CN103089056B - 直线铁塔单挂点改双挂点的安装金具及使用方法 - Google Patents
直线铁塔单挂点改双挂点的安装金具及使用方法 Download PDFInfo
- Publication number
- CN103089056B CN103089056B CN201310039408.5A CN201310039408A CN103089056B CN 103089056 B CN103089056 B CN 103089056B CN 201310039408 A CN201310039408 A CN 201310039408A CN 103089056 B CN103089056 B CN 103089056B
- Authority
- CN
- China
- Prior art keywords
- hanging
- plate
- splint
- iron tower
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及直线铁塔单挂点改双挂点的安装金具及使用方法,包括挂线板、上夹板、下夹板,上、下夹板通过紧固件一连接,上夹板与挂线板的上部通过紧固件二连接,下夹板与挂线板的中部通过紧固件三连接,挂线板、上夹板、下夹板将原铁塔挂线角钢夹在它们之间,所述的挂线板下部设有两个挂线孔。本发明的优点是:适用于ZM型及GUZ型直线铁塔挂点,适用于∠90及以下角钢,可适用不同厚度的挂线角钢,通用性强,结构简单,便于安装,并且不改变铁塔杆塔结构,不拆杆塔构件;将该金具固定在原挂线角钢上,实现双固定挂点,满足了规程要求。
Description
技术领域
本发明涉及一种直线铁塔挂点改造为双独立挂点的通用工具,尤其涉及一种220kV 的ZM型及GUZ型直线铁塔单挂点改双挂点通用型安装金具。
背景技术
2005年《国家电网公司十八项电网重大反事故措施》中6.1.8规定,“对于重要的直线型交叉跨越塔,包括跨越110kV及以上线路、铁路、高等级公路和高速公路、通航河流等,应采用双悬垂串、V型或八字型绝缘子串结构,并尽可能采用双独立挂点”。2010年《110kV~750kV架空输电线路设计规范》中13.0.10规定,“悬垂绝缘子串宜采用双联串或两个单联串”。以上对新改建线路提出了设计标准,各网省公司对已运行的输电线路也进行了大量的双串改造,但对于原横担挂点只有单一挂点的杆塔没有更好的解决办法,针 对这一点,设计一款双挂点挂线板,能方便固定在原挂线角钢上,这样挂线点的高度不致于降低很多,影响导线与铁塔的空气间隙。
发明内容
为克服现有技术的不足,本发明的目的是提供直线铁塔单挂点改双挂点的安装金具及使用方法,不改变原铁塔横担结构的前提下,实现双固定挂点。
为实现上述目的,本发明通过以下技术方案实现:
直线铁塔单挂点改双挂点的安装金具,包括挂线板、上夹板、下夹板,上、下夹板通过紧固件一连接,上夹板与挂线板的上部通过紧固件二连接,下夹板与挂线板的中部通过紧固件三连接,挂线板、上夹板、下夹板将原铁塔挂线角钢夹在它们之间,所述的挂线板下部设有两个挂线孔。
所述的挂线孔间距为398-402mm。
所述的挂线板中部与下夹板连接的连接孔为长圆孔,适用于夹紧不同厚度的原铁塔挂线角钢。
所述的上夹板包括板一、板二、加强筋一,板一与板二垂直固定连接,加强筋一与板一、板二固定连接。
所述的下夹板包括板三、板四、加强筋二,板三与板四垂直固定连接,加强筋二与板三、板四固定连接。
直线铁塔单挂点改双挂点的安装金具的使用方法,包括以下步骤:
1)使用起吊工具转移导线荷载;
2)拆除原导线挂点金具及原挂线板;
3)安装挂线板和上夹板,并夹紧原铁塔挂线角钢;
4)安装下夹板使其同挂线板和上夹板固定并夹紧原铁塔挂线角钢,所有连接螺栓采用双帽连接;
5)安装双绝缘子串于挂线孔;
6)松落起吊工具转移导线荷载至绝缘子串上;
7)拆除所有工具,安装即完成。
与现有技术相比,本发明的有益效果是:
适用于ZM型及GUZ型直线铁塔挂点,适用于∠90及以下角钢,可适用不同厚度的挂线角钢,通用性强,结构简单,便于安装,并且不改变铁塔杆塔结构,不拆杆塔构件;将该金具固定在原挂线角钢上,实现双固定挂点,满足了规程要求。
附图说明
图1是本发明的结构示意图。
图2是挂线板结构示意图。
图3是上夹板结构示意图。
图4是下夹板结构示意图。
图中:1-挂线板 2-上夹板 3-下夹板 4-板一 5-板二6-加强筋一 7-板三 8-板四 9-加强筋二 10-紧固件一11-紧固件二 12-紧固件三 13-原杆塔挂点角钢 14-挂线孔 15-连接孔。
具体实施方式
下面结合说明书附图对本发明进行详细地描述,但是应该指出本发明的实施不限于以下的实施方式。
见图1-图4,直线铁塔单挂点改双挂点的安装金具,包括挂线板1、上夹板2、下夹板3,上、下夹板2、3通过紧固件一10连接,上夹板2与挂线板1的上部通过紧固件二11连接,下夹板3与挂线板1的中部通过紧固件三12连接,挂线板1、上夹板2、下夹板3将原铁塔挂线角钢13夹在它们之间,所述的挂线板1下部设有两个挂线孔14。
所述的挂线孔14间距为398-402mm。
所述的挂线板1中部与下夹板3连接的连接孔15为长圆孔,适用于夹紧不同厚度的原铁塔挂线角钢13。
所述的上夹板2包括板一4、板二5、加强筋一6,板一4与板二5垂直固定连接,加强筋一6与板一4、板二5固定连接。
所述的下夹板3包括板三7、板四8、加强筋二9,板三7与板四8垂直固定连接,加强筋二9与板三7、板四8固定连接。
直线铁塔单挂点改双挂点的安装金具的使用方法,包括以下步骤:
1)使用起吊工具转移导线荷载;
2)拆除原导线挂点金具及原挂线板;
3)安装挂线板1和上夹板2,并夹紧原铁塔挂线角钢13;
4)安装下夹板3使其同挂线板1和上夹板2固定并夹紧原铁塔挂线角钢13,所有连接螺栓采用双帽连接;
5)安装双绝缘子串于挂线孔14;
6)松落起吊工具转移导线荷载至绝缘子串上;
7)拆除所有工具,安装即完成。
实施例:
见图1-图4,挂线板1采用厚度为16mm的钢板制作,上、下夹板2、3采用厚度为8mm的钢板制作。所有连接螺栓均采用双螺帽锁紧,金属件全部采用热镀锌防腐方式,螺栓等级采用铁塔用6.8级。
见图2,挂线板上部分别和上夹板2、下夹板3连接,与下夹板3的连接孔15设为长圆孔,以适应不同厚度的原杆塔挂点角钢13。下部设有两个独立挂线孔14,间距400mm。挂线板1的尺寸设计尽量减少挂点位置的下移,不致影响改造后导线对杆塔构件的安全距离。
见图3,上夹板2包括板一4、板二5和加强筋一6,板一4和板二5尺寸相同,相互成直角焊接,加强筋一6垂直板一4和板二5设于内角处,加强板一4与板二5的牢固性。
见图4,下夹板3结构与上夹板2相似,包括板三7、板四8和加强筋二9,板三7和板四8相互成直角焊接,加强筋二9垂直板三7和板四8设于内角处,加强板三7与板四8的牢固性。
220kV直线铁塔单挂点改双挂点时:首先,使用起吊工具转移导线荷载,拆除原导线挂点金具及挂线板;然后,安装挂线板及上夹板于夹紧原挂线角钢,安装下夹板使其同挂线板和上夹板固定并夹紧原挂线角钢,所有连接螺栓采用双帽连接;最后,安装双绝缘子串于新挂点,松落起吊工具转移导线荷载至绝缘子串上,拆除所有工具,安装即完成。
本发明适用于ZM型及GUZ型直线铁塔挂点,适用于∠90及以下角钢,可适用不同厚度的挂线角钢,通用性强,结构简单,便于安装,并且不改变铁塔杆塔结构,不拆杆塔构件;将该金具固定在原挂线角钢上,实现双固定挂点,满足了规程要求。
Claims (6)
1.直线铁塔单挂点改双挂点的安装金具,其特征在于,包括挂线板、上夹板、下夹板,上、下夹板通过紧固件一连接,上夹板与挂线板的上部通过紧固件二连接,下夹板与挂线板的中部通过紧固件三连接,挂线板、上夹板、下夹板将原铁塔挂线角钢夹在它们之间,所述的挂线板下部设有两个挂线孔。
2.根据权利要求1所述的直线铁塔单挂点改双挂点的安装金具,其特征在于,所述的挂线孔间距为398-402mm。
3.根据权利要求1所述的直线铁塔单挂点改双挂点的安装金具,其特征在于,所述的挂线板中部与下夹板连接的连接孔为长圆孔,适用于夹紧不同厚度的原铁塔挂线角钢。
4.根据权利要求1所述的直线铁塔单挂点改双挂点的安装金具,其特征在于,所述的上夹板包括板一、板二、加强筋一,板一与板二垂直固定连接,加强筋一与板一、板二固定连接。
5.根据权利要求1所述的直线铁塔单挂点改双挂点的安装金具,其特征在于,所述的下夹板包括板三、板四、加强筋二,板三与板四垂直固定连接,加强筋二与板三、板四固定连接。
6.直线铁塔单挂点改双挂点的安装金具的使用方法,其特征在于,包括以下步骤:
1)使用起吊工具转移导线荷载;
2)拆除原导线挂点金具及原挂线板;
3)安装挂线板和上夹板,并夹紧原铁塔挂线角钢;
4)安装下夹板使其同挂线板和上夹板固定并夹紧原铁塔挂线角钢,所有连接螺栓采用双帽连接;
5)安装双绝缘子串于挂线孔;
6)松落起吊工具转移导线荷载至绝缘子串上;
7)拆除所有工具,安装即完成。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310039408.5A CN103089056B (zh) | 2013-01-31 | 2013-01-31 | 直线铁塔单挂点改双挂点的安装金具及使用方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310039408.5A CN103089056B (zh) | 2013-01-31 | 2013-01-31 | 直线铁塔单挂点改双挂点的安装金具及使用方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103089056A CN103089056A (zh) | 2013-05-08 |
| CN103089056B true CN103089056B (zh) | 2014-11-05 |
Family
ID=48202142
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310039408.5A Expired - Fee Related CN103089056B (zh) | 2013-01-31 | 2013-01-31 | 直线铁塔单挂点改双挂点的安装金具及使用方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103089056B (zh) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103883597A (zh) * | 2014-03-14 | 2014-06-25 | 国家电网公司 | 一种用于角钢塔体上安装箱体类装置的夹板组件 |
| CN104989710A (zh) * | 2015-05-27 | 2015-10-21 | 镇江佳鑫精工设备有限公司 | 一种紧固夹具 |
| CN105048384A (zh) * | 2015-07-22 | 2015-11-11 | 国家电网公司 | 一种钢管杆横担单双挂点装置 |
| CN105470864A (zh) * | 2015-12-30 | 2016-04-06 | 国家电网公司 | 一种输电线施工用辅助横担 |
| CN108149998B (zh) * | 2018-02-07 | 2024-08-16 | 福州万山电力咨询有限公司 | 一种新型三跨耐张塔单改双挂点结构及其制作方法 |
| CN112383009A (zh) * | 2020-12-03 | 2021-02-19 | 国网山东省电力公司临沂供电公司 | 一种防掉串保护装置及防掉串保护装置的使用方法 |
| CN115451304A (zh) * | 2022-09-07 | 2022-12-09 | 上海欣影电力科技股份有限公司 | 一种用于输电线路角钢塔安装摄像机的固定装置 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5357487A (en) * | 1976-11-02 | 1978-05-24 | Nippon Telegr & Teleph Corp <Ntt> | Transfer process of cable |
| CN201332234Y (zh) * | 2008-12-26 | 2009-10-21 | 西安创源电力金具有限公司 | 一种组合式可调节联板 |
| CN102227062B (zh) * | 2011-03-21 | 2013-07-03 | 国家电网公司 | 带电更换吊环式挂点悬垂式绝缘子串作业工具及其作业方法 |
| CN202127201U (zh) * | 2011-06-24 | 2012-01-25 | 北京市电力公司 | 用于输电线路上的悬挂承力工具的挂点构件 |
| CN102237654B (zh) * | 2011-07-05 | 2014-04-16 | 河南省电力公司洛阳供电公司 | 使用双角钢挂点更换跳线串的工具来更换跳线串的方法 |
| CN203113879U (zh) * | 2013-01-31 | 2013-08-07 | 辽宁省电力有限公司鞍山供电公司 | 直线铁塔单挂点改双挂点的安装金具 |
-
2013
- 2013-01-31 CN CN201310039408.5A patent/CN103089056B/zh not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN103089056A (zh) | 2013-05-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103089056B (zh) | 直线铁塔单挂点改双挂点的安装金具及使用方法 | |
| CN103291699A (zh) | 一种可调式电杆抱箍 | |
| CN203113879U (zh) | 直线铁塔单挂点改双挂点的安装金具 | |
| CN202432119U (zh) | 玻璃钢电缆桥架 | |
| CN202017379U (zh) | 交流特高压钢管塔法兰连接变坡节点 | |
| CN203891557U (zh) | 紧凑型绝缘支架 | |
| CN201918113U (zh) | 塔材用简便连接器 | |
| CN202737386U (zh) | 绝缘子串固定牵引工具 | |
| CN204992482U (zh) | 一种可任意设置角度的地线挂板 | |
| CN103825222A (zh) | 一种带电更换220kV窄基塔耐张绝缘子串用工具 | |
| CN204651850U (zh) | 特高压交流线路悬垂塔通用挂点结构 | |
| CN203850090U (zh) | 通用型互感器定型安装底座 | |
| CN205101349U (zh) | 一种建筑脚手架的螺丝 | |
| CN202181614U (zh) | 工字钢的钢管固定装置 | |
| CN203361165U (zh) | 一种建筑基坑围护用支撑梁连接结构 | |
| CN103825223B (zh) | 带电更换220kv窄基塔耐张绝缘子串工具及作业方法 | |
| CN203813334U (zh) | 用于带电更换220kV耐张绝缘子串的直角联板卡具 | |
| CN202586164U (zh) | 水泥杆横担头部卡具 | |
| CN202259718U (zh) | 可移动式接地桩 | |
| CN201312106Y (zh) | 500kV线路可控避雷针安装底座 | |
| CN203351131U (zh) | 一种叠压式相位牌紧固金具 | |
| CN206654644U (zh) | 一种吊装辅助夹具 | |
| CN206517013U (zh) | 电缆终端塔角钢固定卡具 | |
| CN205618861U (zh) | 变压器通用注油法兰装置 | |
| CN203441898U (zh) | 一种交叉杆卡合组件 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 |