CN103104203A - Drilling-fluid solid-control control process - Google Patents

Drilling-fluid solid-control control process Download PDF

Info

Publication number
CN103104203A
CN103104203A CN 201110370182 CN201110370182A CN103104203A CN 103104203 A CN103104203 A CN 103104203A CN 201110370182 CN201110370182 CN 201110370182 CN 201110370182 A CN201110370182 A CN 201110370182A CN 103104203 A CN103104203 A CN 103104203A
Authority
CN
China
Prior art keywords
mud
slurry
drilling
tank
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110370182
Other languages
Chinese (zh)
Inventor
吕宪冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110370182 priority Critical patent/CN103104203A/en
Publication of CN103104203A publication Critical patent/CN103104203A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a drilling-fluid solid-control control process. The drilling-fluid solid-control control process comprises: (a) slurry enters into a tank body from a slurry inlet (5) firstly, a great deal of large-particle rock debris is eliminated after the slurry is disposed through a vibration screen (11), and conditions are created for working of next-stage solid control equipment; (b) the slurry disposed by the vibration screen (11) enters into a sand settling tank (6), and the particle rock debris is eliminated further through a grit catcher (2); (c) then, the slurry enters into a second tank (7), a part of the slurry, which does not meet standards, is removed through a silt remover (3), and then the slurry enters into a third tank (8); and (d) after the slurry is further disposed through a centrifugal separator inside the third tank (8), the slurry enters into a suction tank (9) and is reserved. By means of the drilling-fluid solid-control control process, solid control of the slurry can be completed, disposing efficiency is high, disposing steps are simple, disposing cost of the slurry is greatly lowered, and foundation is provided for recycling of the slurry in a well-drilling course.

Description

Solids control for drilling fluids is controlled technique
Technical field
The present invention relates to a kind of Solids control for drilling fluids and control technique.
Background technology
Drilling Mud has become the important component part of modern oil/gas drilling engineering.A large amount of research data show that mud has carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit, drilling tool and transmission hydrodynamic force etc. and is directly connected to drilling cost in drilling process both at home and abroad, even have influence on the important function of drilling well success or failure.Drilling practice also proves, the quality of mud property, and whether use, maintenance and treatment measures are appropriate, directly affect the stability of the borehole wall, and the stability of the borehole wall is related to admission, bit speed, quality and the cost of geologic information, so people often liken mud to the blood of drilling engineering.Therefore, the mud property parameter is carried out real-time monitoring and just seem very important.
In the each task of oil exploration and oil field development, drilling well plays a very important role.In drilling process, the bottom rock rear landwaste that produces that is broken is carried on ground by circulating mud, and this process is called well-flushing.Well-flushing is to realize by circulating mud as the important step in drilling process, therefore there is the people mud to be likened to the blood of drilling engineering.
Drilling fluid refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulation of fluids of drilling well need of work.Drilling fluid claims again drilling mud or referred to as mud (Muds), this paper with drilling fluid referred to as mud.Mud has the effects such as carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit, drilling tool and transmission hydrodynamic force in drilling process.
Nowadays Drilling Mud has become the important component part of oil/gas drilling engineering.Drilling practice shows, the quality of mud property is used, the maintenance measure appropriate direct stability that affects the borehole wall whether, and the stability of the borehole wall is related to admission, bit speed, quality and the cost of geologic information, so people often liken mud to the blood of drilling engineering.
Over nearly 40 years, indoor and industry spot experimental study proves in a large number both at home and abroad, and in the ordinary course of things, the solid concentration increase can cause the increase of density, viscosity, shear force, cake thickness and the sand content of mud, the decline of fluid loss.And the variation of these performances will obviously reduce drilling speed, increases the drill bit consumption, even might increase the situations such as leakage, gas cut, bit freezing, makes drilling cost significantly rise.
Mud refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulation of fluids of drilling well need of work.The circulation of mud is kept by slush pump.The high-pressure slurry of discharging from slush pump through ground high pressure pipe joint, standpipe, hose, water tap, kelly bar, drilling rod, drill collar to drill bit, from the bit nozzle ejection, with bottom-hole cleaning and cutting carring.And then upwards flow along the annular space that drill string and the borehole wall (or sleeve pipe) form, flow into mud pit by discharge pipe arriving ground, then return to upper pool after various solid phase control appliances are processed, the Recycling of the most laggard people's slush pump.The various pipe fittings of slurry flows warp, equipment have consisted of a whole set of mud circulating system.
In the each task of oil exploration and oil field development, drilling well plays a very important role.In drilling process, the bottom rock rear landwaste that produces that is broken is carried on ground by circulating mud, and this process is called well-flushing.Well-flushing is to realize by circulating mud as the important step in drilling process, therefore there is the people mud to be likened to the blood of drilling engineering.
Mud refers to satisfy with its several functions in the oil/gas drilling process general name of the various circulation of fluids of drilling well need of work.The circulation of mud is kept by slush pump.The high-pressure slurry of discharging from slush pump through ground high pressure pipe joint, standpipe, hose, water tap, kelly bar, drilling rod, drill collar to drill bit, from the bit nozzle ejection, with bottom-hole cleaning and cutting carring.And then upwards flow along the annular space that drill string and the borehole wall (or sleeve pipe) form, flow into mud pit by discharge pipe arriving ground, then return to upper pool after various solid phase control appliances are processed, the Recycling of the most laggard people's slush pump.The various pipe fittings of slurry flows warp, Drilling Mud are the important component parts of modern oil/gas drilling engineering.Mud has the effect of the several respects such as carry and suspend landwaste, stabilizing borehole and equilibrium strata pressure, Cooling and Lubricator drill bit and drilling tool, transmission hydrodynamic force in drilling process.Drilling practice proves, the quality of mud property, whether use, maintenance and processing be proper, is directly connected to rate of penetration, bit life, down-hole problem, ground installation wearing and tearing, mud expense and the whole drilling well integrated cost of drilling well, even is related to the success or failure of drilling well.Therefore, necessary the mud property parameter is carried out real-time measurement, feedback, in order in time pinpoint the problems.
Therefore, for mud in drilling process can recycle, just must carry out solid phase to mud and control.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, provide a kind of Solids control for drilling fluids to control technique, this Solids control for drilling fluids is controlled the solid phase control that technique can be completed mud, and treatment effeciency is high, treatment step is simple, greatly reduce the processing cost of mud, for recycling of mud in drilling process provides the foundation.
Purpose of the present invention is achieved through the following technical solutions: Solids control for drilling fluids is controlled technique, it is characterized in that, comprises the following steps:
(a) at first mud enter tank body from the mud import, after processing by vibrosieve, removes the task of a large amount of larger particles landwaste, and be that the work of next stage solid phase control appliance creates conditions;
(b) process later mud through vibrosieve, enter mud settling tank, further remove the degranulation landwaste by desander;
(c) then, mud enters tank No. two, removes a part of non-compliant mud by desilter, then enters tank No. three;
(d) in No. three tanks, mud enters suction tank standby after further being processed by centrifugal separator.
Above-mentioned control technique solidification control system for well drilling liguid used mainly by tank body, and is arranged on desander on tank body, desilter and centrifugal separator and consists of, and runs through being provided with the mud import on described tank body.
Described tank body mainly is made of mud settling tank, No. two tanks, No. three tanks and suction tank.
Described desander is connected with mud settling tank and No. two tanks respectively.
Described desilter is connected with No. two tanks and No. three tanks respectively.
Described centrifugal separator is connected with No. three tanks and suction tank respectively.
The inside of described tank body also is provided with deaerator, and the two ends of deaerator are separately positioned in mud settling tank and No. two tanks.
The inside of described tank body also is provided with the vibrosieve that is positioned at the desander front end.
In sum, the invention has the beneficial effects as follows: the solid phase that can complete mud is controlled, and treatment effeciency is high, and treatment step is simple, greatly reduces the processing cost of mud, for recycling of mud in drilling process provides the foundation.
Description of drawings
Fig. 1 is the structural representation of the present invention's equipment used.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The Solids control for drilling fluids that the present invention relates to is controlled technique, comprises the following steps:
(a) at first mud enter tank body from mud import 5, after processing by vibrosieve 11, removes the task of a large amount of larger particles landwaste, and be that the work of next stage solid phase control appliance creates conditions;
(b) process later mud through vibrosieve 11, enter mud settling tank 6, further remove the degranulation landwaste by desander 2;
(c) then, mud enters tank 7 No. two, removes a part of non-compliant mud by desilter 3, then enters tank 8 No. three;
(d) in No. three tanks 8, mud enters suction tank 9 standby after further being processed by centrifugal separator.
Above-mentioned technique device therefor mainly by tank body, and is arranged on desander 2 on tank body, desilter 3 and centrifugal separator 4 and consists of as shown in Figure 1, runs through being provided with mud import 5 on described tank body.
Described tank body mainly is made of mud settling tank 6, No. two tanks 7, No. three tanks 8 and suction tank 9.
Described desander 2 is connected with mud settling tank 6 and No. two tanks 7 respectively.
Described desilter 3 is connected with No. two tanks 7 and No. three tanks 8 respectively.
Described centrifugal separator 4 is connected with No. three tanks 8 and suction tank 9 respectively.
The inside of described tank body also is provided with deaerator 10, and the two ends of deaerator 10 are separately positioned in mud settling tank 6 and No. two tanks 7.
The above is only preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations that above embodiment is done are within all falling into protection scope of the present invention.

Claims (1)

1. Solids control for drilling fluids is controlled technique, it is characterized in that, comprises the following steps:
(a) at first mud enter tank body from mud import (5), after processing by vibrosieve (11), removes the task of a large amount of larger particles landwaste, and be that the work of next stage solid phase control appliance creates conditions;
(b) process later mud through vibrosieve (11), enter mud settling tank (6), further remove the degranulation landwaste by desander (2);
(c) then, mud enters No. two tanks (7), removes a part of non-compliant mud by desilter (3), then enters No. three tanks (8);
(d) in No. three tanks (8), mud enters suction tank (9) standby after further being processed by centrifugal separator.
CN 201110370182 2011-11-10 2011-11-10 Drilling-fluid solid-control control process Pending CN103104203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110370182 CN103104203A (en) 2011-11-10 2011-11-10 Drilling-fluid solid-control control process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110370182 CN103104203A (en) 2011-11-10 2011-11-10 Drilling-fluid solid-control control process

Publications (1)

Publication Number Publication Date
CN103104203A true CN103104203A (en) 2013-05-15

Family

ID=48312369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110370182 Pending CN103104203A (en) 2011-11-10 2011-11-10 Drilling-fluid solid-control control process

Country Status (1)

Country Link
CN (1) CN103104203A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527123A (en) * 2013-10-22 2014-01-22 任丘市华北石油天华环保节能有限公司 Abandoned well drilling matter disposal system with abandoned well drilling matter not falling on ground during drilling
CN104420844A (en) * 2013-08-21 2015-03-18 德惠同利(北京)石油技术服务有限公司 Circulating drilling fluid non-landing solid-liquid separation method
CN106150412A (en) * 2016-08-31 2016-11-23 中国石油集团川庆钻探工程有限公司长庆钻井总公司 A kind of sieve two grades of solidifying and controlling devices of one machine formula
CN104265214B (en) * 2014-08-04 2017-02-22 田立杰 Landing-free automatic recovering and processing device for drill cuttings and waste liquid
CN109779546A (en) * 2019-03-19 2019-05-21 核工业二0三研究所 Uranium ore green reconnoitres drilling fluid following drill processing equipment and method
CN111734330A (en) * 2020-06-29 2020-10-02 内江瑞丰环保科技有限公司 Water-based drilling debris treatment system
US10800690B2 (en) 2016-09-26 2020-10-13 Wilmac, Inc. Portable liquid recovery system with optional preliminary processor and feed

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104420844A (en) * 2013-08-21 2015-03-18 德惠同利(北京)石油技术服务有限公司 Circulating drilling fluid non-landing solid-liquid separation method
CN103527123A (en) * 2013-10-22 2014-01-22 任丘市华北石油天华环保节能有限公司 Abandoned well drilling matter disposal system with abandoned well drilling matter not falling on ground during drilling
CN104265214B (en) * 2014-08-04 2017-02-22 田立杰 Landing-free automatic recovering and processing device for drill cuttings and waste liquid
CN106150412A (en) * 2016-08-31 2016-11-23 中国石油集团川庆钻探工程有限公司长庆钻井总公司 A kind of sieve two grades of solidifying and controlling devices of one machine formula
US10800690B2 (en) 2016-09-26 2020-10-13 Wilmac, Inc. Portable liquid recovery system with optional preliminary processor and feed
CN109779546A (en) * 2019-03-19 2019-05-21 核工业二0三研究所 Uranium ore green reconnoitres drilling fluid following drill processing equipment and method
CN111734330A (en) * 2020-06-29 2020-10-02 内江瑞丰环保科技有限公司 Water-based drilling debris treatment system

Similar Documents

Publication Publication Date Title
CN103104203A (en) Drilling-fluid solid-control control process
RU2416711C2 (en) Circulation method and system of fluid medium in system of wells
CN103527092B (en) Suction bits expanding method is penetrated in horizontal orientation boring
US9995126B1 (en) Low-frequency pulsing sonic and hydraulic mining system
US10557323B2 (en) Drilling fluid filter screen and method of use
WO1991017339A1 (en) Method and apparatus for drilling and coring
NO334766B1 (en) Method for drilling wellbores
CN103089176A (en) Drilling liquid fixing and control system
CN206785336U (en) Rig with roller cutter bit
CN115093839A (en) Coal mine drilling system and method and drilling fluid
CN103089177A (en) Drilling liquid fixing and control system and control technology thereof
CN104453716B (en) Compound Two-way Cycle underbalance sleeve pipe is with brill drilling technology
Boonstra et al. Well design and construction
CN101545358B (en) Erosion reducing system for gas drilling
RU2225938C1 (en) Methods for exploiting oil extracting wells
CN103105217A (en) Rock debris measuring sensor and measuring method thereof
CN103104245A (en) Sensor used for measuring mud density and mass flow rate
CN103104248A (en) Method for measuring mud density and mass flow rate
CN205063899U (en) Oil -water well is water conservancy whirl washing unit in pit
CN104499970A (en) Technological method for drilling fluid solid control circulation system
CN103105343A (en) Sensor for measuring density and mass flow of mud and measurement method based on sensor
CN218202628U (en) Coal mine drilling system
CN104533282B (en) Compound Two-way Cycle under balance pressure drilling technique
RU2291957C2 (en) Method for operation of product well and equipment for realization of said method
CN204266961U (en) A kind of equipment combination of Solids control for drilling fluids circulating system technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130515