Along with the fast development that Longspan Bridge is built, cable stayed bridge and suspension bridge obtain applying more and more widely, wire digging line is the critical component being applied to cable stayed bridge and suspension bridge, drag-line inside is steel wire, shaped by band colligation, then pack into high density polyethylene (HDPE) sheath, protective sleeve of pulling cable plays the antisepsis of hawser, present stage protective sleeve of pulling cable installation, before drag-line two ends are fixing, circular pipe type sheath one section a section must be enclosed within drag-line and then by breaking and be welded to Len req.This construction method, in the process of reeving, jacket inner wall is likely subject to the damage of drag-line steel wire, and also needs to planish face of weld before sheath welding, needs to leave certain space between drag-line and sheath, otherwise easily hurts drag-line steel wire in the process of plane.The method of this installation difficulty of not only planishing large and also easily displacement be difficult to centering, constructing operation is very difficult.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of mounting method of simple protective sleeve of pulling cable, the mounting method of this protective sleeve of pulling cable, can solve the problem that the fragile difficulty of protective sleeve of pulling cable is installed.
In order to solve the problem, the technical solution used in the present invention is: the mounting method of this protective sleeve of pulling cable, adopts a kind of guard component, and this guard component is one section and is respectively equipped with half body of draw pin and tongue-and-groove at two junction surfaces;
Install according to following steps:
A, installation first described guard component: first described guard component is enclosed within outside the side of drag-line;
B, second described guard component is installed: by second described guard component and first described guard component buckling sleeve outside drag-line, and allow the termination of these two described guard component stagger;
C, the 3rd described guard component is installed: by the 3rd described guard component and second described guard component buckling sleeve outside drag-line, and allow the 3rd described guard component dock with first described guard component termination;
D, one by one described guard component to be contained in outside drag-line according to the method for step C, until need the part of protection all to load onto described guard component at drag-line.
In the mounting method technical scheme of above-mentioned protective sleeve of pulling cable, technical scheme can also be more specifically: by cutting the protection needs allowing the termination of the described guard component be enclosed within outside drag-line be suitable for drag-line two ends.
Further: the lateral surface of described half body is provided with protruding spiral rib, allows the spiral rib of described semicanal outside mutually dock during installation.
Owing to have employed technique scheme, the present invention compared with prior art has following beneficial effect:
1, protective sleeve of pulling cable can be installed after drag-line installs, change in the past when reeving jacket inner wall be subject to the damage of drag-line steel wire.
2, the connection of protective sleeve of pulling cable need not be welded, and avoids the damage of drag-line steel wire.
3, install simple and convenient, improve operating efficiency.
4, the helix of protective sleeve of pulling cable external surface protrusion, can stop the formation of rain line, have the effect of weather proof exciting.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the invention will be further described:
Guard component 4 is as shown in Figures 3 to 5 one section and is respectively equipped with half body of draw pin 2 and tongue-and-groove 3 at two junction surfaces, is provided with protruding spiral rib 1 at the lateral surface of half body; Multiple guard component 4 are as shown in Figure 1 and Figure 2 installed to the method on drag-line, carry out according to following steps: A, installation first guard component: be enclosed within outside the side of drag-line by first guard component; B, installation second guard component: the tongue-and-groove 3 draw pin 2 of second guard component being inserted first guard component, mutual fastening forms pipe, drag-line is made to surround in this pipe, and allow the termination of these two guard component stagger certain distance, allow the spiral rib 1 of their lateral surfaces mutually dock; C, installation the 3rd guard component: the termination of the 3rd guard component is docked with the termination of first guard component, and its draw pin is inserted the tongue-and-groove of second guard component, mutual buckling sleeve, outside drag-line, allows the spiral rib 1 of the lateral surface of the 3rd guard component mutually dock with the spiral rib 1 of first guard component and second guard component lateral surface; D, one by one guard component 4 to be arranged on outside drag-line according to the method for step C, until need the part of protection all to load onto guard component at drag-line.Cut according to the termination of needs to the guard component 4 be enclosed within outside drag-line being suitable for the protection of drag-line two ends again.