CN103105219A - Measuring method based on rock debris measuring transducer - Google Patents
Measuring method based on rock debris measuring transducer Download PDFInfo
- Publication number
- CN103105219A CN103105219A CN 201110370241 CN201110370241A CN103105219A CN 103105219 A CN103105219 A CN 103105219A CN 201110370241 CN201110370241 CN 201110370241 CN 201110370241 A CN201110370241 A CN 201110370241A CN 103105219 A CN103105219 A CN 103105219A
- Authority
- CN
- China
- Prior art keywords
- belt
- measuring
- drilling
- mud
- rock debris
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention discloses a measuring method based on a rock debris measuring transducer. The method is characterized by comprising the steps of (a) enabling rock debris to pass through a belt of a weighing frame, weighing out the weight of a certain small section of the belt through a weighing transducer; (b) meanwhile, measuring the linear speed of the belt at the same moment through a speed measuring transducer; (c) carrying out continuously measurement and obtaining a plurality of groups of data in the manner; and (d) calculating and obtaining the total weight of the rock debris through the data. According to the measuring method based on the rock debris measuring transducer, the functions are complete, instantaneous conveying quantity and accumulated quantity can be weighed out, and the functions of tare weight removing, automatic zero calibration and the like are provided.
Description
Technical field
The present invention relates to a kind of measuring method based on the landwaste survey sensor.
Background technology
Drilling Mud has become the important component part of modern oil/gas drilling engineering.A large amount of research data show that mud has carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit, drilling tool and transmission hydrodynamic force etc. and is directly connected to drilling cost in drilling process both at home and abroad, even have influence on the vital role of drilling well success or failure.Drilling practice also proves, the quality of mud property, and whether use, maintenance and treatment measures are appropriate, directly affect the stability of the borehole wall, and the stability of the borehole wall is related to admission, bit speed, quality and the cost of geologic information, so people often liken mud to the blood of drilling engineering.Therefore, the mud property parameter is carried out real-time monitoring and just seem very important.
In the each task of petroleum prospecting and oil-field development, drilling well plays a very important role.In drilling process, the bottom rock rear landwaste that produces that is broken is carried on ground by circulating mud, and this process is called well-flushing.Well-flushing is to realize by circulating mud as the important step in drilling process, therefore there is the people mud to be likened to the blood of drilling engineering.
Drilling fluid refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulating fluid of drilling well need of work.Drilling fluid claims again drilling mud or referred to as mud (Muds), this paper with drilling fluid referred to as mud.Mud has the effects such as carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit, drilling tool and transmission hydrodynamic force in drilling process.
Nowadays Drilling Mud has become the important component part of oil/gas drilling engineering.Drilling practice shows, the quality of mud property is used, the maintenance measure appropriate direct stability that affects the borehole wall whether, and the stability of the borehole wall is related to admission, bit speed, quality and the cost of geologic information, so people often liken mud to the blood of drilling engineering.
Over nearly 40 years, indoor and industry spot experimental study proves in a large number both at home and abroad, and in the ordinary course of things, the solid load increase can cause the increase of density, viscosity, shear force, mud cake thickness and the sand cut of mud, the decline of fluid loss.And the variation of these performances will obviously reduce drilling speed, increases the drill bit consumption, even might increase the situations such as leakage, gas cut, bit freezing, makes drilling cost significantly rise.
Mud refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulating fluid of drilling well need of work.The circulation of mud is kept by steam piano.The high-pressure slurry of discharging from steam piano through ground high pressure pipe joint, standpipe, rotary hose, water swivel, square kelly, drilling rod, drill collar to drill bit, from the bit nozzle ejection, with bottom-hole cleaning and cutting carring.And then upwards flow along the annular space that drill string and the borehole wall (or sleeve pipe) form, flow into suction pit by vent line arriving ground, then return to upper pool after various solid phase opertaing devices are processed, the Recycling of the most laggard people's steam piano.The various pipe fittings of mud stream warp, equipment have consisted of a whole set of mud circulating system.
In the each task of petroleum prospecting and oil-field development, drilling well plays a very important role.In drilling process, the bottom rock rear landwaste that produces that is broken is carried on ground by circulating mud, and this process is called well-flushing.Well-flushing is to realize by circulating mud as the important step in drilling process, therefore there is the people mud to be likened to the blood of drilling engineering.
Mud refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulating fluid of drilling well need of work.The circulation of mud is kept by steam piano.The high-pressure slurry of discharging from steam piano through ground high pressure pipe joint, standpipe, rotary hose, water swivel, square kelly, drilling rod, drill collar to drill bit, from the bit nozzle ejection, with bottom-hole cleaning and cutting carring.And then upwards flow along the annular space that drill string and the borehole wall (or sleeve pipe) form, flow into suction pit by vent line arriving ground, then return to upper pool after various solid phase opertaing devices are processed, the Recycling of the most laggard people's steam piano.The various pipe fittings of mud stream warp, Drilling Mud are the important component parts of modern oil/gas drilling engineering.Mud has the effect of the several respects such as carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit and drilling tool, transmission hydrodynamic force in drilling process.Drilling practice proves, the quality of mud property, whether use, maintenance and processing be proper, is directly connected to rate of penetration, bit life, down-hole problem, uphole equipment wearing and tearing, mud expense and the whole drilling well integrated cost of drilling well, even is related to the success or failure of drilling well.Therefore, necessary the mud property parameter is carried out real-time measurement, feedback, in order in time pinpoint the problems.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, a kind of measuring method based on the landwaste survey sensor is provided, should be comparatively perfect based on the measuring method function of landwaste survey sensor, can weigh up instantaneous operational throughput, accumulative total, and have the functions such as peeling weight, automatic zero adjustment.
Purpose of the present invention is achieved through the following technical solutions: the measuring method based on the landwaste survey sensor, it is characterized in that, and comprise the following steps:
(a) landwaste is through the belt of weighing frame, weighs up the weight on a certain small section of belt by LOAD CELLS;
(b) simultaneously, measure the same linear velocity of belt in a flash by tachogenerator;
(c) record so continuously some groups of data;
(d) data are calculated by following formula, namely got the general assembly (TW) of landwaste.
In formula, the instantaneous operational throughput (kg/s) of w (t)-belt feeder; Instantaneous mass on q (t)-belt unit length.
The landwaste survey sensor that above-mentioned measuring method is used, main by weighing frame, be arranged on the rod of weighing on weighing frame, the LOAD CELLS that is arranged on rod one end of weighing and the tachogenerator that is arranged on weighing frame and consist of.
The described rod of weighing is arranged on the top of weighing frame.
Described tachogenerator is arranged on the bottom of weighing frame.
Also comprise the balanced body that is arranged on weighing frame.
Described balanced body is arranged on the bottom of weighing frame.
In sum, the invention has the beneficial effects as follows: function is comparatively perfect, can weigh up instantaneous operational throughput, accumulative total, and has the functions such as peeling weight, automatic zero adjustment.
Description of drawings
Fig. 1 is the structural representation of the present invention's sensor used.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The measuring method based on the landwaste survey sensor that the present invention relates to comprises the following steps:
(a) landwaste is through the belt of weighing frame 1, weighs up the weight on a certain small section of belt by LOAD CELLS 3;
(b) simultaneously, measure the same linear velocity of belt in a flash by tachogenerator 4;
(c) record so continuously some groups of data;
(d) data are calculated by following formula, namely got the general assembly (TW) of landwaste.
In formula, the instantaneous operational throughput (kg/s) of w (t)-belt feeder; Instantaneous mass on q (t)-belt unit length.
As shown in Figure 1, the landwaste survey sensor that the present invention is used, mainly by weighing frame 1, be arranged on the rod 2 of weighing on weighing frame 1, be arranged on the LOAD CELLS 3 of rod 2 one ends of weighing and the tachogenerator 4 that is arranged on weighing frame 1 consists of.
The described rod 2 of weighing is arranged on the top of weighing frame 1.
Described tachogenerator 4 is arranged on the bottom of weighing frame 1.
Also comprise the balanced body 5 that is arranged on weighing frame 1.
Described balanced body 5 is arranged on the bottom of weighing frame 1.
The above is only preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations that above embodiment is done are within all falling into protection scope of the present invention.
Claims (1)
1. based on the measuring method of landwaste survey sensor, it is characterized in that, comprise the following steps:
(a) landwaste through the belt of weighing frame (1), weighs up the weight on a certain small section of belt by LOAD CELLS (3);
(b) simultaneously, measure the same linear velocity of belt in a flash by tachogenerator (4);
(c) record so continuously some groups of data;
(d) data are calculated by following formula, namely got the general assembly (TW) of landwaste.
In formula, the instantaneous operational throughput (kg/s) of w (t)-belt feeder; Instantaneous mass on q (t)-belt unit length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110370241 CN103105219A (en) | 2011-11-10 | 2011-11-10 | Measuring method based on rock debris measuring transducer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110370241 CN103105219A (en) | 2011-11-10 | 2011-11-10 | Measuring method based on rock debris measuring transducer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103105219A true CN103105219A (en) | 2013-05-15 |
Family
ID=48313244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110370241 Pending CN103105219A (en) | 2011-11-10 | 2011-11-10 | Measuring method based on rock debris measuring transducer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103105219A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112456042A (en) * | 2020-11-05 | 2021-03-09 | 中国石油天然气集团有限公司 | Debris bed early warning method based on real-time weighing of debris conveying |
-
2011
- 2011-11-10 CN CN 201110370241 patent/CN103105219A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112456042A (en) * | 2020-11-05 | 2021-03-09 | 中国石油天然气集团有限公司 | Debris bed early warning method based on real-time weighing of debris conveying |
CN112456042B (en) * | 2020-11-05 | 2021-08-13 | 中国石油天然气集团有限公司 | Debris bed early warning method based on real-time weighing of debris conveying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2338119C (en) | Method and apparatus for measuring fluid density and determining hole cleaning problems | |
Finger et al. | Handbook of best practices for geothermal drilling | |
US20090260430A1 (en) | Method and Apparatus for Measurement of Formation Fluid Loss | |
US2290408A (en) | Exploration of boreholes | |
CN100412314C (en) | Process for gas collection by a well with one mouth and multiple branches drilled along coal layer | |
Guan et al. | Theory and technology of drilling engineering | |
Ozbayoglu et al. | Hole cleaning performance of light-weight drilling fluids during horizontal underbalanced drilling | |
RU2688652C2 (en) | Methods of operation of downhole equipment based on conditions in wellbore | |
CN103104203A (en) | Drilling-fluid solid-control control process | |
CN103105217A (en) | Rock debris measuring sensor and measuring method thereof | |
CN103105219A (en) | Measuring method based on rock debris measuring transducer | |
Contreras et al. | An innovative approach for pore pressure prediction and drilling optimization in an abnormally subpressured basin | |
Cao et al. | Studies on pneumatic transport of ice cores in reverse circulation air drilling | |
CN103105218A (en) | Rock debris measuring sensor | |
CN204312004U (en) | A kind of novel gas well drift size gauge tool | |
CN103104245A (en) | Sensor used for measuring mud density and mass flow rate | |
CN204851134U (en) | Sand washing instrument is carried to cable | |
CN103089176A (en) | Drilling liquid fixing and control system | |
CN103105343A (en) | Sensor for measuring density and mass flow of mud and measurement method based on sensor | |
CN103104248A (en) | Method for measuring mud density and mass flow rate | |
CN106948800B (en) | A kind of staged fracturing of horizontal well construction diagnostic method of working condition | |
CN103104243A (en) | Processing method for vibrating screen mud parameter signals | |
CN103090919A (en) | Automatic compensation target type flowmeter and measurement and control method thereof | |
CN103104204A (en) | Self-compensation target flowmeter | |
Morton et al. | Hydrogeology of the Venetia diamond mine, South Africa |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130515 |