CN103091229B CN201310038456.2A CN201310038456A CN103091229B CN 103091229 B CN103091229 B CN 103091229B CN 201310038456 A CN201310038456 A CN 201310038456A CN 103091229 B CN103091229 B CN 103091229B
Authority
CN
China
Prior art keywords
embolism
air pressure
boring
measured
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310038456.2A
Other languages
English (en)
Other versions
CN103091229A (zh
Inventor
陈亮
王保田
黄德文
詹泸成
赵敬川
罗志琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201310038456.2A priority Critical patent/CN103091229B/zh
Publication of CN103091229A publication Critical patent/CN103091229A/zh
Application granted granted Critical
Publication of CN103091229B publication Critical patent/CN103091229B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供的一种变水头分段渗透系数测量设备,包括降水头微水试验装置、双栓塞封堵装置和探头;所述微水试验装置包括通过导水管连接的量筒和漏水花管;所述双栓塞封堵装置包括通过导气管自上而下依次连接的高压气筒、单向阀、压力计、第一栓塞和第二栓塞,所述单向阀和压力计之间还设有气阀;所述第一栓塞、漏水花管和第二栓塞自上而下依次设于探头内。本发明还提供了一种利用上述设备测量分段渗透系数的方法。该测量设备结构简单、成本低廉、使用方便,通过高压气筒压入空气使第一栓塞和第二栓塞膨胀并封堵隔离一段钻孔,利用微水试验装置即可测量封堵段钻孔附近含水层的渗透系数,测量结果准确。

Description

一种变水头分段渗透系数测量设备及测量方法
技术领域
本发明属于岩土工程参数探测领域,特别涉及一种变水头分段渗透系数测量设备,还涉及利用该设备测量渗透系数的方法。
背景技术
利用钻孔测量含水层的渗透系数一般采用注水法或抽水法,这两种方法测量的都是钻孔揭露的地层的平均渗透性。然而,由于地质条件的复杂性,不同深度的地层的渗透系数并不相同,有的甚至相差好几个数量级;因此,这两种方法不能反映渗透的不均匀性。
目前对钻孔的分段渗透系数测量通常采用压水法,例如《水利水电工程钻孔压水试验规程SL25-92》。压水法对钻孔及栓塞的要求比较严格,如采用金刚石钻进、岩石坚硬、孔壁完整、连续钻进深度不超过40m等。然而,由于钻孔的施工工艺不同,地质情况复杂多变,导致很多钻孔难以满足上述要求。同时,由于压水法中的水压较大,一般分为三级压力值(0.3MPa、0.6MPa、1.0MPa),因此对栓塞的密封性能要求很高,例如上述规程中要求栓塞的长度达到7.5倍钻孔孔径,即对于钻孔孔径为1dm的钻孔需要的封堵栓塞的长度达到了7.5dm;然而,即使这样也很难达到较好的封堵效果。此外,压水法测量时间较长,成本较高,对于急于得到岩土体渗透系数的工程不太实用。
发明内容
发明目的:本发明的第一目的是提供一种测定时间短、结果准确的变水头分段渗透系数测量设备,还涉及利用该设备测量渗透系数的方法。
技术方案:本发明提供的一种变水头分段渗透系数测量设备,包括降水头微水试验装置、双栓塞封堵装置和探头;所述微水试验装置包括通过导水管连接的量筒和漏水花管;所述双栓塞封堵装置包括通过导气管自上而下依次连接的高压气筒、单向阀、压力计、第一栓塞和第二栓塞,所述单向阀和压力计之间还设有气阀;所述第一栓塞、漏水花管和第二栓塞自上而下依次设于探头内。
作为本发明变水头分段渗透系数测量设备的一种改进,还包括三脚架,所述三脚架设于量筒底部。
作为本发明变水头分段渗透系数测量设备的一种优选,所述第一栓塞和第二栓塞均为弹性材料制成,由于第一栓塞和第二栓塞膨胀性能、密封性能良好的弹性材料制成,从而保证了良好的封堵密封性;进一步优选地,所述弹性材料为橡胶等材料,如轮胎内胆等。
作为本发明变水头分段渗透系数测量设备的另一种优选,所述第一栓塞的长度为15-20cm,所述第二栓塞的长度为15-20cm。
本发明还提供了一种变水头分段渗透系数测量方法,包括以下步骤:
(1)确定待测钻孔的封堵气压和极限气压:无水压的条件下,测定待测钻孔所需的封堵气压和极限气压,所述封堵气压为确保钻孔中待测段不漏水的最小气压,所述极限气压为确保栓塞安全的最大气压;
(2)将变水头分段渗透系数测量设备的探头置于待测钻孔的指定深度,测量待测钻孔水位,根据探头深度和待测钻孔水位计算附加封堵气压,所述附加封堵气压即抵抗水压力所需的气压;
(3)将第一栓塞和第二栓塞加压至封堵气压,钻孔中待测段即被封堵;
(4)向量筒内注水,并记录量筒内水位随时间的变化关系,即得钻孔中待测段地层的渗透系数;
(5)测试结束后,打开气阀,释放第一栓塞和第二栓塞内的气压;此外,改变探头深度即可进行下一次测试。
有益效果:本发明提供的变水头分段渗透系数测量设备结构简单、成本低廉、使用方便,通过高压气筒压入空气使第一栓塞和第二栓塞膨胀并封堵隔离一段钻孔,利用微水试验装置即可测量封堵段钻孔附近含水层的渗透系数,测量结果准确。
本发明提供的变水头分段渗透系数测量设备,相对于压水实验装置省去了高压注水的装置,由于采用降水头微水试验来测量渗透系数,不需要较高的水压,因此封堵栓塞较短,并能达到较好的密封效果,结构简单、成本低廉,而且操作方便。
本发明提供的变水头分段渗透系数测量方法利用量筒内水头随时间变化关系,绘制出来ln(Ht/H0)~t变化曲线,根据相关参数即可计算出渗透系数,能够快速的现场测量出岩土体的渗透系数,测量时间短、成本低、容易实现。
附图说明
图1为本发明变水头分段渗透系数测量设备的结构示意图。
图2为本发明变水头分段渗透系数测量方法各参数示意图。
图3为ln(Ht/H0)随时间变化曲线。
具体实施方式
下面结合附图对本发明的技术方案作出进一步说明。
实施例1
变水头分段渗透系数测量设备,见图1,包括降水头微水试验装置1、双栓塞封堵装置2和探头3;所述微水试验装置包括通过导水管13连接的量筒11和漏水花管12,漏水花管12下部隔水,量筒11底部还设有三脚架14;所述双栓塞封堵装置包括通过导气管26自上而下依次连接的高压气筒21、单向阀22、压力计23、第一栓塞24和第二栓塞25,所述单向阀22和压力计23之间还设有气阀27;所述第一栓塞24、漏水花管12和第二栓塞25自上而下依次设于探头3内。
所述第一栓塞24和第二栓塞25均为轮胎内胆制成;可选地,也可以采用其他弹性材料制成,优选地,所述弹性材料为橡胶等材料。
所述第一栓塞24的长度为15-20cm,所述第二栓塞25的长度为15-20cm。
利用上述变水头分段渗透系数测量设备测量分段渗透系数,包括以下步骤:
(1)确定待测钻孔的封堵气压和极限气压:无水压的条件下,测定待测钻孔所需的封堵气压和极限气压,所述封堵气压为确保钻孔中待测段不漏水的最小气压,所述极限气压为确保栓塞安全的最大气压;
(2)通过固定钢索4将变水头分段渗透系数测量设备的探头置于待测钻孔5的指定深度,测量待测钻孔5的水位,根据探头深度和待测钻孔5的水位计算附加封堵气压,所述附加封堵气压即抵抗水压力所需的气压;
(3)将第一栓塞和第二栓塞加压至封堵气压,待测钻孔5中待测段即被封堵;
(4)向量筒内注水,并记录量筒内水位随时间的变化关系,通过以下公式即可计算出该段钻孔附近土体的渗透系数:
K r = - 0.24 r c 2 b ln ( H t H 0 ) t ,
其中,
t为间隔时间,
Kr为渗透系数,
rc为量筒半径,
b为测量段长度,
H0为刚注入水时量筒中的水位高度,即量筒中注水后的初始液面到钻孔中液面的高度,
Ht为量筒内水位下降并间隔时间t的水位高度,即间隔时间t后量筒内液面到钻孔中液面的高度,Ht=h0+ht,其中h0为绝对水头,即钻孔中液面至量筒底部的距离,ht为相对水头,即量筒液面至量筒底部的距离,见图2,A为钻孔中地下水位,B为测量深度;
(5)测试结束后,打开气阀,释放第一栓塞和第二栓塞内的气压;
(6)重复(2)到(5)即可分段测量不同深度钻井附近地层的渗透系数。
利用上述方法对锡澄运河4#防渗墙中心钻孔(深度4m)进行分段渗透系数测量试验,钻孔中深度为4m段测量数据记录见表1。
表1锡澄运河4#防渗墙中心钻孔进行分段渗透系数测量结果
历时(秒) 量筒读数ml 转换成高度ht Ht=h0+ht ln(Ht/H0)
0 365 20.678 99.678 0
60 360 20.413 99.413 -0.002662101
120 350 19.883 98.883 -0.008007658
180 340 19.353 98.353 -0.013381943
240 330 18.823 97.823 -0.018785267
300 317 18.134 97.134 -0.025853522
360 305 17.498 96.498 -0.032422708
420 292 16.809 95.809 -0.039588364
480 282 16.279 95.279 -0.045135561
540 275 15.908 94.908 -0.049036989
量筒半径rc=2.5cm,测量段长度b=55cm,绝对水头h0=79cm;
ln(Ht/H0)随时间变化曲线如图3所示,取等于图3中趋势线斜率-1*10^(-4),则由公式计算可得:
K r = - 0.24 r c 2 b ln ( H t H 0 ) t = - 0.24 * 2.5 2 55 * ( - 1 * 10 - 4 ) = 2.72727 * 10 - 6 cm / s
即测得的该段钻孔附近土体渗透系数为2.72727×10-6cm/s。
查询相关资料得到该段水泥土防渗墙的水泥和土比例为22%,根据已有对水泥土渗透系数研究(水泥土的渗透特性,侯永峰等;水泥土渗透系数的室内试验研究,孙宇雁等)可知,当水泥和土的比例为22%时,室内实验测得的渗透系数为10-7cm/s;然而,通常室内实验测得的渗透系数相对于原位测试结果偏小。而通过该方法测得的渗透系数介于粘土渗透系数6.16*10-6cm/s(悬挂式防渗墙控制堤基渗透变形的机理与工程应用,王保田等)和水泥土室内实验结果之间,说明该方法的准确性和适用性。

Claims (5)

1.一种变水头分段渗透系数测量设备,其特征在于:包括降水头微水试验装置(1)、双栓塞封堵装置(2)和探头(3);所述微水试验装置包括通过导水管(13)连接的量筒(11)和漏水花管(12);所述双栓塞封堵装置包括通过导气管(26)自上而下依次连接的高压气筒(21)、单向阀(22)、压力计(23)、第一栓塞(24)和第二栓塞(25),所述单向阀(22)和压力计(23)之间还设有气阀(27);所述第一栓塞(24)、漏水花管(12)和第二栓塞(25)自上而下依次设于探头(3)内。
2.根据权利要求1所述的一种变水头分段渗透系数测量设备,其特征在于:还包括三脚架(14),所述三脚架(14)设于量筒(11)底部。
3.根据权利要求1所述的一种变水头分段渗透系数测量设备,其特征在于:所述第一栓塞(24)和第二栓塞(25)均为弹性材料制成。
4.根据权利要求1所述的一种变水头分段渗透系数测量设备,其特征在于:所述第一栓塞(24)的长度为15-20cm,所述第二栓塞(25)的长度为15-20cm。
5.一种变水头分段渗透系数测量方法,利用权利要求1至4任一项所述的变水头分段渗透系数测量设备,其特征在于:包括以下步骤:
(1)确定待测钻孔的封堵气压和极限气压:无水压的条件下,测定待测钻孔所需的封堵气压和极限气压,所述封堵气压为确保钻孔中待测段不漏水的最小气压,所述极限气压为确保栓塞安全的最大气压;
(2)将变水头分段渗透系数测量设备的探头置于待测钻孔的指定深度,测量待测钻孔水位,根据探头深度和待测钻孔水位计算附加封堵气压,所述附加封堵气压即抵抗水压力所需的气压;
(3)将第一栓塞和第二栓塞加压至封堵气压,钻孔中待测段即被封堵;
(4)向量筒内注水,并记录量筒内水位随时间的变化关系,即得钻孔中待测段地层的渗透系数。
CN201310038456.2A 2013-01-31 2013-01-31 一种变水头分段渗透系数测量设备及测量方法 Expired - Fee Related CN103091229B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310038456.2A CN103091229B (zh) 2013-01-31 2013-01-31 一种变水头分段渗透系数测量设备及测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310038456.2A CN103091229B (zh) 2013-01-31 2013-01-31 一种变水头分段渗透系数测量设备及测量方法

Publications (2)

Publication Number Publication Date
CN103091229A CN103091229A (zh) 2013-05-08
CN103091229B true CN103091229B (zh) 2014-12-31

Family

ID=48204071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310038456.2A Expired - Fee Related CN103091229B (zh) 2013-01-31 2013-01-31 一种变水头分段渗透系数测量设备及测量方法

Country Status (1)

Country Link
CN (1) CN103091229B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682740A (zh) * 2019-02-11 2019-04-26 河海大学 一种确定错动带非线性流渗透参数的方法

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089664B (zh) * 2015-08-14 2019-06-04 中国地质调查局水文地质环境地质调查中心 多含水层深孔分层抽水试验自动测量系统及方法
CN106018239A (zh) * 2016-06-21 2016-10-12 浙江工业大学 一种测量现场不同深度地层处渗透系数的方法及其装置
CN106769788B (zh) * 2017-02-21 2023-08-25 中国水利水电科学研究院 一种岩土体压水试验装置及测试方法
CN107144323B (zh) * 2017-05-18 2019-03-08 水利部交通运输部国家能源局南京水利科学研究院 隔室摄像式地下水位测量装置及其工作方法
CN107589058A (zh) * 2017-09-28 2018-01-16 上海岩土工程勘察设计研究院有限公司 一种孔内双柱塞注水渗透试验仪及其工作方法
CN108387496A (zh) * 2018-01-23 2018-08-10 青岛市地铁号线有限公司 一种trd连续墙渗透性检测方法
CN109060631B (zh) * 2018-09-07 2019-06-14 山东科技大学 一种变水头渗透系数测量系统和测量方法
CN109459371B (zh) * 2018-12-25 2024-04-09 核工业北京地质研究院 一种岩石材料气体渗透率测试装置及其测试方法
CN109900452A (zh) * 2019-03-25 2019-06-18 河海大学 一套在井内任意深度进行微水实验并自动采集数据的装置
CN112554782B (zh) * 2020-12-11 2024-01-30 徐州中矿地科岩土工程技术有限公司 一种进行压水、测压、抽水钻孔分段隔离的方法
CN113189289B (zh) * 2021-04-28 2023-07-04 东北大学 一种水动力弥散度现场测定系统
CN113640191A (zh) * 2021-08-13 2021-11-12 中水淮河规划设计研究有限公司 一种大尺寸现场注水试验装置及测试方法
CN114487347B (zh) * 2022-01-24 2022-10-25 河海大学 一种识别钻孔正薄壁效应并确定含水层水文地质参数的微水试验法
CN114594037B (zh) * 2022-03-30 2023-07-07 中国水利水电科学研究院 土料渗透系数的测定方法
CN115308110B (zh) * 2022-08-09 2024-01-30 河南省地质调查院 一种变水头渗透系数测定方法及装置
CN116105946A (zh) * 2023-04-12 2023-05-12 中国电建集团西北勘测设计研究院有限公司 一种钻孔高压压气试验装置及测试方法
CN116124676B (zh) * 2023-04-17 2023-06-20 中国有色金属工业昆明勘察设计研究院有限公司 一种测定土体渗透系数的原位测试装置及测定方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0647813B2 (ja) * 1988-06-09 1994-06-22 動力炉・核燃料開発事業団 低水圧制御水理試験法
US5219388A (en) * 1992-01-17 1993-06-15 University Of Florida Method and apparatus for testing water permeability of concrete
JP2626457B2 (ja) * 1993-04-09 1997-07-02 鹿島建設株式会社 注水式岩盤透水試験装置
JP2000234326A (ja) * 1999-02-16 2000-08-29 Central Res Inst Of Electric Power Ind 孔内流体透過試験装置
CN201460877U (zh) * 2009-08-05 2010-05-12 黄河勘测规划设计有限公司 钻孔压水试验综合测试系统
CN102621002A (zh) * 2012-04-10 2012-08-01 长江水利委员会长江科学院 裂隙岩体渗流、应力、变形耦合特性现场试验系统
CN102721634B (zh) * 2012-06-08 2014-12-03 上海勘测设计研究院 钻孔压力注水原位渗透试验方法及试验装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682740A (zh) * 2019-02-11 2019-04-26 河海大学 一种确定错动带非线性流渗透参数的方法
CN109682740B (zh) * 2019-02-11 2021-11-30 河海大学 一种确定错动带非线性流渗透参数的方法

Also Published As

Publication number Publication date
CN103091229A (zh) 2013-05-08

Similar Documents

Publication Publication Date Title
CN103091229B (zh) 一种变水头分段渗透系数测量设备及测量方法
Hvorslev Time lag and soil permeability in ground-water observations
Quinn et al. Hydraulic testing using a versatile straddle packer system for improved transmissivity estimation in fractured-rock boreholes
CN108195723B (zh) 一种加固松散砾石土的渗透注浆试验系统及方法
CN103161435B (zh) 一种稠油热采直井试井解释方法
CN105239611B (zh) 确定基坑开挖面下方止水帷幕渗漏对周边环境影响的方法
Stormont In situ gas permeability measurements to delineate damage in rock salt
EP2605049A1 (en) Method for detecting gas outflow from an underground gas storage layer by means of pressure monitoring, and an underground gas storage system
CN104373118A (zh) 钻孔有效抽采半径的测定方法
CN105547967A (zh) 裂隙介质系统渗透张量室内测定装置
CN103161436B (zh) 一种稠油热采水平井试井解释方法
Unal et al. Investigation of leakage at Ataturk dam and hydroelectric power plant by means of hydrometric measurements
CN107102378B (zh) 利用孔压静力触探测定承压含水层水位与水头高度的方法
Kim et al. Field evaluation of permeability of concrete linings and rock masses around underground lined rock caverns by a novel in-situ measurement system
Tolooiyan et al. Investigation of an Australian soft rock permeability variation
Wassermann et al. Characterization and monitoring of the excavation damaged zone in fractured gneisses of the Roselend tunnel, French Alps
Jung Hydraulic fracturing and hydraulic testing in the granitic section of borehole GPK-1, Soultz-sous-Forêts
Bonacci et al. Water losses from the Ričice reservoir built in the Dinaric karst
CN112557279A (zh) 一种风化基岩孔-裂隙垂向渗透性测试装置及方法
Pearson et al. Improvements in the Lugeon or packer permeability test
Fabbri et al. Estimation of hydraulic conductivity using the slug test method in a shallow aquifer in the Venetian Plain (NE, Italy)
AU2014202119B2 (en) Method for testing connectivity between vertical formations while drilling
Stormont Conduct and interpretation of gas permeability measurements in rock salt
Ratnam et al. A field permeability measurement technique using a conventional self-boring pressuremeter
Chapuis et al. Pressure-pulse test for field hydraulic conductivity of soils: is the common interpretation method adequate?

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20180131

CF01 Termination of patent right due to non-payment of annual fee