CN103093314A - Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine - Google Patents

Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine Download PDF

Info

Publication number
CN103093314A
CN103093314A CN2013100175001A CN201310017500A CN103093314A CN 103093314 A CN103093314 A CN 103093314A CN 2013100175001 A CN2013100175001 A CN 2013100175001A CN 201310017500 A CN201310017500 A CN 201310017500A CN 103093314 A CN103093314 A CN 103093314A
Authority
CN
China
Prior art keywords
emergency
action task
task scheduling
plan
concrete action
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100175001A
Other languages
Chinese (zh)
Inventor
朱侃
王建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Hua Jun Technology Co Ltd
Original Assignee
Zhengzhou Hua Jun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Hua Jun Technology Co Ltd filed Critical Zhengzhou Hua Jun Technology Co Ltd
Priority to CN2013100175001A priority Critical patent/CN103093314A/en
Publication of CN103093314A publication Critical patent/CN103093314A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a four-layer emergency plan digitization generation method based on a rule engine and a four-layer emergency plan digitization emergency system based on the rule engine. The four-layer emergency plan digitization generation method based on the rule engine and the four-layer emergency plan digitization emergency system based on the rule engine are used for solving the problems that an existing emergency plan generation method is in a single serial structure, is incapable of achieving emergency linkage or resource association when an emergency occurs, and is low in working efficiency. The four-layer emergency plan digitization generation method based on the rule engine and the four-layer contingency plan digitization emergency system based on the rule engine comprise building a database of a general planning aiming at all emergencies, inquiring an emergency action strategy adopted in a corresponding plan of the database of the general planning when the emergency is monitored, laying down a specific action task plan according to the emergency action strategy, and adopting a corresponding emergency method according to the specific action task plan so as to accomplish an action task contained in the specific action task plan. The four-layer emergency plan digitization generation method based on the rule engine is a multilevel digital emergency plan generation method combining series and parallel, is capable of achieving association of resources and linkage of emergency, improves working efficiency, and is capable of avoiding occurrence of disasters and protecting safety of lives and property.

Description

Four layers of emergency preplan digitizing generation method of rule-based engine and emergency system
Technical field
The present invention relates to the emergency preplan digitizing and generate the method and system technical field, refer to especially a kind of four layers of emergency preplan digitizing generation method and emergency system of rule-based engine.
Background technology
In prior art, there are the following problems for emergency preplan digitizing generation method:
1, general " serial " structure that just emergency preplan is decomposed into the single task role level.But in the emergency cooperative of accident occurring, needing to walk abreast just can satisfy the demands with multi-level structure.
2, lack effective means aspect the prediction scheme digitized processing, cause prediction scheme digitizing flow process unclear, can't be related with resource, it is little that the user independently customizes " power ".
3, lack effectively integrated to the means of information and issue.
As seen, existing emergency preplan generation method is single serial structure, in the face of accident can't realize that emergency cooperative is related with resource, can not farthest meet customer need, and inefficiency.
Summary of the invention
The invention provides a kind of digitized generation method and system of four layers of emergency preplan of rule-based engine, be single serial structure in order to existing emergency preplan generation method, in the face of accident can't realize that emergency cooperative is related with resource, can not farthest meet customer need, ineffective problem.
For solving the problems of the technologies described above, the technical scheme of the embodiment of the present invention is achieved in that
Four layers of emergency preplan digitizing generation method of rule-based engine comprise:
Set up the database of overall plan for all accidents;
When monitoring accident, in the database of inquiry overall plan, corresponding scheme is taked the contingency operation strategy;
For contingency operation policy development concrete action task scheduling;
The action task of taking corresponding emergency method to complete to comprise in the concrete action task scheduling according to the concrete action task scheduling.
Wherein, preferably, set up the database of overall plan for all accidents, comprising:
Classify and other scheme foundation of classification for all accidents;
For different classes of and accident different stage, the scheme that emergency mechanism, post and personnel are configured is set up;
Emergence treatment scheme for the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism is set up;
Give, drill, assess and check the emergent scheme foundation that exercises supervision training for emergency mechanism;
Scheme for manpower, financial resources material, health and the communication support of emergency mechanism is set up.
Wherein, preferably, when monitoring accident, in inquiry overall plan, corresponding scheme takes the contingency operation strategy to be specially:
In inquiry overall plan for whole life cycle manage at ordinary times, the different phase of early warning disposal, emergency response and emergency recovery, different classes of, varying environment and the corresponding contingency operation strategy of different emergency mechanism;
For the contingency operation strategy procedure of meeting an urgent need.
Wherein, preferably, comprise for contingency operation policy development concrete action task scheduling: automatically perform task scheduling, general task scheduling, calling task plan and select task scheduling.
Wherein, preferably, the action task of taking corresponding emergency method to complete to comprise in the concrete action task scheduling according to the concrete action task scheduling specifically comprises:
Automatically carry out according to the concrete action task scheduling action task that the concrete action task scheduling comprises;
Wait for that according to the concrete action task scheduling staff confirms to provide indication and carries out afterwards, again the action task that the concrete action task scheduling comprises;
According to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that the concrete action task scheduling comprises;
According to the concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
Four layers of emergency preplan digitizing emergency system of rule-based engine comprise:
Memory module is set up overall plan for pre-stored for all accidents;
Enquiry module is used for receiving the emergency signals that monitoring system sends, and the emergency preplan that inquiry and emergency signals are complementary from memory module is also taked corresponding contingency operation strategy, is connected with memory module;
Parsing module is used for for contingency operation policy development concrete action task scheduling, is connected with enquiry module;
Execution module, the action task according to the concrete action task scheduling is taked corresponding emergency method to complete to comprise in the concrete action task scheduling is connected with parsing module.
Wherein, preferably, memory module comprises:
Classification and minute rank scheme sub module stored are for classification and other scheme of classification of all accidents of storage;
The allocation plan sub module stored is used for storing scheme different classes of and the corresponding emergency mechanism of accident different stage, post and personnel's configuration;
The emergence treatment scheme sub module stored is used for storage for the emergence treatment scheme of the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism;
Supervision scheme sub module stored is used for storage to the scheme of the supervision of training, rehearsal, assessment and the inspection of emergency mechanism;
Ensure sub module stored, be used for the scheme of manpower, financial resources material, health and the communication support of storage emergency mechanism.
Wherein, preferably, execution module comprises:
Automatically perform the task submodule, be used for automatically carrying out according to the concrete action task scheduling action task that the concrete action task scheduling comprises;
General tasks carrying submodule, be used for according to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out the action task that the concrete action task scheduling comprises again;
The calling task implementation sub-module, be used for according to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that the concrete action task scheduling comprises;
Select the tasks carrying submodule, according to the concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
Wherein, preferably, also comprise:
Logging modle is used for when execution module is completed the execution of action task after, records loss that accident brings for future analysis and evaluation being carried out in accident.
By the invention provides four layers of emergency preplan digitizing generation method of rule-based engine, make overall plan, countermeasure, action scheme, concrete action to emergency event consist of an organic whole.The emergency preplan of complexity is carried out prediction scheme according to the method for certain applicability oversimplify and digitizing, make it have operability, ease for use and science.With emergency preplan generation method in prior art be single serial structure, in the face of accident can't realize that emergency cooperative is related with resource, can not meet customer need, inefficiency is compared, four layers of emergency preplan digitizing generation method that the embodiment of the present invention provides can realize the association of resource, emergent interlock for the emergency preplan generation method of multi-level " string, also " row combination, can meet customer need, and improve work efficiency.
Description of drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or description of the Prior Art, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the process flow diagram of four layers of emergency preplan digitizing generation method of rule-based engine in the embodiment of the present invention;
Fig. 2 is the structural representation of four layers of emergency preplan digitizing emergency system of rule-based engine in the embodiment of the present invention;
Fig. 3 is the schematic flow sheet of mission Interpreter work in four layers of emergency preplan digitizing emergency system of rule-based engine in the embodiment of the present invention;
The schematic flow sheet of tasks carrying device work in four of rule-based engine layers of emergency preplan digitizing emergency system in Fig. 4 embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Based on the embodiment in the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
As shown in Figure 1, the embodiment of the present invention provides four layers of emergency preplan digitizing generation method of rule-based engine, comprises the steps:
Step S1: the database of setting up overall plan for all accidents;
Step S2: when monitoring accident, in the database of inquiry overall plan, corresponding scheme is taked the contingency operation strategy;
Step S3: for contingency operation policy development concrete action task scheduling;
Step S4: the action task of taking corresponding emergency method to complete to comprise in the concrete action task scheduling according to the concrete action task scheduling.
Four layers of emergency preplan digitizing generation method of the rule-based engine that provides by the embodiment of the present invention make overall plan, countermeasure, action scheme, concrete action to emergency event consist of an organic whole.The emergency preplan of complexity is carried out prediction scheme according to the method for certain applicability oversimplify and digitizing, make it have operability, ease for use and science.With emergency preplan generation method in prior art be single serial structure, in the face of accident can't realize that emergency cooperative is related with resource, can not meet customer need, inefficiency is compared, the generation method of four layers of emergency preplan that the embodiment of the present invention provides can realize the association of resource, emergent interlock for the emergency preplan digitizing generation method of multi-level " string, also " row combination, can meet customer need, and improve work efficiency.
Wherein, preferably, step S1: set up overall plan for all accidents, comprising:
Classify and other scheme foundation of classification for all accidents;
For different classes of and accident different stage, the scheme that emergency mechanism, post and personnel are configured is set up;
Emergence treatment scheme for the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism is set up;
Give, drill, assess and check the emergent scheme foundation that exercises supervision training for emergency mechanism;
Scheme for manpower, financial resources material, health and the communication support of emergency mechanism is set up.
Wherein, preferably, step S2: when monitoring accident, in the database of inquiry overall plan, corresponding scheme takes the contingency operation strategy to be specially:
S201: in inquiry overall plan for whole life cycle manage at ordinary times, the different phase of early warning disposal, emergency response and emergency recovery, different classes of, varying environment and the corresponding contingency operation strategy of different emergency mechanism;
S202: for the contingency operation strategy procedure of meeting an urgent need.
Wherein, preferably, step S3: comprise for contingency operation policy development concrete action task scheduling: automatically perform task scheduling, general task scheduling, calling task plan and select task scheduling.
Wherein, preferably, step S4: the action task of taking corresponding emergency method to complete to comprise in the concrete action task scheduling according to the concrete action task scheduling specifically comprises:
Automatically carry out according to the concrete action task scheduling action task that the concrete action task scheduling comprises;
Wait for that according to the concrete action task scheduling staff confirms to provide indication and carries out afterwards, again the action task that the concrete action task scheduling comprises;
According to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that the concrete action task scheduling comprises;
According to the concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
As shown in Figure 2, the embodiment of the present invention provides four layers of digitized emergency system of emergency preplan of rule-based engine, comprising:
Memory module is used for the pre-stored overall plan of setting up for all accidents;
Enquiry module is used for receiving the emergency signals that monitoring system sends, and the emergency preplan that inquiry and emergency signals are complementary from memory module is also taked corresponding contingency operation strategy, is connected with memory module;
Parsing module is used for for contingency operation policy development concrete action task scheduling, is connected with enquiry module; This parsing module can be specifically a mission Interpreter, and the flow process strategy of emergency preplan is converted to the form that computing machine can be identified execution, and concrete workflow schematic diagram sees also Fig. 3.
Execution module, the action task according to the concrete action task scheduling is taked corresponding emergency method to complete to comprise in the concrete action task scheduling is connected with parsing module.This execution module can be specifically a tasks carrying device, and the discernible form of computing machine is carried out, and comprises automatically performing and carrying out by man-machine conversation, and concrete workflow schematic diagram sees also Fig. 4.
Wherein, preferably, memory module comprises:
Classification and minute rank scheme sub module stored are for classification and other scheme of classification of all accidents of storage;
The allocation plan sub module stored is used for storing scheme different classes of and the corresponding emergency mechanism of accident different stage, post and personnel's configuration;
The emergence treatment scheme sub module stored is used for storage for the emergence treatment scheme of the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism;
Supervision scheme sub module stored is used for storage to the scheme of the supervision of training, rehearsal, assessment and the inspection of emergency mechanism;
Ensure sub module stored, be used for the scheme of manpower, financial resources material, health and the communication support of storage emergency mechanism.
Wherein, preferably, execution module comprises:
Automatically perform the task submodule, be used for automatically carrying out according to the concrete action task scheduling action task that the concrete action task scheduling comprises;
General tasks carrying submodule, be used for according to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out the action task that the concrete action task scheduling comprises again;
The calling task implementation sub-module, be used for according to the concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that the concrete action task scheduling comprises;
Select the tasks carrying submodule, according to the concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
Wherein, preferably, also comprise:
Logging modle is used for when execution module is completed the execution of action task after, records loss that accident brings for future analysis and evaluation being carried out in accident.
Four layers of digitized emergency system of emergency preplan of rule-based engine provided by the invention can be applied in different industries, the below is applied to petrochemical enterprise as example take emergency system provided by the invention, and four layers of digitized emergency system of emergency preplan of rule-based engine are described:
at first, actual conditions for this enterprise, set up the database of overall plan for all contingent crisis accidents, for example: if be arranged on the particular location of the detector that is used for the detection inflammable gas of this enterprise, the situation of combustible gas leakage or emergency preplan of other situations etc. occur, this database is a set of these contingent all emergency circumstances of enterprise, then, when monitoring accident, for example: when the detector that is arranged on the inflammable gas Test Field detects inflammable gas and reaches preset alarm concentration, send alerting signal to Indoor Monitoring System on duty, this emergency system receives the alerting signal of Indoor Monitoring System on duty, this emergency system can automatically be implemented some removing the hidden trouble measures: automatically control the equipment that is connected with this system, for example automatically control the window of opening Test Field, in time get rid of inflammable gas, also can carry out manually-operated according to staff on duty and get rid of hidden danger, for example, emergency system shows, whether want the alert phone of automatic poking sparking, the staff can be according to hazard level, select whether will select to report a fire, or, emergency system has multiple choices, for example, automatically send mail or SMS notification etc. for the technical work personnel.Certainly can also comprise, the safety approach of this enterprise self, for example, gate control system, when having the internal staff to swipe the card to enter, this system is opening door lock automatically, access, if illegal invasion is arranged, when this emergency system detects, can automatically start the camera that is attached thereto, record the concrete condition at illegal invasion scene as evidence, or send alarm sound, and allow staff on duty know, in time take corresponding emergency measure.
Utilize emergency preplan that technique scheme that the embodiment of the present invention provides generates and emergency system to provide unified, comprehensive, comprehensive solution for city and enterprise safety operation and contingency management, help Government and enterprise to set up efficient Emergency System, perfect emergency mechanism, improve and ensure public safety and the ability of dealing with contingencies, prevention and the infringement that reduces Emergent Public Events and cause.
In detail, emergency preplan digitizing and the emergency system of utilizing technique scheme that the embodiment of the present invention provides to generate, with domestic and international similar technology relatively, have following advantage:
1, aspect prediction scheme digitizing, structuring, propose first and four hierarchical structures and the algorithm of the rule-based engine realized, this technology at home and abroad maintains the leading position.
2, the emergent platform of emergency system has covered the life cycle of contingency management, can form complete contingency management infosystem and a maneuvering platform.
3, this contingency management platform can inter-tradely be used, the demand of applicable different industries.
4,, advantage advanced aspect creative in the achievement that obtains:
A: the multi-level emergency preplan digitizing of rule-based engine.Prediction scheme is decomposed into " flow process, task, instruction " at many levels " string, also " row in conjunction with the emergency preplan digitizing solution, will be the key that system meets customer need.
B: this system comprises the fusion of the multisystems such as computer software and hardware, communication, business intelligence, GIS, GPS.Comprise the Message Processing with Unified message management engines such as phone, fax, mail, voice, data integration take data engine as core, switching technology, emergency command framework and policy management techniques take regulation engine as core, data statistics take Report Engine as core and analytical technology, data display take the GIS engine as core and aid decision making, issued transaction take workflow engine as core and circulation of official document treatment technology, the auxiliary decision technology of the hazard prediction take the BI engine as core, Disaster Assessment, rescue method.
C: based on the framework of SOA, merging preferably above system and technology, is the key of native system success.
The above is only preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, is equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (9)

1. four of rule-based engine layers of emergency preplan digitizing generation method, is characterized in that, comprising:
Set up the database of overall plan for all accidents;
When monitoring accident, in the database of the described overall plan of inquiry, corresponding scheme is taked the contingency operation strategy;
For described contingency operation policy development concrete action task scheduling;
Take corresponding emergency method to complete the action task that comprises in described concrete action task scheduling according to described concrete action task scheduling.
2. four layers of emergency preplan digitizing generation method as claimed in claim 1, is characterized in that, the described database of setting up overall plan for all accidents comprises:
Classify and other scheme foundation of classification for all accidents;
For different classes of and accident different stage, the scheme that emergency mechanism, post and personnel are configured is set up;
Emergence treatment scheme for the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism is set up;
Give, drill, assess and check the emergent scheme foundation that exercises supervision training for emergency mechanism;
Scheme for manpower, financial resources material, health and the communication support of emergency mechanism is set up.
3. four layers of emergency preplan digitizing generation method as claimed in claim 2, is characterized in that, and are described when monitoring accident, and in the database of the described overall plan of inquiry, corresponding scheme takes the contingency operation strategy to be specially:
Inquire about in the database of described overall plan for whole life cycle manage at ordinary times, the different phase of early warning disposal, emergency response and emergency recovery, different classes of, varying environment and the corresponding contingency operation strategy of different emergency mechanism;
For the described contingency operation strategy procedure of meeting an urgent need.
4. four layers of emergency preplan digitizing generation method as claimed in claim 3, it is characterized in that, describedly comprise for described contingency operation policy development concrete action task scheduling: automatically perform task scheduling, general task scheduling, calling task plan and select task scheduling.
5. four layers of emergency preplan digitizing generation method as claimed in claim 4, is characterized in that, describedly takes corresponding emergency method to complete the action task that comprises in described concrete action task scheduling according to described concrete action task scheduling specifically to comprise:
Automatically carry out according to described concrete action task scheduling the action task that described concrete action task scheduling comprises;
Wait for that according to described concrete action task scheduling the staff confirms to provide indication and carries out afterwards, again the action task that described concrete action task scheduling comprises;
According to described concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that described concrete action task scheduling comprises;
According to described concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
6. four of rule-based engine layers of emergency preplan digitizing emergency system, is characterized in that, comprising:
Memory module is used for the pre-stored overall plan of setting up for all accidents;
Enquiry module is used for receiving the emergency signals that monitoring system sends, and the emergency preplan that inquiry and described emergency signals are complementary from described memory module is also taked corresponding contingency operation strategy, is connected with described memory module;
Parsing module is used for for described contingency operation policy development concrete action task scheduling, is connected with described enquiry module;
Execution module takes corresponding emergency method to complete the action task that comprises in described concrete action task scheduling according to described concrete action task scheduling, is connected with described parsing module.
7. four layers of emergency preplan digitizing emergency system as claimed in claim 6, is characterized in that,
Described memory module comprises:
Classification and minute rank scheme sub module stored are for classification and other scheme of classification of all accidents of storage;
The allocation plan sub module stored is used for storing scheme different classes of and the corresponding emergency mechanism of accident different stage, post and personnel's configuration;
The emergence treatment scheme sub module stored is used for storage for the emergence treatment scheme of the whole life cycle of management, early warning disposal, emergency response and emergency recovery at ordinary times of emergency mechanism;
Supervision scheme sub module stored is used for storage to the scheme of the supervision of training, rehearsal, assessment and the inspection of emergency mechanism;
Ensure sub module stored, be used for the scheme of manpower, financial resources material, health and the communication support of storage emergency mechanism.
8. four layers of emergency preplan digitizing emergency system as claimed in claim 7, is characterized in that,
Described execution module comprises:
Automatically perform the task submodule, be used for automatically carrying out according to described concrete action task scheduling the action task that described concrete action task scheduling comprises;
General tasks carrying submodule, be used for according to described concrete action task scheduling wait for the staff confirm to provide indication after, carry out the action task that described concrete action task scheduling comprises again;
The calling task implementation sub-module, be used for according to described concrete action task scheduling wait for the staff confirm to provide indication after, carry out again the action task of next process cycle that described concrete action task scheduling comprises;
Select the tasks carrying submodule, according to described concrete action task scheduling wait for the staff select to confirm to provide indication after, the action task that comprises of selected concrete action task of execution work personnel plan again.
9. four layers of digitized emergency system of emergency preplan as claimed in claim 7, is characterized in that, also comprises:
Logging modle is used for when described execution module is completed the execution of action task after, records loss that accident brings for future analysis and evaluation being carried out in accident.
CN2013100175001A 2013-01-17 2013-01-17 Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine Pending CN103093314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100175001A CN103093314A (en) 2013-01-17 2013-01-17 Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100175001A CN103093314A (en) 2013-01-17 2013-01-17 Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine

Publications (1)

Publication Number Publication Date
CN103093314A true CN103093314A (en) 2013-05-08

Family

ID=48205854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100175001A Pending CN103093314A (en) 2013-01-17 2013-01-17 Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine

Country Status (1)

Country Link
CN (1) CN103093314A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103700054A (en) * 2013-12-10 2014-04-02 中国地质大学武汉 Sudden-onset geological disaster emergency plan digitization system
CN105631794A (en) * 2015-12-24 2016-06-01 北京和利时系统工程有限公司 Method and system for realizing emergency command
CN106202903A (en) * 2016-07-04 2016-12-07 广州瑞康本圣生物科技有限公司 Internet of Things wisdom hospital event Flow driving engine method
CN108921756A (en) * 2018-07-04 2018-11-30 浙江元亨通信技术股份有限公司 A kind of joint emergency response system, method and computer readable storage medium
CN109636141A (en) * 2018-11-27 2019-04-16 深圳市城市公共安全技术研究院有限公司 Dangerous chemical emergency disposal guiding method and system
CN110009541A (en) * 2019-03-21 2019-07-12 北京博图纵横科技有限责任公司 Processing method, device, computer equipment and the storage medium of occurred events of public safety
CN113554256A (en) * 2020-04-24 2021-10-26 深圳市中兴系统集成技术有限公司 Intelligent emergency command integration platform and method in rail transit

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706897A (en) * 2009-11-24 2010-05-12 蒋伶丽 Emergency response management device and emergency command system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706897A (en) * 2009-11-24 2010-05-12 蒋伶丽 Emergency response management device and emergency command system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103700054A (en) * 2013-12-10 2014-04-02 中国地质大学武汉 Sudden-onset geological disaster emergency plan digitization system
CN103700054B (en) * 2013-12-10 2017-08-25 中国地质大学武汉 A kind of Sudden Geological Hazards emergency preplan digitization system
CN105631794A (en) * 2015-12-24 2016-06-01 北京和利时系统工程有限公司 Method and system for realizing emergency command
CN106202903A (en) * 2016-07-04 2016-12-07 广州瑞康本圣生物科技有限公司 Internet of Things wisdom hospital event Flow driving engine method
CN108921756A (en) * 2018-07-04 2018-11-30 浙江元亨通信技术股份有限公司 A kind of joint emergency response system, method and computer readable storage medium
CN109636141A (en) * 2018-11-27 2019-04-16 深圳市城市公共安全技术研究院有限公司 Dangerous chemical emergency disposal guiding method and system
CN110009541A (en) * 2019-03-21 2019-07-12 北京博图纵横科技有限责任公司 Processing method, device, computer equipment and the storage medium of occurred events of public safety
CN113554256A (en) * 2020-04-24 2021-10-26 深圳市中兴系统集成技术有限公司 Intelligent emergency command integration platform and method in rail transit

Similar Documents

Publication Publication Date Title
CN103093314A (en) Four-layer emergency plan digitization generation method based on rule engine and four-layer emergency plan digitization emergency system based on rule engine
Labaka et al. Resilience framework for critical infrastructures: An empirical study in a nuclear plant
CN109636131A (en) A kind of emergency communication intelligent emergent DSS
CN103558827B (en) Mine emergency communication for command and management information system
CN101582192A (en) Establishing method of water body environment early warning system
CN104599049A (en) Method and device for gridding managing polices
Zimmerman et al. Analyzing cascading effects within infrastructure sectors for consequence reduction
CN109672663A (en) A kind of the closed loop network security monitoring and managing method and system of security threat event
KR102201772B1 (en) Method and device for providing situation propagation platform to strengthen disaster response capabilities
Parry-Jones et al. Crisis management for biobanks
CN106297105A (en) A kind of emergency command system
CN107392416A (en) Environmental emergency scheme automatic creation system based on big data analysis
Waterson et al. Methodological considerations in using AcciMaps and the Risk Management Framework to analyse large-scale systemic failures
Cinque et al. SECTOR: secure Common Information Space for the interoperability of first responders
Tekinerdogan et al. Feature-Driven Survey of Physical Protection Systems
Masuda Development of a building continuity support system as building management system for business continuity—Fundamental research on implementation of resilient buildings
Song Risk factors analysis of criminals escape from prison based on interpretative structural modelling
Pallagi et al. Increasing the Resilience of Critical Infrastructures with Defense Zone System
CN115985061B (en) Security event analysis and disposition platform based on intelligent city
CN201937713U (en) Warning information processing device
Brinkman et al. Regulation of physical security for the electric distribution system
CN102572150A (en) Alarm information processing method and device
Valdevies A Single platform approach for the management of emergency in complex environments such as large events, digital cities, and networked regions
Valouma et al. Solutions for Protecting the Space Ground Segments: From Risk Assessment to Emergency
Musa Bezpečnostní aplikace v kontextu vybraného odvětví kritické infrastruktury v Nigérii

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130508