CN103103921A - Inhaul cable protecting bush - Google Patents

Inhaul cable protecting bush Download PDF

Info

Publication number
CN103103921A
CN103103921A CN2013100486392A CN201310048639A CN103103921A CN 103103921 A CN103103921 A CN 103103921A CN 2013100486392 A CN2013100486392 A CN 2013100486392A CN 201310048639 A CN201310048639 A CN 201310048639A CN 103103921 A CN103103921 A CN 103103921A
Authority
CN
China
Prior art keywords
protective sleeve
pulling cable
inhaul cable
tube
protecting bush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100486392A
Other languages
Chinese (zh)
Inventor
朱其财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU GUANQIAO PRESTRESSED MACHINERY CO Ltd
Original Assignee
LIUZHOU GUANQIAO PRESTRESSED MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU GUANQIAO PRESTRESSED MACHINERY CO Ltd filed Critical LIUZHOU GUANQIAO PRESTRESSED MACHINERY CO Ltd
Priority to CN2013100486392A priority Critical patent/CN103103921A/en
Publication of CN103103921A publication Critical patent/CN103103921A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an inhaul cable protecting bush and relates to the technical field of architectural engineering. Each half-tube body is provided with a draw-bore pin and a mortise, wherein the draw-bore pin and the mortise are arranged on two connection parts. Protruded spiral rib bars are arranged on the outer side faces of the half-tube bodies. According to the two half-tube bodies, under the status that the draw-bore pin of one half-tube body is inserted into the mortise of the other half-tube body to form a round tube, the spiral rib bars on the exteriors of the two half-tube bodies are in mutual butt joint. According to the inhaul cable protecting bush, the problem of wind-and-rain shock excitation of an ordinary high-density polyethylene protecting bush can be solved.

Description

Protective sleeve of pulling cable
Technical field
The present invention relates to construction engineering technical field, especially a kind of protective jacket of building guy cable.
Background technology
Building guy cable is the critical component that is applied on construction work, especially bridge structure, drag-line inside is steel wire, finalized the design by the band colligation, pack into again the high density polyethylene (HDPE) sheath, protective sleeve of pulling cable plays the antisepsis of hawser, the cross section profile of drag-line is circular, and the pe sheath surface is comparatively smooth.This ganoid pe sheath easily causes rain wind induced vibration under the service condition with wind and rain, i.e. significantly vibration, and in order to solve this rain wind induced vibration, it is in the pe sheath surface soldered, spiral convex rib to be arranged that a kind of technical scheme is arranged.But, this external surface is very inconvenient with installing and using of the protective sleeve of pulling cable of spiral convex rib, generally, for the convenience of producing and transporting, this protective sleeve of pulling cable is made the specification of 6-8 rice length mostly, and a lot of bridge cables often reach km, even longer, so long bridge cable need to be sleeved on a large amount of protective sleeve of pulling cable on long bridge cable when above-mentioned protective sleeve of pulling cable is installed one by one, also need each root protective sleeve of pulling cable is welded together in the junction, engineering quantity is quite large, and the operation difficult even can't be constructed under many circumstances.In order to solve many protective sleeve of pulling cable by the inconvenience of root suit and welding, people have invented a kind of protective sleeve of pulling cable, and the mutual fastening by the junction surface surrounds a tubular shape to this protective sleeve of pulling cable by two-part semicanal.One in two junction surfaces of this semicanal is draw pin, and another is tongue-and-groove.But the protective sleeve of pulling cable lateral surface that this semicanal fastens remains smooth, does not have the effect that prevents rain wind induced vibration.
Summary of the invention
Technical problem to be solved by this invention is to provide the protective sleeve of pulling cable of the anti-exciting of a kind of efficient corrosion resisting, and this protective sleeve of pulling cable can solve the problem of general high density polyethylene (HDPE) sheath rain wind induced vibration.
In order to address the above problem, the technical solution used in the present invention is: this protective sleeve of pulling cable, have half body that is provided with respectively draw pin and tongue-and-groove at two junction surfaces, and be provided with the spiral rib of projection at the lateral surface of described half body.
In above-mentioned protective sleeve of pulling cable technical scheme, technical scheme can also be more specifically: the draw pin of described two and half bodys by their sides inserts in the opposing party's tongue-and-groove and consists of under the state of pipe, and the external spiral rib of these two semicanals docks mutually.
Owing to having adopted technique scheme, the present invention compared with prior art has following beneficial effect:
The helix of the protrusion of protective sleeve of pulling cable external surface can stop the formation of rain line, has the effect of weather proof exciting.
The installation of sheath is simple and convenient, and jacket inner wall can not be subject to the damage of drag-line steel wire.
Description of drawings
Fig. 1 is the structural representation of protective sleeve of pulling cable.
Fig. 2 is Fig. 1 top view.
Fig. 3 is the structural representation of half body.
Fig. 4 is the top view of Fig. 3.
Fig. 5 is the I place enlarged drawing of Fig. 2.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing embodiment:
Include half body that is provided with respectively draw pin 2 and tongue-and-groove 3 at two junction surfaces as Fig. 1 to protective sleeve of pulling cable shown in Figure 5, be provided with the spiral rib 1 of projection at the lateral surface of half body.During installation, with two and half bodys with between drag-line parcel and they, their sides' draw pin 2 is inserted the opposing party's the interior formation pipe of tongue-and-groove 3, drag-line is surrounded in this pipe, consist of under the state of pipe, the external spiral rib 1 of these two semicanals mutually docks and forms continuous helix, until the part that need to protect at drag-line all fills upper body half.This protective sleeve of pulling cable, stop the formation of rain line, effectively prevent the rain wind induced vibration of drag-line and install simple and conveniently, can carry out sheath and install after drag-line installs, do not hinder the inwall of protective sleeve of pulling cable, change circular pipe type sheath in the past and be installed to unfavorable situation on drag-line before must be fixing at drag-line two ends.The present invention both can be used for the installation construction of new bridge, can be used for again maintenance and the replacing of old bridge protective sleeve of pulling cable.Effect with weather proof exciting has greatly improved the antiseptic property of drag-line.

Claims (2)

1. a protective sleeve of pulling cable, have half body that is provided with respectively draw pin (2) and tongue-and-groove (3) at two junction surfaces, it is characterized in that: the spiral rib (1) that is provided with projection at the lateral surface of described half body.
2. protective sleeve of pulling cable according to claim 1, it is characterized in that: the draw pin (2) of described two and half bodys by their sides inserts in the opposing party's tongue-and-groove (3) and consists of under the state of pipe, spiral rib (1) docking mutually that these two semicanals are external.
CN2013100486392A 2013-02-07 2013-02-07 Inhaul cable protecting bush Pending CN103103921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100486392A CN103103921A (en) 2013-02-07 2013-02-07 Inhaul cable protecting bush

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100486392A CN103103921A (en) 2013-02-07 2013-02-07 Inhaul cable protecting bush

Publications (1)

Publication Number Publication Date
CN103103921A true CN103103921A (en) 2013-05-15

Family

ID=48312095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100486392A Pending CN103103921A (en) 2013-02-07 2013-02-07 Inhaul cable protecting bush

Country Status (1)

Country Link
CN (1) CN103103921A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652274A (en) * 2014-06-20 2015-05-27 柳州市冠桥预应力机械有限公司 Protecting sleeve for inhaul cable
CN104652272A (en) * 2014-06-20 2015-05-27 柳州市冠桥预应力机械有限公司 Connecting method of protecting sleeve for inhaul cable
CN104695326A (en) * 2015-03-03 2015-06-10 江苏法尔胜缆索有限公司 Sheath for bridge cable

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0571104A (en) * 1991-04-10 1993-03-23 Nippon Mentetsuku Kk Overcoat protective tube of laid cable
DE19906374A1 (en) * 1999-02-16 2000-09-14 Polyethylen Specialisten Sr Gm Corrosion protection tube for wrapping tensioning cables on bridges or similar structures has a plastic welding wire welded to the outer and/or inner surfaces of a tubular sleeve
CN2555278Y (en) * 2002-07-08 2003-06-11 中铁大桥局集团第一工程有限公司郑州缆索厂 Windproof and rainproof and shockproof standing rope
CN200940255Y (en) * 2006-08-14 2007-08-29 朱祥发 Protecting sleeve for steel cable
CN201228344Y (en) * 2008-06-27 2009-04-29 柳州市桥厦工程管材有限公司 Light cable plastic sheath tube
CN201447664U (en) * 2009-07-03 2010-05-05 江苏法尔胜新日制铁缆索有限公司 Novel compound wind/rain excitation resisting stayed cable
US20100314811A1 (en) * 2007-11-12 2010-12-16 Soletanche Freyssinet Method For Improving The Stability Against Vibrations Of A Stay Cable
CN203096613U (en) * 2013-02-07 2013-07-31 柳州市冠桥预应力机械有限公司 Inhaul cable protective sleeve

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0571104A (en) * 1991-04-10 1993-03-23 Nippon Mentetsuku Kk Overcoat protective tube of laid cable
DE19906374A1 (en) * 1999-02-16 2000-09-14 Polyethylen Specialisten Sr Gm Corrosion protection tube for wrapping tensioning cables on bridges or similar structures has a plastic welding wire welded to the outer and/or inner surfaces of a tubular sleeve
CN2555278Y (en) * 2002-07-08 2003-06-11 中铁大桥局集团第一工程有限公司郑州缆索厂 Windproof and rainproof and shockproof standing rope
CN200940255Y (en) * 2006-08-14 2007-08-29 朱祥发 Protecting sleeve for steel cable
US20100314811A1 (en) * 2007-11-12 2010-12-16 Soletanche Freyssinet Method For Improving The Stability Against Vibrations Of A Stay Cable
CN201228344Y (en) * 2008-06-27 2009-04-29 柳州市桥厦工程管材有限公司 Light cable plastic sheath tube
CN201447664U (en) * 2009-07-03 2010-05-05 江苏法尔胜新日制铁缆索有限公司 Novel compound wind/rain excitation resisting stayed cable
CN203096613U (en) * 2013-02-07 2013-07-31 柳州市冠桥预应力机械有限公司 Inhaul cable protective sleeve

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652274A (en) * 2014-06-20 2015-05-27 柳州市冠桥预应力机械有限公司 Protecting sleeve for inhaul cable
CN104652272A (en) * 2014-06-20 2015-05-27 柳州市冠桥预应力机械有限公司 Connecting method of protecting sleeve for inhaul cable
CN104695326A (en) * 2015-03-03 2015-06-10 江苏法尔胜缆索有限公司 Sheath for bridge cable
CN104695326B (en) * 2015-03-03 2016-09-28 江苏法尔胜缆索有限公司 Bridge cable sheath

Similar Documents

Publication Publication Date Title
CN103103926B (en) Connection method of inhaul cable protecting bush
US7748755B2 (en) Couplings for water fed poles
CN203096613U (en) Inhaul cable protective sleeve
CN103103921A (en) Inhaul cable protecting bush
CN103103927B (en) Installation method of inhaul cable protecting bush
CN202678908U (en) High-toughness power cable protection tube
CN103292063B (en) HDPE (high-density polyethylene) inside-outside-reinforced winding reinforced pipe
CN208835712U (en) A kind of buried electric power protecting pipe
CN105888351A (en) Butt-joint concrete pole
RU187923U9 (en) PIPE FOR LAYING CABLE LINE WITH PROTECTION OF CABLE SHELL AGAINST MECHANICAL DAMAGE AT END PARTS
CN209860476U (en) Supporting tube for crossing construction of power transmission line
CN201504082U (en) Buried ointment sleeve pipe
CN210318864U (en) High strength carat pipe
CN208589764U (en) A kind of bracing means avoiding tieing damage among cable
CN202125678U (en) High-Density Polyethylene (HDPE) reinforced traction pipe
CN204983677U (en) Steel bar connecting structure
CN201764159U (en) Fast-assembled pipe fitting
CN218489248U (en) Novel high-strength carbon corrugated pipe
CN203551865U (en) Connecting tube for stainless steel bellows and seven-hole plum blossom-shaped tube in communication micropipeline
CN204068116U (en) A kind of communication solid wall pipe
CN220036723U (en) Socket-type multilayer composite escape pipeline
JP6564623B2 (en) Reinforcing method and structure of reinforced concrete structure
CN216238127U (en) A bridge sleeve pipe for lock cable for municipal bridge engineering
CN203258216U (en) HDPE (High Density Polyethylene) adapting-form internal/external diameter-increased winding reinforcing pipe
CN202586240U (en) MPP (modified polypropylene) cable sheath tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zheng Youning

Inventor before: Zhu Qicai

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHU QICAI TO: ZHENG YOUNING

SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130515