steel beam is compared with the support body of traditional construction mode, and scaffolding height is little, and it is little that support body sets up width, and the arrangement pitch of cross bar, vertical rod, bridging is slightly aobvious loose, and workman's easy construction, the steel pipe quantity of input is few.Scaffold floor above section steel platform be completely taped against position and fixing can rearward, the upper and lower support work of setting up of platform can be constructed simultaneously.The support system of this platform upper and lower dismountable after structure construction, retains this platform and continues to use in the decoration construction stage.Improve efficiency, accelerate speed of application, save the duration, save construction cost.Can similar across the construction of hollow structure in take the method.
The construction scaffolding that the present invention can be widely used in the horizontal members such as hollow position place beam slab is set up.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is elevation of the present invention.
Fig. 2 is platform plane detail drawing.
Fig. 3 is the bar dowel position view of template scaffold and the socket connection of lateral type girder steel.
Reference numeral: 1-lateral type girder steel, 2-end winding support part, 3-support scaffolding, 4-longitudinal type girder steel, 5-template scaffold, 6-bar dowel, 7-scaffold floor, 8-lower template platform, 9-intend steel concrete horizontal member, the 10-pull bar of construction.
Detailed description of the invention
Embodiment is see shown in Fig. 1 to Fig. 3, a kind of hollow ultrahigh template section steel platform, template scaffold 5 is set up thereon, comprise lateral type girder steel 1, longitudinal type girder steel 4, scaffold floor 7, support scaffolding 3 and at least two contour lower template platforms 8, the two ends of described lateral type girder steel 1 are set up respectively on two lower template platforms 8, and fixed by end winding support part 2, described longitudinal type girder steel 4 vertical rack is located on lateral type girder steel 1, and be fixedly connected with lateral type girder steel 1, the plane that described longitudinal type girder steel 4 and lateral type girder steel 1 intertexture are formed lays scaffold floor 7, plane lower support has support scaffolding 3, described support scaffolding 3 and lower template platform 8 are by pull bar 10 drawknot.
Described lateral type girder steel 1 and longitudinal type girder steel 4 are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
Described lateral type girder steel 1 end face is arranged at intervals with bar dowel 6, and the bottom of upright rod of described template scaffold 5 inserts bar dowel 6.
The length of described bar dowel 6 is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold 5 matches.
Described end winding support part 2 is anchor ring or U-shaped reinforcing bar.
The construction sequence of above-mentioned hollow ultrahigh template section steel platform is as follows:
Step one, is placed lateral type girder steel 1 at lower one deck hollow place of the steel concrete horizontal member 9 intending construction, and is fixed at lateral type girder steel 1 two ends by end winding support part 2; Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member 9 of constructing; The object arranging two fixed points is to prevent termination from tilting;
Step 2, divides into support scaffolding 3 at lateral type girder steel 1; Support scaffolding 3 is positioned at lateral type girder steel 1 middle part, and support scaffolding 3 sets up width depending on lateral type girder steel 1 span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding 3, horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, is linked to be entirety along perpendicular to lateral type girder steel 1 is long to welding with longitudinal type girder steel 4, ensures section steel beam platform and integrally; Then completely scaffold floor 7 is spread; Described scaffold floor 7 must be laid tightly, prevents falling object from high altitude;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel 1 end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold 5 of the steel concrete horizontal member 9 of construction accurately drops on the bar dowel 6 on lateral type girder steel 1; The stencil design of the steel concrete horizontal member 9 of constructing according to the plan at top sets up template scaffold 5, lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member 9 intending construction reaches more than the 100%(8M span of design strength), carry out the dismounting of steel concrete horizontal member template; After dismounting, can carry out an acceptance inspection to courtyard constructional appearance through supervisor, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel 4, is removed by lateral type girder steel 1 by root, finally removes support scaffolding 3 from top to bottom.

Claims (5)

1. the construction method of a hollow ultrahigh template section steel platform, it is characterized in that: template scaffold (5) is set up on described section steel platform, described section steel platform comprises lateral type girder steel (1), longitudinal type girder steel (4), scaffold floor (7), support scaffolding (3) and at least two contour lower template platforms (8), the two ends of described lateral type girder steel (1) are set up respectively on two lower template platforms (8), and fixed by end winding support part (2), described longitudinal type girder steel (4) vertical rack is located on lateral type girder steel (1), and be fixedly connected with lateral type girder steel (1), the plane that described longitudinal type girder steel (4) and lateral type girder steel (1) intertexture are formed lays scaffold floor (7), plane lower support has support scaffolding (3), described support scaffolding (3) and lower template platform (8) are by pull bar (10) drawknot,
Construction sequence is as follows:
Step one, is placed lateral type girder steel (1) at lower one deck hollow place of the steel concrete horizontal member (9) intending construction, and is fixed at lateral type girder steel (1) two ends by end winding support part (2); Often end fixes 2 points, respectively apart from end face 200mm and 1000mm intending the steel concrete horizontal member (9) of constructing;
Step 2, divides into support scaffolding (3) at lateral type girder steel (1); Support scaffolding (3) is positioned at lateral type girder steel (1) middle part, and support scaffolding (3) sets up width depending on lateral type girder steel (1) span, should be calculated determine by girder steel amount of deflection; The vertical pole ' s span 600mm-1200mm of support scaffolding (3), horizon bar spacing 900mm-1800mm, if 60 degree of bridgings, determined by support body stable calculation; Meanwhile, if support body height is more than 8 meters, transverse direction and pillar or beam slab drawknot should be considered, prevent support body from tilting;
Step 3, is linked to be entirety along perpendicular to lateral type girder steel (1) is long to welding with longitudinal type girder steel (4), ensures section steel beam platform and integrally; Then scaffold floor (7) is completely spread;
Step 4, under section steel platform, control point is set, carry out deflection observation to lateral type girder steel (1) end and middle part, four-stage carries out after observation point shaped steel putting up platform, after the reinforcement installation of steel concrete horizontal member, in concreting and after concrete initial set;
Step 5, the vertical rod intending the template scaffold (5) of the steel concrete horizontal member (9) of construction accurately drops on the bar dowel (6) on lateral type girder steel (1); The stencil design of the steel concrete horizontal member (9) of constructing according to the plan at top sets up template scaffold (5), lays steel concrete horizontal member template, lays reinforcing bar, concreting;
Step 6, waits that the concrete strength of the steel concrete horizontal member (9) intending construction reaches 100% of design strength, carries out the dismounting of steel concrete horizontal member template; After dismounting, courtyard constructional appearance is carried out an acceptance inspection, insert steel concrete horizontal member decoration construction in advance, reduce section steel platform life cycle;
Step 7, section steel platform is removed, and is first disconnected by longitudinal type girder steel (4), is removed by lateral type girder steel (1), finally remove support scaffolding (3) from top to bottom by root.
2. the construction method of hollow ultrahigh template section steel platform according to claim 1, is characterized in that: described lateral type girder steel (1) and longitudinal type girder steel (4) are steel I-beam, H profile steel beam, steel beam with box shape or above-mentioned any combination.
3. the construction method of hollow ultrahigh template section steel platform according to claim 1, is characterized in that: described lateral type girder steel (1) end face is arranged at intervals with bar dowel (6), and the bottom of upright rod of described template scaffold (5) inserts bar dowel (6).
4. the construction method of the hollow ultrahigh template section steel platform according to claim 1 or 3, is characterized in that: the length of described bar dowel (6) is not less than 15cm, and the vertical rod internal diameter of its diameter and template scaffold (5) matches.
5. the construction method of the hollow ultrahigh template section steel platform according to claim 1 or 3, is characterized in that: described end winding support part (2) is anchor ring or U-shaped reinforcing bar.
CN201310090282.4A 2013-03-21 2013-03-21 The construction method of hollow ultrahigh template section steel platform Active CN103114713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310090282.4A CN103114713B (en) 2013-03-21 2013-03-21 The construction method of hollow ultrahigh template section steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310090282.4A CN103114713B (en) 2013-03-21 2013-03-21 The construction method of hollow ultrahigh template section steel platform

Publications (2)

Publication Number Publication Date
CN103114713A CN103114713A (en) 2013-05-22
CN103114713B true CN103114713B (en) 2015-07-29

Family

ID=48413141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310090282.4A Active CN103114713B (en) 2013-03-21 2013-03-21 The construction method of hollow ultrahigh template section steel platform

Country Status (1)

Country Link
CN (1) CN103114713B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953188A (en) * 2014-04-09 2014-07-30 天津一建建筑工程有限公司 High-altitude supporting mold of structureless floor slab
CN111305582A (en) * 2020-02-25 2020-06-19 南通四建集团有限公司 Building falling prevention construction steel platform based on BIM and application method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100902A (en) * 2007-07-31 2008-01-09 龙信建设集团有限公司 Inclined drawing steel truss high-supported formwork structure system and construction method thereof
CN201158933Y (en) * 2007-12-27 2008-12-03 上海市第七建筑有限公司 High-rise maintaining scaffold device with extruding structure
CN202090577U (en) * 2011-05-24 2011-12-28 南通市中房建设工程有限公司 Template supporting construction platform for lift wells in high-rise buildings
CN103015693A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Three-dimensional construction device for super high-rise core tube beam-slab structure
CN203238948U (en) * 2013-03-21 2013-10-16 北京六建集团有限责任公司 Hollow ultrahigh formwork profile steel platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4154534B2 (en) * 2005-09-20 2008-09-24 株式会社日立プラントテクノロジー Construction method for inspection of large boiler parts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100902A (en) * 2007-07-31 2008-01-09 龙信建设集团有限公司 Inclined drawing steel truss high-supported formwork structure system and construction method thereof
CN201158933Y (en) * 2007-12-27 2008-12-03 上海市第七建筑有限公司 High-rise maintaining scaffold device with extruding structure
CN202090577U (en) * 2011-05-24 2011-12-28 南通市中房建设工程有限公司 Template supporting construction platform for lift wells in high-rise buildings
CN103015693A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Three-dimensional construction device for super high-rise core tube beam-slab structure
CN203238948U (en) * 2013-03-21 2013-10-16 北京六建集团有限责任公司 Hollow ultrahigh formwork profile steel platform

Also Published As

Publication number Publication date
CN103114713A (en) 2013-05-22

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN203238948U (en) Hollow ultrahigh formwork profile steel platform
CN104018581A (en) Prestress concrete F slab and framework structure system
CN103821376A (en) Single-layer reticulated shell structure high-altitude inclined rail accumulated slide moving construction method
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN105298107B (en) A kind of high carriage of High Large Cantilever structure
CN106284988A (en) Oblique circular cylinder template and construction method thereof
CN103114713B (en) The construction method of hollow ultrahigh template section steel platform
CN103603491A (en) Beam plate post-cast strip form plate support frame and setting up method thereof
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN102392532B (en) Construction method for built-in hanging scaffold of high-rise building
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN204040437U (en) Cantilever tripod and single protective frame system of encorbelmenting
CN105350761A (en) Installation method of I-steel cantilevered external scaffolding
CN103147573A (en) Natatorium roof beam slab high formwork construction method
CN204024010U (en) The flat sliding platform of a kind of high long cornice construction water
CN202577802U (en) Large-roof and large-span cornice bucket arch steel skeleton of archaized architecture
CN201915630U (en) Combined platform of fire control joint gallery form supporting steel beam
CN203924655U (en) A kind of novel elevator pit shaft operating platform frame
CN206529710U (en) Bridge maintenance track supporting steel cantilever
CN206090309U (en) A device that is used for outdoor portion of case roof beam case to be under construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant