CN103089204A - 双煤层分层控压联合排采装置 - Google Patents

双煤层分层控压联合排采装置 Download PDF

Info

Publication number
CN103089204A
CN103089204A CN2013100210749A CN201310021074A CN103089204A CN 103089204 A CN103089204 A CN 103089204A CN 2013100210749 A CN2013100210749 A CN 2013100210749A CN 201310021074 A CN201310021074 A CN 201310021074A CN 103089204 A CN103089204 A CN 103089204A
Authority
CN
China
Prior art keywords
coal
oil pipe
pump barrel
mining
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100210749A
Other languages
English (en)
Other versions
CN103089204B (zh
Inventor
张群
姜在炳
杜新锋
李彬刚
降文萍
万志杰
王正喜
庞涛
乔康
张东亮
许耀波
辛欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201310021074.9A priority Critical patent/CN103089204B/zh
Publication of CN103089204A publication Critical patent/CN103089204A/zh
Application granted granted Critical
Publication of CN103089204B publication Critical patent/CN103089204B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种双煤层分层控压联合排采装置。煤层气井往往会遇到两个煤层,一般都是上面的煤层先产气,随着动液面的下降,下面的煤层才开始产气,很难保证两个煤层同时解吸、产气。双煤层分层控压联合排采装置,包括抽采泵、油管和抽油杆,油管包括上油管和下油管,上油管外壁设置有扶正器,其特征在于:所述抽采泵为联合抽采泵,下油管设置有封隔器,下油管设置有辅助连通管,辅助连通管位于封隔器上方。本发明解决了双煤层在排采过程中产生的层间干扰问题,保证了双煤层同时解吸、产气,适用于双煤层地区进行煤层气井联合开采。

Description

双煤层分层控压联合排采装置
技术领域
本发明属于煤层气排采技术领域,涉及双煤层分层控压联合排采装置。
背景技术
煤层气井在排水产气过程中,煤储层应力的变化是一个复杂的过程。随着排水降压的持续进行,会产生应力差效应。当有效应力增加到到一定数值时,煤储层的渗透率将下降到难以使煤层水流动的状态,在单煤层排采时,通过合理的控制排采速度和动液面位置,可以避免压力差效应对煤储层的伤害,但是在实际的开发中,煤层气井往往会遇到两个煤层,如果煤储层压力梯度不一致或者煤层间距较大时,一般都是上面的煤层先产气,随着液面的下降,下面的煤层才开始产气,很难保证两个煤层生产层同时解吸、产气,有时甚至出现上煤层排采半径缩短、产生速敏效应吐粉吐砂、支撑剂颗粒镶嵌煤层、裂缝闭合速率加快等,致使煤层渗透率迅速下降,严重影响产气效果。
发明内容
本发明所要解决的技术问题是提供一种实现双煤层分层控压、保证煤层气井稳产高产的排采装置。
本发明的技术方案是:双煤层分层控压联合排采装置,包括抽采泵、油管和抽油杆,油管包括上油管和下油管,上油管上设置有扶正器,其特别之处于:所述抽采泵为联合抽采泵,下油管设置有封隔器和辅助连通管,辅助连通管位于封隔器上方。
所述联合抽采泵包括泵筒、柱塞和固定阀,所述泵筒包括外泵筒和内泵筒,所述内泵筒悬空设置于外泵筒内,所述柱塞包括上柱塞和下柱塞,所述固定阀包括上固定阀和下固定阀,所述下柱塞和所述上固定阀分别间隔的位于内泵筒的上端和下端,上柱塞位于下柱塞顶部的外泵筒内,抽油杆与上柱塞连接,所述上柱塞和下柱塞之间通过空心连通杆连通,所述下固定阀位于外泵筒的底端,所述上固定阀底端的内泵筒侧部设置有吸入口,所述下柱塞侧部设置有进水孔。
所述吸入口和进水孔均为通孔,所述下固定阀与外泵筒围成第一空腔,所述上固定阀与下柱塞围成第二空腔。
所述封隔器为皮碗式封隔器,所述扶正器上设置有电缆通道和辅助连通管通道,所述辅助连通管穿过辅助连通管通道通过扶正器固定。
所述下油管管壁上设置有压力计,所述压力计位于封隔器的下部,压力计上连接有压力计电缆。
与现有技术相比,本发明的有益效果为:
1.本发明中设置有联合抽采泵、封隔器和辅助连通管,在使用时联合抽采泵、封隔器和辅助连通管组合使用,达到双煤层分层控压联合排采的效果;
2.本发明中选用的抽采泵为联合抽采泵,能够实现双煤层煤层水分层抽采;
3. 本发明中设置有皮碗式封隔器,该皮碗式封隔器将两个煤层封隔在不同的压力系统中,消除双煤层排采过程中层间干扰,而且该皮碗式封隔器易解封,适合于煤层气生产井;
4. 本发明中设置有辅助连通管,作为下部煤层的产气通道;
5. 本发明中所采用的扶正器为三通道扶正器,用以固定2条压力计电缆和1根辅助连通管。
附图说明
下面结合附图和具体实施方式对本发明进行详细说明。
图1为本发明的结构示意图;
图2为本发明中扶正器的结构示意图。
图中:1.套管,2.压力计电缆,3.抽油杆,4.联合抽采泵,5.上油管,6.下油管,7.扶正器,8.封隔器,9.辅助连通管,10.外泵筒,11.内泵筒,12.上柱塞,13.下柱塞,14.上固定阀,15.下固定阀,16.空心连通杆,17.吸入口,18.进水孔,19.第一空腔,20.第二空腔,21.电缆通道,22.辅助连通管通道,23.压力计,24.进水管,25.上游动阀,26.下游动阀。
具体实施方式
如图1和2所示,本发明的双煤层分层控压联合排采装置,包括联合抽采泵4、油管和抽油杆3,油管包括上油管5和下油管6,联合抽采泵4的顶端与上油管5连通,联合抽采泵4的底端与下油管6连通,抽油杆3位于上油管5内并且与联合抽采泵4连接,上油管5外壁上设置有扶正器7,扶正器7上设置有电缆通道和辅助连通管通道。
联合抽采泵4包括泵筒、柱塞和固定阀,泵筒包括外泵筒10和内泵筒11,内泵筒11悬空设置于外泵筒10内,柱塞包括上柱塞12和下柱塞13,固定阀包括上固定阀14和下固定阀15,下柱塞13和所述上固定阀14分别间隔的位于内泵筒11的上端和下端,上柱塞12位于下柱塞13顶部的外泵筒10内,抽油杆3伸入上油管5内与上柱塞12连接,抽油杆3能够带动上柱塞12和下柱塞13上下运动,上柱塞12和下柱塞13之间通过空心连通杆16连通,下固定阀15位于外泵筒10的底端,上固定阀14底端的内泵筒11侧部设置有吸入口17,下柱塞13侧部设置有进水孔18,吸入口17和进水孔18均为通孔。
在下油管6上设置有封隔器8,该封隔器8优选皮碗式封隔器,下油管6上设置有辅助连通管9,辅助连通管9位于封隔器8上方,辅助连通管9穿过辅助连通管道22通过扶正器7固定,下油管6内设置有进水管24。
上油管5和下油管6上分别设置有压力计23,压力计23上连接有压力计电缆2,压力计电缆2穿过扶正器7上的电缆通道21至扶正器7上部。
本发明的工作原理是:将该装置下入双煤层气井的套管1中,扶正器7位于上油管5和套管1之间,封隔器8位于下油管6和套管1之间,封隔器8分别与下油管6和套管1密封连接,上冲程时,抽油杆3带动上柱塞5向上运动,下柱塞6也随之向上运动,上游动阀25和下游动阀26均关闭,第一空腔19和第二空腔20内的体积增大,压力减小,下固定阀15和上固定阀14均打开,下煤层中的水进入第一空腔19,当下柱塞13侧部的吸入口17高于内泵筒11侧壁时,第一腔室19中的水从进水孔18进入下柱塞13内,上煤层中的水通过吸入口17进入第二空腔20;下冲程时,抽油杆3带动上柱塞12和下柱塞13向下运动,下柱塞13的进水孔18低于内筒臂上沿,下柱塞13与第一空腔19相分隔,第一空腔19和第二空腔20的体积减小,压力增大,上固定阀14和下固定阀15关闭,下游动阀26和上游动阀25在水压的作用下被顶开进入上油管5内排出,随着下煤层中水的不断抽出,下煤层的压力下降,套管1与油管之间的动液面下降,下煤层解吸出的气体经过辅助连通管9排出,上煤层的气体随着动液面的下降也排出,上冲程和下冲程不断交替同时完成两个煤层水与气的排采。
在排采的过程中,压力计23对水压进行实时监控测量。
综上所述,本发明解决了双煤层在排采过程中产生的层间干扰问题,保证了两层煤层同时解吸、产气,适用于双煤层地区进行煤层气联合开采。

Claims (5)

1.双煤层分层控压联合排采装置,包括抽采泵、油管和抽油杆(3),所述油管包括上油管(5)和下油管(6),上油管(5)上设置有扶正器(7),其特征在于:所述抽采泵为联合抽采泵(4),下油管(6)上设置有封隔器(8)和辅助连通管(9),所述辅助连通管(9)位于封隔器(8)上方。
2.根据权利要求1所述的双煤层分层控压联合排采装置,其特征在于:所述联合抽采泵包括泵筒、柱塞和固定阀,所述泵筒包括外泵筒(10)和内泵筒(11),所述内泵筒(11)悬空设置于外泵筒(10)内,所述柱塞包括上柱塞(12)和下柱塞(13),所述固定阀包括上固定阀(14)和下固定阀(15),所述下柱塞(13)和所述上固定阀(14)分别间隔的位于内泵筒(11)的上端和下端,上柱塞(12)位于下柱塞(13)顶部的外泵筒(10)内,抽油杆(3)与上柱塞(12)连接,所述上柱塞(12)和下柱塞(13)之间通过空心连通杆(16)连通,所述下固定阀(15)位于外泵筒(10)的底端,所述上固定阀(14)底端的内泵筒(11)侧部设置有吸入口(17),所述下柱塞(13)侧部设置有进水孔(18)。
3.根据权利要求2所述的双煤层分层控压联合排采装置,其特征在于:所述吸入口(17)和进水孔(18)均为通孔,所述下固定阀(15)与外泵筒(10)围成第一空腔(19),所述上固定阀(14)与下柱塞(13)围成第二空腔(20)。
4.根据权利要求1、2或3所述的双煤层分层控压联合排采装置,其特征在于:所述封隔器(8)为皮碗式封隔器,所述扶正器(7)上设置有电缆通道(21)和辅助连通管通道(22),所述辅助连通管(9)穿过辅助连通管通道(22)通过扶正器(7)固定。
5.根据权利要求4所述的双煤层分层控压联合排采装置,其特征在于:所述下油管(6)管壁上设置有压力计(23),所述压力计(23)位于封隔器(8)的下部,压力计(23)上连接有压力计电缆(2)。
CN201310021074.9A 2013-01-21 2013-01-21 双煤层分层控压联合排采装置 Active CN103089204B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310021074.9A CN103089204B (zh) 2013-01-21 2013-01-21 双煤层分层控压联合排采装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310021074.9A CN103089204B (zh) 2013-01-21 2013-01-21 双煤层分层控压联合排采装置

Publications (2)

Publication Number Publication Date
CN103089204A true CN103089204A (zh) 2013-05-08
CN103089204B CN103089204B (zh) 2015-04-08

Family

ID=48202281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310021074.9A Active CN103089204B (zh) 2013-01-21 2013-01-21 双煤层分层控压联合排采装置

Country Status (1)

Country Link
CN (1) CN103089204B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527148A (zh) * 2013-09-26 2014-01-22 中煤科工集团西安研究院有限公司 一种双套管单泵分层控压合层排采技术及装置
CN104121002A (zh) * 2014-08-12 2014-10-29 托普威尔石油技术股份公司 一种分层采油控制器
CN107313753A (zh) * 2017-07-24 2017-11-03 山西晋城无烟煤矿业集团有限责任公司 一种煤层气井分采分出泵及装置
CN109458161A (zh) * 2018-10-24 2019-03-12 中国矿业大学 一种多煤层独立含气系统控压单泵排采装置及排采方法
CN112832716A (zh) * 2021-01-15 2021-05-25 中煤科工集团西安研究院有限公司 一种双煤层孔眼限流分层控水煤层气井排采方法及装置
CN113550720A (zh) * 2021-09-23 2021-10-26 中煤科工集团西安研究院有限公司 一种多源煤系气分层控压单独计量排采装置及方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988707B (zh) * 2017-04-10 2019-12-17 中煤科工集团西安研究院有限公司 双煤层四通道封隔器分层控压联合排采装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2532237Y (zh) * 2002-01-30 2003-01-22 大庆油田有限责任公司 单泵分抽管柱
CN101915083A (zh) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 煤矿井上下联合抽采煤层气的方法
RU2410530C1 (ru) * 2010-02-12 2011-01-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Установка для одновременно-раздельной эксплуатации пластов
CN203114260U (zh) * 2013-01-21 2013-08-07 中煤科工集团西安研究院 一种双煤层分层控压联合排采装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2532237Y (zh) * 2002-01-30 2003-01-22 大庆油田有限责任公司 单泵分抽管柱
RU2410530C1 (ru) * 2010-02-12 2011-01-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Установка для одновременно-раздельной эксплуатации пластов
CN101915083A (zh) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 煤矿井上下联合抽采煤层气的方法
CN203114260U (zh) * 2013-01-21 2013-08-07 中煤科工集团西安研究院 一种双煤层分层控压联合排采装置

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527148A (zh) * 2013-09-26 2014-01-22 中煤科工集团西安研究院有限公司 一种双套管单泵分层控压合层排采技术及装置
CN104121002A (zh) * 2014-08-12 2014-10-29 托普威尔石油技术股份公司 一种分层采油控制器
CN104121002B (zh) * 2014-08-12 2016-09-07 托普威尔石油技术股份公司 一种分层采油控制器
CN107313753A (zh) * 2017-07-24 2017-11-03 山西晋城无烟煤矿业集团有限责任公司 一种煤层气井分采分出泵及装置
CN107313753B (zh) * 2017-07-24 2019-09-13 山西晋城无烟煤矿业集团有限责任公司 一种煤层气井分采分出泵及装置
CN109458161A (zh) * 2018-10-24 2019-03-12 中国矿业大学 一种多煤层独立含气系统控压单泵排采装置及排采方法
CN112832716A (zh) * 2021-01-15 2021-05-25 中煤科工集团西安研究院有限公司 一种双煤层孔眼限流分层控水煤层气井排采方法及装置
CN113550720A (zh) * 2021-09-23 2021-10-26 中煤科工集团西安研究院有限公司 一种多源煤系气分层控压单独计量排采装置及方法

Also Published As

Publication number Publication date
CN103089204B (zh) 2015-04-08

Similar Documents

Publication Publication Date Title
CN103089204B (zh) 双煤层分层控压联合排采装置
CN107313753B (zh) 一种煤层气井分采分出泵及装置
CN105649578B (zh) 煤层气直井双层分压合采方法及其装置
WO2020082716A1 (zh) 一种多煤层独立含气系统控压单泵排采装置及排采方法
CN104533356B (zh) 一种两层自控分层采油的方法和分层采油方法
CN104481484B (zh) 水平井分段间歇蒸汽吞吐注采一体化管柱
CN202937296U (zh) 煤层气多功能排采工艺管柱
CN103061724B (zh) 面向易吐粉吐砂双煤层的分层控压联合排采装置
CN205744381U (zh) 多层分采分出抽油泵
CN109322647A (zh) 一种分层注采一体化管柱及工艺
CN108071365B (zh) 一种煤层气采气、排水与注水一体化管柱
CN201568034U (zh) 一种分层合采采油管柱
CN203114260U (zh) 一种双煤层分层控压联合排采装置
RU2513566C2 (ru) Способ одновременно-раздельной эксплуатации двух пластов в скважине с повышенным газовым фактором и устройство для его осуществления
CN104806211B (zh) 一种接替压气采油装置及方法
CN209892171U (zh) 一种水平井段交错驱替和渗吸驱油注采管柱
RU49573U1 (ru) Насосная установка для одновременной раздельной эксплуатации двух пластов в скважине (варианты)
CN206346893U (zh) 一种井下气液换能增压泵
CN203640970U (zh) 一种井下液力活塞泵
CN205744406U (zh) 油井抽油泵增排助抽装置
CN204532295U (zh) 一种接替压气采油装置
CN103821703A (zh) 一种井下液力活塞泵
CN203114259U (zh) 一种面向易吐粉吐砂双煤层的分层控压联合排采装置
CN211230399U (zh) 一种页岩气复合排采工艺管柱
CN201574737U (zh) 一种可分体式细分层采油装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Applicant after: Xi'an Research Institute, CCTEG

Address before: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Applicant before: China Coal Technology & Engineering Group Xi'an Research Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RESEARCH INSTITUTE TO: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant